ML17345A091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 4
| page count = 4
| project = EPID:L-2017-LLR-0078, CAC:MG0068, CAC:MG0069, EPID:L-2017-LLR-0078
| project = EPID:L-2017-LLR-0078, CAC:MG0068, CAC:MG0069, EPID:L-2017-LLR-0078
| stage = Other
| stage = RAI
}}
}}



Revision as of 17:58, 2 April 2018

Calvert Cliffs Nuclear Plants, Units 1 and 2 - Request for Additional Information Regarding Alternative Request SI-RR-01, Rev. 0 (CAC Nos. MG0068 and MG0069; EPID L-2017-LLR-0078)
ML17345A091
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/19/2018
From: Marshall M L
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Marshall M L, NRR/DORL/LPLI, 415-2871
References
CAC MG0068, CAC MG0069, EPID L-2017-LLR-0078
Download: ML17345A091 (4)


Text

Mr. Bryan C. Hanson January 19, 2018 Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING ALTERNATIVE REQUEST SI-RR-01, REV. 0 (CAC NOS. MG0068 AND MG0069; EPID L-2017-LLR-0078) Dear Mr. Hanson:

By letter dated August 2, 2017 (Agencywide Documents Access and Management System Accession No. ML17215A007), Exelon Generation Company, LLC (the licensee) submitted relief requests associated with the fifth 10-year inservice testing interval for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. One of the alternative requests, designated SI-RR-01, Rev. 0, would authorize testing the low pressure safety injection pumps as Group B pumps during power operations instead of as Group A pumps. The U.S. Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information. The request for additional information was discussed with your staff on January 17, 2018, and it was agreed that your response would be provided within 30 days from the date of this letter.

If you have any questions regarding this issue, please contact me at (301) 415-2871 or Michael.Marshall@nrc.gov. Sincerely, /RA/ Michael L. Marshall, Jr., Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 Enclosure: Request for Additional Information

cc w/Enclosure: Distribution via Listserv

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING ALTERNATIVE REQUEST SI-RR-01, REV. 0 (CAC NOS. MG0068 AND MG0069; EPID L-2017-LLR-0078) DATED JANUARY 19, 2018

DISTRIBUTION: PUBLIC PM Reading File RidsNrrDorlLpl1 Resource RidsNrrPMCalvertCliffs Resource RidsNrrLALRonewicz Resource RidsACRS_MailCTR Resource RidsRgn1MailCenter Resource RidsNrrDeEmib Resource RWolfgang, NRR

ADAMS Accession No.: ML17345A091 *by e-mail OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DE/EMIB/BC(A)* NAME MMarshall LRonewicz MFranan DATE 01/09/2018 12/12/2017 11/24/2017 OFFICE NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME JDanna MMarshall DATE 01/19/2018 01/19/2018 OFFICIAL RECORD COPY Enclosure REQUEST FOR ADDITIONAL INFORMATION ALTERNATIVE REQUEST SI-RR-01, REV. 0 EXELON GENERATION COMPANY, LLC CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-317 AND 50-318 By letter dated August 2, 2017 (Agencywide Documents Access and Management System Accession No. ML17215A007), Exelon Generation Company, LLC (the licensee) submitted relief requests associated with the fifth 10-year inservice testing interval for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. One of the alternative requests, designated SI-RR-01, Rev. 0, would authorize testing the low pressure safety injection (LPSI) pumps as Group B pumps during power operations instead of as Group A pumps.

The U.S. Nuclear Regulatory Commission staff has determined that additional information is needed to complete its review of the request.

Requests for Additional Information 1. In Section 4 of the alternative request, it states: Additionally, in Generic Letter (GL) 89-04, Position 9, the NRC determined that, in cases where pump flow can only be established through a non-instrumented, minimum-flow path during quarterly pump testing, and a path exists at cold shutdown or refueling outages to perform a test of the pump under full or substantial flow conditions, the increased interval is an acceptable alternative to the Code requirements. Therefore, the proposed alternative testing of LPSI pumps as Group B during Modes 1-4 and as Group A during Modes 5-6 is consistent with GL 89-04, Position 9.

Provide an explanation describing how the proposed alternative is consistent with Generic Letter 89-04, Position 9, when the minimum recirculation flow common header used for quarterly testing is instrumented with an ultrasonic flow meter.

2. In Section 4, it is stated that: The low pressure safety injection (LPSI) pumps are tested at a substantial flow rate (approximately 3000 gallons per minute (gpm)) during every refueling outage, as well as during planned and unplanned cold shutdown periods when plant conditions and circumstances permit.

- 2 - It is also stated that: The quarterly tests are performed at approximately 55 - 65 gpm, which is between approximately 1.3% - 1.6% the LPSI pumps' Best Efficiency Flow rate. There are large differences in the substantial flow rate, the best efficiency flow rate, and the low quarterly test flow rate. a. Are the LPSI pumps operated below the manufacturer's minimum continuous stable flow? b. Provide the manufacturer's recommended minimum flow and maximum run time at the minimum flow for the LPSI pumps and compare that to the flow rate and maximum run time for the LPSI pumps for the quarterly test. c. Explain any differences between manufacturer's recommended minimum flow and maximum run time at the minimum flow and the flow rate and maximum run time for the LPSI pumps for the quarterly test.