| {{#Wiki_filter:a aps 10 CFR 50.59 / 10 CFR 72.48Palo Verde102-07045-TNW/TMJ Nuclear Generating StationP.O. Box 52034May 15, 2015 Phoenix, AZ 85072Mail Station 7636ATTN: Document Control Desk Tel: (623) 393-5764U.S. Nuclear Regulatory CommissionWashington, DC 20555-0001 | | {{#Wiki_filter:a aps 10 CFR 50.59 / 10 CFR 72.48Palo Verde102-07045-TNW/TMJ Nuclear Generating StationP.O. Box 52034May 15, 2015 Phoenix, AZ 85072Mail Station 7636ATTN: Document Control Desk Tel: (623) 393-5764U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 |
|
| |
|
| ==Dear Sirs:== | | ==Dear Sirs:== |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, & 3 and Independent Spent Fuel Storage Installation(ISFSI)Docket Nos. STN 50-528/529/530 and 72-4410 CFR 50.59, 10 CFR 72.48, and Commitment ChangeAnnual Reports and NotificationsEnclosed please find the Arizona Public Service Company (APS) 10 CFR 50.59 and10 CFR 72.48 report for January 1, 2014 through December 31, 2014. TheCommitment Change Report is for the period of June 28, 2014, throughDecember 31, 2014. Please note that the Commitment Change Report for the periodof January 1, 2014, through June 27, 2014, was included in the June 27, 2014submittal (ADAMS Accession Number ML14184B413).In accordance with 10 CFR 50.59(d)(2), APS is providing a brief description and summaryof the evaluations required by 10 CFR 50.59(d)(1) for each change completed during theperiod. This report contains the evaluations written during 2014, regardless of theimplementation status of the evaluated action, and is included as an enclosure to thisletter.In accordance with 10 CFR 72.48(d)(2), APS is reporting that there were no changescompleted during the period that were required to be reported pursuant to 10 CFR 72.48.In accordance with the APS commitment management program, APS is reporting thatthere were no commitment changes made during the period mentioned above that werenot otherwise reported.No new commitments are being made to the NRC by this letter. Should you needfurther information regarding this submittal, please contact Michael D. Dilorenzo,Regulatory Affairs, Section Leader, at (623) 393-3495.Sincerely, aj~ 4 (Thomas N. WeberDepartment Leader, Regulatory AffairsTNW/TMJ/hsc | | |
| | Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, & 3 and Independent Spent Fuel Storage Installation (ISFSI)Docket Nos. STN 50-528/529/530 and 72-4410 CFR 50.59, 10 CFR 72.48, and Commitment ChangeAnnual Reports and Notifications Enclosed please find the Arizona Public Service Company (APS) 10 CFR 50.59 and10 CFR 72.48 report for January 1, 2014 through December 31, 2014. TheCommitment Change Report is for the period of June 28, 2014, throughDecember 31, 2014. Please note that the Commitment Change Report for the periodof January 1, 2014, through June 27, 2014, was included in the June 27, 2014submittal (ADAMS Accession Number ML14184B413). |
| | In accordance with 10 CFR 50.59(d)(2), |
| | APS is providing a brief description and summaryof the evaluations required by 10 CFR 50.59(d)(1) for each change completed during theperiod. This report contains the evaluations written during 2014, regardless of theimplementation status of the evaluated action, and is included as an enclosure to thisletter.In accordance with 10 CFR 72.48(d)(2), |
| | APS is reporting that there were no changescompleted during the period that were required to be reported pursuant to 10 CFR 72.48.In accordance with the APS commitment management |
| | : program, APS is reporting thatthere were no commitment changes made during the period mentioned above that werenot otherwise reported. |
| | No new commitments are being made to the NRC by this letter. Should you needfurther information regarding this submittal, please contact Michael D. Dilorenzo, Regulatory |
| | : Affairs, Section Leader, at (623) 393-3495. |
| | Sincerely, aj~ 4 (Thomas N. WeberDepartment Leader, Regulatory AffairsTNW/TMJ/hsc |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| 10 CFR 50.59 and 10 CFR 72.48 Report January 2014 -December 2014A member of the STARS (Strategic Teaming and Resource Sharing) AllianceCallaway | | |
| | 10 CFR 50.59 and 10 CFR 72.48 Report January 2014 -December 2014A member of the STARS (Strategic Teaming and Resource Sharing) |
| | AllianceCallaway |
| * Diablo Canyon | | * Diablo Canyon |
| * Palo Verde | | * Palo Verde |
| * Wolf Creek ATTN: Document Control DeskU.S. Nuclear Regulatory CommissionAnnual 10 CFR 50.59, 10 CFR 72.48, and Commitment Change ReportPage 2cc: M. L. DapasM. M. WatfordC. A. PeabodyM. D. LombardNRC Region IV Regional AdministratorNRC NRR Project ManagerNRC Senior Resident Inspector for PVNGSDirector, Division of Spent Fuel Management ENCLOSUREPALO VERDE NUCLEAR GENERATING STATION10 CFR 50.59 and 10 CFR 72.48 ReportJanuary 2014 -December 2014 10 CFR 50.59 and 10 CFR 72.48 REPORT (JANUARY 2014 through DECEMBER 2014)Log Doc Doc Number Description SummaryTypeE-13-0004 LDCR 2014-F002 The piping, valves, and fittings provided for This change does not requireRev. 0 2014-F003 injection of hydrogen into the charging pump prior NRC approval indischarge line of the Chemical and Volume accordance with 10 CFRControl System system will be removed and 50.59(c)(1).the connecting tee on the charging linereplaced with a straight pipe segment.E-14-0001 STDY 13-MS-B094 Rev I Involves issuance of several documents to an This change does not requireRev. 0 CALC 13-MC-CH-0201 Rev 8 engineering study, calculation, operating prior NRC approval inPROC 40DP-9ZZ04 Rev 9 procedure, and LDCR that implement three accordance with 10 CFRLDCR 2014-F007 interrelated changes pertaining to Refueling 50.59(c)(1).Water Tank transfer volume sizing. Thesechanges include (1) accounting for thepostulated single failure of LPSI pump to stopfollowing a Recirculation Actuation Signal, (2)recovering discretionary margin from theconservative Containment Spray pump flowrate previously used in the supportinganalysis; and (3) reducing the time criticaloperator action from 8 minutes to 5 minutesE-14-0002 DMWO 3232547 Replacement of the normal inverters and This change does not requireRev. 0 addition of a swing inverter will continue to prior NRC approval inprovide four independent Class 1E, 120V vital accordance with 10 CFRinstrumentation and control Alternating 50.59(c)(1).Current power supplies.E-13-0001 DMWO 3270069 The Legacy Honeywell Plant Computer (PC) This change does not requireRev. 1 System and associated software are being prior NRC approval inreplaced with a new Rolls Royce System. The accordance with 10 CFRproposed change is applicable to Units 1, 2, 50.59(c)(1).and 3.E-14-0003 DMWO 3286783 The legacy Main Generator Excitation and This change does not requireRev. 0 Voltage Regulator System (GENERREX) is to prior NRC approval inbe replaced with a new General Electric (GE) accordance with 10 CFRdigital excitation control system (EX2100e). 50.59(c)(1).EnclosurePage 1 of 2 Log Doc Doc Number Description SummaryTypeE-14-0005 CALC 13-MC-ZZ-0633 R13 Document the addition of two Safety Injection This change does not requireRev. 0 LDCR 13-MC-ZZ-0594 R7 system High Energy Line Break locations and prior NRC approval in2014-F051 associated evaluation of effects into the design accordance with 10 CFRbases 50.59(c)(1).ACRONYMN/ABBREVIATION LISTDMWO Design Modification Work OrderLDCR Licensing Document Change RequestPROC ProcedureSTDY StudyNOTE: There were no 10 CFR 72.48 evaluations in 2014.EnclosurePage 2 of 2}} | | * Wolf Creek ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Annual 10 CFR 50.59, 10 CFR 72.48, and Commitment Change ReportPage 2cc: M. L. DapasM. M. WatfordC. A. PeabodyM. D. LombardNRC Region IV Regional Administrator NRC NRR Project ManagerNRC Senior Resident Inspector for PVNGSDirector, Division of Spent Fuel Management ENCLOSURE PALO VERDE NUCLEAR GENERATING STATION10 CFR 50.59 and 10 CFR 72.48 ReportJanuary 2014 -December 2014 10 CFR 50.59 and 10 CFR 72.48 REPORT (JANUARY 2014 through DECEMBER 2014)Log Doc Doc Number Description SummaryTypeE-13-0004 LDCR 2014-F002 The piping, valves, and fittings provided for This change does not requireRev. 0 2014-F003 injection of hydrogen into the charging pump prior NRC approval indischarge line of the Chemical and Volume accordance with 10 CFRControl System system will be removed and 50.59(c)(1). |
