{{#Wiki_filter:~CATEGORY1REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSXON NBR:9612260012 DOC.DATE:
{{#Wiki_filter:~CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSXON NBR:9612260012 DOC.DATE: 96/12/20 NOTARIZED:
96/12/20NOTARIZED:
NO FACIL:50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION BENKEN,E.J.
NOFACIL:50-389 St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATION BENKEN,E.J.
Florida Power&Light Co.STALL,J.A, Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000389
FloridaPower&LightCo.STALL,J.A, FloridaPower&LightCo.RECIP.NAME RECIPIENT AFFILIATION DOCKET05000389


==SUBJECT:==
==SUBJECT:==
LER96-005-00:on 961206,determined thatindependent operability oftripcoilshadnotbeenadequately tested.Causedbyinadequate surveillance procedure.
LER 96-005-00:on 961206,determined that independent operability of trip coils had not been adequately tested.Caused by inadequate surveillance procedure.
Performed testingofcoils&revisedprocedures.W/961220 ltr.DZSTRZBUTZON CODE:ZE22TCOFZESRECEZVED:LTR 2ENCL/SZZE:TXTXE:50.73/50.9 LicenseeEventReport(XER),IncidentRpt,etc.NOTES:RECIPIENT IDCODE/NAME PD2-3PDINTERNAL:
Performed testing of coils&revised procedures.W/961220 ltr.DZSTRZBUTZON CODE: ZE22T COFZES RECEZVED:LTR 2 ENCL/SZZE: TXTXE: 50.73/50.9 Licensee Event Report (XER), Incident Rpt, etc.NOTES: RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB EXTERNAL: L ST LOBBY WARD NOAC MURPHY,G.A NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME WIENS,L.B FILE CEN ELB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN2 FXLE 01 LXTCO BRYCE,J H NOAC POORE,W.NUDOCS FULL TXT COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1 D E NOTE TO ALL"RIDS" RECIPIENTS:
ACRSAEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB EXTERNAL:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26 Florida Power&Light Company, P.O.Box 128, Fort Pierce, FL 34954.0128 December 20, 1996 L-96-337 10 CFR 50.73 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: St.Lucie Unit 2 Docket No.50-389 Reportable Event: 96-005 Date of Event: December 6, 1996 Operation Prohibited by Technical Specifications
LSTLOBBYWARDNOACMURPHY,G.A NRCPDRCOPIESLTTRENCL111122111111111111111111RECIPIENT IDCODE/NAME WIENS,L.BFILECENELBNRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN2FXLE01LXTCOBRYCE,JHNOACPOORE,W.NUDOCSFULLTXTCOPIESLTTRENCL11221111111111111'111111DENOTETOALL"RIDS"RECIPIENTS:
'breakers The attached Licensee Event Report is being submitted pursuant to the requirements of 10 CFR 50.73 to provide notification of the subject event.Very truly yours, J.A.Stall Vice President St.Lucie Plant JAS/EJB Attachment cc;Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St.Lucie Plant 96i22600i2 96i220 PDR ADQCK 05000389 8 PDR an FPL Group company M(t NRC FORM 388 (4.96)U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)(See reverse for required number of digits/characters for each block)APPROVED SY OMS NO.31 60<104 sxFSIEs 04isorse ESTIMATED BURDEN PER RESPONSE To COMPLY WITH THIS MANDATO INFORMATION COLLECTION REQUESTI 60.0 HRS.REPORTED LESSON LEARNED ARE INCORPORATED INTO THE UCENSINO PROCESS AND F BACK TO NOUSTRY.FORWARD COMMENTS REGARDING BURDEN ESTIMAT TO THE INFORMATION ANO RECORDS MANAGEMENT BRANCH me F33I UW NUCLEAR REGIAATORY COMMISSION.
PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFNSD-5(EXT.
415-2083)
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:
LTTR26ENCL26 FloridaPower&LightCompany,P.O.Box128,FortPierce,FL34954.0128 December20,1996L-96-33710CFR50.73U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555Re:St.LucieUnit2DocketNo.50-389Reportable Event:96-005DateofEvent:December6,1996Operation Prohibited byTechnical Specifications
'breakers TheattachedLicenseeEventReportisbeingsubmitted pursuanttotherequirements of10CFR50.73toprovidenotification ofthesubjectevent.Verytrulyyours,J.A.StallVicePresident St.LuciePlantJAS/EJBAttachment cc;RegionalAdministrator, USNRCRegionIISeniorResidentInspector, USNRC,St.LuciePlant96i22600i2 96i220PDRADQCK050003898PDRanFPLGroupcompanyM(t NRCFORM388(4.96)U.S.NUCLEARREGULATORY COMMISSION LICENSEEEVENTREPORT(LER)(Seereverseforrequirednumberofdigits/characters foreachblock)APPROVEDSYOMSNO.3160<104sxFSIEs04isorseESTIMATED BURDENPERRESPONSEToCOMPLYWITHTHISMANDATOINFORMATION COLLECTION REQUESTI60.0HRS.REPORTEDLESSONLEARNEDAREINCORPORATED INTOTHEUCENSINOPROCESSANDFBACKTONOUSTRY.FORWARDCOMMENTSREGARDING BURDENESTIMATTOTHEINFORMATION ANORECORDSMANAGEMENT BRANCHmeF33IUWNUCLEARREGIAATORY COMMISSION.
WASHINGTON.
WASHINGTON.
OC20666~1ANDTOTHEPAPERWORK REDUCTION PROJECT(31600104),
OC 20666~1 AND TO THE PAPERWORK REDUCTION PROJECT (31600104), OFHCE 0 MANAGEMENT AND BUDGET, WASHINGTON, OC 20603.FACILITY NAME Ill ST LUCIE UNIT 2 DOCKET NISASBl (21 05000389 PAGE nl 1 OF7 TITLE 14l Operation Prohibited by Technical Specifications due to Inadequate Surveillance Testing of Reactor Trip Breakers 12 OAY 06 96 SEQUENTIAL REVISION NUMBER NUMBER 96-005-00 MONTH DAY 12 20 96 FACIUTY NAME N/A FACIUlY NAM 6 N/A DOCKET NUMSER DOCKET NUMBER OPERATIN0 MODE (9)POWER LEVEL (10)<MC4':;<;:x"'.>3 20.2201 (b)20.2203(a)
OFHCE0MANAGEMENT ANDBUDGET,WASHINGTON, OC20603.FACILITYNAMEIllSTLUCIEUNIT2DOCKETNISASBl(2105000389PAGEnl1OF7TITLE14lOperation Prohibited byTechnical Specifications duetoInadequate Surveillance TestingofReactorTripBreakers12OAY0696SEQUENTIAL REVISIONNUMBERNUMBER96-005-00MONTHDAY122096FACIUTYNAMEN/AFACIUlYNAM6N/ADOCKETNUMSERDOCKETNUMBEROPERATIN0 MODE(9)POWERLEVEL(10)<MC4':;<;:x"'.>
(2)(i)20.2203 (a){2){iii)20.2203 (0)(2)(iv)20.2203 (0){2)(v)20.2203(a)
320.2201(b)20.2203(a)
(3)(ii)50.38(c)(1) 50.3 8(c)(2)50.73{a){2){i)60.73(a)(2)(ai) 50.73(a){2)(v)50.73(a)(2)(vii) 50.73(a)(2)
(2)(i)20.2203(a){2){iii)20.2203(0)(2)(iv)20.2203(0){2)(v)20.2203(a)
{viii)73.71 OTHER Specify in Abstract below or In NRC Form 3BBA NAME Edwin J.Benken, Licensing Engineer TELEPHONE NUMBER Onc4aa hraa coda)(561)467-7156 cAUBE SYSTEM COMPONENT MANUFACTURER REPORTABLE To NPRDS CAUSE SYSTEM COMPONENT REPORTABLE To NPROS YEB{If yee, complete EXPECTED SUBMISSION DATE).X No EXPECTED SUBMISSION DATE (16)MONTH OAY YEAR ABSTRACT (umit to 1400 spaces, i.eapproximately 15 single.spaced typewritten lines)(18)On December 6, 1996, St.Lucie Unit 2 was operating in Mode 1 at 100 percent reactor power.While performing a review as requested by NRC Generic Letter 96-01,"Testing of Safety Related Logic Circuits," FPL determined that the independent operability of trip coils associated with the Reactor Protective System (RPS)Trip Circuit Breakers (TCB)had not been adequately tested by surveillance procedure.
