ML19324C552

From kanterella
Revision as of 14:42, 2 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review - Hatch Relief Request to Implement BWRVIP-38 and 76 in Lieu of B-N-s Examinations for Core Support Structures
ML19324C552
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/19/2019
From: John Lamb
NRC/NRR/DORL/LPL2-1
To: Enfinger T
Southern Nuclear Operating Co
References
Download: ML19324C552 (3)


Text

From: Lamb, John Sent: Tuesday, November 19, 2019 4:16 PM To: Enfinger, Timothy Lee

Subject:

Acceptance Review - Hatch Relief Request to Implement BWRVIP-38 and 76 in Lieu of B-N-s Examinations for Core Support Structures Importance: High

Tim, By letter dated November 4, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19308A110), Southern Nuclear Operating Company (SNC, the licensee) submitted a relief request for Edwin I. Hatch Nuclear Plant (HNP), Units 1 and 2. SNC submitted a relief request to implement Boiling Water Reactor Vessel and Internals Project (BWRVIP) guidelines, BWRVIP-38 and BWRVIP-76, in lieu of B-N-2 examinations for Core Support Structures.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 195 hours8.125 days <br />1.161 weeks <br />0.267 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is November 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

John G. Lamb, Senior Project Manager

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier: NRR_DRMA Email Number: 320 Mail Envelope Properties (SN6PR0901MB23996B10F66C4F02CABE9A30FA4C0)

Subject:

Acceptance Review - Hatch Relief Request to Implement BWRVIP-38 and 76 in Lieu of B-N-s Examinations for Core Support Structures Sent Date: 11/19/2019 4:16:15 PM Received Date: 11/19/2019 4:16:00 PM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:

"Enfinger, Timothy Lee" <TLENFING@SOUTHERNCO.COM>

Tracking Status: None Post Office: SN6PR0901MB2399.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2950 11/19/2019 4:16:00 PM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: