Proposed Tech Specs Re Control Rod Drive Mechanism Testing Requirement
ML18058B350
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/19/1993
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18058B349 List:
References
NUDOCS 9301270198
Download: ML18058B350 (4)


Text

ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION PAGE --------. 9301270198 930119 PDR ADOCK 05000255 P PDR January 19, 1993 1 Page

1. Control Rods 2. Control Rods 3. Pressurizer Safety Valves 4. Main Steam Safety Valves 5. Refueling System Interlocks
6. Service Water System Valve Actuation (SIS-CHP)
7. Primary System Leakage 8. Diesel Fuel supply Table 4.2.2 Minimum Frequencies for Equipment Tests Test Drop Times of All Full-Length Rods Partial Movement of All Rods (Minimum of 6 In) Set Point Set Point Functioning Functioning Evaluate Fuel Inventory Frequency Each Refueling Shutdown Every Two Weeks* One Each Refueling Shutdown Five Each Refueling Shutdown Prior to Refueling Operations Each Refueling Operation Daily Dai Ly FSAR Section Reference 7.4.1.3 7.4.1.3 7.3.7 4.3.4 9.11.3 9.1.2 4 Amend 15, Ques 4.3.7 8.4.1
  • During the remainder of cycle 10, CRD-20 and CRD-31 will be tested once in March 1993 in lieu of testing once every two weeks. 4-15 Amendment No 112.P/1,lB1ff1J'fJ1.

ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 EXISTING TECHNICAL SPECIFICATION PAGE MARKED TO SHOW THE PROPOSED CHANGES January 19, 1993 1 Page

' ' Table 4.2.2 Minimum Frequencies for Equipment Tests FSAR Section Test Frequency Reference

1. Control Rods Drop Times of All Full-Each Refueling 7.4.1.3 Length Rods Shutdown 2. Control Rods Partial Movement of All Every Two 7.4.1.3 Rods (Minimum of 6 In) 3. Pressurizer Safety Set Point One Each Refueling

7.3.7 Valves

Shutdown 4. Main Steam Safety Set Point Five Each Refueling

4.3.4 Valves

Shutdown 5. Refueling System Functioning Prior to Refueling 9.11.3 Interlocks Operations

6. Service Water Functioning Each Refueling

9.1.2 System

Valve Operation Actuation (SIS-CHP)

7. Primary System Evaluate Daily 4 Leakage Amend 15, Ques 4.3.7 8. Diesel Fuel Supply Fuel Inventory Daily 8.4.1 7(-

o+ C-LJCJtL b*.. +eskA o t I'\ mc..v-c i 1q3 +wo we.e.K ! o i CIC'D-Jo CJC.\'J-5 l wi \.\ 1 V\ \ 1 e.u._ o{ +esft.\ onc_e euex-y 4-15 Amendment No 1/2.8'1, 1 Ba f ¢'J. Gorrooted November 13, 1992