MONTHYEARML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML14161A5482014-06-0909 June 2014 Requalification Program Inspection IR 05000271/20143012014-04-0303 April 2014 Er 05000271-14-301; March 25, 2014; Vermont Yankee; Initial Operator Licensing Examination Report ML14164A0482014-03-25025 March 2014 Walk-through Retake Exam Administered 3/24-25/2014 ML14057A7962014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14055A0412014-02-14014 February 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML14057A7262014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14058A1252014-02-14014 February 2014 Draft Written Exam (Folder 2) ML14059A0202014-02-14014 February 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14059A0562014-02-14014 February 2014 Draft - Outlines (Folder 2) ML14059A5422014-02-14014 February 2014 Final Outlines (Folder 3) ML14059A5462014-02-14014 February 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14063A5142014-02-14014 February 2014 Handouts to Applicants (Folder 3) ML14064A0512014-02-14014 February 2014 Final Qa/Related Forms (Folder 1) ML14029A3202014-01-29029 January 2014 Initial Operator Licensing Operating Test and Written Exam Approval ML13206A2282013-07-25025 July 2013 Senior Reactor Operator Initial License Examinations - 120 Day Notification Letter ML13106A1102013-04-11011 April 2013 Addendum to Final Qa/Related Forms (Folder 1) ML13128A1202013-03-18018 March 2013 Final Qa/Related Forms (Folder 1) ML13088A2752013-03-0808 March 2013 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML13088A2652013-03-0808 March 2013 Final Outlines (Folder 3) ML13088A2802013-03-0505 March 2013 Handouts to Applicants (Folder 3) ML13106A1212013-02-27027 February 2013 NRC Comments on Draft Licensee Developed Exam (Written) (Folder 2) ML13106A1922013-02-22022 February 2013 Draft Written Exam (Folder 2) ML13106A1832013-02-22022 February 2013 Draft - Outlines (Folder 2) ML13022A3112013-01-22022 January 2013 Reactor Operator Written Retake Examination ML12319A1562012-10-25025 October 2012 Post Exam Comments and Resolution (Folder 1) ML12362A3252012-10-24024 October 2012 Final Qa/Related Forms (Folder 1). Examination Preparation Checklist ML12278A3442012-10-0404 October 2012 Initial Operator Licensing Written Examination Approval ML12311A1822012-10-0303 October 2012 Summary of Handouts to Applicants (Folder 3) ML12311A1732012-10-0303 October 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML12311A2132012-09-21021 September 2012 Final Outlines (Folder 3) ML12311A1982012-09-21021 September 2012 Final Operating Exam (Sections a, B, and C) (Folder 3) ML12261A2492012-09-17017 September 2012 Initial Operator Licensing Operating Test Approval - Vermont Yankee ML12311A1402012-09-14014 September 2012 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML12311A1032012-09-14014 September 2012 Draft Written Exam (Folder 2) ML12311A0982012-09-14014 September 2012 Draft - Outlines (Folder 2) ML12311A0952012-09-14014 September 2012 Facility Comments on Draft NRC-Developed Exam (Written) (Folder 2) ML12150A2462012-05-29029 May 2012 Requalification Program Inspection - Vermont Yankee ML12116A0312012-04-24024 April 2012 Senior Reactor and Reactor Operator Initial License Examinations - Vermont Yankee ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML11251A0542011-09-0202 September 2011 June 2011 NRC Generic Fundamentals Examination Boiling Water Reactor - Answer Key ML1119904022011-07-18018 July 2011 June 8, 2011, NRC Generic Fundamentals Examination Results for Vermont Yankee Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML11251A0552011-06-23023 June 2011 June 2011 NRC GFE Roster Report on Total and Grade ML11251A0572011-06-0808 June 2011 Us NRC Examination Answer Sheet ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204392011-01-0505 January 2011 Final Qa/Related Forms (Folder 1) ML1032801642010-11-24024 November 2010 Operator Licensing Examination Approval, Vermont Yankee ML1102002602010-11-0101 