Proposed Tech Specs,Changing Frequency of Testing RHR Cross Tie valve,RHR-MOV-MO20,position Indication from Once Per Month to Once Per Operating CycleML20148G348 |
Person / Time |
---|
Site: |
Cooper |
---|
Issue date: |
05/30/1997 |
---|
From: |
NEBRASKA PUBLIC POWER DISTRICT |
---|
To: |
|
---|
Shared Package |
---|
ML20148G303 |
List: |
---|
References |
---|
NUDOCS 9706050288 |
Download: ML20148G348 (4) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217C7961999-10-0606 October 1999 Marked-up & Type Written Proposed TS Pages,Revising TSs 1.0, 3.6,Bases 3.0,Bases 3.6 & 5.5,to Adopt Implementation Requirements of 10CFR50,App J,Option B for Performance of Type A,B & C Containment Leakage Rate Testing ML20209A7351999-06-23023 June 1999 Proposed Tech Specs Pages 3.3-4 & 3.3-6,replacing Page 3.3-6 Re Recirculation Loop Flow Transmitters & Applicable SRs Associated with Function 2.b ML20196B4741999-06-17017 June 1999 Proposed Tech Specs Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610 ML20195E9101999-06-0808 June 1999 Proposed Tech Specs,Correcting Described Method by Which SGTS Heaters Are to Be Tested ML20205H2891999-03-31031 March 1999 Proposed Tech Specs Modifying ACs for Unit Staff Qualifications for Shift Supervisor,Senior Operator,Licensed Operator,Shift Technical Advisor & Radiation Manager Positions ML20236W1141998-07-28028 July 1998 Proposed Tech Specs Re Implementation of BWR Thermal Hydraulic Stability Solution ML20151Q0621998-07-28028 July 1998 Final Version of Improved TS & Bases Re Proposed Change to Conversion to Improved Standard TS ML20236R9821998-07-16016 July 1998 Proposed Tech Specs Section 6.5.1,re Implementation of BWR Thermal Hydraulic Stability Solution ML20236Q0641998-07-13013 July 1998 Proposed Tech Specs Re Rev B to Conversion to Improved STS ML20216H0801998-04-15015 April 1998 Proposed Tech Specs Sections 2.1.A.1.d & 3.2.C,deleting Max Rated Power for APRM Rod Block Trip Setting ML20216H0571998-04-15015 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20216B4481998-04-0202 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20148G3481997-05-30030 May 1997 Proposed Tech Specs,Changing Frequency of Testing RHR Cross Tie valve,RHR-MOV-MO20,position Indication from Once Per Month to Once Per Operating Cycle ML20138J0751997-05-0505 May 1997 Proposed Tech Specs,Relocating Control of Standby Liquid Control Relief Valve Setpoint in TS 4.4.A.2.a & Associated Bases ML20148B0041997-05-0202 May 1997 Proposed Tech Specs,Deleting SLC Relief Valve Testing Described in TS Section 4.4.A.2.a & Associated Bases in Bases Section 3.4.A Since Testing Is Already Performed Under ISI Program ML20134K3771997-02-10010 February 1997 Proposed Tech Specs Re Requirements for Avoidance & Protection from Thermal Hydraulic Instabilities to Be Consistent w/NEDO-31960 & NEDO-31960,Suppl 1, BWR Owners Group Long-Term Stability Solutions.. ML20117K3291996-06-0606 June 1996 Proposed Tech Specs Revising Safety Limit MCPR from 1.06 to 1.07 for Dual Recirculation Loop Operation & from 1.07 to 1.08 for Single Recirculation Loop Operation ML20100R4431996-03-0505 March 1996 Proposed Tech Specs,Consisting of Change Request 142, Revising TS, DG Enhancements ML20086K4421995-07-14014 July 1995 Revised Proposed Tech Specs Re DG Enhancements Reflecting More Conservative Approach to Enhancing DGs ML20086B7061995-06-28028 June 1995 Proposed Tech Specs Re Increasing Required RPV Boron Concentration & Modifying Surveillance Frequency for SLC Pump Operability Testing