ML071410441

From kanterella
Jump to navigation Jump to search
Final - Section B Operating Exam (Folder 3)
ML071410441
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 04/25/2007
From:
Entergy Nuclear Vermont Yankee
To: Todd Fish
Operations Branch I
Sykes, Marvin D.
Shared Package
ML062050096 List:
References
Download: ML071410441 (70)


Text

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Rx Startup to Criticality Failure Mode: Short period during startup

Reference:

OP 0105, Reactor Operations, Rev. 83 Task Number: xxxxx Task Performance: AO/RO/SRO __ RO/SRO Only X SE Only -

Sequence Critical: Yes - No J Time Critical: Yes - No 2 Individual Performing Task:

Examiner:

Date of Evaluation:

Ilx L Activity Code:

Method of Testing: Simulation __ Performance X Discuss -

Setting: Classroom - Simulator X Plant -

Performance Expected Completion Time: 20 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any TJnsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being; evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The plant is starting up.

OP 0105 Phase 1A is complete through step A.26.

Initiating Cues:

Continue the startup and take the reactor critical.

Task Standards:

While pulling control rods to take the reactor critical, a high worth rod takes reactor period to shorter than 30 seconds. The student takes action to take the reactor subcritical per OP 0105.

Required Materials:

OP 0105, Phase A Reactor Operations (latest revision)

VYOPF 0105.03 with doubling count rates filled in.

Simulator Setup:

Reset to IC 861 (just before critical).

Evaluation Performance Steps TIME START:

SATRJNSAT Step 1: Obtain procedure: review administrative limits, precautions, and prerequisites Standard: OP 0105 Phase 1A obtained; administrative limits, precautions, and prerequisites reviewed.

Interim Cue: Inform Operator that all prerequisites are SAT.

SAT/UNSAT *Step 2: Continue to withdraw control rods in such a manner as to avoid having a sustained period shorter than 30 seconds (desired 100 to 200 seconds).

Standard: Pulls correct control rod, otherwise a reactivity mismanagement issue.

Examiner NOTE: Just prior to critically the short period alarm will come in. (about 4 movements on control rod)

SATRJNSAT *Step 3: If the sustained period becomes shorter than 30 seconds Standard: Recognizes short period along with annunciator 5-P-5.

Simulator Operator Note: Upon receiving cue (going from notch 18 to 20) that the next notch of rod 18-31 will cause a high period, INSERT KEY 1following notching out.

SATAJNSAT *Step 4: Use EMERGENCY IN switch to turn the period Standard: uses the EMERGENCY IN switch to reduce period.

Simulator Operator Note: Upon receiving cue from evaluator OR by observing operator using EMERGENCY IN, INSERT KEY 2 after rod moves in 2 notches.

SATAJNSAT *Step 5: Insert Control Rods until the reactor is subcritical Standard: Continues to insert control rods with EMERGENCY IN until the reactor is subcritical.

SATAJNSAT Step 6: Notifv the SM, OM and RE Standard: Notifies appropriate management.

"@e

  • Critical Step TIME FIMSH:

Terminating Cue: The reactor is subcritical and management is notified.

Evaluator Comments:

1 stem:215004 WA's: K1.O1

EXAMINEE HANDOUT

,, Initial Conditions:

The plant is starting up.

OP 0105 Phase 1A is complete through step A.26.

Initiating Cues:

Continue the startup and take the reactor critical.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Secure Standby Gas Treatment Failure Mode: N/A

Reference:

OP 21 17, Standby Gas Treatment, Rev. 17, LPC 4 Task Number: 2610060101 Task Performance: AO/RO/SRO - RO/SRO Only X SE Only -

Sequence Critical: Yes - No 2 Time Critical: Yes - No 2 Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

'p, Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom - Simulator X Plant -

Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS __ FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is shpped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

Both trains of SBGT are running as a result of auto initiation An operator has verified and backed up the initiation.

  • I Initiating signals are clear.

Reactor Building ventilation is operating normally.

Initiating Cues:

You have been directed by the CRS to return both trains of SBGT to a normal lineup, in accordance with OP 21 17, Section D.

Task Standards:

Both SBGT Trains in Standby mode, with torus vent path aligned through SBGT Train "A".

Required Materials:

OP 21 17, Standby Gas Treatment (latest revision)

Simulator Setup:

Reset to IC 862 0 Ensure RB Ventilation is running 0 Ensure both trains of SBGT are running

Evaluation Performance Steps IME START:

