{{#Wiki_filter:_ . . _ . _ _ - .
{{#Wiki_filter:_.. _. _ _ -.
l     ,
l LithTING CONDITION FOP OPEATION SlTVE}L14[LQE REOU1REMENT N 3. 7.1\\ (cont'd) 4.7.P. (cont'd)
LithTING CONDITION FOP OPEATION                         SlTVE}L14[LQE REOU1REMENT N 3 . 7 .1\ (cont'd)                                             4.7.P. (cont'd)
: h. The resolts of laboratory enrhon
: h. The resolts of laboratory enrhon                     b. Cold DOP testing ihall be performed snmple analysis shall show 299%                         after             each complete or partial radioactive rne thyl iodide t ernovnl                     replacemene of the llEpA filter bank with inlet conditions of: velocity                       or after any structurai maintenan:e
: b. Cold DOP testing ihall be performed snmple analysis shall show 299%
                          >77 FPM, 21.75 mg/m 3 inlet methyl                      on the system housing.
after each complete or partial radioactive rne thyl iodide t ernovnl replacemene of the llEpA filter bank with inlet conditions of: velocity or after any structurai maintenan:e 3 inlet methyl on the system housing.
lodide concentration, 270% R.ll. and
>77 FPM, 21.75 mg/m lodide concentration, 270% R.ll. and
:;30
:;30
* C ,                                           c. lialt gensted                   hydrocarbon   testing shal'. be performed after each
* C,
: c. Ench fan shall be shown to provide                       complete or partial repi nc ernent of j/80 CMF 110%.                                           the chnrcoal ndsorber hnnk or niter any structural maintenance on the 3,     Frnm and after the date that one                         system housing, standby gas treatment systerr. is made or fourd to be inoperable for any                   d. Each system shall be operated with reason,       reactor   operation     is               the henters on at l e nt. L 10 hours permissible       only   during     the               every month, succeeding seven days unless such system is sooner unde operable,                     e. Test sealing of gaskets fo. housing provided that during such seven days                     doors downstream of the llEPA filters all active components of the other                       and charcoal adsorbers r.bn l l be standby gns treatment system, and                       performed at, and in conformance its associated diesel generator,                         with,                 each   test performed   for shn11 he operable.                                       compliance                   with     Specification
: c. lialt gensted hydrocarbon testing shal'.
: 4. 7, D . 2. a               and     Specification Fuel     handling   requirements     are               3.7.B.2.a.
be performed after each c.
Ench fan shall be shown to provide complete or partial repi nc ernent of j/80 CMF 110%.
the chnrcoal ndsorber hnnk or niter any structural maintenance on the 3,
Frnm and after the date that one system housing, standby gas treatment systerr. is made or fourd to be inoperable for any
: d. Each system shall be operated with
: reason, reactor operation is the henters on at l e nt. L 10 hours permissible only during the every month, succeeding seven days unless such system is sooner unde operable,