ML20085J2631995-06-15015 June 1995 Proposed Tech Specs Re Extension of Surveillance Intervals for Logic Sys Functional Testing for ECCS ML20083A7241995-05-0505 May 1995 Proposed Tech Specs Reflecting Changes to TSs & Associated Bases for License DPR-46 ML20083A1341995-05-0202 May 1995 Proposed Tech Specs Re Temporary Rev to SR to Extend Two Year LLRT Interval Requirement ML20149H8821994-12-27027 December 1994 Proposed Tech Specs Re Control Room Emergency Filter Sys ML20078S5711994-12-22022 December 1994 Proposed Tech Specs Re Definition of Lco,Per GL 87-09 ML20073J2371994-09-26026 September 1994 Proposed TS LCOs 3.5.C.1 & 3.5.C.4,increasing Min Pressure at Which HPCI Sys Required to Be Operable from Greater than 113 Psig to Greater than 150 Psig ML20071K1541994-07-26026 July 1994 Proposed Tech Specs to Increase Flow Capacity of Control Room Emergency Filter System ML20070M6671994-04-26026 April 1994 Proposed Tech Specs Re Intermittent Operation of Hydrogen/ Oxygen Analyzers ML20065K1931994-04-12012 April 1994 Proposed Tech Specs,Reflecting Removal of Definitions 1.0.Z.B.1 Through 5,change to LCO 3.21.B.1.a (Line 5) Re Ref to 10CFR20.106 & Change to Paragraphs 1,4,5 & 6 (Lines 6,3,8 & 2 Respectively) Re Ref to 10CFR20.106 ML20058N2321993-12-10010 December 1993 Proposed Tech Specs 3/4.21, Environ/Radiological Effluents, 6.5, Station Reporting Requirements & 6.5.1.C.2 Re 10CFR50.59(b) Rept ML20058N2881993-12-10010 December 1993 Proposed Tech Specs for Pressure Vs Temp Operating Limit Curves ML20058M2591993-09-28028 September 1993 Proposed Tech Specs Modifying Organizational Structure by Removing Mgt Positions of Site Manager & Senior Manager of Operation ML20056G5971993-08-31031 August 1993 Proposed TS Re Primary Containment Isolation Valve Tables ML20056G5821993-08-31031 August 1993 Proposed TS Re Primary & Secondary Containment Integrity ML20056G2341993-08-25025 August 1993 Proposed Tech Specs Bases Section to Reflect Operational & Design Changes Made to CNS Svc Water Sys During 1993 Refueling Outage ML20056F3331993-08-23023 August 1993 Proposed Tech Specs 6.0, Administrative Controls, Reflecting Creation of Mgt Position of Vice President - Nuclear ML20045D8991993-06-23023 June 1993 Proposed TS SR 4.9.A.2 Re Determination of Particulate Concentration Level of Diesel Fuel Oil Storage Tanks ML20045C0031993-06-14014 June 1993 Proposed Tech Specs Associated W/Dc Performance Criteria ML20045C8301993-06-14014 June 1993 Proposed Tech Specs Incorporating New Requirements of 10CFR20 ML20128L5561993-02-12012 February 1993 Proposed TS Table 4.2.D, Min Test & Calibr Frequencies for Radiation Monitoring Sys & TS Pages 81 & 84 Re Notes for Tables 4.2.A Through 4.2.F ML20128E6201993-02-0101 February 1993 Proposed Tech Specs Reflecting Current NRC Positions Re Leak Detection & ISI Schedules,Methods,Personnel & Sample Expansion,Per GL 88-01 ML20127B8331993-01-0505 January 1993 Proposed TS Pages 53,55,70 & 71,removing Bus 1A & 1B Low Voltage Auxiliary Relays ML20115F8531992-10-15015 October 1992 Proposed Tech Specs Page 48,reflecting Relocation of Mechanical Vacuum Pump Isolation SRs ML20115A3481992-10-0808 October 1992 Proposed TS Section 6.1.2 Re Offsite & Onsite Organizations, Delineating Responsibilities of Site Manager & 6.2.1.A Re Min Composition of Station Operations Review Committee ML20104B2091992-09-0909 September 1992 Proposed TS 3.1.1 Re Reactor Protection Sys Instrumentation Requirements & TS Table 3.2.D Re Radiation Monitoring Sys That Initiate &/Or Isolate Sys