(3)(ii)50.38(c)(1) 50.38(c)(2)50.73{a){2){i)60.73(a)(2)(ai) 50.73(a){2)(v)50.73(a)(2)(vii) 50.73(a)(2)
The appropriate Technical Specification Action requirements were implemented for failure to perform a surveillance requirement.
{viii)73.71OTHERSpecifyinAbstractbeloworInNRCForm3BBANAMEEdwinJ.Benken,Licensing EngineerTELEPHONE NUMBEROnc4aahraacoda)(561)467-7156cAUBESYSTEMCOMPONENT MANUFACTURER REPORTABLE ToNPRDSCAUSESYSTEMCOMPONENT REPORTABLE ToNPROSYEB{Ifyee,completeEXPECTEDSUBMISSION DATE).XNoEXPECTEDSUBMISSION DATE(16)MONTHOAYYEARABSTRACT(umitto1400spaces,i.eapproximately 15single.spacedtypewritten lines)(18)OnDecember6,1996,St.LucieUnit2wasoperating inMode1at100percentreactorpower.Whileperforming areviewasrequested byNRCGenericLetter96-01,"TestingofSafetyRelatedLogicCircuits,"
Additional testing was initiated and subsequently completed satisfactorily per Technical Specification requirements.
FPLdetermined thattheindependent operability oftripcoilsassociated withtheReactorProtective System(RPS)TripCircuitBreakers(TCB)hadnotbeenadequately testedbysurveillance procedure.
The cause of the event was an inadequate surveillance procedure for testing the operation of the reactor trip circuit breakers.Corrective actions include: 1)Operability testing of the trip coils was performed to include additional testing of electrical contacts in the TCB circuit paths.2)The surveillance procedure governing the testing of the Reactor Protective System logic was changed to include testing the required circuitry contacts.3)Additional safety related electrical circuitry is continuing to be reviewed with regard to testing adequacy in accordance with the actions requested in NRC Generic Letter 96-01.
Theappropriate Technical Specification Actionrequirements wereimplemented forfailuretoperformasurveillance requirement.
NRC FORM 366A I4-9SI LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSI ST.LUCIE UNIT 2 05000389 YEAR SEQUENTIAL REVISION 96-005-00 2 OF 7 TEXT ilf more spece is required, use edditionel copies of fVRC f'orm 366Ai I17I On December 6, 1996, with St.Lucie Unit 2 operating in Mode 1 at 100 percent power, FPL engineering personnel determined that the independent operability of the undervoltage and shunt trip electrical logic paths for the Reactor Trip Circuit Breakers (TCBs)(EIIS:JC)may not have been adequately tested by current St.Lucie Unit 2 procedures.
Additional testingwasinitiated andsubsequently completed satisfactorily perTechnical Specification requirements.
This determination was made following a review of a similar condition found at Palo Verde Station and an assessment of NRC Generic Letter, 96-01,"Testing of Safety Related Logic Circuits" for applicability to St.Lucie Plant.St.Lucie Unit 2 Technical Specification (TS)4.3.1.1, requires that a functional test be performed at least once per 18 months or following maintenance or adjustment of the reactor trip circuit breakers to verify the independent operability of the undervoltage and shunt trips.At 1705 on December 6, 1996, based upon the above determination, Operations invoked Technical S, cification 4.0.3.for failure to perform a surveillance requirement within the allowed surveillance interval.A Condition Report (CR)was initiated to assess the validity of the testing requirements and review the operability of the TCBs.TS 4.0.3 specifies that failure to perform a surveillance requirement within the allowed surveillance interval shall constitute noncompliance with the operability requirements for a Limiting Condition for Operation (LCO)~TS 4.0.3 allows that action requirements may be delayed for up to 24 hours to permit the completion of a surveillance when the allowable outage time limits of the LCO action requirements are less than 24 hours.Following discovery of the above condition, functional testing was initiated at 2145, on December 6, 1996, to verify the independent operability of the undervoltage and shunt trips for the reactor TCBs.This testing was completed satisfactorily at 2215 on December 6, 1996, and TS 4.0.3 was then exited.The cause of the event was an inadequate surveillance test procedure.
Thecauseoftheeventwasaninadequate surveillance procedure fortestingtheoperation ofthereactortripcircuitbreakers.
Operating Procedure 2-1400059,"Reactor Protection System-Periodic Logic Matrix Test," contains the instructions for performance of the operability test for the Reactor Trip Circuit Breakers shunt trip and undervoltage trip devices (coils).The surveillance test instructions of the procedure verified the satisfactory operation of both of the above shunt and undervoltage trip devices, and were consistent with vendor recommendations, however, the test did not verify the independent operation of the electrical contacts which operate the shunt and undervoltage trip coils.At the time of the event, the surveillance adequacy of the reactor trip circuit breakers had been identified for additional engineering review in accordance with the schedule referenced in the FPL response to Generic Letter 96-01, dated April 18, 1996.This event is reportable under 10 CFR 50.73 (a)(2)(i)(B) as"any operation or condition prohibited by the plant's Technical Specifications." St.Lucie Unit 2 TS 4.3.1.1 requires that each reactor protective instrumentation channel be demonstrated operable by the performance of the channel check, channel calibration and channel functional test operations for the Modes and frequencies shown in table 4.3-".NRC FORM 388A I4 9SI NRC FORM 368A I4-96I LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSI ST.LUCIE UNIT 2 05000389 YEAR SEQUENTIAL REVISION 96-005-00 3 OF 7 TEXT/if more specs is required, use edditionel copies of NRC cform 366A/I17I TS table 4.3.1 requires that at least once per 18 months and following maintenance and adjustment of the reactor trip breakers, the channel functional test shall include verification of the independent operability of the undervoltage and shunt trips.Following a,determination that the independent operability of the above undervoltage and shunt trip devices had not been adequately tested at St.Lucia Unit 2, Operations personnel implemented the surveillance requirements of TS 4.0.3.As previously discussed, TS 4.0.3 specifies that failure to perform a surveillance requirement within the allowed surveillance interval constitutes noncompliance with the operability requirements fo'r an LCO and permits action requirements to be delayed for up to 24 hours to facilitate completion of the surveillance.