| | the connecting tee on the charging linereplaced with a straight pipe segment.E-14-0001 STDY 13-MS-B094 Rev I Involves issuance of several documents to an This change does not requireRev. 0 CALC 13-MC-CH-0201 Rev 8 engineering study, calculation, operating prior NRC approval inPROC 40DP-9ZZ04 Rev 9 procedure, and LDCR that implement three accordance with 10 CFRLDCR 2014-F007 interrelated changes pertaining to Refueling 50.59(c)(1). |
| | Water Tank transfer volume sizing. Thesechanges include (1) accounting for thepostulated single failure of LPSI pump to stopfollowing a Recirculation Actuation Signal, (2)recovering discretionary margin from theconservative Containment Spray pump flowrate previously used in the supporting analysis; and (3) reducing the time criticaloperator action from 8 minutes to 5 minutesE-14-0002 DMWO 3232547 Replacement of the normal inverters and This change does not requireRev. 0 addition of a swing inverter will continue to prior NRC approval inprovide four independent Class 1E, 120V vital accordance with 10 CFRinstrumentation and control Alternating 50.59(c)(1). |
| | Current power supplies. |
| | E-13-0001 DMWO 3270069 The Legacy Honeywell Plant Computer (PC) This change does not requireRev. 1 System and associated software are being prior NRC approval inreplaced with a new Rolls Royce System. The accordance with 10 CFRproposed change is applicable to Units 1, 2, 50.59(c)(1). |
| | and 3.E-14-0003 DMWO 3286783 The legacy Main Generator Excitation and This change does not requireRev. 0 Voltage Regulator System (GENERREX) is to prior NRC approval inbe replaced with a new General Electric (GE) accordance with 10 CFRdigital excitation control system (EX2100e). |
| | 50.59(c)(1). |
| | Enclosure Page 1 of 2 Log Doc Doc Number Description SummaryTypeE-14-0005 CALC 13-MC-ZZ-0633 R13 Document the addition of two Safety Injection This change does not requireRev. 0 LDCR 13-MC-ZZ-0594 R7 system High Energy Line Break locations and prior NRC approval in2014-F051 associated evaluation of effects into the design accordance with 10 CFRbases 50.59(c)(1). |
| | ACRONYMN/ABBREVIATION LISTDMWO Design Modification Work OrderLDCR Licensing Document Change RequestPROC Procedure STDY StudyNOTE: There were no 10 CFR 72.48 evaluations in 2014.Enclosure Page 2 of 2}} |
|
---|
Category:Annual Operating Report
MONTHYEARML24312A3152024-11-0505 November 2024 Independent Spent Fuel Storage Installation - Updated Annual Radioactive Effluent Release Report 2023 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML22116A1102022-04-26026 April 2022 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2021 ML21126A3412021-05-0606 May 2021 Annual Radiological Environmental Operating Report 2020 ML21104A4292021-04-14014 April 2021 Annual Environmental Operating Report ML20107J5642020-04-16016 April 2020 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2019 ML18152B8832018-06-0101 June 2018 Independent Spent Fuel Storage Installation (ISFSI) - 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports ML18136A7382018-05-16016 May 2018 Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2017 ML17115A5212017-04-21021 April 2017 ISFSI - Transmittal of 10 CFR 50.59, 10 CFR 72.48, Annual Reports Correction ML17101A6952017-04-0606 April 2017 Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46Ca)(3)(ii) Annual Report for Calendar Year 2016 ML17097A5732017-04-0606 April 2017 Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2016 ML16127A3982016-05-0606 May 2016 ISFSI - Notification of 10 CFR 50.59, 10 CFR 72.48, and Commitment Change, Annual Reports and Notifications ML15142A4162015-05-15015 May 2015 Independent Spent Fuel Storage Installation - 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications ML15105A0392015-04-10010 April 2015 Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2014 ML14184B4132014-06-27027 June 2014 Independent Spent Fuel Storage Installation, 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications ML14129A0072014-05-0202 May 2014 Submittal of Annual Radiological Environmental Operating Report 2013 ML14125A2952014-04-30030 April 2014 Independent Spent Fuel Storage Installation (Isfsi), Annual Radioactive Effluent Release Report 2013 ML14112A4362014-04-0808 