Proposed Tech Specs,Correcting Described Method by Which SGTS Heaters Are to Be Tested
ML20195E910
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/08/1999
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20195E902 List:
References
NUDOCS 9906140133
Download: ML20195E910 (2)


Text

_

q

' '[ <rograms and Manuals l ,

5.5 1

5.5 Programs and Manuals t

Ventilation Filter Testina Proaram (VFTP) l 5.5.7 (continued)

e. Demonstrate that the heaters for the SGT System dissipate

$t ., b m '

V y $HN <S enc l1 plouse cf % . h ed k r ci(coi F bded syshm Od*

5.5.8 Exolosive Gas and Storace Tank Radioactivity Monitorina Proaram This program provides controls for potentially explosive gas mixtures contained in the Augmented Offgas Treatment System, and the quantity of radioactivity contained in unprotected outdoor liquid storage tanks. ,

i The program shall include: l

a. The limits for concentrations of hydrogen in the Augmented Offgas Treatment System and a surveillance program to ensure the limits are mainttined. Such limits shall be appropriate to the system's deshin criteria (i.e., whether or not the system is designed t.c withstand a hydrogen i explosion); and , l 1
b. A surveillance program to ensure the quantity of  ;

radioactivity contained in each outside temporary liquid l radwaste tank that is not surrounded by a liner, dike, or wall capable of holding the tank's contents and that does

.- .c- not have a tank overflow and surrounding area drain -

A c: connected to the Liquid Radwaste System is :s; 10 curies,  !

excluding H-3 and dissolved noble gases.

The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the l Explosive Gas and Storage Tank Radioactivity Monitoring Program Surveillance Frequencies.

l 9906140133 99060s "

PDR ADOCK o p -

(continued)

Cooper 5.0-13 Amendment No. 178

'e.

t -l ATTACHMENT 3 LIST OF NRC COMMITMENTS l l

l  : Correspondence No: NLS990027

-The,following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or

( planned actions by the District. They are described to the NRC for the NRC's

.l information and are not regulatory commitments. Please notify the NL&S Manager at Cooper. Nuclear Station of any questions regarding this document ei any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None

)

l l

i i

l J

i 4

i l

l- PROCEDURE-NUMBER 0.42 l REVISION NUMBER 6 l PAGE 9 OF 13 l