ML17331A024: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:seem,zmmooocmvrzmoj:sxvnoxsvsxzrvrREGULA'l~
{{#Wiki_filter:seem,zm mo oocmvrzm oj:sx vnox svsxzrvr REGULA'l~INFORMATION DISTRIBUTIO YSTEM (RIDS)ACCESSION NBR:9302020072 DOC.DATE: 93/01/27 NOTARIZED:
INFORMATION DISTRIBUTIO YSTEM(RIDS)ACCESSION NBR:9302020072 DOC.DATE:
YES DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
93/01/27NOTARIZED:
Indiana Michigan Power Co.(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R'URLEY,T.E.
YESDOCKETFACIL:50-315 DonaldC.CookNuclearPowerPlant,Unit1,IndianaM0500031550-316DonaldC.CookNuclearPowerPlant,Unit2,IndianaM05000316AUTH.NAMEAUTHORAFFILIATION FITZPATRICK,E.
Document Control Branch (Document Control Desk)
IndianaMichiganPowerCo.(formerly Indiana6MichiganEleRECIP.NAME RECIPIENT AFFILIATION R'URLEY,T.E.
DocumentControlBranch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
ForwardsrevisedTSpagestosupport920212application foramendstoLicensesDPR-586DPR-74,per NRCrequest.Submittal amendedTS3/47.9.1,"FireProtection Sys"toreflectinstallation oftwofireprotection waterstoragetanks.DISTRIBUTION CODE:A006DCOPIESRECEIVED:LTR ENCLSIZETITLE:OR/Licensing Submittal:
Forwards revised TS pages to support 920212 application for amends to Licenses DPR-58 6 DPR-74,per NRC request.Submittal amended TS 3/4 7.9.1,"Fire Protection Sys" to reflect installation of two fire protection water storage tanks.DISTRIBUTION CODE: A006D COPIES RECEIVED:LTR ENCL SIZE TITLE: OR/Licensing Submittal:
FireProtection NOTES:DRECIPIENT IDCODE/NAME PD3-1LADEANiWINTERNAL:
Fire Protection NOTES: D RECIPIENT ID CODE/NAME PD3-1 LA DEANiW INTERNAL: NRR WERMEILiJ NRR/DST/SPLB8D1 GCQIuIB REG FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1 0 2 2 1 0 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD3-1 PD NRR/DST 8E2 NUDOCS-ABSTRACT OGC/HDS2 NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 0 1 1 D D D D NOTE TO ALL"RIDS" RECIPIENTS:
NRRWERMEILiJ NRR/DST/SPLB8D1 GCQIuIBREGFILE01EXTERNAL:
PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!D TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 9 A~'
NRCPDRCOPIESLTTRENCL10221011101111RECIPIENT IDCODE/NAME PD3-1PDNRR/DST8E2NUDOCS-ABSTRACT OGC/HDS2NSICCOPIESLTTRENCL1111111011DDDDNOTETOALL"RIDS"RECIPIENTS:
1 a II indiana Michigan Power Company P.O.Box 16631~Coiumbus, OH 43216 ItHWANA MlCNMQN PQWM Donald C.Cook Nuclear Plant Units 1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 TECHNICAL SPECIFICATION CHANGE REQUEST FIRE WATER STORAGE TANKS U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Attn: T.E.Murley January 27, 1993 AEP:NRCt0692CL
PLEASEHELPUSTOREDUCEWASTElCONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXT.504-2065)
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!DTOTALNUMBEROFCOPIESREQUIRED:
LTTR13ENCL9A~'
1aII indianaMichiganPowerCompanyP.O.Box16631~Coiumbus, OH43216ItHWANAMlCNMQNPQWMDonaldC.CookNuclearPlantUnits1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74TECHNICAL SPECIFICATION CHANGEREQUESTFIREWATERSTORAGETANKSU.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555Attn:T.E.MurleyJanuary27,1993AEP:NRCt0692CL