April 2014 Submittal of Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2013 ML13128A0072013-04-30030 April 2013 Independent Spent Fuel Installation (Isfsi), Annual Radioactive Effluent Release Report 2012 ML13128A0062013-04-26026 April 2013 Submittal of Annual Radiological Environmental Operating Report 2012 ML13114A2512013-04-17017 April 2013 Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2012 ML13098A0292013-03-29029 March 2013 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Reports (January 2012 - December 2012) ML12256A0052012-08-27027 August 2012 Submittal of Annual Financial Reports ML12138A1342012-04-27027 April 2012 Annual Environmental Operating Report ML12138A1362012-04-27027 April 2012 2011 Annual Radiological Environmental Operating Report ML11146A0322011-05-13013 May 2011 Annual Radiological Environmental Operating Report 2010 ML11136A0422011-04-29029 April 2011 Submittal of Annual Radioactive Effluent Release Report 2010 ML11129A0302011-04-26026 April 2011 2010 Annual Environmental Operating Report ML1112505722011-04-22022 April 2011 Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2010 ML1013900612010-05-11011 May 2010 Submittal of Annual Radiological Environmental Operating Report for 2009 ML0918107032009-06-18018 June 2009 Submittal of Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(II) Annual Report for Calendar Year 2008 ML0912402872009-04-24024 April 2009 Annual Radiological Environmental Operating Report 2008 ML0831003672008-10-29029 October 2008 Submittal of 2007 Annual Financial Reports ML0821903172008-07-0202 July 2008 Submission of El Paso Electric Company Form 10-K Annual Report for the Fiscal Year Ended December 31, 2007, Certified 2008 Cash Flow Projection, and Application for Withholding Information from Public Disclosure ML0812005992008-04-23023 April 2008 Transmittal of Westinghouse Electric Company'S 10 CFR 50.46 Annual Notification and Reporting for 2007 Emergency Core Cooling System Performance Evaluation Models ML0809404712008-03-25025 March 2008 Annual Environmental Operating Report ML0713101372007-05-0101 May 2007 Annual Radiological Environmental Operating Report 2006 ML0712702472007-04-26026 April 2007 Annual Environmental Operating Report 2006 ML0712202922007-04-25025 April 2007 Transmittal of Annual Radioactive Effluent Release Report 2006 ML0712202982006-12-31031 December 2006 Annual Radioactive Effluent Release Report, Cover Through Appendix D ML0612902932006-04-25025 April 2006 Annual Radiological Environmental Operating Report 2005 ML0534900852005-12-0505 December 2005 CFR 50.59 Report (January - December 2004) ML0511502522005-04-0808 April 2005 Annual Environmental Operating Report 2004 ML0413304222004-03-11011 March 2004 Scppa 2002-2003 - Annual Report ML0413304022004-03-11011 March 2004 2002 Annual Financial Reports ML0413304092004-03-11011 March 2004 El Paso Electric - 2002 Annual Report ML0413304172004-03-11011 March 2004 Pnm Resources - 2002 Annual Report ML0413304192004-03-11011 March 2004 Pinnacle West Capital Corporation - 2003 Annual Report 2024-11-05
[Table view] Category:Letter
MONTHYEARML24312A3152024-11-0505 November 2024 Independent Spent Fuel Storage Installation - Updated Annual Radioactive Effluent Release Report 2023 ML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 2024-09-27
[Table view] |
Text
a aps 10 CFR 50.59 / 10 CFR 72.48Palo Verde102-07045-TNW/TMJ Nuclear Generating StationP.O. Box 52034May 15, 2015 Phoenix, AZ 85072Mail Station 7636ATTN: Document Control Desk Tel: (623) 393-5764U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, & 3 and Independent Spent Fuel Storage Installation (ISFSI)Docket Nos. STN 50-528/529/530 and 72-4410 CFR 50.59, 10 CFR 72.48, and Commitment ChangeAnnual Reports and Notifications Enclosed please find the Arizona Public Service Company (APS) 10 CFR 50.59 and10 CFR 72.48 report for January 1, 2014 through December 31, 2014. TheCommitment Change Report is for the period of June 28, 2014, throughDecember 31, 2014. Please note that the Commitment Change Report for the periodof January 1, 2014, through June 27, 2014, was included in the June 27, 2014submittal (ADAMS Accession Number ML14184B413).
