I' LIMITI!n CO!1DITIOtJS FOR OPEPATIO!!
SURVEILLANCE PFOUIREMEtJT9
(-
3.2
( cont,' d. )
42 (cont'd.)
D.
Radiation Monitorino Systems -
D.
Radiation Monitoring Rvstems -
Isolation Ts -Initiation Functions Isolation & Init iation E' unctions 1.
Steam Jet Air Ejector of f-Gas System 1.
Steam Jet Air Ejector Of f-Gas _ System a.
Operability of the Steam Jet Instrumentation surveillance Air Ejector Off-Gas System requirements are given on-monitor is defined in Table 4.2.D.
Table 3.21.A.2.
b.
The time delay setting for closure of the steam jet air ejector isolation valves shall 1.ot exceed 15 minutes.
c.
Other limiting conditions for operation are_given on Table 3.2.D and Specifications 3.21.A.2 and 3.21.C.6.
2.
Reactor Building Isolation and Standby. Gas Treatment Initiation 2.
Reactor Building Isolation -and Standby Gas Treatment Initiation The limiting conditions for operation are given on Table 3.2.D.
Instrumentation surveillance requirements are given-on 3.
Liquid Radwaste Discharge Isolation Table 4.2.D.
The limiting conditions for operation are given on Table 3.2.D 3.
Liquid Radwaste Discharge Isolation and Specification 3.21.B.
Instrumentation surveillance requirements are given on 4.
Main Control Room Ventilation Table-4.2.D.
Isolation 4.
Main Control Room
. Ventilation-The limiting conditions for Isola h operation are given on Table 3.2.D and the Section entitled " Additional The instrument
.urveillance Safety Related Plant Capabilities."
requirements are
.given on
-Table 4.2.D.
5.
Mechanical Vacuum Pump Isolation a.
The mechanical: vacuum pump 5.
Mechanical Vacuum Pump Isolation-shall-be capable of being automatically isolated and The instrument surveillance secured by a signal of high requirements are given in-1 radiation in the main steam Tables 4.2.A and 4.2.D.
line tunnel whenever the main steam isolation valves-are open.
b.
If the limits of (3.2.D.S.a) are not met, the vacuum pump shall be isolated.
gOCK05000298 242 921015 P