ML071410434
ML071410434 | |
Person / Time | |
---|---|
Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
Issue date: | 04/25/2007 |
From: | Rua S Entergy Nuclear Vermont Yankee |
To: | Todd Fish Operations Branch I |
Sykes, Marvin D. | |
Shared Package | |
ML062050096 | List: |
References | |
Download: ML071410434 (1) | |
Similar Documents at Vermont Yankee | |
---|---|
Category:License-Operator
MONTHYEARML18005A4202018-01-0303 January 2018
[Table view]Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML14161A5482014-06-0909 June 2014 Requalification Program Inspection IR 05000271/20143012014-04-0303 April 2014 Er 05000271-14-301; March 25, 2014; Vermont Yankee; Initial Operator Licensing Examination Report ML14164A0482014-03-25025 March 2014 Walk-through Retake Exam Administered 3/24-25/2014 ML14057A7962014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14055A0412014-02-14014 February 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML14057A7262014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14058A1252014-02-14014 February 2014 Draft Written Exam (Folder 2) ML14059A0202014-02-14014 February 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14059A0562014-02-14014 February 2014 Draft - Outlines (Folder 2) ML14059A5422014-02-14014 February 2014 Final Outlines (Folder 3) ML14059A5462014-02-14014 February 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14063A5142014-02-14014 February 2014 Handouts to Applicants (Folder 3) ML14064A0512014-02-14014 February 2014 Final Qa/Related Forms (Folder 1) ML14029A3202014-01-29029 January 2014 Initial Operator Licensing Operating Test and Written Exam Approval ML13206A2282013-07-25025 July 2013 Senior Reactor Operator Initial License Examinations - 120 Day Notification Letter ML13106A1102013-04-11011 April 2013 Addendum to Final Qa/Related Forms (Folder 1) ML13128A1202013-03-18018 March 2013 Final Qa/Related Forms (Folder 1) ML13088A2752013-03-0808 March 2013 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML13088A2652013-03-0808 March 2013 Final Outlines (Folder 3) ML13088A2802013-03-0505 March 2013 Handouts to Applicants (Folder 3) ML13106A1212013-02-27027 February 2013 NRC Comments on Draft Licensee Developed Exam (Written) (Folder 2) ML13106A1922013-02-22022 February 2013 Draft Written Exam (Folder 2) ML13106A1832013-02-22022 February 2013 Draft - Outlines (Folder 2) ML13022A3112013-01-22022 January 2013 Reactor Operator Written Retake Examination ML12319A1562012-10-25025 October 2012 Post Exam Comments and Resolution (Folder 1) ML12362A3252012-10-24024 October 2012 Final Qa/Related Forms (Folder 1). Examination Preparation Checklist ML12278A3442012-10-0404 October 2012 Initial Operator Licensing Written Examination Approval ML12311A1822012-10-0303 October 2012 Summary of Handouts to Applicants (Folder 3) ML12311A1732012-10-0303 October 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML12311A2132012-09-21021 September 2012 Final Outlines (Folder 3) ML12311A1982012-09-21021 September 2012 Final Operating Exam (Sections a, B, and C) (Folder 3) ML12261A2492012-09-17017 September 2012 Initial Operator Licensing Operating Test Approval - Vermont Yankee ML12311A1402012-09-14014 September 2012 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML12311A1032012-09-14014 September 2012 Draft Written Exam (Folder 2) ML12311A0982012-09-14014 September 2012 Draft - Outlines (Folder 2) ML12311A0952012-09-14014 September 2012 Facility Comments on Draft NRC-Developed Exam (Written) (Folder 2) ML12150A2462012-05-29029 May 2012 Requalification Program Inspection - Vermont Yankee ML12116A0312012-04-24024 April 2012 Senior Reactor and Reactor Operator Initial License Examinations - Vermont Yankee ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML11251A0542011-09-0202 September 2011 June 2011 NRC Generic Fundamentals Examination Boiling Water Reactor - Answer Key ML1119904022011-07-18018 July 2011 June 8, 2011, NRC Generic Fundamentals Examination Results for Vermont Yankee Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML11251A0552011-06-23023 June 2011 June 2011 NRC