SAT/UNSAT Step 1: Obtain procedure: review administrative limits, precautions, and prerequisites Standard: OP 21 17 Section D obtained; administrative limits, precautions, and prerequisites reviewed.

~~~ ~

Interim Cue: Inform Operator that all prerequisites are SAT.

Procedure Step Step 2: SecureZheck secure the first train as follows:

SAT/UNSAT Step 3: Verify initiatine signal has cleared Standard: Verifies initiating signal cleared based on initial conditions, Interim Cue: If asked, restate the initiating signal has cleared.

SAT/UNSAT Step 4: Ensure either reactor building HVAC is running per OP 2192, Heating Ventilatinp and Air Conditioninp System or the other train of SBGT is runninp.

Standard: Ensures reactor building HVAC is running based on initial conditions.

Interim Cue: If asked, restate the initial conditions and reactor building HVAC is operating

Evaluation Performance Steps SATAJNSAT *Step 5: Momentarily place SBGT Fan A REF-2A (SBGT Fan B REF-2B) control switch on CRP 9-26 to STOP Standard: Operator momentarily places SBGT FAN A(B) REF 2-A(B) control switch on CRP 9-26 to STOP.

Verify SBGT A/B stopped Observe red light Off and green light On for SBGT A(B) on CRP 9-26.

Note: Step 6 is not critical because SGT-2A and 3A are reopened later in the procedure.

SATKJNSAT Step 6: Close/verify closed the following valves SGT-2A(B)

SGT-3A(B)

Standard: Operator closes SGT-2A(B) by repositioning control switch to CLOSE AUTO-OP and observing green light On and red light Off on CRP 9-26.

Operator closes SGT-3A(B) by repositioning control switch to CLOSE

)aa AUTO-OP and observing green light On and red light Off on CRP 9-26.

SATAJNSAT *Step 7: Close/Check closed SGT-1A(B)

Standard: Operator takes control switch on CRP 9-26 to CLOSE AUTO-OP.

Verifies SGT-1A(B) closed by observing red light Off and green light On for SGT-1A(B) on CRP 9-26..

Procedure Step Step 8: Secure the second train as follows:

SATAJNSAT Step 9:Ensure reactor buildinp HVAC is running per OP 2192 Heating, Ventilating and Air Conditioninp System Standard: Ensures reactor building HVAC is running based on initial conditions.

terim Cue: If asked, restate the initial conditions

Evaluation Performance Steps SATAJNSAT *Step 10: Momentarily place SBGT Fan A REF-2A (SBGT Fan BREF-2B) control switch on CRP 9-26 to STOP Standard: Operator momentarily places SBGT FAN B(A) REF 2-B(A) control switch to STOP on CRP 9-26.

SATAJNSAT *Step 11: If SGT Train B is secured, closdverifv closed the following valves:

SGT-2B SGT-3B Standard: Operator closes SGT-2B by repositioning control switch to CLOSE AUTO-OP and observing green light On and red light Off on CRP 9-26.

Operator closes SGT-3B by repositioning control switch to CLOSE AUTO-OP and observing green light On and red light Off on CRP 9-26.

IT/UNSAT *Step 12: Close/Check closed SGT-1B Standard: Operator takes SGT-1B control switch on CRP 9-26 to CLOSE AUTO-OP, then verifies SGT-1B closed by red light off, green light on on CRP 9-26 SAT/UNSAT *Step 13: If SGT Train A is secured. establish torus vent path through the following valves bv opening or checking open:

SGT-2A.and SGT-3A Standard: Operator opens SGT-2A and SGT-3A on CRP 9-26 by taking associated control switch to OPEN.

Operator verifies SGT-2A and SGT-3A are open by, observing red light On and green light Off for SGT-2A and SGT-3A on CRP 9-26.

SAT/UNSAT Step 14: Closdcheck closed SGT-1A Standard: Operator checks closed SGT-1A on CRP 9-26 by verifying red light On, green light Off.

Evaluation Performance Steps SAT/UNSAT Step 15: When both SBGT are secured, verify the following normal valve lineun.

SGT-lA(B), SGT-2B. SGT3B, SGT-4A (B), and SGT-5 are closed.

SGT-2A and SGT-3A are open.

SBGT Fan A (B) control switches are in Auto.

9KW heaters SBGT-A Elect HTR EUH-2 and SBGT-B Elect HTR EUH-4 control switches are in auto.

Standard: Operator verifies the following on CRP 9-26:

SGT-lA(B), SGT-2B, SGT-3B, SGT-4A(B) and SGT-5 are closed SGT-2A and SGT-3A open SBGT Fan A(B) control switches in AUTO 9 KW heaters SBGT-A Elec Htr EUH-2 and SBGT-B Elec Htr EUH-4 control switches are in AUTO

  • Critical Step Terminating Cue: SBGT System in Standby Mode, with torus vent path established through SBGT Train A

Evaluator Comments:

System: 26 1000 WAs: K1.O1

Examinee Handout Initial Conditions:

Both trains of SBGT are running as a result of auto initiation An operator has verified and backed up the initiation.

Initiating signals are clear.

Reactor Building ventilation is operating normally.

Initiating Cues:

You have been directed by the CRS to return SBGT to a normal lineup in accordance with OP 21 17, Section D.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Transfer Pressure Control From MPR to EPR Failure Mode: N/A

Reference:

OP 2160, Turbine Generator Support Systems Operation, Rev. 24 Task Number: 2490020101 Task Performance: AO/RO/SRO - RO/SRO Only X SE Only __

Sequence Critical: Yes - No 2 Time Critical: Yes - No 2 Individual Performing Task:

Examiner:

Date of Evaluation:

  • Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom - Simulator X Plant -

Performance Expected Completion Time: 12 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to

-*i ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform all actions.

You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The plant is operating at 100% power with the MPR controlling pressure. The EPR Cutout Switch has b been in NORMAL for the past 30 minutes.

Initiating Cues:

The CRS has directed you to transfer pressure control to the EPR in accordance with OP 2160, Section B.2.

Task Standards:

Plant operating normally with pressure control transferred to the EPR Required Materials:

OP 2160, Turbine Generator Support Systems Operation (latest revision)

Simulator Setup:

Reset to IC 862 Pressure control transferred to the MPR EPR Cutout Switch in NORMAL Annunciators reset

'?valuation Performance Steps TIME START:

SAT/UNSAT Step 1: Obtain Procedure: review Precautions, Admin Limits, Prerequisites, and Section B.2 Standard: Procedure obtained, Precautions, Admin Limits, Prerequisites and Section B.2 reviewed.

Interim Cue: If asked, all prerequisites are met.

SAT/UNSAT Step 2: Verify EPR is ready for service:

0 EPR CUTOUT SWITCH in NORMAL (ON) 0 EPR CONTROL PWR LOSS annunciator 7-6-2 clear Standard: Operator verifies that the EPR Cutout Switch is in NORMAL and that annunciator 7-G-2 is clear.

SAT/UNSAT Step 3: Verify bulb for oncoming pressure regulator is sound Standard: Operator removes EPR white light bulb and places bulb in a known-energized lamp socket to verify that the bulb is good, then replaces bulb in the EPR white light socket, OR verifies it is sound by observing the intact filament.

SATKJNSAT *SteI) 4: Usinp EPR SETPOINT switch, slowly lower the EPR setpoint by goinp to LOWER until the EPR OUTPUT STROKE begins to move Standard: Operator places the EPR Setpoint control switch to LOWER until the EPR Output Stroke begins to move.

a.

Evaluator Notelcue: Student may notice that EPR stroke is not rising

,valuation Performance Steps SAT/UNSAT Step 5: As the EPR OUTPUT STROKE increases, control the rate bv adjusting the EPR SETPOINT switch such that it continues to increase slowly.