ML20104A8691992-09-0202 September 1992 Proposed TS 3.9 & 4.9 Re Auxiliary Electrical Sys ML20099D4151992-07-28028 July 1992 Proposed TS 3.6 Re LCO for Primary Sys Boundary & 4.6 Re Surveillance Requirements for Primary Sys Boundary ML20113G8241992-05-0404 May 1992 Proposed Tech Spec Pages for Removal of Component Lists,Per Generic Ltr 91-08 ML20096D6111992-05-0404 May 1992 Proposed Tech Specs Change 100 to Eliminate Main Steam Line Radiation Monitor Scram & Isolation Functions ML20090A8061992-02-25025 February 1992 Proposed Tech Specs Re Dc Power Sys 1999-06-08
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217C7961999-10-0606 October 1999 Marked-up & Type Written Proposed TS Pages,Revising TSs 1.0, 3.6,Bases 3.0,Bases 3.6 & 5.5,to Adopt Implementation Requirements of 10CFR50,App J,Option B for Performance of Type A,B & C Containment Leakage Rate Testing ML20209A7351999-06-23023 June 1999 Proposed Tech Specs Pages 3.3-4 & 3.3-6,replacing Page 3.3-6 Re Recirculation Loop Flow Transmitters & Applicable SRs Associated with Function 2.b ML20196B4741999-06-17017 June 1999 Proposed Tech Specs Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610 ML20195E9101999-06-0808 June 1999 Proposed Tech Specs,Correcting Described Method by Which SGTS Heaters Are to Be Tested ML20207A0761999-05-14014 May 1999 Rev 3 to CNS Strategy for Achieving Engineering Excellence ML20206J2661999-04-22022 April 1999 CNS Offsite Dose Assessment Manual (Odam) ML20205H2891999-03-31031 March 1999 Proposed Tech Specs Modifying ACs for Unit Staff Qualifications for Shift Supervisor,Senior Operator,Licensed Operator,Shift Technical Advisor & Radiation Manager Positions ML20151Q0621998-07-28028 July 1998 Final Version of Improved TS & Bases Re Proposed Change to Conversion to Improved Standard TS ML20236W1141998-07-28028 July 1998 Proposed Tech Specs Re Implementation of BWR Thermal Hydraulic Stability Solution ML20236R9821998-07-16016 July 1998 Proposed Tech Specs Section 6.5.1,re Implementation of BWR Thermal Hydraulic Stability Solution ML20236Q0641998-07-13013 July 1998 Proposed Tech Specs Re Rev B to Conversion to Improved STS ML20206P9051998-07-0707 July 1998 Rev 2, Strategy for Achieving Engineering Excellence, for Cooper Nuclear Station ML20216H0571998-04-15015 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20216H0801998-04-15015 April 1998 Proposed Tech Specs Sections 2.1.A.1.d & 3.2.C,deleting Max Rated Power for APRM Rod Block Trip Setting ML20216D8971998-04-0808 April 1998 Rev 1 to Strategy for Achieving Engineering Excellence ML20216B4481998-04-0202 April 1998 Proposed Tech Specs 4.2.C,exempting Neutron Detectors from Channel Calibr Requirements ML20203G4271998-02-24024 February 1998 Rev 0 to First Ten-Year Interval Containment Insp Program for Cns ML20202H5311998-02-11011 February 1998 Strategy for Achieving Engineering Excellence ML20216G1571997-09-0505 September 1997 Rev 2.1 to Third 10-Yr Interval Inservice Insp Program ML20210H5641997-08-0707 August 1997 Rev 2 to NPPD CNS Third Interval Inservice Testing Program ML20148G3481997-05-30030 May 1997 Proposed Tech Specs,Changing Frequency of Testing RHR Cross Tie valve,RHR-MOV-MO20,position Indication from Once Per Month to Once Per Operating Cycle ML20148G8531997-05-0909 May 1997 Nebraska Public Power District Nuclear Power Group Phase 3 Performance Improvement Plan, Closure Rept ML20138J0751997-05-0505 May 1997 Proposed Tech Specs,Relocating Control of Standby Liquid Control Relief Valve Setpoint in TS 4.4.A.2.a & Associated Bases