: e. Test sealing of gaskets fo. housing provided that during such seven days doors downstream of the llEPA filters all active components of the other and charcoal adsorbers r.bn l l be standby gns treatment system, and performed at, and in conformance its associated diesel generator,
: with, each test performed for shn11 he operable.
compliance with Specification
: 4. 7, D. 2. a and Specification Fuel handling requirements are 3.7.B.2.a.
specified in Specification 3.10.E.
specified in Specification 3.10.E.
: 3.       System drains where present shn11 he
3.
                )
System drains where present shn11 he 4.
: 4.     If these conditions cannet be met,                       inspected quarterly for adequate
If these conditions cannet be met, inspected quarterly for adequate
                ,          procedures     shall   be   .nitinted                 water level J.n loop senis.
)
immediately to establish reactor conditions for which the standby gas           4.a. Ac least once per operating cycle treatment system is not required,                       automatic initiation of each branch of the standby gas treatment system chall be .emonstrated.
procedures shall be
.nitinted water level J.n loop senis.
immediately to establish reactor conditions for which the standby gas 4.a. Ac least once per operating cycle treatment system is not required, automatic initiation of each branch of the standby gas treatment system chall be.emonstrated.
: b. At least once per operating cycle manual operability of the bypass valve for filter cooling shall be demonstrated.
: b. At least once per operating cycle manual operability of the bypass valve for filter cooling shall be demonstrated.
N               c. When one                   standby  gas  trentment system becomes inoperable the other
standby gas trentment N
                                                            .h, e?                   standby gas treatment system shall he _3--^A to be operable
: c. When one
[C                          imme'diately and daily therenfter.
.h, e?
system becomes inoperable the other standby gas treatment system shall
[C
_3--^A to be operable he imme'diately and daily therenfter.
A c'emonstration of diesel generator operability is not required by this specification.
A c'emonstration of diesel generator operability is not required by this specification.
C.     Secondary Containment                           C.       Secondary Conta lmeJ1t;
C.
: 1.     Secondnty     containment   i ntegri ty       1.     Secondary containment surveillance shall be maintained durinS all modes                     shall be pe r f orrne d as indicated of pinnt operation except when all                       below:
Secondary Containment C.
Secondary Conta lmeJ1t; 1.
Secondnty containment i ntegri ty 1.
Secondary containment surveillance shall be maintained durinS all modes shall be pe r f orrne d as indicated of pinnt operation except when all below:
of the following conditions are met.
of the following conditions are met.
91080'70117 ping PDR     ADOCK 05000298 P                                             -165a-                                                       ne,f nf 91 PDR
91080'70117 ping PDR ADOCK 05000298 P
-165a-ne,f nf 91 PDR


