|
---|
Category:Inspection Report
MONTHYEARIR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 IR 05000213/19740012024-06-27027 June 2024 49-50; License; Amendment No. 12; License No. 50-21374-01; Mail Control No. 639882 IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) IR 05000213/20180012018-05-31031 May 2018 NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2018001 and 05000213/2018001, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 07200039/20184012018-05-17017 May 2018 Connecticut Yankee Atomic Power Company Independent Spent Fuel Storage Security Inspection Report No. 07200039/2018401 - (Cover Letter Only) IR 05000213/20160022016-11-22022 November 2016 NRC Inspection Report No. 05000213/2016002 and 07200039/2016002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20160012016-05-18018 May 2016 IR 05000213-16-001 and 07200039-16-001 on 4/21/16, Connecticut Yankee Atomic Power Company, East Hampton, CT Site IR 07200039/20140012014-05-0606 May 2014 IR 07200039-14-001, on 04/17-18/14, Independent Spent Fuel Installation Inspection, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 07200039/20100012010-12-22022 December 2010 IR 07200039-10-001, on 11/29/10, Connecticut Yankee Atomic Power Company, East Hampton, CT IR 05000213/20070012007-11-20020 November 2007 IR 05000213-07-001, on 04/23-26/07, 06/06-07/07, 07/17/07, 09/04/07, 10/29/07, 10/31/07, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut IR 05000213/20060032007-04-11011 April 2007 IR 05000213-06-003, on 10/01/2006 - 03/30/2007, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060022006-09-19019 September 2006 IR 05000213-06-002, on 06/26-29/2006, 07/24-28/2006, and 08/21-25/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20060012006-07-14014 July 2006 IR 05000213-06-001, on 01/27/06 - 06/15/2006, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050032006-02-0707 February 2006 IR 05000213-05-003; Connecticut Yankee Atomic Power Company; on 10/01/2006 - 01/26/2006; Connecticut Yankee Atomic Power Company IR 05000213/20050022005-11-10010 November 2005 IR 05000213-05-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 05000213/20050012005-08-0505 August 2005 IR 05000213-05-001, on 01/01/2005 - 03/31/2005, Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Office of Investigations Report No. 1-2004-032 and Notice of Violation IR 05000213/20040022005-02-0808 February 2005 IR 05000213-04-002, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site and Notice of Violation IR 05000213/20040012004-09-20020 September 2004 IR 05000213-04-001, on 02/07/04 to 06/08/04, Connecticut Yankee Atomic Power Company IR 05000213/20030012003-07-0303 July 2003 IR 05000213-03-001 on 02/18/03 - 06/11/03 for Haddam Neck, Regarding Dismantlement and Decommissioning of Facility ML0320401272003-06-24024 June 2003 Powerpoint Presentation at Yankee Rowe Connecticut Yankee Management Meeting with the NRC, June 23, 2003 IR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility IR 05000213/19960121999-04-0505 April 1999 Discusses NRC Insp Repts 50-213/96-12 & 50-213/98-04 on 961102-27 Re Airborne Radioactivity Contamination Event That Occurred in Fuel Transfer Canal & Reactor Cavity in Nov 1996.Notice of Violation Encl IR 05000213/19980061999-02-26026 February 1999 Insp Rept 50-213/98-06 on 981103-990118.Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility. Security Program Was Also Inspected IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19980041998-11-27027 November 1998 Forwards Special Insp Rept 50-213/98-04 of Licensee Performance During Reactor Coolant Sys Chemical Decontamination IR 05000213/19980031998-08-21021 August 1998 Insp Rept 50-213/98-03 on 980414-0803 & 13.Violations Noted. Major Areas Inspected:Operations,Maint,Sf Safety, Decommissioning Activities & Radiological Controls IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support IR 05000213/19970101998-02-0202 February 1998 Discusses Inspection Rept 50-213/97-10 & Forwards Worker Dose Assessment.Insp Rept Provides Analysis of Occupational Dose Assessment for Workers Involved in 961102 Airborne Radioactivity Event.No Exposures in Excess Identified IR 05000213/19970081998-01-29029 January 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-08 on 970703 & 0811-0919.Violation Involved Failure to Follow Radiation Protection Procedures IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support IR 05000213/19970031997-10-0909 October 1997 Insp Rept 50-213/97-03 on 970408-0707 & 0805.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000213/19970071997-08-18018 August 1997 Insp Rept 50-213/97-07 on 970715-30.No Violations Noted. Major Areas Inspected:Plant Support Area IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct IR 05000213/19970011997-07-31031 July 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/97-01 IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures IR 05000213/19950271997-05-12012 May 1997 Discusses Insp Repts 50-213/95-27,50-213/96-06,50-213/96-07, 50-213/96-08,50-213/96-11,50-213/96-80 & 50-213/96-201 on 951121-961122 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $650,000 IR 05000213/19960071997-04-0909 April 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-213/96-07 IR 05000245/19960121997-03-27027 March 1997 Informs That Info Will Be Withheld from Public Disclosure Per Licensee 970303 Request.Licensee Re Exam Rept 50-245/96-12,dtd 970207 Also Discussed IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation IR 05000213/19960111997-03-0707 March 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 50-213/96-11.Exam of Actions Will Be Done During Future Insp IR 05000213/19960101996-11-0505 November 1996 Insp Rept 50-213/96-10 on 960811-0920.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000213/19962011996-11-0505 November 1996 Ack Receipt of Requesting Schedule Change for pre-decisional EC Re Plant Insp Repts 50-213/96-201, 50-213/96-06,50-213/96-08.Originally Scheduled EC for 961018 Requested to Be Delayed Until Dec 1996 IR 05000213/19960801996-10-30030 October 1996 Insp Rept 50-213/96-80 on 960903-1002.Violation Noted. Major Areas Inspected:Operations,Maint,Engineering & Mgt Oversight & Controls 2024-08-27
