ML23342A097

From kanterella
Jump to navigation Jump to search
Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan
ML23342A097
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/09/2024
From: Daniel Schroeder
NRC Region 1
To: Desmarais R
Connecticut Yankee Atomic Power Co
References
Download: ML23342A097 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD, SUIT E 102 KING OF PRUSSIA, PA 19406-1415

January 9, 2024

Rob Desmarais ISFSI Manager Connecticut Yankee Atomic Power Company 362 Injun Hollow Road East Hampton, Connecticut 06424-3099

SUBJECT:

CONNECTICUT YANKEE ATOMIC POWER COMPANY - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN

Dear Rob Desmarais:

The enclosed inspection plan lists the security inspections scheduled through December 31, 2025. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on site.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-52 62 with any questions you may have regarding the inspection plan.

Sincerely,

Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security

Docket No. 072 00039 License No. SFGL -21

Enclosure:

Connecticut Yankee Atomic Power Company - Independant Spent Fuel Storage Installation Security Inspection Plan

ML23342A097 n -Sensitive Publvlle SUNSI Review Sensitive n -Publiclyvlable

OFFICE /DRSS /DRSS /DRSS / DRSS ME Tk Jwas ADrdis / DScoed TE 12/ /2023 12/ /2023 01/03/2024 01/08/2024

Site Inspection Activity Plan 07200039 - Haddam Neck (ISFSI)

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

CY - ISFSI Security Inspection 2

8/18/2025 8/22/2025 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations

Prepared on 11/6/2023 1:51:58 PM 1 of 1