f                                                                         .        ,
f 1.IMITING CONDITION FOR OPERATION SURVEILIANCE REOUinrMENT
1.IMITING CONDITION FOR OPERATION                               SURVEILIANCE REOUinrMENT
.3.7.B (cont'd) 4.7.B (cont'd)
      .3.7.B (cont'd)                                                     4.7.B (cont'd)
: b. The results of laboratory carbon
: b. The results of laboratory carbon                               b. Cold DOP testing shall be performed sample analysis shall show 299%                                   after each complete                           or partial radioactive methyl iodide removal                                 replacement of the HEPA filter bank with inlet conditions of: velocity                               or after any structural maintenance 227 FPM, 21.75 mg/m 3      inlet methyl                           on the system housing.
: b. Cold DOP testing shall be performed sample analysis shall show 299%
after each complete or partial radioactive methyl iodide removal replacement of the HEPA filter bank with inlet conditions of: velocity or after any structural maintenance 3
227 FPM, 21.75 mg/m inlet methyl on the system housing.
iodide concentration, 270% R.H. and
iodide concentration, 270% R.H. and
                $30'C.                                                       c. Halogenated         hydrocarbon                           testing shall     be     performed after each
$30'C.
: c. Each fan shall be shown to provide                               complete or partial replacement of 1780 CMF 110%.                                                   the charcoal adsorber bank or af ter any structural maintenance on the
: c. Halogenated hydrocarbon testing shall be performed after each c.
: 3.     From and after the date that one                                 system housing.
Each fan shall be shown to provide complete or partial replacement of 1780 CMF 110%.
standby gas treatment system is made or found to be inoperable for any                             d. Each system shall be operated with reason,     reactor     operation           is                 the heaters on at least 10 hours permissible       only     during           the                   every month, succeeding seven days unless such system is sooner made operable,                               e. Test sealing of gaskets for housing provided that dor ic,g s 2ch seven days                           doors downstream of the HEPA filters all activo comi.onents of the other                               and charcoal adsotbers shall be standby gas treatment system, and                                 performed at, and in conformance its associated diescl generator,                                 with,     each test performed                                 for shall ba operable,                                               compliance         with                 Specification 4.7.B.2.a           and               Specification Fuel   handling     requirements are                             3.7.B.T.c, specified in Specification 3.10.E.
the charcoal adsorber bank or af ter any structural maintenance on the 3.
: 3.       System drains where preront shall be 4       If these canditions cannot be met.                               inspected quarterly for adequate
From and after the date that one system housing.
(               procedures     shall   be   initiated                         water level in loop-seals.
standby gas treatment system is made or found to be inoperable for any
!                immediately to establish reactor
: d. Each system shall be operated with
!                conditions fo: which the standby gas                     4.a. At least once per operating cycle treatment system is not required.                                 automatic initiatien of each branch of the standby gas treatment system
: reason, reactor operation is the heaters on at least 10 hours permissible only during the every month, succeeding seven days unless such system is sooner made operable,
                                                                                    . hall be demonstrated.
: e. Test sealing of gaskets for housing provided that dor ic,g s 2ch seven days doors downstream of the HEPA filters all activo comi.onents of the other and charcoal adsotbers shall be standby gas treatment system, and performed at, and in conformance its associated diescl generator,
!                                                                        b.       At least once per operating cycle l                                                                                 manual operability of the bypass l                                                                                 valve for filter cooling shall be l                                                                                 demonstrated.
: with, each test performed for shall ba operable, compliance with Specification 4.7.B.2.a and Specification Fuel handling requirements are 3.7.B.T.c, specified in Specification 3.10.E.
l c       hn one           standoy gas                       treatment syst,m becomes inoperable the other standby gas treatment system shall be     verified             to         be               operable           l immediately and daily thereaf ter.
3.
System drains where preront shall be 4
If these canditions cannot be met.
inspected quarterly for adequate
(
procedures shall be initiated water level in loop-seals.
immediately to establish reactor conditions fo: which the standby gas 4.a.
At least once per operating cycle treatment system is not required.
automatic initiatien of each branch of the standby gas treatment system
. hall be demonstrated.
b.
At least once per operating cycle l
manual operability of the bypass l
valve for filter cooling shall be l
demonstrated.
l c
hn one standoy gas treatment syst,m becomes inoperable the other standby gas treatment system shall be verified to be operable l
immediately and daily thereaf ter.
A demonstration of diesel generator operability is not required by this specification.
A demonstration of diesel generator operability is not required by this specification.
C.     Secondar" Conninm m                                   ;  C.       Senndar" conraimmnt Secondary     containment     integrity                 1.       Secondary containment survei!1ance sh?'l be maintained during all w> des                             shall be performed as indicated oi plant opecation excep- when all                               below:
C.
of the f ollowing condition: are me t ,
Secondar" Conninm m C.
Senndar" conraimmnt Secondary containment integrity 1.
Secondary containment survei!1ance sh?'l be maintained during all w> des shall be performed as indicated oi plant opecation excep-when all below:
of the f ollowing condition: are me t,
t
t
                                                                  -165a-
-165a-
_            ._                    _ _ _ _ .    ._ _                                  _ _ _ _ _ . _ _                              . _ . _ _}}
. _. _ _}}