Corrective actionsinclude:1)Operability testingofthetripcoilswasperformed toincludeadditional testingofelectrical contactsintheTCBcircuitpaths.2)Thesurveillance procedure governing thetestingoftheReactorProtective Systemlogicwaschangedtoincludetestingtherequiredcircuitry contacts.
FPL satisfactorily performed the additional, required testing of the electrical logic paths a<<ociated with the reactor trip circuit breakers within the allowable time constraints of TS 4.0.3.The reactor trip circuit breakers are a functional unit of the Reactor Protective System (RPS)instrumentation at St.Lucie Plant.The operability of the RPS instrumentation and bypasses ensures that 1)the associated reactor trip will be initiated when a monitored parameter reaches its set point, 2)the specified coincidence logic is maintained, 3)sufficient redundancy is maintained to permit a channel to be out of service for testing or maintenance, and 4)sufficient system functional capability is available from diverse parameters.
3)Additional safetyrelatedelectrical circuitry iscontinuing tobereviewedwithregardtotestingadequacyinaccordance withtheactionsrequested inNRCGenericLetter96-01.
The RPS is designed so that any single failure within the system will not prevent proper protective action at the system level when required.There are four Reactor Trip Channels associated with the RPS.A two-out-of-four RPS logic trip signal results in the deenergization of four trip path relays, which in turn results in the deenergization of undervoltage coils and energization of shunt trip coils on eight reactor TCBs (Refer to Figure 1).Either of the two trip coils associated with a reactor TCB is capable of tripping the breaker from an RPS actuation.
NRCFORM366AI4-9SILICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSIST.LUCIEUNIT205000389YEARSEQUENTIAL REVISION96-005-002OF7TEXTilfmorespeceisrequired, useedditionel copiesoffVRCf'orm366AiI17IOnDecember6,1996,withSt.LucieUnit2operating inMode1at100percentpower,FPLengineering personnel determined thattheindependent operability oftheundervoltage andshunttripelectrical logicpathsfortheReactorTripCircuitBreakers(TCBs)(EIIS:JC) maynothavebeenadequately testedbycurrentSt.LucieUnit2procedures.
Both of the trip paths are actuated by the same RPS relay and use different sets of relay contacts to actuate their associated trip coils (Refer to Figure 2).One or>>both of these contacts changing state will result in the opening of the TCB.The following tests are performed at St.Lucie to verify the operability of the reactor TCBs: The Trip Coil of each reactor TCB is tested by use of a test push-button which energizes the shunt trip coil and opens the breaker.This test is conducted at least every 18 months and following maintenance or adjustment of the TCB.2.The Undervoltage (UV)Coil of each reactor TCB is tested by removing the power supply fuse which deenergizes the UV coil and opens the breaker.This test is also conducted every 18 months and following maintenance or adjustment of the TCB.3.The RPS Periodic Logic Matrix Test is performed each month to verify that RPS trip path relays function correctly and the TCBs open when required.NRC FORM 368A I4-96I NRC FORM 368A I4-9SI LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGUlATORY COMINISSIO ST.LUCIE UNIT 2 YEAR SEQUENTIAL REVISION 05000389 96-005-00 4 OF 7 TEXT (If more specs is required, use edditionel copies of NRC&rm 368AJ I17)As described by the above tests, the ability of the reactor trip breakers to open on an RPS actuation signal is demonstrated by the RPS Logic Matrix Test, which is performed monthly.Additionally, the operability of the TCB trip coils and undervoltage coils is demonstrated at least every 18 months.Performance of the above testing, however, does not specifically verify that the contacts in the electrical logic paths change state to actuate the undervoltage or shunt trip coils.Individual contacts that perform a safety function are required to be tested in accordance with the guidance provided by Generic Letter 96-01.Subsequent to this event, FPL Engineering performed a review of the testing requirements associated with the reactor TCBs.This review determined that while the potential for an undetected failure of one contact in the electrical flowpath to an RPS TCB exists during performance of the RPS Logic Matrix Test, this will not result in the failure of the TCB to trip.The dual path, electrical arrangement associated with each reactor TCB is not designed as a redundant feature, as there is no separation or isolation, and common equipment is used in both paths.The two paths are diverse, however, in that different mechanisms (energization vs.deenergization and the use of different trip coils)are provided fo increased reliability of the trip mechanism.
Thisdetermination wasmadefollowing areviewofasimilarcondition foundatPaloVerdeStationandanassessment ofNRCGenericLetter,96-01,"TestingofSafetyRelatedLogicCircuits" forapplicability toSt.LuciePlant.St.LucieUnit2Technical Specification (TS)4.3.1.1,requiresthatafunctional testbeperformed atleastonceper18monthsorfollowing maintenance oradjustment ofthereactortripcircuitbreakerstoverifytheindependent operability oftheundervoltage andshunttrips.At1705onDecember6,1996,basedupontheabovedetermination, Operations invokedTechnical S,cification 4.0.3.forfailuretoperformasurveillance requirement withintheallowedsurveillance interval.
A review of TCB surveillance tests performed at St.Lucie Unit 1 determined that at Unit 1, the RPS Logic Matrix Test Procedure, performed monthly, includes a verification of indicating lights (unique to Unit 1)provided in both the shunt and undervoltage trip paths.These indicating lights are not available at St.Lucie Unit 2.Additionally, St.Lucie Unit 1 Technical Specifications do not require a functional check be performed of the independent operability of the shunt and undervoltage trip paths.Therefore, this condition is not applicable to St.Lucie Unit 1.Additional surveillance testing performed as a result of this event satisfactorily demonstrated that the electrical logic contacts responsible for actuating the undervoltage and shunt trip coils on the reactor TCBs were operational.