Standard: Operator intermittently manipulates the EPR Setpoint Control Switch to effect a slow rate of EPR Output Stroke increase.

SAT/UNSAT "Step 6: Continue to slowlv lower the EPR SETPOINT until the EPR begins to take control Standard: Operator continues to observe the slowly rising stroke, watching for the EPR white light to energize, adjusting the setpoint as necessary.

SAT/UNSAT Step 7: Verify that the EPR is in control of pressure bv observing:

1) Verify white light above EPR SETPOINT switch is illuminated.

"k

2) Verify white light above MPR SETPOINT switch is extinmished.
3) On CRP 9-5, verify stable reactor pressure, Standard: Operator verifies that the EPR is in control of pressure by observing the above-listed indications.

SATAJNSAT *Step 8: If either pressure repulator fails to control pressure, refer to OT 3115 for immediate actions.

Standard: Operator observes pressure is under control.

SAT/UNSAT *Step 9: Using MPR SETPOINT switch, slowly RAISE the MPR SETPOINT, bv goinp to RAISE, until the MPR OUTPUT STROKE is 10%

below the EPR.

Standard: Operator places the MPR Setpoint Control Switch to RAISE as necessary to adjust the MPR Output Stroke to a setting 10%below the EPR.

,AT/UNSAT Step 10: Ad-iust reactor pressure as necessary Standard: Operator uses the EPR Setpoint Control Switch to adjust reactor pressure as necessary.

Interim Cue: Inform Operator that no pressure adjustment is necessary.

TIME FINISH:

Terminating Cue: Pressure control transferred to the EPR with the MPR stroke 10% below that of the EPR and reactor pressure stable.

Evaluator Comments:

System: 241000 WA's: K1.02, K4.01, A1.O1, A4.16, A4.19 System Generic WA's: 2.1.20, 2.1.21 b

EXAMINEE HANDOUT

  • , <J Initial Conditions:

The plant is operating at 100% power with the MPR controlling pressure. The EPR Cutout Switch has been in NORMAL for the past 30 minutes.

Initiating Cues:

The CRS has directed you to transfer pressure control to the EPR in accordance with OP 2160, Section B.2.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Energize Bus 4 From the Vernon Tie Line During a Station Blackout Failure Mode: Breaker 3V Does Not Close

Reference:

OT 3122, Loss of Normal Power, Appendix A. Rev. 21, LPC 4 Task Number: 2000040501 Task Performance: AO/RO/SRO - ROISRO SRO Only Sequence Critical: Yes X No -

Time Critical: Yes- N o 2 Operator Performing Task:

Examiner:

Date of Evaluation:

b Activity Code:

Method of Testing: Simulation - Performance Discuss __

Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 7 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedlCertified Reviewer Date "ii proved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning Performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is shpped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk throwh" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

A turbine trip has occurred following a loss of all offsite power; both diesels have failed to start. A station Blackout has been declared.

Initiating Cues:

You are directed to perform Immediate Operator Actions IAW OT-3122 Appendix A to restore AC power to Bus 3 or Bus 4 from the Vernon Tie. Bus 3 is preferred.

Task Standards:

Bus 4 energized from Vernon Tie Line IAW OT 3122 appendix A.

Required Materials:

OT 3122, Appendix A Simulator Set-Up:

Reset to IC 864 Ensure following malfunctions are inserted:

DG05B DG05A 0 ED17 Using softpanels select 3V breaker to TRIP (ED18B)

Evaluation Performance Steps

  • % TIMESTART:

SATAJNSAT Ster, 1: Obtain OT 3122. Review entrv conditions, immediate operator actions, and follow-up actions.

Standard: OT 3 122, appendix A obtained, entry conditions, immediate operator actions and follow-up actions reviewed.

SATAJNSAT *Step 2: Place the service water pump control switches to STOP, then NORMAL.

Standard: At CRP 9-6, take each SW pp control switch to STOP and then to NORMAL. Observe the green light on and red light off for each pump.

SATAJNSAT Step 3: Place all ECCS pumps in PULL-TO-LOCK Standard: At CRP 9-3 place the control switches for each of the four RHR pumps and both Core Spray pumps in PULL-TO-LOCK.

SATAJNSAT *Step 4: Energize Bus 3 from Vernon tie:

Close 3V4 and the selected bus feeder breaker.

Standard: Breaker handswitch on CRP 9-3 for 3V4 taken to CLOSE Check breaker 3V4 closed by observing red light ON and green light OFF above breaker control switch on CRP 9-8 SAT/UNSAT *Step 5: Close the selected bus tie breaker (3V)

Standard: Breaker handswitch on CRP 9-8 for 3V taken to CLOSED Observe failure of breaker 3V by observing green indicating light ON and red light OFF above breaker control switch on CRP 9-8 Interim Cue: If informed as CRS that the 3V breaker failed, repeat the request to restore power from Vernon Tie.

SATAJNSAT "Step 6: Close the selected bus tie breaker (4V)

Standard: Breaker handswitch on CRP 9-8 for 4V taken to CLOSED Observe closure of breaker 4V by observing red indicating light ON and green light OFF above breaker control switch on CRP 9-8 SATAJNSAT Step 7: Check voltage and current on Bus 4 Standard: Observes voltage and current meters on CRP 9-8

  • Critical Step TIME FINISH:

Terminating Cue: Bus 4 energized from Vernon Tie line.

Evaluators Comments:

System: 295003

EXAMINEE HANDOUT

-a Initial Conditions:

A turbine trip has occurred following a loss of all offsite power; both diesels have failed to start. A station Blackout has been declared.

Initiating Cues:

You are directed to perform Immediate Operator Actions IAW OT-3122 Appendix A to restore AC power to Bus 3 or Bus 4 from the Vernon Tie. Bus 3 is preferred.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 t

Task Identification:

Title:

Manual RCIC Start With Iniection to the Rx Vessel Failure Mode Failure of the Flow Controller in Auto

Reference:

OP 2121 Appendix C, Reactor Core Isolation Cooling System, Rev 30, LPC3 Task Number: 2170030101 Task Performance: AO/RO/SRO __ RO/SRO X SRO Only Sequence Critical: Yes - No Time Critical: Yes- NoX Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance Discuss -

Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedKertified Reviewer Date

.>provedby:

Operations Training Manager Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily,then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions. a, You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

There has been a spurious Group I isolation and resulting Rx scram. All three feed pumps are "kr unavailable. Actions have been taken IAW OT 3100 and EOP-1.

Initiating Cues:

The CRS directs you to start RCIC and inject to the vessel to raise level to the normal band (150"-160") IAW OP 2121 Appendix C.

Task Standards:

Operator starts RCIC and injects to the vessel. Reactor vessel level is increasing.

Reauired Materials:

OP 2121, Reactor Core Isolation Cooling System, Appendix C Simulator Set-Up:

Reset to IC 865 Ensure Malf RC03 @ 0% is entered.

c

Evaluation Performance Steps TIMESTART:

SATKJNSAT Step 1: Obtain OP 2121, Review Administrative Limits, Precautions, and Prerequisites Standard: OP 2121, Section D MAY be obtained. Admin. limits, precautions and prerequisites reviewed. However, Appendix C, the mini-procedure is expected to be used.

Interim Cue: If asked, inform operator that all prerequisites are satisfied.