In accordance with 10 CFR 50.59(d)(2),
APS is providing a brief description and summaryof the evaluations required by 10 CFR 50.59(d)(1) for each change completed during theperiod. This report contains the evaluations written during 2014, regardless of theimplementation status of the evaluated action, and is included as an enclosure to thisletter.In accordance with 10 CFR 72.48(d)(2),
APS is reporting that there were no changescompleted during the period that were required to be reported pursuant to 10 CFR 72.48.In accordance with the APS commitment management
- program, APS is reporting thatthere were no commitment changes made during the period mentioned above that werenot otherwise reported.
No new commitments are being made to the NRC by this letter. Should you needfurther information regarding this submittal, please contact Michael D. Dilorenzo, Regulatory
- Affairs, Section Leader, at (623) 393-3495.
Sincerely, aj~ 4 (Thomas N. WeberDepartment Leader, Regulatory AffairsTNW/TMJ/hsc
Enclosure:
10 CFR 50.59 and 10 CFR 72.48 Report January 2014 -December 2014A member of the STARS (Strategic Teaming and Resource Sharing)
AllianceCallaway
- Wolf Creek ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Annual 10 CFR 50.59, 10 CFR 72.48, and Commitment Change ReportPage 2cc: M. L. DapasM. M. WatfordC. A. PeabodyM. D. LombardNRC Region IV Regional Administrator NRC NRR Project ManagerNRC Senior Resident Inspector for PVNGSDirector, Division of Spent Fuel Management ENCLOSURE PALO VERDE NUCLEAR GENERATING STATION10 CFR 50.59 and 10 CFR 72.48 ReportJanuary 2014 -December 2014 10 CFR 50.59 and 10 CFR 72.48 REPORT (JANUARY 2014 through DECEMBER 2014)Log Doc Doc Number Description SummaryTypeE-13-0004 LDCR 2014-F002 The piping, valves, and fittings provided for This change does not requireRev. 0 2014-F003 injection of hydrogen into the charging pump prior NRC approval indischarge line of the Chemical and Volume accordance with 10 CFRControl System system will be removed and 50.59(c)(1).
the connecting tee on the charging linereplaced with a straight pipe segment.E-14-0001 STDY 13-MS-B094 Rev I Involves issuance of several documents to an This change does not requireRev. 0 CALC 13-MC-CH-0201 Rev 8 engineering study, calculation, operating prior NRC approval inPROC 40DP-9ZZ04 Rev 9 procedure, and LDCR that implement three accordance with 10 CFRLDCR 2014-F007 interrelated changes pertaining to Refueling 50.59(c)(1).
Water Tank transfer volume sizing. Thesechanges include (1) accounting for thepostulated single failure of LPSI pump to stopfollowing a Recirculation Actuation Signal, (2)recovering discretionary margin from theconservative Containment Spray pump flowrate previously used in the supporting analysis; and (3) reducing the time criticaloperator action from 8 minutes to 5 minutesE-14-0002 DMWO 3232547 Replacement of the normal inverters and This change does not requireRev. 0 addition of a swing inverter will continue to prior NRC approval inprovide four independent Class 1E, 120V vital accordance with 10 CFRinstrumentation and control Alternating 50.59(c)(1).
Current power supplies.
E-13-0001 DMWO 3270069 The Legacy Honeywell Plant Computer (PC) This change does not requireRev. 1 System and associated software are being prior NRC approval inreplaced with a new Rolls Royce System. The accordance with 10 CFRproposed change is applicable to Units 1, 2, 50.59(c)(1).
and 3.E-14-0003 DMWO 3286783 The legacy Main Generator Excitation and This change does not requireRev. 0 Voltage Regulator System (GENERREX) is to prior NRC approval inbe replaced with a new General Electric (GE) accordance with 10 CFRdigital excitation control system (EX2100e).
50.59(c)(1).
Enclosure Page 1 of 2 Log Doc Doc Number Description SummaryTypeE-14-0005 CALC 13-MC-ZZ-0633 R13 Document the addition of two Safety Injection This change does not requireRev. 0 LDCR 13-MC-ZZ-0594 R7 system High Energy Line Break locations and prior NRC approval in2014-F051 associated evaluation of effects into the design accordance with 10 CFRbases 50.59(c)(1).
ACRONYMN/ABBREVIATION LISTDMWO Design Modification Work OrderLDCR Licensing Document Change RequestPROC Procedure STDY StudyNOTE: There were no 10 CFR 72.48 evaluations in 2014.Enclosure Page 2 of 2