PLANT OPERATIONS MANUAL Volume 05                                                                                     05-1-02-I-3 Section 02                                                                                     Revision:   10 Date: 3-24-82 OFF-NORMAL EVENT PROCEJURE SINGLE MSIV CLOSURE SAFETY RELATED Prepared:                         -                                                                ,
r, PLANT OPERATIONS MANUAL Volume 05 05-1-02-I-3 Section 02 Revision:
Reviewed:                   d         L ot             .              /
10 Date: 3-24-82 OFF-NORMAL EVENT PROCEJURE SINGLE MSIV CLOSURE SAFETY RELATED Prepared:
Nuclear Plant Quality Superintendent                     ,< Technical Review Reviewed:
Reviewed:
b Op  O.rations .'Me     Superintendent Approved:                         ,        bu
d L ot
                                                '- Assistant Plant Manage r PSRC:
/
                                                                                /66             /d/b-
Nuclear Plant Quality Superintendent
                              '
,< Technical Review Reviewed:
* s .,
b O..'Me Op rations Superintendent Approved:
Li                       etive.Pages:
bu
                    .Page: * #                         itevision:
'- Assistant Plant Manage r PSRC:
                                      .&                4 1-2
/66
(              .      s,
/d/b-s.,
: n.         f
Li etive.Pages:
                                                    /. [ 10
.Page: * #
                                ,'%, .=,' *" g 8206300244 920625 PDR ADOCK 05000416 p                                 PDR
itevision:
4
/. [ 10
(
1-2 s,
n.
f..
,'%,.=,' *" g 8206300244 920625 PDR ADOCK 05000416 p
PDR


        .,-  n,'
n,'
GRAND GULF NUCLEAR STATION                                   OFF-NORMAL EVENT PROCEDURE
GRAND GULF NUCLEAR STATION OFF-NORMAL EVENT PROCEDURE


==Title:==
==Title:==
Single MSIV Closure       No.: 05-1-02-I-3   Revision:   10 Page: 1     l l     fc%
Single MSIV Closure No.:
4
05-1-02-I-3 Revision:
        %k*
10 Page: 1 l
1.0 PURPOSE / DISCUSSION 1.1     To provide instructions for the operator following a Main Steam Line Isolation Valve (MSIV) failing closed, not including a complete MSIV isolation.
l fc%
1.2     This procedure may interface with the reactor scram procedure ONEP 05-1-02-I-1, with several Emergency Procedures, and with the Emergency Plan. EP-1, Level Control, covers a complete MSIV isolation.
%k*
1.3     An MSIV may fail closed due to the loss of RPS power to both solenoids, loss of accumulator air pressure, or energizing of the tes t solenoid.
4 1.0 PURPOSE / DISCUSSION 1.1 To provide instructions for the operator following a Main Steam Line Isolation Valve (MSIV) failing closed, not including a complete MSIV isolation.
1.2 This procedure may interface with the reactor scram procedure ONEP 05-1-02-I-1, with several Emergency Procedures, and with the Emergency Plan.
EP-1, Level Control, covers a complete MSIV isolation.
1.3 An MSIV may fail closed due to the loss of RPS power to both solenoids, loss of accumulator air pressure, or energizing of the tes t solenoid.
In RUN mode, a Reactor Scram may occur if, at high power the proper combination of MSIV's are > 6% closed. Also, if one MSIV goes full closed, the pressure spike could cause a flux spike on the Neutron Monitoring System suf ficient to cause a scram.
In RUN mode, a Reactor Scram may occur if, at high power the proper combination of MSIV's are > 6% closed. Also, if one MSIV goes full closed, the pressure spike could cause a flux spike on the Neutron Monitoring System suf ficient to cause a scram.
SYMPTOMS 2.1     Possible reactor scran due to a pressure induced high flux trip or Group I Isolation.
SYMPTOMS 2.1 Possible reactor scran due to a pressure induced high flux trip or Group I Isolation.
2.2    MSIV position indicating lights indicate valve closure.
MSIV position indicating lights indicate valve closure.
n 2.3     Increase in Reactor power, reactor pressure, other main steam line flows, feedwater flow, and generator output transient.
2.2 n
2.4     Power spikes on the Neutron Monitoring Recorders 2.5     High flux annunciators on the Neutron Monitoring System 3.0 AUTOMATIC ACTIONS l1 3.1     Possible reactor scram 3.2 Possible Group I Isolation due to high flow in other steam lines. This may cause safety-relief valve actuation.
2.3 Increase in Reactor power, reactor pressure, other main steam line flows, feedwater flow, and generator output transient.
4.0   D4 MEDIATE OPERATOR ACTIONS 4.1     Verify automatic actions have occurred, as applicable.
2.4 Power spikes on the Neutron Monitoring Recorders 2.5 High flux annunciators on the Neutron Monitoring System 3.0 AUTOMATIC ACTIONS l 1 3.1 Possible reactor scram 3.2 Possible Group I Isolation due to high flow in other steam lines. This may cause safety-relief valve actuation.
4.2     If scram has occurred, refer to ONEP 05-1-02-I-1, Reactor Scram.
4.0 D4 MEDIATE OPERATOR ACTIONS 4.1 Verify automatic actions have occurred, as applicable.
I t
4.2 If scram has occurred, refer to ONEP 05-1-02-I-1, Reactor Scram.
4.3     Determine and correct the cause of the closed MSIV.
I 4.3 Determine and correct the cause of the closed MSIV.
1                         6.
t 1
6.
l
l


s e,. s, GRAND GULF NUCLEAR STATION                               OFF-NORMAL EVENT PROCEDURE
s e,.
s, GRAND GULF NUCLEAR STATION OFF-NORMAL EVENT PROCEDURE