SATUSAT *Step 2: Open lube oil COOLING WATER RCIC-132 Standard: RCIC-132 hand switch on CRP 9-4 positioned to OPEN. Observe red light ON, green light OFF SATUSAT *Step 3: Start the GLAND SEAL VACUUM PUMP Standard: Vacuum pump switch on CRP 9-4 positioned to ON. Observe red light ON, green light OFF SAT/UNSAT *Step 4: Open MINIMUM FLOW RCIC-27 Standard: RCIC-27 hand switch positioned to OPEN Observe RCIC-27 red light ON, green light OFF SAT/UNSAT *Step 5: Open STEAM SUPPLY RCIC-131 Standard: RCIC-131 hand switch positioned to OPEN Observe RCIC-131 red light ON, green light OFF

Evaluation Performance Steps aAT/UNSAT Step 6: Confirm turbine start bv observing TURBINE SPEED SI 13-2 and PUMP DISCHARGE PRESSURE PI 13-93 increasing Standard: Observes turbine RPM, SI 13-2, and pump discharge pressure, PI 13-93, increasing (CRP 9-4 vertical display)

SATAJNSAT *Step 7: Open PUMP DISCHARGE, RCIC-21 Standard: RCIC-21 hand switch positioned to OPEN Observe RCIC-21 red light ON, green light OFF SATAJNSAT Step 8: Operator notes the failure of RCIC flow to increase to 400 GPM.

Standard: Operator observes flow <400 GPM on FI-91-1 Interim Cue: If operator requests additional guidance from CRS, instruct him to take the necessary actions to inject with RCIC at 400 GPM or as necessary to return level to the normal band.

SATKJNSAT Step 9: Shift RCIC controller to manual to control level 150 to 160 Standard: Operator shifts RCIC controller knob into manual position on FIC-91 at CRP 9-4.

SATAJNSAT Step 10: Verifv that Minimum Flow RCIC-27 closes (automatic) at approximately 80 GPM Standard: Operator verifies auto closure of RCIC -27 when flow reaches approx. 80 gpm SATAJNSAT Step 11: Monitor the following parameters:

EXHAUST PRESSURE 0-20 psig SUCTION PRESSURE 6-30 psig STM SUPPLY PRESSURE 50-1120 psig TURBINE SPEED >2200-5000 rpm Standard: Observes Exhaust pressure, suction pressure, supply pressure and turbine speed on the indicators on CRP 9-4

&valuatorNote: The JPM may be terminated when level begins to increase due to RCIC operation. Reaching the level band of 150-160 is NOT required to be evaluated.

  • Critical Step TIME FINISH:

Terminating Cue: RCIC started and injecting to the vessel.

Evaluators Comments:

System: 217000

Examinee Handout lib Initial Conditions:

There has been a spurious Group I isolation and resulting Rx scram. All three feed pumps are unavailable. Actions have been taken IAW OT 3 100 and EOP-1.

Initiating Cues:

The CRS directs you to start RCIC and inject to the vessel to raise level to the normal band (150-160) IAW OP 2121 Appendix C.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Perform Core Spray "A" Quarterly Full Flow Test Failure Mode: Minimum Flow Valve Fails Shut

Reference:

OP 4123, Core Sprav System Surveillance, Rev. 41 Task Number: 2090010201 Task Performance: AO/RO/SRO - RO/SRO Only X SE Only -

Sequence Critical: Yes - No Time Critical: Yes - No 2 Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom - Simulator X Plant -

Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS I_ FAIL - Time Required:

Prepared by:

Operations Training Instructor Reviewed by:

SRO LicensedCertified Reviewer Date pproved by:

Operations Training Supervisor Date

3irections:

P Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is shpped or performed unsatisfactorily, then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform the actions.

You are requested to "talk-throueh"the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Tnitial Conditions:

  • ' The plant is operating at power during normal operations.

Initiatinp Cues:

You have been directed by the CRS to perform the Core Spray Quarterly Full Flow Test on the "A" Core Spray Pump IAW OP 4123. The surveillancehas been completed through Step C.3.c. Document results on Form VYOPF 4123.01A.

Task Standards:

"A"Core Spray Quarterly Full Flow Test Performed satisfactorily.

Rewired Materials:

OP 4123, Core Spray System Surveillance (latest revision)

Form VYOPF 4123.01 (latest revision) with Steps 1 & 2 data filled in Simulator Setup:

Reset to IC 866

IME START:

SAT/UNSAT "Step 1: Start Core Spray Pump "A" (step C.3.d)

Standard: Operator places Core Spray Pump "A"hand switch to START on CRP 9-3 horizontal panel, and observes red light On, green light Off above pump start switch.

SATJUNSAT Step 2: Verify Core Spray Pump "A" running (step C.3.d)

Standard: Operator observes running amps approximately 90 SAT/UNSAT "Step 3 Verify Minimum Flow Valve CS-5A remains open (step C.3.e)

Standard: Operator identifies that CS-SA opens when pump is started k, ,AT/UNSAT Step 4: Verify that annunciator 3-A-7 'ADS PERMISSIVE RHR?CS RUNNING' enerpizes Standard: Operator verifies annunciator 3-A-7energizes.

SAT/UNSAT Step 5: Check that the appropriate RRU started automatically Standard: Operator contacts A 0 to check RRU auto started (or checks back panel).

Interim Cue: As AO, acknowledge appropriate RRU has started automatically.Can also be checked on control room back panel RP 9-25 (RRU-7)

SAT/UNSAT *Step 6: Throttle FULL FLOW TEST CS-26A to obtain 3100-3150 gpm as read on PUMP FLOW FI 14-50A.

Standard: Operator throttles flow to obtain 3100-3150 gpm.

'3ATIUNSAT *Step 7: Verifv valve MINIMUM FLOW CS-5A closes as flow increases Standard: Operator verifies valve MINIMUM FLOW CS-SA closes by observing GREEN light ON, RED Light OFF.

SAT/UNSAT Step8 : Maintain test parameters until all readings and measurements have been taken Standard: Operator maintains test parameters.

Interim Cue: Provide Pump Suction & Discharge Pressures (local test gage) of 3.4 psig & 237.5 psig.

After the data on VYOPF 4123.01A has been filled out for step C.5.a, advise operator that testing is complete and the surveillance can continue at step C.5.b. (This data was actual plant data used during 1/3/07 in plant surveillance).

SATAJNSAT *Step 9: Close FULL FLOW TEST CS-26A. Continue to hold the control switch for approximatelv 5 seconds after valve closure.

Standard: Operator closes FULL FLOW TEST CS-26A and holds control switch for approx. 5 seconds after valve closure.

SAT/UNSAT *Step 10: Verifv Minimum Flow Valve CS-SA remains open Standard: Operator identifies that CS-SA did not open; informs CRS Interim Cue: If informed as CRS that valve has failed shut, acknowledge report.

SATAJNSAT *SteD 11: Secure Core Spray Pump "A" Standard: Operator secures pump by talung control switch at CRP 9-3 to STOP This step is required to prevent pump damage by running pump dead headed. See CAUTION prior to step C.3.e.

  • Critical Step TIME FIMSH:

Terminating Cue: "A"Core Spray Pump secured after once it is noted that the Minimum Flow Valve fails shut.

Evaluator Comments:

"n, stem K&A: 209001

Examinee Handout Initial Conditions:

The plant is operating at power during normal operations.

Initiating Cues:

You have been directed by the CRS to perform the Core Spray Quarterly Full Flow Test on the "A" Core Spray Pump IAW OP 4123. The surveillance has been completed through Step C.3.c. Document results on Form VYOPF 4123.01A.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

PCIS Group V Failure Failure Mode: RWCU Fails to Isolate Upon SLC Initiation

Reference:

OP 21 14, Operation of the Standbv Liquid Control System, Rev. 23, LPC 2 Task Number: 2110050101 Task Performance: AO/RO/SRO - RO/SRO Only X SE Only -