ACondition Report(CR)wasinitiated toassessthevalidityofthetestingrequirements andreviewtheoperability oftheTCBs.TS4.0.3specifies thatfailuretoperformasurveillance requirement withintheallowedsurveillance intervalshallconstitute noncompliance withtheoperability requirements foraLimitingCondition forOperation (LCO)~TS4.0.3allowsthatactionrequirements maybedelayedforupto24hourstopermitthecompletion ofasurveillance whentheallowable outagetimelimitsoftheLCOactionrequirements arelessthan24hours.Following discovery oftheabovecondition, functional testingwasinitiated at2145,onDecember6,1996,toverifytheindependent operability oftheundervoltage andshunttripsforthereactorTCBs.Thistestingwascompleted satisfactorily at2215onDecember6,1996,andTS4.0.3wasthenexited.Thecauseoftheeventwasaninadequate surveillance testprocedure.
No reactor trip paths were disabled as a result of the subject testing inadequacy, and sufficient system diversity and functional capability was maintained.
Operating Procedure 2-1400059,"ReactorProtection System-PeriodicLogicMatrixTest,"containstheinstructions forperformance oftheoperability testfortheReactorTripCircuitBreakersshunttripandundervoltage tripdevices(coils).Thesurveillance testinstructions oftheprocedure verifiedthesatisfactory operation ofbothoftheaboveshuntandundervoltage tripdevices,andwereconsistent withvendorrecommendations, however,thetestdidnotverifytheindependent operation oftheelectrical contactswhichoperatetheshuntandundervoltage tripcoils.Atthetimeoftheevent,thesurveillance adequacyofthereactortripcircuitbreakershadbeenidentified foradditional engineering reviewinaccordance withtheschedulereferenced intheFPLresponsetoGenericLetter96-01,datedApril18,1996.Thiseventisreportable under10CFR50.73(a)(2)(i)(B) as"anyoperation orcondition prohibited bytheplant'sTechnical Specifications."
Based upon the above, the protection of the'health and safety of the public was not adversely affected by the event.Testing of the electrical logic contacts for the reactor trip circuit breakers was satisfactorily performed on December 6, 1996.2.The St.Lucie Unit 2 Reactor Protection System-Periodic Logic Matrix Test Procedure (2-1400059)was revised to include additional verification of Trip Relay Contact operation during the 18 month surveillance performance.
St.LucieUnit2TS4.3.1.1requiresthateachreactorprotective instrumentation channelbedemonstrated operablebytheperformance ofthechannelcheck,channelcalibration andchannelfunctional testoperations fortheModesandfrequencies shownintable4.3-".NRCFORM388AI49SI NRCFORM368AI4-96ILICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSIST.LUCIEUNIT205000389YEARSEQUENTIAL REVISION96-005-003OF7TEXT/ifmorespecsisrequired, useedditionel copiesofNRCcform366A/I17ITStable4.3.1requiresthatatleastonceper18monthsandfollowing maintenance andadjustment ofthereactortripbreakers, thechannelfunctional testshallincludeverification oftheindependent operability oftheundervoltage andshunttrips.Following a,determination thattheindependent operability oftheaboveundervoltage andshunttripdeviceshadnotbeenadequately testedatSt.LuciaUnit2,Operations personnel implemented thesurveillance requirements ofTS4.0.3.Aspreviously discussed, TS4.0.3specifies thatfailuretoperformasurveillance requirement withintheallowedsurveillance intervalconstitutes noncompliance withtheoperability requirements fo'ranLCOandpermitsactionrequirements tobedelayedforupto24hourstofacilitate completion ofthesurveillance.
NRC FORM 388A I4.96I NRC FORM 366A 4.95I LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSIO ST.LUCIE UNIT 2 05000389 YEAR SEQUENTIAL REVISION 96-005-00 5 OF 7 TEXT (If more space is required, use additional copies of NRC Form 368AJ I17I 3.In accordance with Generic Letter 96-01, FPL is continuing to review applicable safety relate logic circuitry and testing procedures to ensure that all circuit components required to be tested are adequately addressed by surveillance procedures.
FPLsatisfactorily performed theadditional, requiredtestingoftheelectrical logicpathsa<<ociated withthereactortripcircuitbreakerswithintheallowable timeconstraints ofTS4.0.3.Thereactortripcircuitbreakersareafunctional unitoftheReactorProtective System(RPS)instrumentation atSt.LuciePlant.Theoperability oftheRPSinstrumentation andbypassesensuresthat1)theassociated reactortripwillbeinitiated whenamonitored parameter reachesitssetpoint,2)thespecified coincidence logicismaintained, 3)sufficient redundancy ismaintained topermitachanneltobeoutofservicefortestingormaintenance, and4)sufficient systemfunctional capability isavailable fromdiverseparameters.
None None NRC FORM 386A H-9S)
TheRPSisdesignedsothatanysinglefailurewithinthesystemwillnotpreventproperprotective actionatthesystemlevelwhenrequired.
NRC FORM 388A 14-96)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSI ST.LUCIE UNIT 2 05000389 YEAR SEQUENTIAL REVISION 96-005-00 6 OF 7 TEXT fif more space is reqvired, use additional copies of lIl'RC Form 866Al I17I REACTOR PROTECTIYE SYSTEM SIMPLIFIED LOGIC DIAGRAM I238$789109 1238$8789109 I234$8789109 I 2 3 8$8 7 8 9109 INPUTS FROM IBSS MEAsUREMENT aIANNELS CHANNEL A TRIP UNITS CHANNEL 8 CHANNEL C CHANNEL D LCGIc A.B LOGIC AN LOGIC A 0 LOGIC MATRICES I A87 ASl A8l I ACI ACI i AO2 LOGIC MATIYK RELAYS 8-C LOGIC B.D LOGIC C.D LOGIC 881 8Ct 8CI 8Ci Kl1 187I 1871 SD4 CO>807 807 COI MA 120 VAC INSTRUMENT BVS MB 120 YAC INSTRUMENT BVS MC 120 VAC INSTRUMENT BUS MD 120 VAC INSTRUMENT BUS TRIP PA1113 AB1 AC1 AD1 BCI 801 C01 AB2 AC2 AD2 BC2 BD2 C02 4'AC A80 VAC BVS'I BVS 2 MAIN CIRCVIT BREAKERS MOTOR GENERATORS
TherearefourReactorTripChannelsassociated withtheRPS.Atwo-out-of-four RPSlogictripsignalresultsinthedeenergization offourtrippathrelays,whichinturnresultsinthedeenergization ofundervoltage coilsandenergization ofshunttripcoilsoneightreactorTCBs(RefertoFigure1).Eitherofthetwotripcoilsassociated withareactorTCBiscapableoftrippingthebreakerfromanRPSactuation.
~240 VAC A83 AC3 A03 BC3 803 C03 A84 AC4 A04 BC4 BD4 C04 TRIP CIRCIAT BREAKER CONTROL RELAYS 12$YDC l(US B ((KA I MANU AL TT8PI 4~I I MANUAL 778P 2 7 I KI 12$/USA KI UV ST ST TTYP aRCUIT BREAKERS UY 12$YDC I(US A KA 12$YDC BVS B+ST ST~a am wanga ITY 9 DENOTES ADDITeNAL REACTOR TRIP UNIT ON DIAT 2 CCW LOSS OF FLOW 81DMDUAL CEDM POWER SUPPLIES CEDM CONTROL SYSTEM UeIYIDVAL CEDM POWER SUPPUES GEOM POWER SUPPUES PIRCOD111807.