==Title:==
==Title:==
Single MSIV Closure       th) . : 05-1-02-I-3 Revision: 10   Page: 2 4.4 If scram has not occurred, reopen the closed MSIV per SOI 04-1-01-B21-1 5.0 SUBSEQUENT ACTIONS 5.1 Proceed to impleme nt the Emergency Plan if directed by the Shift Supervisor / Shift Superintendent.                 -
Single MSIV Closure th). :
5.2 If the closed MSIV(s) have been reopened, continue to operate tne plant in accordance with I0I 03-1-01-2, Power Operation.
05-1-02-I-3 Revision: 10 Page:
5.3 If a single closed MSIV cannot be reopened, reduce reactor power as directed by the Reactor Engineer and Shift Supervisor / Shift Superintendent.
2 4.4 If scram has not occurred, reopen the closed MSIV per SOI 04-1-01-B21-1 5.0 SUBSEQUENT ACTIONS 5.1 Proceed to impleme nt the Emergency Plan if directed by the Shift Supervisor / Shift Superintendent.
5.4 Refer to Technical Specification Section 3/4.4.7, Main Steam Line Isolation Valves LCO.
5.2 If the closed MSIV(s) have been reopened, continue to operate tne plant in accordance with I0I 03-1-01-2, Power Operation.
                                                                                          /
5.3 If a single closed MSIV cannot be reopened, reduce reactor power as directed by the Reactor Engineer and Shift Supervisor / Shift Superintendent.
5.4 Refer to Technical Specification Section 3/4.4.7, Main Steam Line Isolation Valves LCO.
/
i k O i
i k O i
i}}
i}}

Latest revision as of 17:14, 17 December 2024

Offnormal Event Procedure 05-1-02-I-3, Single MSIV Closure, Safety-Related, Revision 10
ML20054J963
Person / Time
Site: Grand Gulf  
Issue date: 03/24/1982
From:
MISSISSIPPI POWER & LIGHT CO.
To:
Shared Package
ML20054J949 List:
References
05-1-02-I-3, 5-1-2-I-3, NUDOCS 8206300244
Download: ML20054J963 (3)


Text

-_

e,'

r, PLANT OPERATIONS MANUAL Volume 05 05-1-02-I-3 Section 02 Revision:

10 Date: 3-24-82 OFF-NORMAL EVENT PROCEJURE SINGLE MSIV CLOSURE SAFETY RELATED Prepared:

Reviewed:

d L ot

/

Nuclear Plant Quality Superintendent

,< Technical Review Reviewed:

b O..'Me Op rations Superintendent Approved:

bu

'- Assistant Plant Manage r PSRC:

/66

/d/b-s.,

Li etive.Pages:

.Page: * #

itevision:

4

/. [ 10

(

1-2 s,

n.

f..

,'%,.=,' *" g 8206300244 920625 PDR ADOCK 05000416 p

PDR

n,'

GRAND GULF NUCLEAR STATION OFF-NORMAL EVENT PROCEDURE

Title:

Single MSIV Closure No.:

05-1-02-I-3 Revision:

10 Page: 1 l

l fc%

%k*

4 1.0 PURPOSE / DISCUSSION 1.1 To provide instructions for the operator following a Main Steam Line Isolation Valve (MSIV) failing closed, not including a complete MSIV isolation.

1.2 This procedure may interface with the reactor scram procedure ONEP 05-1-02-I-1, with several Emergency Procedures, and with the Emergency Plan.

EP-1, Level Control, covers a complete MSIV isolation.

1.3 An MSIV may fail closed due to the loss of RPS power to both solenoids, loss of accumulator air pressure, or energizing of the tes t solenoid.

In RUN mode, a Reactor Scram may occur if, at high power the proper combination of MSIV's are > 6% closed. Also, if one MSIV goes full closed, the pressure spike could cause a flux spike on the Neutron Monitoring System suf ficient to cause a scram.

SYMPTOMS 2.1 Possible reactor scran due to a pressure induced high flux trip or Group I Isolation.

MSIV position indicating lights indicate valve closure.

2.2 n

2.3 Increase in Reactor power, reactor pressure, other main steam line flows, feedwater flow, and generator output transient.

2.4 Power spikes on the Neutron Monitoring Recorders 2.5 High flux annunciators on the Neutron Monitoring System 3.0 AUTOMATIC ACTIONS l 1 3.1 Possible reactor scram 3.2 Possible Group I Isolation due to high flow in other steam lines. This may cause safety-relief valve actuation.

4.0 D4 MEDIATE OPERATOR ACTIONS 4.1 Verify automatic actions have occurred, as applicable.

4.2 If scram has occurred, refer to ONEP 05-1-02-I-1, Reactor Scram.

I 4.3 Determine and correct the cause of the closed MSIV.

t 1

6.

l

s e,.

s, GRAND GULF NUCLEAR STATION OFF-NORMAL EVENT PROCEDURE

Title:

Single MSIV Closure th). :

05-1-02-I-3 Revision: 10 Page:

2 4.4 If scram has not occurred, reopen the closed MSIV per SOI 04-1-01-B21-1 5.0 SUBSEQUENT ACTIONS 5.1 Proceed to impleme nt the Emergency Plan if directed by the Shift Supervisor / Shift Superintendent.

5.2 If the closed MSIV(s) have been reopened, continue to operate tne plant in accordance with I0I 03-1-01-2, Power Operation.

5.3 If a single closed MSIV cannot be reopened, reduce reactor power as directed by the Reactor Engineer and Shift Supervisor / Shift Superintendent.

5.4 Refer to Technical Specification Section 3/4.4.7, Main Steam Line Isolation Valves LCO.

/