[Table view] Category:Letter
MONTHYEARIR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 ML24094A0742024-05-30030 May 2024 Issuance of Exemption for Connecticut Yankee Atomic Power Company Regarding Haddam Neck Plant Independent Spent Fuel Storage Installation ML23342A0972024-01-0909 January 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI ML23124A2012023-04-20020 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2022 CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4922023-02-24024 February 2023 Closeout Letter to Connecticut Yankee Regarding 2018 and 2021 Updated DFPs for Haddam Neck Plant ISFSI CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 CY-22-003, and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22011A1352022-01-31031 January 2022 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-22-002, Independent Spent Fuel Storage Installation - Property Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-22-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-011, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2021-12-0101 December 2021 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-21-013, Biennial Update to the Haddam Neck Plant License Termination Plan2021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant License Termination Plan ML22075A2382021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant Updated Final Safety Analysis Report CY-21-014, Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration2021-11-18018 November 2021 Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 ML21144A2512021-04-13013 April 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2020 CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-21-004, Independent Spent Fuel Storage Installation - Property Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-003, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage ML21012A3192021-01-13013 January 2021 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) ML20150A3352020-06-19019 June 2020 COVID-19 Exemption for Haddam Neck CY-20-011, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement2020-05-14014 May 2020 Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement ML20143A0972020-04-16016 April 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019 CY-20-007, Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager2020-03-31031 March 2020 Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-20-002, Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 20202020-01-22022 January 2020 Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 2020 ML20015A5262020-01-15015 January 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML19269C4642019-10-11011 October 2019 Letter to B. Mitchell Exemption from 10 CFR 72.212 and 72.214 for Dry Spent Fuel Storage Activities - Haddam Neck Plant Independent Spent Fuel Storage Installation CY-19-014, Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return2019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return CY-19-012, Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report2019-04-23023 April 2019 Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report ML19070A0332019-02-20020 February 2019 Letter to C. Pizzella Nuclear Regulatory Commission'S Analysis of Connecticut Yankee Atomic Power Company'S Initial and Updated Decommissioning Funding Plans for the Haddam Neck Plant Independent Spent Fuel Storage Installation CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000213/20180012018-05-31031 May 2018 NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2018001 and 05000213/2018001, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site IR 07200039/20184012018-05-17017 May 2018 Connecticut Yankee Atomic Power Company Independent Spent Fuel Storage Security Inspection Report No. 07200039/2018401 - (Cover Letter Only) CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report 2024-08-27
[Table view] |
Text
Shae Hemingway ISFSI Manager UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 May 31, 2018 Connecticut Yankee Atomic Power Company 362 lnjun Hollow Road East Hampton, CT 06424 SUBJECT: NRC INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT NOS. 07200039/2018001 and 05000213/2018001, CONNECTICUT YANKEE ATOMIC POWER COMPANY, EAST HAMPTON, CONNECTICUT SITE
Dear Mr. Hemingway:
On May 3, 2018, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety inspection at the Connecticut Yankee Atomic Power Company (Connecticut Yankee) Independent Spent Fuel Storage Installation (ISFSI}. The inspection examined activities under your license as they relate to safety and compliance with the Commission's regulations and the conditions of your license. The inspection consisted of observations by the inspectors, interviews with personnel, and a review of records and procedures.