November 2010 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1102002542010-11-0101 November 2010 Summary of Handout References to Applications (Folder 3) ML1102002472010-11-0101 November 2010 Final Outlines (Folder 3) 2018-01-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML14161A5482014-06-0909 June 2014 Requalification Program Inspection IR 05000271/20143012014-04-0303 April 2014 Er 05000271-14-301; March 25, 2014; Vermont Yankee; Initial Operator Licensing Examination Report ML14164A0482014-03-25025 March 2014 Walk-through Retake Exam Administered 3/24-25/2014 ML14064A0512014-02-14014 February 2014 Final Qa/Related Forms (Folder 1) ML14063A5142014-02-14014 February 2014 Handouts to Applicants (Folder 3) ML14059A5462014-02-14014 February 2014 Final Operating Exam (Sections a, B, and C) (Folder 3) ML14059A5422014-02-14014 February 2014 Final Outlines (Folder 3) ML14059A0562014-02-14014 February 2014 Draft - Outlines (Folder 2) ML14059A0202014-02-14014 February 2014 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML14058A1252014-02-14014 February 2014 Draft Written Exam (Folder 2) ML14057A7962014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML14057A7262014-02-14014 February 2014 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML14055A0412014-02-14014 February 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML14029A3202014-01-29029 January 2014 Initial Operator Licensing Operating Test and Written Exam Approval ML13206A2282013-07-25025 July 2013 Senior Reactor Operator Initial License Examinations - 120 Day Notification Letter ML13106A1102013-04-11011 April 2013 Addendum to Final Qa/Related Forms (Folder 1) ML13128A1202013-03-18018 March 2013 Final Qa/Related Forms (Folder 1) ML13088A2752013-03-0808 March 2013 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML13088A2652013-03-0808 March 2013 Final Outlines (Folder 3) ML13088A2802013-03-0505 March 2013 Handouts to Applicants (Folder 3) ML13106A1212013-02-27027 February 2013 NRC Comments on Draft Licensee Developed Exam (Written) (Folder 2) ML13106A1922013-02-22022 February 2013 Draft Written Exam (Folder 2) ML13106A1832013-02-22022 February 2013 Draft - Outlines (Folder 2) ML13022A3112013-01-22022 January 2013 Reactor Operator Written Retake Examination ML12319A1562012-10-25025 October 2012 Post Exam Comments and Resolution (Folder 1) ML12362A3252012-10-24024 October 2012 Final Qa/Related Forms (Folder 1). Examination Preparation Checklist ML12278A3442012-10-0404 October 2012 Initial Operator Licensing Written Examination Approval ML12311A1732012-10-0303 October 2012 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML12311A1822012-10-0303 October 2012 Summary of Handouts to Applicants (Folder 3) ML12311A2132012-09-21021 September 2012 Final Outlines (Folder 3) ML12311A1982012-09-21021 September 2012 Final Operating Exam (Sections a, B, and C) (Folder 3) ML12261A2492012-09-17017 September 2012 Initial Operator Licensing Operating Test Approval - Vermont Yankee ML12311A1402012-09-14014 September 2012 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML12311A1032012-09-14014 September 2012 Draft Written Exam (Folder 2) ML12311A0982012-09-14014 September 2012 Draft - Outlines (Folder 2) ML12311A0952012-09-14014 September 2012 Facility Comments on Draft NRC-Developed Exam (Written) (Folder 2) ML12150A2462012-05-29029 May 2012 Requalification Program Inspection - Vermont Yankee ML12116A0312012-04-24024 April 2012 Senior Reactor and Reactor Operator Initial License Examinations - Vermont Yankee ML1130000532011-10-27027 October 2011 Announcement of Generic Fundamentals Examination 2012 Administration Dates ML11251A0542011-09-0202 September 2011 June 2011 NRC Generic Fundamentals Examination Boiling Water Reactor - Answer Key ML1119904022011-07-18018 July 2011 June 8, 2011, NRC Generic Fundamentals Examination Results for Vermont Yankee Nuclear Power Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML11251A0552011-06-23023 June 2011 June 2011 