Latest revision as of 01:22, 15 December 2024

Proposed Tech Specs,Allowing Operability of Certain Equipment to Be Verified Instead of Demonstrated Operable
ML20077K218
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/30/1991
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20077K171 List:
References
NUDOCS 9108070117
Download: ML20077K218 (2)


Text

_.. _. _ _ -.

l LithTING CONDITION FOP OPEATION SlTVE}L14[LQE REOU1REMENT N 3. 7.1\\ (cont'd) 4.7.P. (cont'd)

h. The resolts of laboratory enrhon
b. Cold DOP testing ihall be performed snmple analysis shall show 299%

after each complete or partial radioactive rne thyl iodide t ernovnl replacemene of the llEpA filter bank with inlet conditions of: velocity or after any structurai maintenan:e 3 inlet methyl on the system housing.

>77 FPM, 21.75 mg/m lodide concentration, 270% R.ll. and

30
  • C,
c. lialt gensted hydrocarbon testing shal'.

be performed after each c.

Ench fan shall be shown to provide complete or partial repi nc ernent of j/80 CMF 110%.

the chnrcoal ndsorber hnnk or niter any structural maintenance on the 3,

Frnm and after the date that one system housing, standby gas treatment systerr. is made or fourd to be inoperable for any

d. Each system shall be operated with
reason, reactor operation is the henters on at l e nt. L 10 hours permissible only during the every month, succeeding seven days unless such system is sooner unde operable,
e. Test sealing of gaskets fo. housing provided that during such seven days doors downstream of the llEPA filters all active components of the other and charcoal adsorbers r.bn l l be standby gns treatment system, and performed at, and in conformance its associated diesel generator,
with, each test performed for shn11 he operable.

compliance with Specification

4. 7, D. 2. a and Specification Fuel handling requirements are 3.7.B.2.a.

specified in Specification 3.10.E.

3.

System drains where present shn11 he 4.

If these conditions cannet be met, inspected quarterly for adequate

)

procedures shall be

.nitinted water level J.n loop senis.

immediately to establish reactor conditions for which the standby gas 4.a. Ac least once per operating cycle treatment system is not required, automatic initiation of each branch of the standby gas treatment system chall be.emonstrated.

b. At least once per operating cycle manual operability of the bypass valve for filter cooling shall be demonstrated.

standby gas trentment N

c. When one

.h, e?

system becomes inoperable the other standby gas treatment system shall

[C

_3--^A to be operable he imme'diately and daily therenfter.

A c'emonstration of diesel generator operability is not required by this specification.

C.

Secondary Containment C.

Secondary Conta lmeJ1t; 1.

Secondnty containment i ntegri ty 1.

Secondary containment surveillance shall be maintained durinS all modes shall be pe r f orrne d as indicated of pinnt operation except when all below:

of the following conditions are met.

91080'70117 ping PDR ADOCK 05000298 P

-165a-ne,f nf 91 PDR

f 1.IMITING CONDITION FOR OPERATION SURVEILIANCE REOUinrMENT

.3.7.B (cont'd) 4.7.B (cont'd)

b. The results of laboratory carbon
b. Cold DOP testing shall be performed sample analysis shall show 299%

after each complete or partial radioactive methyl iodide removal replacement of the HEPA filter bank with inlet conditions of: velocity or after any structural maintenance 3

227 FPM, 21.75 mg/m inlet methyl on the system housing.

iodide concentration, 270% R.H. and

$30'C.

c. Halogenated hydrocarbon testing shall be performed after each c.

Each fan shall be shown to provide complete or partial replacement of 1780 CMF 110%.

the charcoal adsorber bank or af ter any structural maintenance on the 3.

From and after the date that one system housing.

standby gas treatment system is made or found to be inoperable for any

d. Each system shall be operated with
reason, reactor operation is the heaters on at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> permissible only during the every month, succeeding seven days unless such system is sooner made operable,
e. Test sealing of gaskets for housing provided that dor ic,g s 2ch seven days doors downstream of the HEPA filters all activo comi.onents of the other and charcoal adsotbers shall be standby gas treatment system, and performed at, and in conformance its associated diescl generator,
with, each test performed for shall ba operable, compliance with Specification 4.7.B.2.a and Specification Fuel handling requirements are 3.7.B.T.c, specified in Specification 3.10.E.

3.

System drains where preront shall be 4

If these canditions cannot be met.

inspected quarterly for adequate

(

procedures shall be initiated water level in loop-seals.

immediately to establish reactor conditions fo: which the standby gas 4.a.

At least once per operating cycle treatment system is not required.

automatic initiatien of each branch of the standby gas treatment system

. hall be demonstrated.

b.

At least once per operating cycle l

manual operability of the bypass l

valve for filter cooling shall be l

demonstrated.

l c

hn one standoy gas treatment syst,m becomes inoperable the other standby gas treatment system shall be verified to be operable l

immediately and daily thereaf ter.

A demonstration of diesel generator operability is not required by this specification.

C.

Secondar" Conninm m C.

Senndar" conraimmnt Secondary containment integrity 1.

Secondary containment survei!1ance sh?'l be maintained during all w> des shall be performed as indicated oi plant opecation excep-when all below:

of the f ollowing condition: are me t,

t

-165a-

. _. _ _