Sequence Critical: Yes - No 2 Time Critical: Yes - No 3 Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation __ Performance X Discuss -

Setting: Classroom - Simulator X Plant Performance Expected Completion Time: 5 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedCertified Reviewer Date pproved by:

Operations Training Superintendent Date

Directions:

\

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily,then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person beinp evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform all actions.

You are requested to "talk-throueh"the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The plant is experiencing an ATWS.

c Initiatinp Cues:

You have been directed by the CRS to initiate and verify SLC injection to the reactor vessel per OP 21 14, App.B. All other ATWS & EOP actions will be performed by another operator.

Task Standards:

Boron injected to the reactor vessel IAW OP 21 14 Required Materials:

OP 21 14, Operation of the Standby Liquid Control System (latest revision)

Simulator Setup:

Reset to 100% power IC and perform the following (Simulator Booth Operator NOTE: Cannot snap to an ATWS Scenario- therefore Simulator needs to be reset for each candidate):

Insert the following malfunctions: mfRP_09A, mfRP-O9B, mfRD_12A(60%),

mfRDW12B(60%).Then go to run and perform the following:

Insert manual scram 0 Initiate ARI/RPT and trip the recirculation pumps

Evaluation Performance Steps I TIMESTART:

SATAJNSAT Step 1: Obtain and review OP 2114 Appendix B Standard: OP 21 14 Appendix B obtained and reviewed Interim Cue: If asked, all pre-requisites are SAT SAT/UNSAT *Step 2: Unlock SLC Switch bv positioning the kev to the two o'clock position Standard: Key positioned to the two o'clock positon bAT/UNSAT "Step 3: Turn SLC switch to SYS 1 or SYS 2.

4 Standard: SLC Switch turned to the SYS 1 or SYS 2 position SATAJNSAT Step 4: Verifv that the "A/BSLC Pump starts Standard: Operator verifies that the "A" or "B" SLC Pump is running by observing the Red light On and Green light Off SATPUNSAT Step 5: SLC discharpe pressure increases as indicated on PI-11-65.

Standard: Operator observes rising pressure indicated on PI 11-65 on CPR 9-5

dvaluation Performance Steps SATNNSAT *Step 6: On CRP 9-4, RWCU system isolation valves automatically close:

CU-15 (Outlet Isolation)

CU-18 (Inlet Isolation)

CU-68 (Return Isolation)

Standard: Operator recognizes that the RWCU System did NOT isolate EVALUATOR NOTE: Operator may elect to take SLC switch to the other position (per step 4 of Appendix B) before manually closing the RWCU valves.

SATKJNSAT Step 7: Manually close CU-15 Standard: Operator places the CU-15 control switch on CRP 9-4 to CLOSE and verify it closes by observing the Green light on and Red light off for CU-15.

EVALUATOR NOTE: Operator may elect to trip the running RWCU Pump first in anticipating an automatic pump trip (on interlock) once RWCU valves are shut.

SAT/UNSAT Step 8: Manually close CU-18 Standard: Operatorplacesthe CU-18 control switch on CRP 9-4 to CLOSE and verifies it closes by observing the Green light on and Red light off for CU-18.

SAT/UNSAT *Step 9: Manually close CU-68 Standard: Operator places the CU-68 control switch on CRP 9-4 to CLOSE and verify it closes by observing the Green light on and Red light off for CU-68.

SATKJNSAT Step 10: Sauib valve SLC-l4A(B) fires, as indicated bv:

Red flow indicator light on (flow greater than 30 gpm).

Standard: Operator observes the following:

Operator observes Red Flow Indicator light is energized on CRP 9-5 SLC tank level decreases as indicated on LI-11-66 Standard: Operator observes SLC Tank Level indicator (LI 11-66) and verifies that level indication is lowering TIME FINISH:

Terminating Cue: Boron is being injected into the reactor vessel IAW OP 21 14 Appendix B

'valuator Comments:

System: 21 1000

Examinee Handout Initial Conditions:

The plant is experiencing an ATWS.

Initiating Cues:

You have been directed by the CRS to initiate and verify SLC injection to the reactor vessel per OP 21 14, App.B. All other ATWS & EOP actions will be performed by another operator.

VERMONT YANKEE JOB PERFORMANCE MEASURE NRC EXAM 2007 Task Identification:

Title:

Startup Idle Recirc Pump With the Other Pump Running Failure Mode: A Recirc Pump Failed Startup Sequence during startup

Reference:

OP 21 10, Reactor Recirc System (Rev 74)

Task Number: 2020040101 Task Performance: AO/RO/SRO - RO/SRO Only X SE Only __

Sequence Critical: Yes - No 3 Time Critical: Yes X No Individual Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation - Performance X Discuss -

Setting: Classroom - Simulator X Plant __

Performance Expected Completion Time: 15 minutes Evaluation Results:

Performance: PASS __ FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time.Cor him to i,

ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily,then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Simulator and you are to perform all actions.

You are requested to "talk-through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

iitial Conditions:

% 0 Reactor is in single loop operation with the "B" Recirc Pump Operating The "A" Recirc Loop is idle and has been prepared for pump start IAW OP 21 10 Section D Step 1 0 Control rods have been inserted as necessary to ensure operation outside Exclusion Region during pump start IAW OP 21 10 Section D- Step 2.

Initiating Cues:

The CRS has directed you to start the "A"Recirc Pump IAW OP 21 10, continuing with section D-Step 3. Reactor control and monitoring during this evolution will be performed by another operator.

Task Standards:

RV-53A opened and "B" Recirc Pump speed raised to 50-70%.

Rewired Materials:

OP 21 10, Reactor Recirc System (latest revision)

Simulator Setup:

k

. IC-888 IC is set up with single loop operations following a Recirc pump trip. Ensure the actions for securing a Recirc pump are complete and control rods have been inserted to exit the buffer/exclusion region and to provide adequate margin for pump start.

Evaluation Performance Steps TIME START:

SATAJNSAT Step 1: Obtain procedure; review admin limits, precautions, and pre-requisites Standard: Procedure obtained; admin limits, precautions, and pre-requisites reviewed Interim Cue: If asked, all pre-requisites are met (This should already be known since steps D1-4 were cued as being complete in initial conditions)

SATKINSAT Step 2: Reduce speed of running pump to minimum as follows: If the operating pump PUMP B CONTROLLER 2-184-16B is in automatic, transfer the controller to manual as follows: On PUMP B CONTROLLER 2-184-16B compare the MG-B.S and MG-B.P values Standard: Operator compares the MG-B.S and MG-B.P values SATAJNSAT Step 2a: If the values are the same depress the A M pushbutton and verifies the red manual LED illuminates.

Standard: Operator depresses the A/M pushbutton and verifies the red manual LED illuminates SAT/UNSAT Step 2b: On PUMP B CONTROLLER 2-184-16B. verifv or select the MG-B.P display and On PUMP B CONTROLLER 2-184-16B, adiust controller output to 0.00 Standard: Operator selects the MG-B.P display and On PUMP B CONTROLLER 2-184-16B and adjusts controller output to 0.00

SATAJNSAT Step 3 : Perform reactor coolant temperature check per VY OPF 4110.05 L,