The results of the inspection were discussed with you at the conclusion of the inspection.
The enclosed report presents the results of this inspection.
Within the scope of this inspection, no violations were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at rm/adams.html.
To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Communications.
The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations
& Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information').
You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800.
The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required.
Please contact Orysia Masnyk Bailey at 864-427-1032 if you have any questions regarding this matter. Dockets Nos.; 07200039, 05000213 License Nos.: SFGL-21, DPR-61 Enclosure:
Sincerely,
- ew:~
Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety Inspection Report Nos. 07200039/2018001 and 05000213/2018001 cc w/Encl: State of Connecticut
SUMMARY
Connecticut
Yankee Atomic Power Company NRC Inspection Report Nos. 07200039/2018001 and 05000213/2018001 An announced safety inspection was conducted on May 3, 2018, at the Connecticut Yankee Atomic Power Company (Connecticut Yankee) Independent Spent Fuel Storage Installation (ISFSI). The inspectors assessed whether Connecticut Yankee personnel were operating and maintaining ISFSI programs at an away-from-reactor (AFR) ISFSI in conformance with the commitments and requirements contained in the Final Safety Analysis Report (FSAR), Safety Evaluation Report (SER), Certificate of Compliance (CoC), Technical Specifications (TS), Quality Assurance (QA) program, Connecticut Yankee procedures, and 10 CFR Part 72. The inspectors'
review was directed toward confirming the ongoing adequacy of the radiation protection, fire protection, emergency preparedness, surveillance, maintenance, environmental monitoring, training, QA, and corrective action programs.
The inspectors observed activities, interviewed personnel, and reviewed records and procedures.
Based on the results of this inspection, no findings of significance were identified.
Inspection Report Nos. 07200039/2018001 and 05000213/2018001 3
REPORT DETAILS
I. Organization and Scope of the Program A. Inspection Scope The inspectors assessed whether Connecticut Yankee personnel were operating and maintaining ISFSI programs at an AFR ISFSI in conformance with the commitments and requirements contained in the FSAR, SER, CoC, TS, QA program, Connecticut Yankee procedures, and 10 CFR Part 72. AFR ISFSI facilities, located at sites where loading operations have been completed, are essentially passive operating facilities.
The inspectors' review was directed towards confirming the ongoing adequacy of the radiation protection, fire protection, emergency preparedness, surveillance, maintenance, environmental monitoring, training, QA, and corrective action programs.
The inspectors observed activities, interviewed personnel, and reviewed records and procedures.
The inspectors also reviewed changes made to Connecticut Yankee's programs and procedures since the last inspection to verify that changes were consistent with the license or CoC and did not reduce the effectiveness of the program. B. Observations The inspectors determined that Connecticut Yankee's plans and preparations for controlling radiological activities were effective at meeting 10 CFR Part 20 requirements.
The inspectors also verified that special nuclear material (SNM) stored at the ISFSI was properly accounted for. Dosimetry records and environmental monitoring reports were reviewed.
All employees were below the regulatory dose limits and dose for members of the public at the nearest accessible location to the ISFSI were within limits prescribed by 10 CFR 72.104. Connecticut Yankee's emergency preparedness program properly coordinated with the appropriate offsite support groups, agencies, and local law enforcement agencies (LLEAs). The emergency call list was current and checked periodically for accuracy.
All revisions to the emergency plan have been submitted to the NRC and reviewed by the Office of Nuclear Security and Incident Response (NSIR). Daily temperature monitoring of the vertical concrete casks (VCCs) was performed by Connecticut Yankee personnel in accordance with surveillance requirements in the TS. Connecticut Yankee's procedures contain backup plans if the primary surveillance method was unavailable.