BothofthetrippathsareactuatedbythesameRPSrelayandusedifferent setsofrelaycontactstoactuatetheirassociated tripcoils(RefertoFigure2).Oneor>>bothofthesecontactschangingstatewillresultintheopeningoftheTCB.Thefollowing testsareperformed atSt.Lucietoverifytheoperability ofthereactorTCBs:TheTripCoilofeachreactorTCBistestedbyuseofatestpush-button whichenergizes theshunttripcoilandopensthebreaker.Thistestisconducted atleastevery18monthsandfollowing maintenance oradjustment oftheTCB.2.TheUndervoltage (UV)CoilofeachreactorTCBistestedbyremovingthepowersupplyfusewhichdeenergizes theUVcoilandopensthebreaker.Thistestisalsoconducted every18monthsandfollowing maintenance oradjustment oftheTCB.3.TheRPSPeriodicLogicMatrixTestisperformed eachmonthtoverifythatRPStrippathrelaysfunctioncorrectly andtheTCBsopenwhenrequired.
CEDM CEDM CEDM COILS COILS GOES CEDM CEDM CEDM CONTROL ELEMENT CaLS Cals Gals DRIVE MECHANISMS NRC FORM 388A 14.96)
NRCFORM368AI4-96I NRCFORM368AI4-9SILICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGUlATORY COMINISSIO ST.LUCIEUNIT2YEARSEQUENTIAL REVISION0500038996-005-004OF7TEXT(Ifmorespecsisrequired, useedditionel copiesofNRC&rm368AJI17)Asdescribed bytheabovetests,theabilityofthereactortripbreakerstoopenonanRPSactuation signalisdemonstrated bytheRPSLogicMatrixTest,whichisperformed monthly.Additionally, theoperability oftheTCBtripcoilsandundervoltage coilsisdemonstrated atleastevery18months.Performance oftheabovetesting,however,doesnotspecifically verifythatthecontactsintheelectrical logicpathschangestatetoactuatetheundervoltage orshunttripcoils.Individual contactsthatperformasafetyfunctionarerequiredtobetestedinaccordance withtheguidanceprovidedbyGenericLetter96-01.Subsequent tothisevent,FPLEngineering performed areviewofthetestingrequirements associated withthereactorTCBs.Thisreviewdetermined thatwhilethepotential foranundetected failureofonecontactintheelectrical flowpathtoanRPSTCBexistsduringperformance oftheRPSLogicMatrixTest,thiswillnotresultinthefailureoftheTCBtotrip.Thedualpath,electrical arrangement associated witheachreactorTCBisnotdesignedasaredundant feature,asthereisnoseparation orisolation, andcommonequipment isusedinbothpaths.Thetwopathsarediverse,however,inthatdifferent mechanisms (energization vs.deenergization andtheuseofdifferent tripcoils)areprovidedfoincreased reliability ofthetripmechanism.
NRC FORM 388A LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSI ST.LUCIE UNIT 2 05000389 YEAR SEQUENTIAL REVISION 96-005-00'7 OF 7 TEXT (if more spece is reqirired, Irse eddidoneicopies of NRC Farm 3M4l I 1 7)REACTOR TRIP CIRCUIT BREAKER SIMPLIFIED WIRING DIAGRAIYI (TYPICAL)NORMALLY CLOSED INOT TESTEO IIIOEPENOENTLY)
AreviewofTCBsurveillance testsperformed atSt.LucieUnit1determined thatatUnit1,theRPSLogicMatrixTestProcedure, performed monthly,includesaverification ofindicating lights(uniquetoUnit1)providedinboththeshuntandundervoltage trippaths.Theseindicating lightsarenotavailable atSt.LucieUnit2.Additionally, St.LucieUnit1Technical Specifications donotrequireafunctional checkbeperformed oftheindependent operability oftheshuntandundervoltage trippaths.Therefore, thiscondition isnotapplicable toSt.LucieUnit1.Additional surveillance testingperformed asaresultofthiseventsatisfactorily demonstrated thattheelectrical logiccontactsresponsible foractuating theundervoltage andshunttripcoilsonthereactorTCBswereoperational.
NORMALLY OPEN INOT TESTEO INOEPENOENTI.Y)
Noreactortrippathsweredisabledasaresultofthesubjecttestinginadequacy, andsufficient systemdiversity andfunctional capability wasmaintained.
TEST PUSH BUTTON BKS 12m)I?EMERG TRIP PUSH BUTTON MANUAL TRIP PUSH BUTTON (RTGB)-R EE DPS CLOSES ON TEST UNDER VOLTAGE UVD COIL REEHEBRZS H?SPENT KB SHUNT TRIP COIL BKBQlZEB TC}}
Basedupontheabove,theprotection ofthe'health andsafetyofthepublicwasnotadversely affectedbytheevent.Testingoftheelectrical logiccontactsforthereactortripcircuitbreakerswassatisfactorily performed onDecember6,1996.2.TheSt.LucieUnit2ReactorProtection System-PeriodicLogicMatrixTestProcedure (2-1400059)wasrevisedtoincludeadditional verification ofTripRelayContactoperation duringthe18monthsurveillance performance.
NRCFORM388AI4.96I NRCFORM366A4.95ILICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSIO ST.LUCIEUNIT205000389YEARSEQUENTIAL REVISION96-005-005OF7TEXT(Ifmorespaceisrequired, useadditional copiesofNRCForm368AJI17I3.Inaccordance withGenericLetter96-01,FPLiscontinuing toreviewapplicable safetyrelatelogiccircuitry andtestingprocedures toensurethatallcircuitcomponents requiredtobetestedareadequately addressed bysurveillance procedures.
NoneNoneNRCFORM386AH-9S)
NRCFORM388A14-96)LICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSIST.LUCIEUNIT205000389YEARSEQUENTIAL REVISION96-005-006OF7TEXTfifmorespaceisreqvired, useadditional copiesoflIl'RCForm866AlI17IREACTORPROTECTIYE SYSTEMSIMPLIFIED LOGICDIAGRAMI238$7891091238$8789109I234$8789109I238$8789109INPUTSFROMIBSSMEAsUREMENT aIANNELSCHANNELATRIPUNITSCHANNEL8CHANNELCCHANNELDLCGIcA.BLOGICANLOGICA0LOGICMATRICESIA87ASlA8lIACIACIiAO2LOGICMATIYKRELAYS8-CLOGICB.DLOGICC.DLOGIC8818Ct8CI8CiKl1187I1871SD4CO>807807COIMA120VACINSTRUMENT BVSMB120YACINSTRUMENT BVSMC120VACINSTRUMENT BUSMD120VACINSTRUMENT BUSTRIPPA1113AB1AC1AD1BCI801C01AB2AC2AD2BC2BD2C024'ACA80VACBVS'IBVS2MAINCIRCVITBREAKERSMOTORGENERATORS
~240VACA83AC3A03BC3803C03A84AC4A04BC4BD4C04TRIPCIRCIATBREAKERCONTROLRELAYS12$YDCl(USB((KAIMANUALTT8PI4~IIMANUAL778P27IKI12$/USAKIUVSTSTTTYPaRCUITBREAKERSUY12$YDCI(USAKA12$YDCBVSB+STST~aamwangaITY9DENOTESADDITeNAL REACTORTRIPUNITONDIAT2CCWLOSSOFFLOW81DMDUALCEDMPOWERSUPPLIESCEDMCONTROLSYSTEMUeIYIDVAL CEDMPOWERSUPPUESGEOMPOWERSUPPUESPIRCOD111807.
CEDMCEDMCEDMCOILSCOILSGOESCEDMCEDMCEDMCONTROLELEMENTCaLSCalsGalsDRIVEMECHANISMS NRCFORM388A14.96)
NRCFORM388ALICENSEEEVENTREPORT(LER)TEXTCONTINUATION U.S.NUCLEARREGULATORY COMMISSIST.LUCIEUNIT205000389YEARSEQUENTIAL REVISION96-005-00'7OF7TEXT(ifmorespeceisreqirired, Irseeddidoneicopies ofNRCFarm3M4lI17)REACTORTRIPCIRCUITBREAKERSIMPLIFIED WIRINGDIAGRAIYI (TYPICAL)
NORMALLYCLOSEDINOTTESTEOIIIOEPENOENTLY)
NORMALLYOPENINOTTESTEOINOEPENOENTI.Y)
TESTPUSHBUTTONBKS12m)I?EMERGTRIPPUSHBUTTONMANUALTRIPPUSHBUTTON(RTGB)-REEDPSCLOSESONTESTUNDERVOLTAGEUVDCOILREEHEBRZS H?SPENTKBSHUNTTRIPCOILBKBQlZEBTC}}