==DearDr.Murley,==
==Dear Dr.Murley,==
OurFebruary12,1992submittal, AEP:NRC:0692CC, requested changestotheTechnical Specifications (T/Ss)forDonaldC.CookNuclearPlantUnits1and2inaccordance with10CFR50.90.Inthatsubmittal weproposedtoamendT/S3/47.9.1,FireSuppression System,forbothunitstoreflecttheinstallation oftwofireprotection waterstoragetanksandthreepumpstosupplyasufficient quantityofclean,reliablewatertotheplant'sfiresuppression system.Duringthecourseofyourstaff'sreviewoftheaforementioned submittal, wewererequested tosubmitrevisedtechnical specification pages.Thissubmittal servestotransmitthosepages.ItshouldbenotedthatsinceourFebruary12,1992submittal, amendments 165and150totheUnit1andUnit2T/Ssrespectively addedafootnotetotheT/Ssregarding surveillance testing.Oncethenewfirewatersuppression systemisdeclaredoperablethisfootnotewi.llnolongerbeapplicable.
Our February 12, 1992 submittal, AEP:NRC:0692CC, requested changes to the Technical Specifications (T/Ss)for Donald C.Cook Nuclear Plant Units 1 and 2 in accordance with 10 CFR 50.90.In that submittal we proposed to amend T/S 3/4 7.9.1, Fire Suppression System, for both units to reflect the installation of two fire protection water storage tanks and three pumps to supply a sufficient quantity of clean, reliable water to the plant's fire suppression system.During the course of your staff's review of the aforementioned submittal, we were requested to submit revised technical specification pages.This submittal serves to transmit those pages.It should be noted that since our February 12, 1992 submittal, amendments 165 and 150 to the Unit 1 and Unit 2 T/Ss respectively added a footnote to the T/Ss regarding surveillance testing.Once the new fire water suppression system is declared operable this footnote wi.ll no longer be applicable.
Consequently, ithasbeendeletedfromtheattachedproposedT/Spages.OurFebruary12,1992submittal indicated thatthenewtanksandpumpswouldbeoperati.onal byMarchof1993.Thisisstillourcurrentplan.Anydelayinmaki.ngthissystemoperational continues tosubjectthesystemtopotential zebramusselinfestation.
Consequently, it has been deleted from the attached proposed T/S pages.Our February 12, 1992 submittal indicated that the new tanks and pumps would be operati.onal by March of 1993.This is still our current plan.Any delay in maki.ng this system operational continues to subject the system to potential zebra mussel infestation.,t'302020072 930i27 PDR ADOCK 05000315 P PDR cob
,t'302020072 930i27PDRADOCK05000315PPDRcob
</4 E, k Dr.T.E.Murley Page 2 AEP!NRC:0692CL The proposed changes have been reviewed by the Plant Nuclear Safety Review Committee and by the Nuclear Safety and Design Review Committee.
</4E,k Dr.T.E.MurleyPage2AEP!NRC:0692CL TheproposedchangeshavebeenreviewedbythePlantNuclearSafetyReviewCommittee andbytheNuclearSafetyandDesignReviewCommittee.
In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to Mr.J.R.Padgett of the Michigan Department of Public Health.This letter is submitted pursuant to 10 CFR 50.54(f)and, as such, an oath statement is attached.ei i)Vice President dr Attachments Dr.T.E.Murley Page 3 AEP'NRC:0692CL coo A.A.Blind-Bridgman J.R.Padgett G.Charnoff A.B.Davis-Region III NRC Resident Inspector-Bridgman NFEM Section Chief Dr.T.E.Murley Page 4 AEP:NRC:0692CL bc: D.H.Malin/K.J.Toth/R.A.Green S.J.Brewer W.G.Smith, Jr.J.B.Shinnock w/o attachment B.M.Dean, NRC>>Washington, D.C.J.F.Stang, NRC-Washington, D.C.AEP NRC:0692CL DC-N-6015.1 STATE OF OHIO)COUNTY OF FRANKLIN)E.E.Fitzpatrick, bei.ng duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power Company, that he has read the foregoing Technical Speci.fication Change Request and knows the contents thereof;and that said contents are true to the best of hi.s knowledge and belief.Subscribed and sworn to before me this~P day of 19~&NOT PUBLIC"~BlTA D.HILL NOTARY PUBLIC.STATE OF OHIO ta>>l I*s 0}}
Incompliance withtherequirements of10CFR50.91(b)(1),
copiesofthisletteranditsattachments havebeentransmitted toMr.J.R.PadgettoftheMichiganDepartment ofPublicHealth.Thisletterissubmitted pursuantto10CFR50.54(f)and,assuch,anoathstatement isattached.
eii)VicePresident drAttachments Dr.T.E.MurleyPage3AEP'NRC:0692CL cooA.A.Blind-BridgmanJ.R.PadgettG.CharnoffA.B.Davis-RegionIIINRCResidentInspector
-BridgmanNFEMSectionChief Dr.T.E.MurleyPage4AEP:NRC:0692CL bc:D.H.Malin/K.J.Toth/R.A.GreenS.J.BrewerW.G.Smith,Jr.J.B.Shinnockw/oattachment B.M.Dean,NRC>>Washington, D.C.J.F.Stang,NRC-Washington, D.C.AEPNRC:0692CL DC-N-6015.1 STATEOFOHIO)COUNTYOFFRANKLIN)
E.E.Fitzpatrick, bei.ngdulysworn,deposesandsaysthatheistheVicePresident oflicenseeIndianaMichiganPowerCompany,thathehasreadtheforegoing Technical Speci.fication ChangeRequestandknowsthecontentsthereof;andthatsaidcontentsaretruetothebestofhi.sknowledge andbelief.Subscribed andsworntobeforemethis~Pdayof19~&NOTPUBLIC"~BlTAD.HILLNOTARYPUBLIC.STATEOFOHIOta>>l I*s0}}

