Pages that link to "NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)"
Jump to navigation
Jump to search
The following pages link to NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40):
Displayed 50 items.
- NRC 2018-0026, Submittal of Technical Requirements Manual Change Summary (← links)
- NRC 2018-0025, Technical Specification Bases Change Summary (← links)
- NRC 2018-0017, 10 CFR 50.59 Evaluation and Commitment Change Summary Report (← links)
- NRC 2018-0020, 2017 Annual Monitoring Report (← links)
- NRC 2018-0023, Response to Regulatory Information Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations. (← links)
- NRC 2018-0001, Transmittal of Construction Truss License Amendment Request Document (← links)
- NRC 2018-0019, Cover Letter Correction - Licensee Event Report 2017-001-00 (← links)
- NRC 2018-0018, License Amendment Request 288, Request to Extend Containment Leakage Rate Test Frequency (← links)
- NRC 2017-0045, Updated Final Response to NRC Generic Letter 2004-02 (← links)
- NRC 2017-0057, Response to Request for Additional Information Regarding License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor (← links)
- NRC 2017-0052, Supplement to LAR 287, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants (← links)
- NRC 2017-0047, Response to Regulatory Information Summary 2017-03 Preparation and Scheduling of Operator Licensing Examinations. (← links)
- NRC 2017-0043, License Amendment Request 287, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Plants (← links)
- NRC 2017-0039, Construction Truss License Amendment Request Audit Plan (← links)
- NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report (← links)
- NRC 2017-0038, Report of Changes to Emergency Plan (← links)
- NRC 2017-0028, License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (← links)
- NRC 2017-0032, Focused Evaluation for Local Intense Precipitation (← links)
- NRC 2017-0014, Transmittal of Fire Protection Program Design Document, Revision 1 (← links)
- NRC 2017-0017, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances (← links)
- NRC 2017-0015, Report of Changes to Emergency Plan (← links)
- NRC 2017-0001, Revision 13 to Physical Security Plan (← links)
- NRC 2017-0002, Notification of Modification Completion (← links)
- NRC 2016-0054, Report of Changes to Emergency Plan (← links)
- NRC 2016-0048, Response to Request for Additional Information Regarding LAR 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program (← links)
- NRC 2016-0046, Submittal of Revision to Report of Changes to Emergency Plan (← links)
- NRC 2016-0027, Submittal of Report of Changes to Emergency Plan Dated 08/26/2016 (← links)
- NRC 2016-0041, Submittal of 10 CFR 50.59 Summary Report for 2015 (← links)
- NRC 2016-0039, Fire Protection Evaluation Report, Revisions 16 and 17 (← links)
- NRC 2016-0038, Technical Specifications Bases Change Summary for 2015 (← links)
- NRC 2016-0037, Submittal of Technical Requirements Manual Change Summary for 2015 (← links)
- NRC 2016-0035, Submittal of Registration of NUHOMS-32PT Casks WNHOMS-32-040, WNHOMS-32-042, and WNHOMS-32-044 (← links)
- NRC 2016-0031, Response to Regulatory Information Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. (← links)
- NRC 2016-0029, Response to Request for Additional Information Regarding License Amendment Request 280 - Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program (← links)
- NRC 2016-0028, Response to Interim Staff Evaluation Open and Confirmatory Items for Order EA-12-049 Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- NRC 2016-0022, Report of Changes to Emergency Plan (← links)
- NRC 2016-0023, Withdrawal of License Amendment Request 282, Modify the Wording of Surveillance Requirement 3.4.12.7 Associated with the Power-Operated Relief Valves (← links)
- NRC 2016-0020, Transmittal of 2015 Annual Monitoring Report (← links)
- NRC 2016-0014, Use of NEI 12-06, Revision 2, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide (← links)
- NRC 2016-0012, Response to Request for Additional Information, License Amendment Request 271 Associated with NFPA 805 (← links)
- NRC 2016-0015, Large Break Loss-of-Coolant Accident Margin Summary Sheet - 30-Day Report (← links)
- NRC 2016-0010, Submittal of 10 CFR 50.46 Annual Report (← links)
- NRC 2016-0007, Open Phase Condition Initiative Commitment Change (← links)
- NRC 2016-0008, Response to Request for Additional Information on NFPA 805 License Amendment Request 271 (← links)
- NRC 2016-0001, Screening and High Confidence Low Probability of Failure (HCLPF) Results for Inaccessible and Late Addition Components (← links)
- NRC 2016-0002, License Amendment Request 280, Removal of Completed License Conditions and Change to the Ventilation Filter Testing Program (← links)
- NRC 2016-0006, License Amendment Request 277. Revision to Staff Augmentation Times in the Emergency Plan, Supplemental Response to Request for Additional Information No. 5 -Correction to Table 5.1 (← links)
- NRC 2016-0003, License Amendment Request 277, Revision to Staff Augmentation Times in the Plant Emergency Plan, Supplemental Response to Request for Additional Information No. 5 (← links)
- NRC 2015-0075, License Amendment Request 279, Elimination of Technical Specification 3.7.14, Primary Auxiliary Building Ventilation (← links)
- NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan (← links)