GFE Roster Report on Total and Grade ML11251A0572011-06-0808 June 2011 Us NRC Examination Answer Sheet ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204392011-01-0505 January 2011 Final Qa/Related Forms (Folder 1) ML1032801642010-11-24024 November 2010 Operator Licensing Examination Approval, Vermont Yankee ML1102002602010-11-0101 November 2010 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1102002542010-11-0101 November 2010 Summary of Handout References to Applications (Folder 3) ML1102002472010-11-0101 November 2010 Final Outlines (Folder 3) 2018-01-03 Category:Part 55 Examination Related Material MONTHYEARML18005A4202018-01-0303 January 2018
[Table view]Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML14161A5482014-06-0909 June 2014 Requalification Program Inspection IR 05000271/20143012014-04-0303 April 2014 Er 05000271-14-301; March 25, 2014; Vermont Yankee; Initial Operator Licensing Examination Report ML14164A0482014-03-25025 March 2014 Walk-through Retake Exam Administered 3/24-25/2014 ML14064A0512014-02-14014 February 2014 Final Qa/Related Forms (Folder 1) ML14063A5142014-02-14014 February 2014 Handouts to Applicants (Folder 3) ML14059A5462014-02-14014 February 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14059A5422014-02-14014 February 2014 Final Outlines (Folder 3) ML14059A0562014-02-14014 February 2014 Draft - Outlines (Folder 2) ML14059A0202014-02-14014 February 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14058A1252014-02-14014 February 2014 Draft Written Exam (Folder 2) ML14057A7962014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14057A7262014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14055A0412014-02-14014 February 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML14029A3202014-01-29029 January 2014 Initial Operator Licensing Operating Test and Written Exam Approval ML13206A2282013-07-25025 July 2013 Senior Reactor Operator Initial License Examinations - 120 Day Notification Letter ML13106A1102013-04-11011 April 2013 Addendum to Final Qa/Related Forms (Folder 1) ML13128A1202013-03-18018 March 2013 Final Qa/Related Forms (Folder 1) ML13088A2752013-03-0808 March 2013 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML13088A2652013-03-0808 March 2013 Final Outlines (Folder 3) ML13088A2802013-03-0505 March 2013 Handouts to Applicants (Folder 3) ML13106A1212013-02-27027 February 2013 NRC Comments on Draft Licensee Developed Exam (Written) (Folder 2) ML13106A1922013-02-22022 February 2013 Draft Written Exam (Folder 2) ML13106A1832013-02-22022 February 2013 Draft - Outlines (Folder 2) ML13022A3112013-01-22022 January 2013 Reactor Operator Written Retake Examination ML12319A1562012-10-25025 October 2012 Post Exam Comments and Resolution (Folder 1) ML12362A3252012-10-24024 October 2012 Final Qa/Related Forms (Folder 1). Examination Preparation Checklist ML12278A3442012-10-0404 October 2012 Initial Operator Licensing Written Examination Approval ML12311A1732012-10-0303 October 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML12311A1822012-10-0303 October 2012 Summary of Handouts to Applicants (Folder 3) ML12311A2132012-09-21021 September 2012 Final Outlines (Folder 3) ML12311A1982012-09-21021 September 2012 Final Operating Exam (Sections a, B, and C) (Folder 3) ML12261A2492012-09-17017 September 2012 Initial Operator Licensing Operating Test Approval - Vermont Yankee ML12311A1402012-09-14014 September 2012 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML12311A1032012-09-14014 September 2012 Draft Written Exam (Folder 2) ML12311A0982012-09-14014 September 2012 Draft - Outlines (Folder 2) ML12311A0952012-09-14014 September 2012 Facility Comments on Draft NRC-Developed Exam (Written) (Folder 2) ML12150A2462012-05-29029 May 2012 Requalification Program Inspection - Vermont Yankee ML12116A0312012-04-24024 April 2012 Senior Reactor and Reactor Operator Initial License Examinations - Vermont Yankee ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML11251A0542011-09-0202 September 2011 June 2011 NRC Generic Fundamentals Examination Boiling Water Reactor - Answer