Revision as of 16:53, 7 July 2018

LER 96-005-00:on 961206,determined That Independent Operability of Trip Coils Had Not Been Adequately Tested. Caused by Inadequate Surveillance Procedure.Performed Testing of Coils & Revised procedures.W/961220 Ltr
ML17229A173
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/20/1996
From: BENKEN E J, STALL J A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-337, LER-96-005-02, LER-96-5-2, NUDOCS 9612260012
Download: ML17229A173 (9)


Text

~CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSXON NBR:9612260012 DOC.DATE: 96/12/20 NOTARIZED:

NO FACIL:50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION BENKEN,E.J.

Florida Power&Light Co.STALL,J.A, Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000389

SUBJECT:

LER 96-005-00:on 961206,determined that independent operability of trip coils had not been adequately tested.Caused by inadequate surveillance procedure.

Performed testing of coils&revised procedures.W/961220 ltr.DZSTRZBUTZON CODE: ZE22T COFZES RECEZVED:LTR 2 ENCL/SZZE: TXTXE: 50.73/50.9 Licensee Event Report (XER), Incident Rpt, etc.NOTES: RECIPIENT ID CODE/NAME PD2-3 PD INTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB EXTERNAL: L ST LOBBY WARD NOAC MURPHY,G.A NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME WIENS,L.B FILE CEN ELB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN2 FXLE 01 LXTCO BRYCE,J H NOAC POORE,W.NUDOCS FULL TXT COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1 D E NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26 Florida Power&Light Company, P.O.Box 128, Fort Pierce, FL 34954.0128 December 20, 1996 L-96-337 10 CFR 50.73 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: St.Lucie Unit 2 Docket No.50-389 Reportable Event: 96-005 Date of Event: December 6, 1996 Operation Prohibited by Technical Specifications

'breakers The attached Licensee Event Report is being submitted pursuant to the requirements of 10 CFR 50.73 to provide notification of the subject event.Very truly yours, J.A.Stall Vice President St.Lucie Plant JAS/EJB Attachment cc;Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St.Lucie Plant 96i22600i2 96i220 PDR ADQCK 05000389 8 PDR an FPL Group company M(t NRC FORM 388 (4.96)U.S.NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)(See reverse for required number of digits/characters for each block)APPROVED SY OMS NO.31 60<104 sxFSIEs 04isorse ESTIMATED BURDEN PER RESPONSE To COMPLY WITH THIS MANDATO INFORMATION COLLECTION REQUESTI 60.0 HRS.REPORTED LESSON LEARNED ARE INCORPORATED INTO THE UCENSINO PROCESS AND F BACK TO NOUSTRY.FORWARD COMMENTS REGARDING BURDEN ESTIMAT TO THE INFORMATION ANO RECORDS MANAGEMENT BRANCH me F33I UW NUCLEAR REGIAATORY COMMISSION.

WASHINGTON.

OC 20666~1 AND TO THE PAPERWORK REDUCTION PROJECT (31600104), OFHCE 0 MANAGEMENT AND BUDGET, WASHINGTON, OC 20603.FACILITY NAME Ill ST LUCIE UNIT 2 DOCKET NISASBl (21 05000389 PAGE nl 1 OF7 TITLE 14l Operation Prohibited by Technical Specifications due to Inadequate Surveillance Testing of Reactor Trip Breakers 12 OAY 06 96 SEQUENTIAL REVISION NUMBER NUMBER 96-005-00 MONTH DAY 12 20 96 FACIUTY NAME N/A FACIUlY NAM 6 N/A DOCKET NUMSER DOCKET NUMBER OPERATIN0 MODE (9)POWER LEVEL (10)<MC4':;<;:x"'.>3 20.2201 (b)20.2203(a)

(2)(i)20.2203 (a){2){iii)20.2203 (0)(2)(iv)20.2203 (0){2)(v)20.2203(a)

(3)(ii)50.38(c)(1) 50.3 8(c)(2)50.73{a){2){i)60.73(a)(2)(ai) 50.73(a){2)(v)50.73(a)(2)(vii) 50.73(a)(2)

{viii)73.71 OTHER Specify in Abstract below or In NRC Form 3BBA NAME Edwin J.Benken, Licensing Engineer TELEPHONE NUMBER Onc4aa hraa coda)(561)467-7156 cAUBE SYSTEM COMPONENT MANUFACTURER REPORTABLE To NPRDS CAUSE SYSTEM COMPONENT REPORTABLE To NPROS YEB{If yee, complete EXPECTED SUBMISSION DATE).X No EXPECTED SUBMISSION DATE (16)MONTH OAY YEAR ABSTRACT (umit to 1400 spaces, i.eapproximately 15 single.spaced typewritten lines)(18)On December 6, 1996, St.Lucie Unit 2 was operating in Mode 1 at 100 percent reactor power.While performing a review as requested by NRC Generic Letter 96-01,"Testing of Safety Related Logic Circuits," FPL determined that the independent operability of trip coils associated with the Reactor Protective System (RPS)Trip Circuit Breakers (TCB)had not been adequately tested by surveillance procedure.

