ML18058B350
| ML18058B350 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 01/19/1993 |
| From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML18058B349 | List: |
| References | |
| NUDOCS 9301270198 | |
| Download: ML18058B350 (4) | |
Text
~----
ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION PAGE 9301270198 930119 PDR ADOCK 05000255 P
PDR January 19, 1993 1 Page
- 1. Control Rods
- 2. Control Rods
- 3. Pressurizer Safety Valves
- 5. Refueling System Interlocks
- 6. Service Water System Valve Actuation (SIS-CHP)
- 7. Primary System Leakage
- 8. Diesel Fuel supply Table 4.2.2 Minimum Frequencies for Equipment Tests Test Drop Times of All Full-Length Rods Partial Movement of All Rods (Minimum of 6 In)
Set Point Set Point Functioning Functioning Evaluate Fuel Inventory Frequency Each Refueling Shutdown Every Two Weeks*
One Each Refueling Shutdown Five Each Refueling Shutdown Prior to Refueling Operations Each Refueling Operation Daily Dai Ly FSAR Section Reference 7.4.1.3 7.4.1.3 7.3.7 4.3.4 9.11.3 9.1.2 4
Amend 15, Ques 4.3.7 8.4.1
- During the remainder of cycle 10, CRD-20 and CRD-31 will be tested once in March 1993 in lieu of testing once every two weeks.
4-15 Amendment No 112.P/1,lB1ff1J'fJ1.
ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 EXISTING TECHNICAL SPECIFICATION PAGE MARKED TO SHOW THE PROPOSED CHANGES January 19, 1993 1 Page
Table 4.2.2 Minimum Frequencies for Equipment Tests FSAR Section Test Frequency Reference
- 1. Control Rods Drop Times of All Full-Each Refueling 7.4.1.3 Length Rods Shutdown
- 2. Control Rods Partial Movement of All Every Two Weeks~
7.4.1.3 Rods (Minimum of 6 In)
- 3. Pressurizer Safety Set Point One Each Refueling 7.3.7 Valves Shutdown
- 4.
Main Steam Safety Set Point Five Each Refueling 4.3.4 Valves Shutdown
- 5. Refueling System Functioning Prior to Refueling 9.11.3 Interlocks Operations
- 6.
Service Water Functioning Each Refueling 9.1.2 System Valve Operation Actuation (SIS-CHP)
- 7. Primary System Evaluate Daily 4
Leakage Amend 15, Ques 4.3.7
- 8. Diesel Fuel Supply Fuel Inventory Daily 8.4.1 7(- DLLr~~~+hL \\e.,M~ncle.,v-o+ C-LJCJtL b.. +eskA o ~~ t I'\\
mc..v-c ~ i 1q3
+wo we.e.K ~.
! o i CIC'D-Jo a.~ CJC.\\'J-5 l wi \\.\\
1 V\\
\\ 1e.u._ o{ +esft.\\ onc_e euex-y 4-15 Amendment No 1/2.8'1, 1 Ba f ¢'J.
Gorrooted November 13, 1992