Standard: Operator performs reactor coolant temperature check per VYOPF 41 10.05.

___ ___ ~~

Interim Cue: Inform candidate that all temperatures are within spec.

SATKJNSAT *Step 4: Ensure motor-peneratorset start permissives are satisfied.

Standard: Operator verifies the following:

Pump Suction Valve (RV-43A) is open Generator field breaker is open Lockout relay is reset Lube oil circulation flow is normal (40-65 psig as indicated on PI 184-3A)

Drive motor bus is at or near rated voltage Discharge Bypass Valve (RV-54A) is open Pump Discharge Valve (RV-53A) is closed Interim Cue: If asked, the lockout relay is reset; lube oil pressure indicates 55 psig SATKJNSAT Step 5: Monitor ERFIS Point M040 Standard: Operator monitors Point M040 on ERFIS SATAJNSAT *Step 6: Start the "A" Recirc Pump (P-18-1A)

Standard: Operator takes the Recirc Pump "A" Drive Motor control switch to

'r '

START

4T/UNSAT *Step 7: Observe that Field breaker closes approximately 7 sec. after drive

  • motor breaker is closed, Generator speed hits peak of approximately 80%. and Generator speed settles out to approximately 40% speed and then decays to approximately 20% speed.

Standard: Operator verifies that field breaker DID NOT close within approximately 7 seconds and after approximately 12 seconds the drive breaker has TRIPPED resulting in annunciators 4-A-1,4-A-2,4-A-5, and 4-A-7 and A Recirc Pump Trip; Notifies the CRS that the A Recirc pump tripped.

SAT/UNSAT *Step 8: IF for any reason, the Recirculation Pump started then tripped, THEN Immediately close RV-53A pump discharge valve Standard: Operator verifies RV-53A pump discharge valve closed Evaluator Note: If the operator was quick to open the discharge valve (RV-53A) based on field breaker failing to shut within 7 seconds, then RV-53A would have to be closed following the 4, pump trip.

SAT/UNSAT *Step 9: IF for any reason, the Recirculation Pump started then tripped, THEN Raise speed of the running pump to between 50% to 70%

speed provided bottom head drain temperature is within 145°F of saturation temperature.

Standard: Operator verifies bottom head drain temperature is within 145°F of saturation temperature, then raises speed of the running pump to between 50-70% speed.

Evaluator Cue: Provide cue to the candidate that bottom drain temperature is within 145°F of saturation temperature

~ _ _ _ _

Terminating Cue: Discharge valve (RV-53A) closed and B Recirc Pump running at 50-70% speed

TIME FINISH.

Evaluator Comments:

System: 202001

Examinee Handout k

Initial Conditions:

Reactor is in single loop operation with the B Recirc Pump Operating 0 The A Recirc Loop is idle and has been prepared for pump start IAW OP 21 10 Section D Step 1 0 Control rods have been inserted as necessary to ensure operation outside Exclusion Region during pump start IAW OP 21 10 Section D- Step 2.

Initiating Cues:

The CRS has directed you to start the ARecirc Pump IAW OP 21 10, continuing with section D-Step 3. Reactor control and monitoring during this evolution will be performed by another operator.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Shutdown the Diesel Generator Locally Failure Mode: N/A

Reference:

OP 2126, Diesel Generators, Rev. 54 Task Number: 2647230101,2640090104 Task Performance: AO/RO/SRO X RO/SRO - SRO Only- A 0 Only -

Sequence Critical: Yes X No Time Critical: Yes - No 3 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

c Method of Testing: Simulation Performance -Discuss -

Setting: Classroom - Simulator - Plant 2 Performance Expected Completion Time: 20 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily, then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the plant and you are to simulate the actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

The "A" DG has been running for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, paralleled to the bus, loaded to 2500 KW, 1600 KVARs (OUT) per OP 2126. All "A"DG data readings have been completed satisfactorilyby another operator and the diesel is ready to be secured.

Initiating Cues:

You have been directed by the CRS to shutdown the diesel generator locally, per OP 2126, Section D.

Task Standards:

The local shutdown of the diesel generator is complete and satisfactory.

Reauired Materials:

OP 2 126, Diesel Generators (latest revision)

Simulator Setup:

N/A

Evaluation Performance Steps TIME START:

SATAJNSAT Step 1: Obtain Procedure OP 2126 and review PrecautionsLimitations.

Standard: OP 2126 obtained, reviewed the precautions/limitations Interim Cue: Inform operator the precautionsfiimitations are SAT.

Note: All steps are performed in the A EDG Room.

SAT/UNSAT *Step 2: On generator panel DG-l-lA, using the GOVERNOR control switch, gradually reduce load to approximately 50 % .

Standard: On DG A, the operator intermittently positions diesel governor control switch to LOWER until generator unloads to 50% on Diesel Control Panel.

k*

Interim Cue: DG unloaded to 1250 KW SATAJNSAT Ster, 3: UsinP the AUTO VOLTAGE REG ADJUST switch, adiust reactive load to as close to zero KVARs as possible Standard: Operator takes switch to LOWER until Reactive load reads approximately zero KVARs.

Interim Cue: When asked, KVARs are reading approximately zero SATAJNSAT Step 4: Run unit at 50% load for 5 minutes.

Standard: Operator allows unit to run for 5 minutes at 50% load.

Interim Cue: Inform operator that using time-compression, diesel has been running at 50% load for 5 minutes.

Yvaluation Performance Steps 7 SATAJNSAT *Step 5: On generator panel DG-l-lA, using the GOVERNOR control switch, unload unit to e 200 kw.

Standard: Operator intermittently positions diesel governor control switch to LOWER until generator unloads to < 200KW, as indicated on the Diesel Control Panel.

Interim Cue: DG unloaded to 180 KW SAT/UNSAT *Step 6: On CRP 9-8 open diesel output breaker 4KV BREAKER DIESEL GENERATOR 1A.

Standard: Operator directs another operator to open the DG A output breaker from CRP 9-8.

Interim Cue: Inform Operator that the output breaker has been opened, and DG KW is zero.

SAT/UNSAT Step 7: Run unloaded for approximately 1 minute.

Standard: Operator allows diesel to run unloaded for approximately one minute.

Interim Cue: Inform Operator that using time-compression,the diesel has been running unloaded for one minute.

SATAJNSAT *Step 8: Reset the SPEED DROOP to Zero Standard: Operator resets the speed droop to zero at the Diesel Governor. (Top left knob on governor- counterclockwise).

Interim Cue: Inform Operator that the speed droop is at zero.

,valuation Performance Steps SAT/UNSAT Step 9: Check the voltage regulator maintaininp approximately 4160V and the governor maintaining 60 Hz.

Standard: Operator observes voltage and adjusts voltage regulator as necessary to maintain 4160V, and observes frequency meter and adjusts governor as necessary to maintain 60 HZ.

Interim Cue: Voltage indicates 4160V. Frequency is 60 Hz.

SATAJNSAT Step 10: Have a second operator independently verifv the governor is maintaining diesel generator frequency a t 60 Hz.

Standard: Operator contacts another operator to perform independent verification of Diesel frequency.

Interim Cue: Second operator has performed independent verification.