Key ML1119904022011-07-18018 July 2011 June 8, 2011, NRC Generic Fundamentals Examination Results for Vermont Yankee Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML11251A0552011-06-23023 June 2011 June 2011 NRC GFE Roster Report on Total and Grade ML11251A0572011-06-0808 June 2011 Us NRC Examination Answer Sheet ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204392011-01-0505 January 2011 Final Qa/Related Forms (Folder 1) ML1032801642010-11-24024 November 2010 Operator Licensing Examination Approval, Vermont Yankee ML1102002602010-11-0101 November 2010 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1102002542010-11-0101 November 2010 Summary of Handout References to Applications (Folder 3) ML1102002472010-11-0101 November 2010 Final Outlines (Folder 3) 2018-01-03 Category:Memoranda MONTHYEARML19317D0762019-11-18018 November 2019
[Table view]Summary of Meeting Near Vermont Yankee Power Station Regarding Establishment and Opration of Community Advisory Boards ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17143A1552017-06-0606 June 2017 Memorandum to C. Bladey Notice of Availability of Exemption for Entergy Energy Operations, Inc., Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML17045A5282017-05-25025 May 2017 Memo to C. Bladey Notice of Availability of Environmental Assessment and Finding of No Significant Impact for Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation Exemption Requ ML17055A5042017-03-0101 March 2017 Revision of the NRC Vermont Yankee Decommissioning Webpage ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML14209A7052014-08-0606 August 2014 Letter to FEMA Requesting Review and Concurrence of Certain Proposed Entergy Nuclear Operations, Inc. Emergency Response Organization Changes to the Vermont Yankee Site Emergency Plan ML14209A9352014-07-24024 July 2014 1st Quarter 2014 Performance Review ML13150A2182013-05-31031 May 2013 6/12/13 Notice of Conference Call with Entergy Nuclear Operations, Inc. to Discuss Draft Request for Additional Information for Vermont Yankee NRC Order Number EA-12-049 Related to Mitigation Strategies ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML12298A0882012-10-24024 October 2012 Forthcoming Meeting to Discuss Proposed License Amendment Request to Revise 10 CFR 50.63 Alternate AC Power Source to SBO EDG ML13219A0472012-03-15015 March 2012 Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis ML13127A3692012-03-15015 March 2012 Memo from M. Murphy to G. Wilson, Subj: Safety Evaluation Regarding Vermont Yankee Nuclear Power Station Core Plate Hold Down Bolt Inspection Plan and Analysis ML11321A2282011-11-17017 November 2011 Third Quarter 2011 Performance Review Memorandum ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1100502522011-02-0909 February 2011 Memo to Chairman Jaczko Fm R. W. Borchardt, EDO Initiatives for Improved Communication of Groundwater Incidents ML1030101362010-10-28028 October 2010 Memorandum and Order (Ruling on Motion to Reopen Proffering New Contention) (LBP-10-19) ML1009904582010-04-0808 April 2010 Deviation from the Reactor Oversight Process to Provide Increase NRC Oversight to Specific Issues at Vermont Yankee Nuclear Power Station ML1009603212010-04-0505 April 2010 Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased NRC Oversight of Specific Issues at Vermont Yankee ML1006401882010-03-0505 March 2010 Charter for the Groundwater Contamination Task Force ML0927301372009-10-0909 October 2009 Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries ML0915200092009-06-0808 June 2009 Forwarding of Supplement 1 to NUREG 1907 to the ACRS ML0913308232009-05-13013 May 2009 Summary of Annual Assessment Mtg - Vermont Yankee - 4/16/09 ML0904005422009-02-17017 February 2009 Audit Plan for Review of Confirmatory Analyses for the Core Spray and Reactor Recirculation Outlet Nozzles at the Vermont Yankee Nuclear Power Station ML0820601722008-08-0808 August 2008 Docketing of Additional Information Pertaining to the License Renewal Application of the Vermont Yankee Nuclear Power Station ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0805606272008-02-27027 