NRC GFE Roster Report on Total and Grade ML11251A0572011-06-0808 June 2011 Us NRC Examination Answer Sheet ML1101403432011-01-14014 January 2011 Announcement of Generic Fundamentals Examination (GFE) 2011 Administration Dates ML1106204392011-01-0505 January 2011 Final Qa/Related Forms (Folder 1) ML1032801642010-11-24024 November 2010 Operator Licensing Examination Approval, Vermont Yankee ML1102002602010-11-0101 November 2010 Final Operating Exam (Sections a, B, and C) (Folder 3) ML1102002542010-11-0101 November 2010 Summary of Handout References to Applications (Folder 3) ML1102002472010-11-0101 November 2010 Final Outlines (Folder 3) 2018-01-03
[Table view] |
Text
Vermont Yankee 2014 Initial Licensed Operator Examination - Operating Test Review Comments Admin JPMs
- 1) A1a, Post Surveillance Board Walkdown (Admin JPM 1 appears to be very simple. Have a spare handy during on-site validation.)
- Initial Conditions (Examinee Handout also) o Specify job position (e.g., extra RO on shift)
- Performance Step (PS) 3 - Revise Interim Cue o Specify that the applicants role has changed and that he is now the CRS, and is to determine the operability of the HPCI system and identify any required Technical Specification actions.
- PS 5 - Revise Interim Cue o Add cue to identify actions necessary to return HPCI to an operable configuration.
o Add performance step(s) for identifying necessary actions to return HPCI to operable status.
A1b, Review Daily SRM Response Check Prior to Conducting Core Alteration
- References - add reference that includes standards/expectations of CRS (SRO) responsibilities/actions for reviewing completed surveillance/test packages.
- Initial Conditions (Examinee Handout also) - Specify job position (e.g., CRS)
- Initiating Cue o Revise to direct applicant to conduct the supervisory review of the completed test package.
o Remove bulleted direction. This should be self-evident from the assigned task.
- PS 1 - unnecessary step since completed test package is provided to applicant when given the initial conditions and read the initiating cue.
- PS 2, Interim Cue - change CRS to test performer.
- PS 4, Evaluator Note - need additional information on use of OP 2130 Figure 4
- PS 5 & 6, TYPO - both steps included within same step block (no line separating steps)
- PEDIGREE - need to identify link between assigned task and selected K/A (2.1.36)
A2, Review Completed Surveillance and Take Action for Out of Spec Data
- PEDIGREE - need to identify link between assigned task and selected K/A (2.2.12)
- References - add reference that includes standards/expectations of CRS (SRO) responsibilities/actions for reviewing completed surveillance/test packages.
- Initial Conditions (Examinee Handout also) - Specify job position (e.g., CRS)
- PS 1 - unnecessary step since completed test package is provided to applicant when given the initial conditions and read the initiating cue.
- PS 3, Spelling - personal should be personnel
- PS 4 thru 6 are essentially the same step with three elements to the standard.
o Combine into one PS
- Add new critical PS (replaces current PS 10) to Identify/determine operability of affected components/system.
- PS 11, and initiates required actions Page 1 of 4
Vermont Yankee 2014 Initial Licensed Operator Examination - Operating Test Review Comments A3, Determine the Radiological Protection Requirements for Entering a Locked High Radiation Area
- Determine the radiological requirements to locally close HPCI 16
- The bulleted questions should be the standards for completing the assigned task.
- Performance Steps (refer to 2013 CPS Exam RO Admin JPM) o Identify location of HPCI 16 and obtain associated Survey Map o From Survey Map identify type of RCA (Posting Requirements) o Locate associated RWP o Identify Task o Complete trip ticket A4, Classify an Event and Complete Event Notification Form
- Initial Conditions (Examinee Handout also)
- Outline states Mode 5, the IC states Mode 4 preparing to enter Mode 5.