SATAJNSAT *Step 11: StoD the diesel from the DG-1-1A GENERATOR panel by depressing the MANUAL ENG. STOP pushbutton.

Standard: Operator depresses the MANUAL ENG. STOP pushbutton on the Diesel Generator Control panel.

~

Interim Cue: DG slows, noise level is reduced to normal background.

SAT/UNSAT Step 12: Locally verifv the following cycle on after the diesel has stopped.

a. Lube oil pump
b. Cooling water pump
c. Heaters Standard: Operator observes breaker lights, pressures and amps, to verify lube oil pump, cooling water pump, and heater breakers cycle on as diesel speed decreases.

Interim Cue: If asked, inform Operator that the lube oil pump, cooling water pump, and heater breakers are

operating as designed.

,valuation Performance Steps

\ha SATKJNSAT Step 13: Refill the diesel dav tank to the automatic high level cutout bv depressing the FUEL OIL TRANSFER PUMP START button at the DG-1-A GENERATOR Panel.

Standard: Operator depresses the Fuel Oil Transfer Pump START button at the Diesel generator control panel.

Interim Cue: START pushbutton is depressemed light on SATKJNSAT Step 14: Verifv that the diesel dav tank level alarms are clear.

Standard: Operator observes diesel day tank level alarms are clear Interim Cue: Inform the Operator that both Diesel Day tank alarms are clear. (DG-D- 1, High level alarm and DG-D-2, Low level alarm)

~~

SATKJNSAT Step 15: Close DLO-IOA, LO DAY TANK SUPPLY VALVE if previouslv opened to make up oil.

a. Verifv lube oil makeup tank is at least 5/8 full.
b. If lube oil tank level is e 5/8 full submit a WR Standard: Operator observes DLO-1OA position and if open, rotates valve hand wheel fully clockwise to the SHUT position.

Interim Cue: When Operator indicates he will check valve shut by rotating clockwise, inform Operator that the valve is closed and the lube oil tank level is > 5/8 full.

SATKJNSAT Step 16: Reset all relay tarpets.

Standard: Operator observes all relay targets on Diesel Control Panel.

I erminating Cue: All relays are reset, the EDG is shutdown. The JPM is complete

'I

  • Critical Step TIME FINISH:

Terminating Cue: The diesel generator is shutdown.

Evaluators Comments:

System: 264000 WA's: A4.04

EXAMINEE HANDOUT Initial Conditions:

The "A"DG has been running for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, paralleled to the bus, loaded to 2500 KW, 1600 KVARs (OUT) per OP 2126. All "A" DG data readings have been completed satisfactorily by another operator and the diesel is ready to be secured.

Initiating Cues:

You have been directed by the CRS to shutdown the diesel generator locally, per OP 2126 Section D.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Lineup to Operate SRV-71 A and B From The RCIC Room Failure Mode: N/A

Reference:

OP 3126, Appendix C, Shutdown Usinn Alternate Shutdown Methods, Rev. 18, LPC 2 Task Number: 2007170501 Task Performance: AOROISRO - ROISRO SRO Only -

Sequence Critical: Yes - No 3 Time Critical: Yes - No X Operator Performing Task:

Examiner:

\ Date of Evaluation:

Activity Code:

Method of Testing: Simulation Performance -Discuss -

Setting: Classroom - Simulator - Plant Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

.Operations Training Instructor Date Reviewed by:

SRO LicensedCertified Reviewer Date pproved by:

Operations Training Supervisor Date

Trections:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily,then the operator has failed the Job Performance Measure.

After providing the initiating cue, ask the operator "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Plant and you are to simulate all actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

iitial Conditions:

w Plant Shutdown is in progress from outside the Control Room, and reactor depressurization is required.

All OP 3 126 Initial Actions are complete. Plant Pressure is currently at 800#. Maintenance Electricians are not available to perform this procedure.

Initiatinp Cues:

The SM directs you to energize the Alt SD panels for RCIC and SRV in the RCIC room per OP 3126, Appendix C step 4 (Steps 1 , 2 & 3 of Appendix C are complete). Once the appropriate panels are energized and available for operation, commence a cooldown using local SRV operation.

Task Standards:

OP 3126, Appendix C (Steps 4 through 6) properly completed.

Required Materials:

OP 3 126 (Shutdown Using Alternate Shutdown Methods) Appendix C (latest revision)

~ ,valuation Performance Steps TIME START:

SATAJNSAT Step 1: Obtain Procedure, review Appendix C.

Standard: OP 3126 obtained, Appendix C reviewed.

SATAJNSAT Step 2: At the RCIC Corner Room (Rx Bldg. 213' level) on ALTERNATE SHUTDOWN STATION ADS SAFETY RELIEF VALVES panel B1300SII perform the following:

Checkhlace SAFETY RELIEF VALVE RV2-71A control switch to CLOSE Standard: Operator indicates switch closed iterim Cue: Inform Operator that switch is in CLOSE SATAJNSAT Step 3: ChecWplace Safety Relief Valve RV2-71B control switch to CLOSE Standard: Operator indicates switch closed Interim Cue: Inform Operator that switch is in CLOSE SATAJNSAT *Step 4: At the APPENDIX R SRV ALT SHUTDOWN PANEL (RCIC Corner Room 232' level), Place ADS Transfer Switch (SS-752) to EMERGENCY.

Standard: Operator places the switch is in the EMERGENCY position.

Interim Cue: When operator indicates he will reposition the switch, inform him the switch moves sharply to the EMERGENCY position.

i*&

SAT/UNSAT *Step 5: At the RCIC Corner Room (RxBldP. 213' level) perform the following:

Transfer 125VDC Manual RCIC Transfer Switch (MTS-13-1) to EMERGENCY by turning counter-clockwise.

Standard: Operator turns switch counter-clockwiseto the EMERGENCY position.

Interim Cue: Inform Operator that the switch moves smartly counter-clockwiseto the EMERGENCY position.

SAT/UNSAT *Step 6: At CP-82-1 RCIC ALTERNATE SHUTDOWN SYSTEM: place the three RCIC ALTERNATE SHUTDOWN TRANSFER switches to EMER in the following sequence:

1) SS1178A
2) SS1178B
3) SS1178C Standard: The operator indicates that the transfer switches on the RCIC shutdown panel are placed in EMER in the following order: SSl178A,SSl178B, SS 1178C.

Interim Cue: When operator indicates he is placing the transfer switches in EMER, inform him that each switch moves counter-clockwiseto the EMER position.

SAT/UNSAT *Step 7: In Dane1 B1300SI1, transfer the SRV control power knifeswitch to EMER.

Standard: Operator indicates the SRV control power knife switch is in EMER.

yterim Cue: When the operator indicates that he will open the panel to place the knife switch in EMER, inform him the switch moves and then comes to a hard stop. Then show a picture of front panel indications (SRV indicating lights are green).

ATKJNSAT Step 8: If the power is not available on the panel, or to some valves, replace 4,

the fuses as described in Appendix E.

Standard: Operator indicates he would check the lights and meters for power.

Interim Cue: When the operator indicates that he is checking for power, inform him everything appears to be energized.

OP-3126 Appendix C Steps 8-15 have been completed. RCIC is injecting and controlling level 137-167. Youve been directed by the Shift Manager to commence a cooldown IAW OP-3126 Appendix C, Step 16.

SAT/UNSAT *Step 9: Determine the reactor water temperature for the existing reactor pressure using the saturation curve (figure 1of Appendix C)