Revision as of 08:38, 6 July 2018

Forwards Revised TS Pages to Support 920212 Application for Amends to Licenses DPR-58 & DPR-74,per NRC Request.Submittal Amended TS 3/4 7.9.1, Fire Protection Sys to Reflect Installation of Two Fire Protection Water Storage Tanks
ML17331A024
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/27/1993
From: FITZPATRICK E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: MURLEY T E
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17331A025 List:
References
AEP:NRC:0692CL, AEP:NRC:692CL, NUDOCS 9302020072
Download: ML17331A024 (9)


Text

seem,zm mo oocmvrzm oj:sx vnox svsxzrvr REGULA'l~INFORMATION DISTRIBUTIO YSTEM (RIDS)ACCESSION NBR:9302020072 DOC.DATE: 93/01/27 NOTARIZED:

YES DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.

Indiana Michigan Power Co.(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R'URLEY,T.E.

Document Control Branch (Document Control Desk)

SUBJECT:

Forwards revised TS pages to support 920212 application for amends to Licenses DPR-58 6 DPR-74,per NRC request.Submittal amended TS 3/4 7.9.1,"Fire Protection Sys" to reflect installation of two fire protection water storage tanks.DISTRIBUTION CODE: A006D COPIES RECEIVED:LTR ENCL SIZE TITLE: OR/Licensing Submittal:

Fire Protection NOTES: D RECIPIENT ID CODE/NAME PD3-1 LA DEANiW INTERNAL: NRR WERMEILiJ NRR/DST/SPLB8D1 GCQIuIB REG FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1 0 2 2 1 0 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD3-1 PD NRR/DST 8E2 NUDOCS-ABSTRACT OGC/HDS2 NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 0 1 1 D D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!D TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 9 A~'

1 a II indiana Michigan Power Company P.O.Box 16631~Coiumbus, OH 43216 ItHWANA MlCNMQN PQWM Donald C.Cook Nuclear Plant Units 1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 TECHNICAL SPECIFICATION CHANGE REQUEST FIRE WATER STORAGE TANKS U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Attn: T.E.Murley January 27, 1993 AEP:NRCt0692CL

Dear Dr.Murley,

Our February 12, 1992 submittal, AEP:NRC:0692CC, requested changes to the Technical Specifications (T/Ss)for Donald C.Cook Nuclear Plant Units 1 and 2 in accordance with 10 CFR 50.90.In that submittal we proposed to amend T/S 3/4 7.9.1, Fire Suppression System, for both units to reflect the installation of two fire protection water storage tanks and three pumps to supply a sufficient quantity of clean, reliable water to the plant's fire suppression system.During the course of your staff's review of the aforementioned submittal, we were requested to submit revised technical specification pages.This submittal serves to transmit those pages.It should be noted that since our February 12, 1992 submittal, amendments 165 and 150 to the Unit 1 and Unit 2 T/Ss respectively added a footnote to the T/Ss regarding surveillance testing.Once the new fire water suppression system is declared operable this footnote wi.ll no longer be applicable.

Consequently, it has been deleted from the attached proposed T/S pages.Our February 12, 1992 submittal indicated that the new tanks and pumps would be operati.onal by March of 1993.This is still our current plan.Any delay in maki.ng this system operational continues to subject the system to potential zebra mussel infestation.,t'302020072 930i27 PDR ADOCK 05000315 P PDR cob

</4 E, k Dr.T.E.Murley Page 2 AEP!NRC:0692CL The proposed changes have been reviewed by the Plant Nuclear Safety Review Committee and by the Nuclear Safety and Design Review Committee.

In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to Mr.J.R.Padgett of the Michigan Department of Public Health.This letter is submitted pursuant to 10 CFR 50.54(f)and, as such, an oath statement is attached.ei i)Vice President dr Attachments Dr.T.E.Murley Page 3 AEP'NRC:0692CL coo A.A.Blind-Bridgman J.R.Padgett G.Charnoff A.B.Davis-Region III NRC Resident Inspector-Bridgman NFEM Section Chief Dr.T.E.Murley Page 4 AEP:NRC:0692CL bc: D.H.Malin/K.J.Toth/R.A.Green S.J.Brewer W.G.Smith, Jr.J.B.Shinnock w/o attachment B.M.Dean, NRC>>Washington, D.C.J.F.Stang, NRC-Washington, D.C.AEP NRC:0692CL DC-N-6015.1 STATE OF OHIO)COUNTY OF FRANKLIN)E.E.Fitzpatrick, bei.ng duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power Company, that he has read the foregoing Technical Speci.fication Change Request and knows the contents thereof;and that said contents are true to the best of hi.s knowledge and belief.Subscribed and sworn to before me this~P day of 19~&NOT PUBLIC"~BlTA D.HILL NOTARY PUBLIC.STATE OF OHIO ta>>l I*s 0