ML20148B0041997-05-0202 May 1997 Proposed Tech Specs,Deleting SLC Relief Valve Testing Described in TS Section 4.4.A.2.a & Associated Bases in Bases Section 3.4.A Since Testing Is Already Performed Under ISI Program ML20138H3861997-04-29029 April 1997 Rev 1.2 to CNS Third Interval IST Program ML20134K3771997-02-10010 February 1997 Proposed Tech Specs Re Requirements for Avoidance & Protection from Thermal Hydraulic Instabilities to Be Consistent w/NEDO-31960 & NEDO-31960,Suppl 1, BWR Owners Group Long-Term Stability Solutions.. ML20134E1091996-10-25025 October 1996 NPPD Cooper Nuclear Station Third Interval IST Program, Rev 1 ML20117K3291996-06-0606 June 1996 Proposed Tech Specs Revising Safety Limit MCPR from 1.06 to 1.07 for Dual Recirculation Loop Operation & from 1.07 to 1.08 for Single Recirculation Loop Operation ML20100R4431996-03-0505 March 1996 Proposed Tech Specs,Consisting of Change Request 142, Revising TS, DG Enhancements ML20101L8381995-12-31031 December 1995 Reactor Containment Bldg Integrated Leak Rate Test. W/ ML20113B0531995-12-29029 December 1995 Rev 4.1 to NPPD CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components ML20093L1901995-10-18018 October 1995 Rev 0 to Third Ten-Yr Interval ISI Program for Cns ML20086K4421995-07-14014 July 1995 Revised Proposed Tech Specs Re DG Enhancements Reflecting More Conservative Approach to Enhancing DGs ML20086H7341995-07-14014 July 1995 Rev 7 to CNS Second Ten Yr Interval IST Program ML20086H7601995-06-30030 June 1995 Rev 4 to CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components ML20086B7061995-06-28028 June 1995 Proposed Tech Specs Re Increasing Required RPV Boron Concentration & Modifying Surveillance Frequency for SLC Pump Operability Testing ML20085J2631995-06-15015 June 1995 Proposed Tech Specs Re Extension of Surveillance Intervals for Logic Sys Functional Testing for ECCS ML20083A7241995-05-0505 May 1995 Proposed Tech Specs Reflecting Changes to TSs & Associated Bases for License DPR-46 ML20083A1341995-05-0202 May 1995 Proposed Tech Specs Re Temporary Rev to SR to Extend Two Year LLRT Interval Requirement ML20083M0401995-01-20020 January 1995 Rev 1 to Restart Readiness Program ML20083M0901995-01-13013 January 1995 Rev 2 to Startup & Power Ascension Plan ML20149H8821994-12-27027 December 1994 Proposed Tech Specs Re Control Room Emergency Filter Sys ML20078S5711994-12-22022 December 1994 Proposed Tech Specs Re Definition of Lco,Per GL 87-09 ML20083M0141994-11-0909 November 1994 Rev 3 to Phase 1 Plan, ML20083M0321994-11-0808 November 1994 Rev 0 to Restart Readiness Program ML20073J2371994-09-26026 September 1994 Proposed TS LCOs 3.5.C.1 & 3.5.C.4,increasing Min Pressure at Which HPCI Sys Required to Be Operable from Greater than 113 Psig to Greater than 150 Psig ML20149F9921994-09-15015 September 1994 Rev 1 to CNS Startup Plan ML20071K9311994-07-27027 July 1994 Diagnostic Self Assessment (DSA) Implementation Plan ML20071K1541994-07-26026 July 1994 Proposed Tech Specs to Increase Flow Capacity of Control Room Emergency Filter System ML20070M6671994-04-26026 April 1994 Proposed Tech Specs Re Intermittent Operation of Hydrogen/ Oxygen Analyzers 1999-06-08
[Table view] |
Text
,
- Attacl$ ment to NLS970115 Page1of3 COOPER NUCLEAR STATION TECHNICAL SPECIFICATIONS RHR CROSS TIE VALVE TESTING Revised Pages 55 71 1.0 Description of Requested Change Change Technical Specification Table 4.2.B (Page 2) Item No.14 identification number to read as "RHR-MO-20 LMS (NFC contact)" vice "RHR-LMS-8".
