ML20143A097

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019
ML20143A097
Person / Time
Site: Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/16/2020
From: Lenois J
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
CY-20-009
Download: ML20143A097 (2)


Text

CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD

A T1N: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation NRC License No. DPR-61 (NRC Docket No. 50-213) 7 z._ - /) 3 CJ I

Subject:

Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019 10 CFR 50.36a(a)(2), Section 2.3.2 of Appendix C of the Connecticut Yankee Atomic Power Company (CYAPCO) Quality Assurance Program (QAP) for the Haddam Neck Independent Spent Fuel Storage Installation (ISFSI), and Section F .2 of the Off-Site Dose Calculation Manual (ODCM) for the Haddam Neck ISFSI require CYAPCO to submit an Annual Radioactive Effluent Release Report. Enclosure 1 provides the report for the period of January 1 through December 31, 2019.

Section 2.3 .1 of Appendix C of the CYAPCO QAP for the Haddam N eek ISFSI and Section F .1 of ODCM for the Haddam Neck ISFSI require CYAPCO to submit an Annual Radiological Environmental Operating Report. Enclosure 2 provides the report for the period of January 1 through December 31, 2019.

Section 2.2.c of Appendix C of the CYAPCO QAP for the Haddam Neck ISFSI requires CYAPCO to submit changes to the ODCM for the Haddam Neck ISFSI as a part of or concurrent with the Annual Radioactive Effluent Release Report. No revisions to the ODCM for the Haddam N eek ISFSI were issued in calendar year 2019.

If you have any questions regarding this submittal, please do not hesitate to contact me at (860) 267-6426 ext. 303.

Respectfully,

)-!Jl>9 a ~s;,

if'-

JimLenois -cE4P ISFSI Manag*er r~zs jV"JSS_ 2 ~

rvHS5

Connecticut Yankee Atomic Power Company CY-20-009/April 16, 2020/Page 2

Enclosures:

1. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, January -December 2019.
2. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report, January-December 2019.
  • cc: D. Lew, NRC Region I Administrator A. Dimitriadis, Chief, Decommissioning Branch, NRC, Region I J. McKirgan, Chief, Division of Fuel Management, Storage and Transportation Licensing Branch J. Semancik, Director, CT DEEP, Radiation Division