The appropriate Technical Specification Action requirements were implemented for failure to perform a surveillance requirement.

Additional testing was initiated and subsequently completed satisfactorily per Technical Specification requirements.

The cause of the event was an inadequate surveillance procedure for testing the operation of the reactor trip circuit breakers.Corrective actions include: 1)Operability testing of the trip coils was performed to include additional testing of electrical contacts in the TCB circuit paths.2)The surveillance procedure governing the testing of the Reactor Protective System logic was changed to include testing the required circuitry contacts.3)Additional safety related electrical circuitry is continuing to be reviewed with regard to testing adequacy in accordance with the actions requested in NRC Generic Letter 96-01.

NRC FORM 366A I4-9SI LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSI ST.LUCIE UNIT 2 05000389 YEAR SEQUENTIAL REVISION 96-005-00 2 OF 7 TEXT ilf more spece is required, use edditionel copies of fVRC f'orm 366Ai I17I On December 6, 1996, with St.Lucie Unit 2 operating in Mode 1 at 100 percent power, FPL engineering personnel determined that the independent operability of the undervoltage and shunt trip electrical logic paths for the Reactor Trip Circuit Breakers (TCBs)(EIIS:JC)may not have been adequately tested by current St.Lucie Unit 2 procedures.

This determination was made following a review of a similar condition found at Palo Verde Station and an assessment of NRC Generic Letter, 96-01,"Testing of Safety Related Logic Circuits" for applicability to St.Lucie Plant.St.Lucie Unit 2 Technical Specification (TS)4.3.1.1, requires that a functional test be performed at least once per 18 months or following maintenance or adjustment of the reactor trip circuit breakers to verify the independent operability of the undervoltage and shunt trips.At 1705 on December 6, 1996, based upon the above determination, Operations invoked Technical S, cification 4.0.3.for failure to perform a surveillance requirement within the allowed surveillance interval.A Condition Report (CR)was initiated to assess the validity of the testing requirements and review the operability of the TCBs.TS 4.0.3 specifies that failure to perform a surveillance requirement within the allowed surveillance interval shall constitute noncompliance with the operability requirements for a Limiting Condition for Operation (LCO)~TS 4.0.3 allows that action requirements may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of a surveillance when the allowable outage time limits of the LCO action requirements are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.Following discovery of the above condition, functional testing was initiated at 2145, on December 6, 1996, to verify the independent operability of the undervoltage and shunt trips for the reactor TCBs.This testing was completed satisfactorily at 2215 on December 6, 1996, and TS 4.0.3 was then exited.The cause of the event was an inadequate surveillance test procedure.

Operating Procedure 2-1400059,"Reactor Protection System-Periodic Logic Matrix Test," contains the instructions for performance of the operability test for the Reactor Trip Circuit Breakers shunt trip and undervoltage trip devices (coils).The surveillance test instructions of the procedure verified the satisfactory operation of both of the above shunt and undervoltage trip devices, and were consistent with vendor recommendations, however, the test did not verify the independent operation of the electrical contacts which operate the shunt and undervoltage trip coils.At the time of the event, the surveillance adequacy of the reactor trip circuit breakers had been identified for additional engineering review in accordance with the schedule referenced in the FPL response to Generic Letter 96-01, dated April 18, 1996.This event is reportable under 10 CFR 50.73 (a)(2)(i)(B) as"any operation or condition prohibited by the plant's Technical Specifications." St.Lucie Unit 2 TS 4.3.1.1 requires that each reactor protective instrumentation channel be demonstrated operable by the performance of the channel check, channel calibration and channel functional test operations for the Modes and frequencies shown in table 4.3-".NRC FORM 388A I4 9SI NRC FORM 368A I4-96I LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSI ST.LUCIE UNIT 2 05000389 YEAR SEQUENTIAL REVISION 96-005-00 3 OF 7 TEXT/if more specs is required, use edditionel copies of NRC cform 366A/I17I TS table 4.3.1 requires that at least once per 18 months and following maintenance and adjustment of the reactor trip breakers, the channel functional test shall include verification of the independent operability of the undervoltage and shunt trips.Following a,determination that the independent operability of the above undervoltage and shunt trip devices had not been adequately tested at St.Lucia Unit 2, Operations personnel implemented the surveillance requirements of TS 4.0.3.As previously discussed, TS 4.0.3 specifies that failure to perform a surveillance requirement within the allowed surveillance interval constitutes noncompliance with the operability requirements fo'r an LCO and permits action requirements to be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to facilitate completion of the surveillance.

FPL satisfactorily performed the additional, required testing of the electrical logic paths a<<ociated with the reactor trip circuit breakers within the allowable time constraints of TS 4.0.3.The reactor trip circuit breakers are a functional unit of the Reactor Protective System (RPS)instrumentation at St.Lucie Plant.The operability of the RPS instrumentation and bypasses ensures that 1)the associated reactor trip will be initiated when a monitored parameter reaches its set point, 2)the specified coincidence logic is maintained, 3)sufficient redundancy is maintained to permit a channel to be out of service for testing or maintenance, and 4)sufficient system functional capability is available from diverse parameters.

The RPS is designed so that any single failure within the system will not prevent proper protective action at the system level when required.There are four Reactor Trip Channels associated with the RPS.A two-out-of-four RPS logic trip signal results in the deenergization of four trip path relays, which in turn results in the deenergization of undervoltage coils and energization of shunt trip coils on eight reactor TCBs (Refer to Figure 1).Either of the two trip coils associated with a reactor TCB is capable of tripping the breaker from an RPS actuation.