The inspectors performed a tour of the ISFSI pad and observed previous pad repairs to assess their material condition.
The inspectors noted that the licensee continues to focus on pad conditions and performs regular inspections.
The inspectors also verified that transient combustibles were not being stored on the ISFSI pad or in the vicinity of the VCCs and confirmed vehicle entry onto the ISFSI pad was controlled in accordance with site procedures Connecticut Yankee has a training program which consists of classroom, and on-the-job training, as well as briefings performed by supervisors.
Refresher training was given on a regular basis and retraining was given as necessary if human performance issues were Inspection Report Nos. 07200039/2018001 and 05000213/2018001 4 identified.
All employees have been trained and qualified to perform their assigned related functions.
The inspectors reviewed the most recent independent audit of the ISFSI program. The inspectors determined that issues were entered into the corrective action program, prioritized, and evaluated commensurate with their safety significance.
Corrective actions were implemented to address identified issues and were tracked to closure. The QA program evaluated changes in the ISFSI program to ensure that any changes that were implemented would not decrease the overall effectiveness of the program. The inspectors also reviewed Connecticut Yankee's 10 CFR 72.212 evaluation report and ensured it was being appropriately updated. C. Findings Based on the results of this inspection, no findings of significance were identified.
II. Exit Meeting Summary On May 3, 2018, the inspectors presented the inspection results to Shae Hemingway, Connecticut Yankee Site Manager and other Connecticut Yankee personnel.
Inspection Report Nos. 07200039/2018001 and 05000213/2018001 5
=SUPPLEMENTAL
INFORMATION=
PARTIAL UST OF PERSONS CONTACTED
Licensee
- M. Baldari, Security Project Manager
- J. Beauchemin, Assistant
Project Manager
- J. Bourassa, RPM/QA Representative
- S. Buchan, ISS
- S. Day, Licensing
Engineer
- R. Desmarais, ISFSI Technical
Specialist
- S. Hemingway, ISFSI Manager
- J. Lenois, 3 Yankee Security Program Manager
- J. Maachi, Program Manager
- R. Mitchell, Assistant
Director of Operations
- D. Pratt, ISS Upgrade
- J. Williams, Technical
Manager
- E. Vidou, ISO ITEMS OPEN, CLOSED, AND DISCUSSED
None UST OF DOCUMENTS
REVIEWED Audits and Reports BYR 2017-20, Special Nuclear Materials Inventory
2017 ISFSI Memo 17-056, Self-Assessment-
Radiation
Protection
Program CY ISFSI 10 CFR 72.212 Evaluation
Report, Rev.13, January 2017 Miscellaneous
Yankee Rowe RWPs Off-Site Dose Calculation
Manual 2017 Completed
June Survey Package Approved Yankee VCC Inlet Port Survey Procedures
EF-3, Rev. 8, Special Nuclear Material and Greater than Class C Waste Control, Accountability, and Reporting
Program E0-5, Rev. 11, Emergency
Planning Implementation
FP-1, Rev. 5, Fire Protection
Program FP-2, Rev. 4, Fire Hazard Analysis FP-3, Rev. 7, Fire Fighting Pre-Plans
OP-7, Rev. 4, VCC and ISFSI Pad Inspection
Program RP-1, Rev. 9, ISFSI Conduct of Radiation
Protection
RP-2, Rev. 16, Radiological
Surveys and Postings RP-3, Rev. 0, Radiological
Environmental
Monitoring
Program (REMP) RP-4, Rev. 0, Personnel
Radiation
Monitoring
RP-5, Rev. 0, Radiation
Work Permits Inspection
Report Nos. 07200039/2018001
and 05000213/2018001
LIST OF ACRONYMS USED AFR CFR CoC CY FSAR IP ISFSI LLEA NSIR QA SER SNM TS vcc Away-From-Reactor
Code of Federal Regulations
Certificate
of Compliance
Connecticut
Yankee Atomic Power Company Final Safety Analysis Report Inspection
Procedure
Independent
Spent Fuel Storage Installation
Local Law Enforcement
Agencies Office of Nuclear Security and Incident Response Quality Assurance
Safety Evaluation
Report Special Nuclear Material Technical
Specification
Vertical Concrete Cask Inspection
Report Nos. 07200039/2018001
and 05000213/2018001