February 2008 Advisory Committee on Reactor Safeguards Review of the Vermont Yankee Nuclear Power Station License Renewal Application - Safety Evaluation Report ML0802205082008-01-31031 January 2008 01/08/2008 Summary of Meeting Between the NRC Staff and Entergy Nuclear Operations, Inc. to Discuss the Response to a Request for Additional Information Pertaining to the Vermont Yankee License Renewal ML0801505932008-01-17017 January 2008 December 2007 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations (10 CFR) Section 2.206 ML0733001522007-11-26026 November 2007 Summary of Telephone Conference Call Held on October 16, 2007, Between U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station License Renewa ML0721804332007-08-0808 August 2007 Summary of Telephone Conference Call Held on July 18, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to the Vermont Yankee Nuclear Power S ML0721805222007-08-0808 August 2007 Summary of Telephone Conference Call Held on June 29, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Vermont Yankee Nuclear Power St ML0718301872007-07-10010 July 2007 06/01/2007 Summary of Telephone Conference Call Between the NRC and Entergy Nuclear Operations, Inc., Concerning Items Pertaining to the Vermont Yankee License Renewal Safety Evaluation Report ML0716303702007-07-10010 July 2007 Trip Report Summarizing May 29, 2007 Visit to Vermont Yankee Nuclear Power Plant Regarding the License Renewal Environmental Review ML0713103192007-05-0808 May 2007 FRN - Plant License Renewal, June 5, 2007 ML0706101802007-05-0101 May 2007 Trip Report for a Trip Taken to Vermont, Massachusetts and New Hampshire ML0714104342007-04-25025 April 2007 Handouts to Applicants (Folder 3) ML0707406912007-04-0303 April 2007 ACRS Review of the Vermont Yankee Nuclear Power Station, License Renewal Application - Safety Evaluation Report ML0705305612007-02-20020 February 2007 Y020070028 - E-mail Hoch, NRR, to Becker, State of Vermont, Seismic and Flood Questions from Anr ML0704000852007-02-13013 February 2007 G20070068/LTR-07-0060/SECY-2007-0019 - Draft Supplemental Environmental Impact Statement for License Renewal of Vermont Yankee - Letters to Senator Leahy, Senator Sanders, Representative Welch from Luis Reyes ML0703605602006-11-0808 November 2006 Y020070028 - Informal Vermont Yankee Seismic and Hydrology Questions ML0627900712006-10-12012 October 2006 2006/10/12-Summary of a Telephone Conference Call Held on September 14, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc, Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Applicatio ML0627202182006-09-29029 September 2006 2006/09/29-Summary of a Telephone Conference Call Held on August 10, 2006, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0625801872006-09-14014 September 2006 2006/09/14-Audit Trip Report Regarding Entergy Nuclear Vermont Yankee, LLC, License Renewal Application for Vermont Yankee Power Station, Dated January 29, 2006 ML0617303972006-07-11011 July 2006 2006/07/11-Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Vermont Yankee Nuclear Power Station 2019-11-18 |
Text
Memo To: Todd Fish, NRC Chief Examiner From: Scott Rua CC: Mike Desilets, VY Training Manager Mike Romeo, VY Operations Training Superintendent Date: May 9,2007 Re: NRC Exam Reference Material Todd, The following is a list of reference materials that were provided to the students for the NRC Written Examination administered on April 27h, 2007.The NRC has been provided a copy of these materials and it is my understanding that another set is not required at this time:
0 Technical Specifications Section 3 and 4 without the bases 0 Core Operating Limits Report (COLR) Power to Flow map 0 All Emergency Operating Procedure (EOP) and Scram Procedure (OT-3100)
Flowcharts with the following removed:
o Entry conditions o TableA o Table B o Table S o Automatic Scram setpoints If you need any additional information concerning the use of reference materials, please let me know and 111 provide that information to you as soon as possible. Thanks you.
RespectfuIIy, Scott M. Rua 1