Both of the trip paths are actuated by the same RPS relay and use different sets of relay contacts to actuate their associated trip coils (Refer to Figure 2).One or>>both of these contacts changing state will result in the opening of the TCB.The following tests are performed at St.Lucie to verify the operability of the reactor TCBs: The Trip Coil of each reactor TCB is tested by use of a test push-button which energizes the shunt trip coil and opens the breaker.This test is conducted at least every 18 months and following maintenance or adjustment of the TCB.2.The Undervoltage (UV)Coil of each reactor TCB is tested by removing the power supply fuse which deenergizes the UV coil and opens the breaker.This test is also conducted every 18 months and following maintenance or adjustment of the TCB.3.The RPS Periodic Logic Matrix Test is performed each month to verify that RPS trip path relays function correctly and the TCBs open when required.NRC FORM 368A I4-96I NRC FORM 368A I4-9SI LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGUlATORY COMINISSIO ST.LUCIE UNIT 2 YEAR SEQUENTIAL REVISION 05000389 96-005-00 4 OF 7 TEXT (If more specs is required, use edditionel copies of NRC&rm 368AJ I17)As described by the above tests, the ability of the reactor trip breakers to open on an RPS actuation signal is demonstrated by the RPS Logic Matrix Test, which is performed monthly.Additionally, the operability of the TCB trip coils and undervoltage coils is demonstrated at least every 18 months.Performance of the above testing, however, does not specifically verify that the contacts in the electrical logic paths change state to actuate the undervoltage or shunt trip coils.Individual contacts that perform a safety function are required to be tested in accordance with the guidance provided by Generic Letter 96-01.Subsequent to this event, FPL Engineering performed a review of the testing requirements associated with the reactor TCBs.This review determined that while the potential for an undetected failure of one contact in the electrical flowpath to an RPS TCB exists during performance of the RPS Logic Matrix Test, this will not result in the failure of the TCB to trip.The dual path, electrical arrangement associated with each reactor TCB is not designed as a redundant feature, as there is no separation or isolation, and common equipment is used in both paths.The two paths are diverse, however, in that different mechanisms (energization vs.deenergization and the use of different trip coils)are provided fo increased reliability of the trip mechanism.

A review of TCB surveillance tests performed at St.Lucie Unit 1 determined that at Unit 1, the RPS Logic Matrix Test Procedure, performed monthly, includes a verification of indicating lights (unique to Unit 1)provided in both the shunt and undervoltage trip paths.These indicating lights are not available at St.Lucie Unit 2.Additionally, St.Lucie Unit 1 Technical Specifications do not require a functional check be performed of the independent operability of the shunt and undervoltage trip paths.Therefore, this condition is not applicable to St.Lucie Unit 1.Additional surveillance testing performed as a result of this event satisfactorily demonstrated that the electrical logic contacts responsible for actuating the undervoltage and shunt trip coils on the reactor TCBs were operational.

No reactor trip paths were disabled as a result of the subject testing inadequacy, and sufficient system diversity and functional capability was maintained.

Based upon the above, the protection of the'health and safety of the public was not adversely affected by the event.Testing of the electrical logic contacts for the reactor trip circuit breakers was satisfactorily performed on December 6, 1996.2.The St.Lucie Unit 2 Reactor Protection System-Periodic Logic Matrix Test Procedure (2-1400059)was revised to include additional verification of Trip Relay Contact operation during the 18 month surveillance performance.

NRC FORM 388A I4.96I NRC FORM 366A 4.95I LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSIO ST.LUCIE UNIT 2 05000389 YEAR SEQUENTIAL REVISION 96-005-00 5 OF 7 TEXT (If more space is required, use additional copies of NRC Form 368AJ I17I 3.In accordance with Generic Letter 96-01, FPL is continuing to review applicable safety relate logic circuitry and testing procedures to ensure that all circuit components required to be tested are adequately addressed by surveillance procedures.

None None NRC FORM 386A H-9S)

NRC FORM 388A 14-96)LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSI ST.LUCIE UNIT 2 05000389 YEAR SEQUENTIAL REVISION 96-005-00 6 OF 7 TEXT fif more space is reqvired, use additional copies of lIl'RC Form 866Al I17I REACTOR PROTECTIYE SYSTEM SIMPLIFIED LOGIC DIAGRAM I238$789109 1238$8789109 I234$8789109 I 2 3 8$8 7 8 9109 INPUTS FROM IBSS MEAsUREMENT aIANNELS CHANNEL A TRIP UNITS CHANNEL 8 CHANNEL C CHANNEL D LCGIc A.B LOGIC AN LOGIC A 0 LOGIC MATRICES I A87 ASl A8l I ACI ACI i AO2 LOGIC MATIYK RELAYS 8-C LOGIC B.D LOGIC C.D LOGIC 881 8Ct 8CI 8Ci Kl1 187I 1871 SD4 CO>807 807 COI MA 120 VAC INSTRUMENT BVS MB 120 YAC INSTRUMENT BVS MC 120 VAC INSTRUMENT BUS MD 120 VAC INSTRUMENT BUS TRIP PA1113 AB1 AC1 AD1 BCI 801 C01 AB2 AC2 AD2 BC2 BD2 C02 4'AC A80 VAC BVS'I BVS 2 MAIN CIRCVIT BREAKERS MOTOR GENERATORS

~240 VAC A83 AC3 A03 BC3 803 C03 A84 AC4 A04 BC4 BD4 C04 TRIP CIRCIAT BREAKER CONTROL RELAYS 12$YDC l(US B ((KA I MANU AL TT8PI 4~I I MANUAL 778P 2 7 I KI 12$/USA KI UV ST ST TTYP aRCUIT BREAKERS UY 12$YDC I(US A KA 12$YDC BVS B+ST ST~a am wanga ITY 9 DENOTES ADDITeNAL REACTOR TRIP UNIT ON DIAT 2 CCW LOSS OF FLOW 81DMDUAL CEDM POWER SUPPLIES CEDM CONTROL SYSTEM UeIYIDVAL CEDM POWER SUPPUES GEOM POWER SUPPUES PIRCOD111807.

CEDM CEDM CEDM COILS COILS GOES CEDM CEDM CEDM CONTROL ELEMENT CaLS Cals Gals DRIVE MECHANISMS NRC FORM 388A 14.96)

NRC FORM 388A LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSI ST.LUCIE UNIT 2 05000389 YEAR SEQUENTIAL REVISION 96-005-00'7 OF 7 TEXT (if more spece is reqirired, Irse eddidoneicopies of NRC Farm 3M4l I 1 7)REACTOR TRIP CIRCUIT BREAKER SIMPLIFIED WIRING DIAGRAIYI (TYPICAL)NORMALLY CLOSED INOT TESTEO IIIOEPENOENTLY)

NORMALLY OPEN INOT TESTEO INOEPENOENTI.Y)

TEST PUSH BUTTON BKS 12m)I?EMERG TRIP PUSH BUTTON MANUAL TRIP PUSH BUTTON (RTGB)-R EE DPS CLOSES ON TEST UNDER VOLTAGE UVD COIL REEHEBRZS H?SPENT KB SHUNT TRIP COIL BKBQlZEB TC