- Specify job position (e.g., SM)
Systems JPMs (None of the JPMs are designated as (L)ow power JPMs, although 2 are low power)
CR(a), Startup the Turbine to Rated Speed (Alternate Path)
- Initial Conditions (Examinee Handout also) - Specify job position (e.g., ATC/BOP)
- PS 1 - unnecessary step since marked up procedure is to be provided to applicant when given the initial conditions and read the initiating cue.
- Add (non-critical) PS to verify that Main Turbine is tripped (stop valves closed and speed decreasing)
CR(b), Open the MSIVs after a Group I Isolation
- Initial Conditions (Examinee Handout also) - Specify job position (e.g., ATC/BOP)
- PS 1 - unnecessary step since marked up procedure is to be provided to applicant when given the initial conditions and read the initiating cue.
CR(c), Manually Start HPCI and Inject to the Vessel (Alternate Path)
- Initial Conditions (Examinee Handout also) - Specify job position (e.g., ATC/BOP/third RO)
- Based on the Initial Conditions, explain why Appendix C wouldnt be used over Appendix D.
- PS 7, How long can HPCI be operated below min flow before damage may occur.
Seems to me this should be a critical step, since valve will not open automatically under the give conditions.
Page 2 of 4
Vermont Yankee 2014 Initial Licensed Operator Examination - Operating Test Review Comments IP(j), Startup the "A" RPS MG Set
- Initial Conditions (Examinee Handout also) - Specify job position (e.g., extra operator on shift or AO)
- PS 1 - unnecessary step since marked up procedure is to be provided to applicant when given the initial conditions and read the initiating cue.
- PS 5 should be incorporated in to the standard/cues for PS 4 Simulator Scenarios Scenario 1
- Start SBLC is not a critical task if the end point of the scenario is all rods in. With all rods in, it doesnt matter if you started SBLC or not.
- Please remove event numbers from pre-loads and add description in the body of the D-1.
- #10 and #11 are not identified as M, I, or C. Identify, add pre-loads to the description.
- Event 4 should also be flagged as a Reactivity Maneuver
- The critical tasks seem to be correctly identified in the expected operator actions section but not in the scenario summary.
- Summary does not identify inhibiting ADS
- Summary identifies rod insertion, but should also include SLC initiation
- Tech Spec calls dont appear to be overly challenging. Consider scripting a follow-up on Tech Specs for RPS and Gr 5 Isolation failures.
Scenario 2
- Please remove event numbers from pre-loads and add description in the body of the D-1.
- First HPCI failure has no success path and cant be counted as a separate event.
Combine it with the second HPCI failure and make it a simple ramp of the HPCI failure.
- Event 1 - Torus Temperature o What is the initial temperature?
o What is the minimum allowable temperature?
o Will the minimum temperature be reached before the major?
- Event 2 o Do APRM A and F need to be restored first?
- Event 3 o Which Aux Oil Pump?
o What major systems are impacted?
- Event 5 o Critical Task states SCRAM before Exceeding MAX SAFE, but standard says with 5 minutes of exceeding MAX SAFE.
o Should standard have stated MAX NORMAL?
o Guide says SRO directs STA to verify Table A but has BOP perform verification of Table A. Which one does it?
o Standard for CT-2 requires action to terminate release within 10 minutes. I thought leak was unisolable. Need clarification.
- Line 29 should state stabilize pressure, THEN commence cooldown.
Page 3 of 4
Vermont Yankee 2014 Initial Licensed Operator Examination - Operating Test Review Comments
- Line 33 - Standard of 5 minutes seems a bit excessive. What is the basis for the 5 minutes?
- Line 40 - Emergency Classification during a scenario by the SRO is not required. This is a SM function.
Page 4 of 4