MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besses 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] |
Text
1 NRR-PMDAPEm Resource From: Nevins, Kathleen J. <kjn evins@firstenergycorp.com>
Sent: Monday, January 16, 2017 12:00 PM To: Hughey, John
Subject:
[External_Sender] Additional Information on DBNPS FLEX Heat Habitability Attachments:White Paper - FLEX Heat Habitability.docxDuring the telephone call discussion held on January 11, 2017, the NRC staff requested clarification on wording used in the Davis-Besse Nuclear Power Station (DBNPS) Final Integrated Plan, Section 2.11.1, Ventilation.
The manner in which the section was written brought into question whether ventilation may be required in some areas. During the discussion, FENOC communicated to the NRC staff that this was not the intent. The intent was to describe that ventilation is not required; however, as resources are available, temporary ventilation equipment (capable of removing heat load) is available for use. The NRC staff requested that FENOC provide additional supporting information for this via e-mail so that the detail may be publicly available in ADAMS.
A white paper is attached to support that the worst case area temperatures remain low enough to allow operators to safety complete tasks without ventilation.
This e-mail and its attachment may be made publicly available in ADAMS.
Thank you.
Kathleen J. Nevins Fleet Licensing A-WAC-B1 Office: 330-315-6840
Cell: 567-277-0416
The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intende d recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notif y us immediatel y , and delete the original message.
Hearing Identifier: NRR_PMDA Email Number: 3276 Mail Envelope Properties (BN6PR05MB2914D9A9511F2A42CF0D4FA9CB7D0)
Subject:
[External_Sender] Additional Information on DBNPS FLEX Heat Habitability Sent Date: 1/16/2017 11:59:55 AM Received Date: 1/16/2017 12:00:01 PM From: Nevins, Kathleen J.
Created By: kjnevins@firstenergycorp.com Recipients: "Hughey, John" <John.Hughey@nrc.gov>
Tracking Status: None
Post Office: BN6PR05MB2914.namprd05.prod.outlook.com Files Size Date & Time MESSAGE 1732 1/16/2017 12:00:01 PM White Paper - FLEX Heat Habitability.docx 138218 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation.
Page 1 of 3 Extreme heat conditions during an ELAP were considered to determine Davis Besse FLEX deployment strategies and timelines as app licable to ventilation. Calculations support that the worst case temperature in each area is low enough to allow operators to safely complete the mitigation tasks without deployment restoration of ventilation. NORM-LP-7201, DAVIS BESSE FLEX VALIDATION PROCESS REPORT, validated the FLEX strategy timelines with minimum crew manning assumed. The team concluded that ventilation can be deployed as resources become available. The following page from the validat ion report shows assignments of the 6 Station Blackout Equipment Operators (SBOEO) for the first 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> until additional resources are assumed per NEI 12-0
- 6.
White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation.
Page 2 of 3 The table below was created to clarify the calculation cross reference to maximum area temperatures used for habitability revie ws. Location Description Max °F without ventilation Calculation HVSG High Voltage Switchgear Rooms 323, 324, 325 115.5°F C-ME-099.25-001 referencing Calc 24.001 (steady state calc) LVSG Low Voltage Switchgear Rooms 428/A/B, 429/A/B 114.4°F C-ME-099.25-001 referencing Calc 25.020 (Time vs. Temp calc showing temp plateau/steady state) CTRM Control Room 505 110.3°F C-ME-099.25-001 referencing Calc 57.001 (steady state calc) MP3 Mechanical Penetration Room 303 104°F C-ME-099.25-001 Fan Alley Rooms 500, 501, 515 104°F C-ME-099.25-001 SFP Spent Fuel Pool Room 300 104°F C-ME-099.25-001 RM100 BWST Pipe Chase Room 100/101 86°F C-ME-050.05-008 (steady state calc) RM124 CWRT 1 Room 124 95°F C-ME-050.05-008 (steady state calc)
EFWF 1 Emergency Feedwater Facility 118.5°F S&L Evaluation 2016-05980 (Time vs. Temp 0-2.5 hrs after ELAP; referenced in EFWF HVAC sizing calc C-ME-050.05-007) 1 EFWF ventilation is restored when 480V is aligned to EFWF MCC by T+2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after ELAP, maintaining temperature 120°F. Time sensitive operator actions are discussed throughout the Final Integrated Plan and section 3.1.2 includes a table for those actions. Columns have been added to the table to combine the detail from the validation report (Reference Page 1) and maximum area temperatures (Reference table above). Time Sensitive Operator Action Task Description Time required for completion from Loss of all AC power Task Performed By Task Location Time in Area Maximum Equilibrium Room Temp assumed at T+0 FLEX Action 1 - Preserve RCS Inventory. Following a Station Blackout, isolate RCS Letdown and Reactor Coolant Pump Seal Return. 10 minutes CTRM Staff CTRM Continuous 110.3°F FLEX Action 2 -
Declare an ELAP. Following a Station Bl ackout, declare an Extended Loss of AC Power. 10 minutes CTRM Staff CTRM Continuous 110.3°F FLEX Action 3 -
DC Bus Load Shed.