Standard: Operator uses Appendix C Figure 1 to determine that Saturation temperature for 800# is 520°F.

w, SAT/UNSAT Step 10: Record the pressure and temperature on Appendix C Reactor Cooldown LOP Standard: Operator records Pressure and Temperature on the Appendix C Reactor Cooldown Log (800#, 520°F)

SATAJNSAT *Step 11: Subtract 90 degrees from the present saturation temperature and determine the correspondinp reactor pressure Standard: Operator subtracts 90°F from 520°F to get 430°F. Once temperature is determined, the operator gets the corresponding saturation pressure (300-350#)

SATKJNSAT Step 12: Record this value on the Reactor Cooldown Log Standard: Operator records 430°F and -325# (300-350#) on the Appendix C Reactor Cooldown Log

x SAT/UNSAT *Step 13: Open SAFETY RELIEF VALVE RV2-71A or RV2-71B to reduce reactor pressure to that calculated in Step 16.b Standard: Operator opens RV2-71A or RV2-71B to reduce reactor pressure to 300-350#.

SAT/UNSAT Step 14: Log the time when the desired pressure is reached Standard: Operator logs the time when desired plant pressure is reached Interim Cue: Time compression is used. Inform the operator when the target pressure they calculated in step 11 is reached.

cAT/UNSAT *Step 15: Operate the SRV as necessarv to maintain pressure within

+loo/-0 psig of the desired pressure Standard: Operator opens/closes RV2-71A or RV2-71B as necessary to maintain pressure within +loo/-0 psig of the desired pressure calculated in step 11.

  • critical Step TIME FINISH:

Terminating Cue: OP 3126, Appendix C, Steps 4 through 7 properly completed.

Evaluator Comments:

System: -295016- K/As: K2.01

Examinee Handout h, -

Initial Conditions:

Plant Shutdown is in progress from outside the Control Room, and reactor depressurizationis required.

All OP 3126 Initial Actions are complete. Plant Pressure is currently at 800#. Maintenance Electricians are not available to perform this procedure.

Initiating Cues:

The SM directs you to energize the Alt SD panels for RCIC and SRV in the RCIC room per OP 3126, Appendix C step 4 (Steps 1 , 2 & 3 of Appendix C are complete). Once the appropriate panels are energized and available for operation, commence a cooldown using local SRV operation.

VERMONT YANKEE JOB PERFORMANCE MEASURE WORKSHEET NRC EXAM 2007 Task Identification:

Title:

Perform Local Firing of Squib Valves Failure Mode: N/A

Reference:

OE 3107, OE Appendices, Appendix I, Rev 23 Task Number: 20070705 Task Performance: AO/RO/SRO X RO/SRO - SRO Only A 0 Only -

Sequence Critical: Yes - No 3 Time Critical: Yes - No 3 Operator Performing Task:

Examiner:

Date of Evaluation:

Activity Code:

Method of Testing: Simulation X Performance -Discuss Setting: Classroom __ Simulator- Plant Performance Expected Completion Time: 10 minutes Evaluation Results:

Performance: PASS - FAIL - Time Required:

Prepared by:

Operations Training Instructor Date Reviewed by:

SRO LicensedCertified Reviewer Date Approved by:

Operations Training Superintendent Date

Directions:

Discuss the information given on this page with the operator being evaluated. Allow time for him to ask questions before beginning performance of the task. As each performance step is performed, evaluate the performance of that step by circling either "Sat" or "Unsat". Comments are required for any "Unsat" classification. If a step is preceded by an asterisk (*), it is a critical step. If a critical step is skipped or performed unsatisfactorily,then the individual has failed the Job Performance Measure.

After providing the initiating cue, ask the individual "Do you understand the task?"

Read to the person being evaluated:

Before starting, I will explain the initial conditions, provide the initiating cues and answer any questions you have.

This JPM will be performed in the Plant and you are to simulate all actions.

You are requested to "talk through" the procedure, stating the parameters you are verifying or checking and the steps you are performing.

Inform me upon completion of this task.

Initial Conditions:

Scram condition exists. Reactor is not shutdown, steps are being taken per EOP-2. Torus temperature is approaching 110°F and normal squib valve firing did not function. SLC keylock switch on CRP 9-5 is in OFF position.

Initiatinp Cues:

CRS directs you to assist the crew with Alternate SLC Injection by local firing of the squib valves using OE 3107, Appendix I starting at Step 4.

Task Standards:

SLC squib valve fired locally in accordance with OE 3 107, Appendix I.

Required Materials:

OE 3 107, OE Appendices, Appendix I General

References:

SLC System (G191171)

OP 4203, Maintenance and Testing of SLC Squib Valves

Evaluation Performance Steps

    • TIME START:

SAT/UNSAT Step 1: Obtain the procedure, review prerequisites.

Standard: OE 3 107 Appendix I obtained; prerequisites reviewed.

SAT/UNSAT *Step 2: Obtain a Firing Battery with an alligator clip on each end.

Standard: Firing Battery obtained from SLC EOP tool box.

Note: EOP toolbox should be opened for this JPM.

Interim Cue: When the operator locates EOP Toolbox and indicates he will get battery firing device, inform him he has the battery firing device. Other prerequisites are satisfied.

IAT/UNSAT *Step 3: Turn SLC switch (keylock) to OFF.

Standard: Contacts control room to verify switch is in off.

Interim Cue: When the operator calls inform the operator that the switch is in OFF.

SAT/UNSAT *Step 4: At SLC-l4A(B) SLC Injection Squib Valve: unscrew amphenol connector from the squib valve Standard: Squib Valve amphenol connector removed from SLC-l4A(B).

Interim Cue: When the operator locates squib valve and describes method to remove connector, inform him that the amphenol connector is disconnected.

- Evaluation Performance Steps

-4 ,AT/UNSAT *Step 5: Clip one of the leads from the battery to Pin A.

Standard: Jumper connected from battery terminal to Pin A; Pin A is the thicker pin (see Figure 1).

Interim Cue: When the operator indicates he will clip one lead from the battery to Pin A (using Figure 1 if necessary), inform him that the lead is connected.

SAT/UNSAT *Step 6: Touch the other battery lead to Pin B (next clockwise terminal).

Standard: Other lead from battery touched to Pin B (see Figure 1).

Interim Cue: When the operator indicates he will touch the other lead to the next clockwise terminal, inform operator that a pop was heard when terminal B was contacted.

AT/UNSAT Step 7: Inform the Control Room that the squib vlaves fired and SLC can be started.

Standard: Operator calls the control room and informs them the squib valves have locally been fired.

TIME FINISH:

Terminating Cue: Squib Valve fired locally in accordance with OE 3107, Appendix I.

Evaluator Comments:

System: 21 1000 KIAs: K1.06

EXAMINEE HANDOUT Initial Conditions:

Scram condition exists. Reactor is not shutdown, steps are being taken EOP-2. Torus temperature is approaching 110°F and normal squib valve firing did not function. The SLC keylock switch on CRP 9-5 is in OFF position.

Initiating Cues:

CRS directs you to assist them with Alternate SLC Injection by local firing of the squib valves using OE 3107, Appendix I starting at Step 4.

PRIMER CHAMBER ASSEMBLY FOR EXPLOSIVE VAT-,VES SLC-l4A(B)

POLARIZING PIN "A"(REF.)

-BRIDGEWIRES

% I PRIMER #1 WIRING DIAGRAM PIN " A PJN "D" PIN "C" Figure 1