Change Technical Specifications Table 4.2.B (Page 2) liem No.14 Functi .2al Test Freq. to read "Once/Oper. Cycle" vice "Once / Month (1)".
Change Technical Specification Table 3.2.B (Page 3) Instrument identification i number to read as "RHR-MO-20 LMS (NFC contact)" vice "RHR-LMS-8".
1 2.0 Justification of Change:
The RHR Crosstie Valve functional test is currently required to be performed by j full stroking RHR-MOV-20 to verify the operability of the Not-Fully-Closed l (NFC) limit switch contact and associated position indicating lights and )
annunciator. Full stroking the valve also tests the full-open contact and verifies pickup of the associated relay (10A-K103). Relay 10A-K103 contacts provide information to the RHR Minimum Flow Valve when the RHR Crosstie Valve is full open.
Opening RHR-MO-20 places both LPCI subsystems in a configuration which is susceptible to common cause failure. This requires an LCO entry during conditions that require LPCI to be operable. Revising the surveillance frequency would reduce the potential for common cause failure by not placing LPCI in the configuration described above when LPCI is required to be operable.
The current Item identification number for the NFC limit switch contact (RHR-LMS-8) is incorrect. The correct limit switch contact number is LS-16. This editorial change has no impact on the specifications.
- 26 na 3E%S ,
P
- Attachment to NLS970115 Page 2 of 3 3.0 Significant Hazard Determination 10 CFR 50.91 (a) (1) requires that licensee requests for operating license amendments be accompanied by an evaluation of significant hazard posed by the issuance of an amendment. This evaluation is performed with respect to the criteria given in 10 CFR 50.92 (c).
3.1 The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated because none of the accident initiators (pipe breaks, control rod malfunctions, fuel handling equipment etc.) are affected by not opening RHR-MO20 during power operation. No new equipment is being installed which could impact accident initiation frequency. The only operational change introduced is the removal of a plant condition which would make both the LPCI subsystems vulnerable to a common mode failure while the plant is at power. No other operational changes are being introduced.
3.2 The proposed change will not significantly increase the consequences of an accident previously evaluated in the USAR because not opening MO20 during power operation will ensure that the LPCI system can fulfill its safety function in the event of an accident. The only design basis function for MO20 is to remain closed to maintain separation of the two LPCI loops in the event of an accident.
Credit is taken for the opening of MO20 in a "Beyond Design Basis Event" involving flooding of the Primary Containment. Testing MO20 once per cycle will still ensure that the valve will be capable of fulfilling this function. The intent of the testing of the MO20 limit switch is to ensure that any inadvertent opening of the MO20 valve is annunciated in the control room. This objective is maintained by 1) testing the limit switch during each refueling outage,2) monthly checks to ensure that MO20 is closed, and 3) requiring a keylock switch to open MO20.
Thus, this change will assist in assuring operability of the LPCI subsystems and therefore will not increase the consequences of an accident previously evaluated.
3.3 The proposed change will not create the possibility of a new or different kind of accident than evaluated in the USAR. The proposed change does not result in any physical change to CNS Structures, Systems, or Component, nor does it change the fit, form, or function of any equipment / component taken credit for in the accident analyses described in the USAR.
I
'I
' to NLS970115 Page 3 of 3 4.0 Conclusion The District has evaluated the proposed changes described above against the criteria of 10 CFR 50.92 in accordance with the requirements of 10 CFR 50.91 (a) (1). This evaluation has determined that the proposed change to Technical Specifications will not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the-possibility for a new or different kind of accident from any accident previously evaluated, or (3) create a significant reduction in the margin of safety. Therefore, the District requests NRC approval of this proposed change.
JJ
l
.* I l ATTACHMENT 3 LIST OF NRC COMMITMENTS l 1
l "6crre'spondence No: NLS970115 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or l
planned actions by the District. They are described to the NRC for the NRC's l information and are not regulatory commitments. Please notify the Licensing Manager i at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE )
l Develop a procedure to check that RHR-MO20 is in the Within 30 days of closed position monthly. receipt of NRC '
Amendment I
i I
i i
l PROCEDURE NUMBER 0.42 l REVISION NUMBER 4 l PAGE 8 OF 9 l