Align 480V to E1 or E2 Following a Station Blackout, align DC Buses and Loads to extend the life of Station Batteries.
Connect Cables across HVSG Rooms to E1 or F1 for power to PZR Heaters 30 minutes for 1st phase and a total of 60 minutes for all actions.
180 minutes SBOEO1 Phase 1 SBOEO2 Phase 2
SBOEO2 LVSG LVSG HVSG 30 minutes 15 minutes
30 minutes 114.4°F 114.4°F 115.5°F FLEX Action 4 -
Manually Start the EFW Pump.
Following a Station Blackout and loss of all AFW, manually start the EFW Pump and supply inventory to SG1. 10 minutes CTRM Staff CTRM Continuous 110.3°F White Paper to clarify FIP Section 2.11.1, in that environmental conditions remain acceptable for personnel habitability during FLEX implementation without ventilation.
Page 3 of 3 Time Sensitive Operator Action Task Description Time required for completion from Loss of all AC power Task Performed By Task Location Time in Area Maximum Equilibrium Room Temp assumed at T+0 FLEX Action 5 - Provide inventory to SG2. Following a Station Blackout and AFW System Failure, manually align Emergency Feedwater to provide inventory to SG2. 90 minutes SBOEO5 MP3 25 minutes After alignment, SG2 flow control is required, but does not
require SBOEO5 to remain in area continuously 104°F FLEX Action 6 - Mechanically align FLEX Charging Pump for RCS inventory. Following a Station Blackout, mechanically align a FLEX Charging
Pump to provide inventory to the Reactor Coolant System. 150 minutes SBOEO1 RM100 or RM124 60 minutes After alignment, pump start and
stop is required, but does not require SBOEO1 to remain in area continuously 86°F 95°F FLEX Action 7 - Electrically align FLEX Charging
Pump for RCS inventory. Following a Station Blackout, electrically align a FLEX Charging Pump to provide inventory to the Reactor Coolant System. 150 minutes SBOEO6 RM100 RM 100, RM124 30 minutes Primary connection 120 minutes Alt connection 86°F 95°F FLEX Action 8 -
Electrically align 480 volt power to EFWF MCC. Following a Station Blackout, electrically align 480 volt power to the EFW Facility MCC. 150 minutes SBOEO6 EFWF 1 30 minutes After start, monitoring does not
require SBOEO6 to remain in area continuously 118.5°F FLEX Action 9 - Initiate RCS Cooldown. Following a Station Blackout, initiate cooldown of the Reactor Coolant System. 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> CTRM Staff SBOEO1 SBOEO3 SBOEO5 CTRM RM100 Fan Alley MP3 Continuous As Required, not continuous As Required, not continuous As Required, not continuous 110.3°F Based on time before required completion, expected time in area for task, effort required, and maximum area temperatures, it is reasonable to expect that the tasks can be performed without ventilation restoration or deployment. The FSGs have been written to deploy ventilation as resources become available. Wording in FIP section 2.11.1 had been interpreted to suggest that ventilation may be required in some areas. The intent was to describe that ventilation is not required, however, as resources are available, temporary ventilation equipment (capable of removing heat load) is available.