ML20096D446: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:\\
                                                                                                                              \
3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT Containment Leakaae i
3/4.6 CONTAINMENT SYSTEMS
i LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be. limited to:
    ,                    3/4.6.1         PRIMARY CONTAINMENT Containment Leakaae i
TEr4 ace Wir#
i                       LIMITING CONDITION FOR OPERATION
2 INSE4 i
!                      3.6.1.2 Containment leakage rates shall be. limited to:                   TEr4 ace Wir#
a.
2 i                             a. M ever:ll integr:ted 1::k g: r:t: cfr                             INSE4 i
M ever:ll integr:ted 1::k g: r:t: cfr i
: 4. 2 L. (ne,000 scen), 0.20 3:r= t by =ight f th:
4.
                                          = t:in nt :f r p:r 21 heer: :t P.,       50 p:is, er
2 L. (ne,000 scen), 0.20 3:r= t by =ight f th: /
                                                                                                          /
= t:in nt :f r p:r 21 heer: :t P., 50 p:is, er 4.
4
2 'g -(*51,000 S00"), 0.050 per::;t by =ight of the 4
: 4. 2 'g -(*51,000   S00"), 0.050 per::;t by =ight of the per 21 5:cr: :t : 7:d =d prn:;r: ef P ,
per 21 5:cr: :t : 7:d =d prn:;r: ef P,
                                          -25 peig.               -      e               A           -
-25 peig.
: b. A combined leakage rate of 5 0.50 L (173,000 SCCM), for all penetrations and valves subject to type B and C tests when l
e A
pressurized to P..
b.
A combined leakage rate of 5 0.50 L (173,000 SCCM), for all penetrations and valves subject to type B and C tests when pressurized to P..
de etccephnnce c.eiferia. spesiRed in de.
de etccephnnce c.eiferia. spesiRed in de.
APPLICABILITY: MODES 1, 2, 3 and 4.                 Conb41 ament
APPLICABILITY: MODES 1, 2, 3 and 4.
                                                                                    ~    leakaye. Wafe 7Es//ng 3*) fem > i
Conb41 ament leakaye. Wafe 7Es//ng 3*) fem > i
                                                                                                ~                             \
~
ACTION: With either (a                 as ed ove 11 inte te               i                         l g o ay ==C a0_v.75 %                 w " . ;_C" .. . ,5 y           ('.,2.,SC_..),:.j                i s p...__.:V or tb) with the measured combine             eakage rate for all.
\\
penetrationsandvalvessubjecttoTypesBandCtestsexceedino0.504, restore th                              containme                      lesi _then er; Qi t; . 75 ' er . ; ...= Or ;;5: L .. ,. 5 ' , E :;;;1 [:b,          1 Ji and the combined leakage rate or all penetrations and valves subject to Type B and C tests to less than or equal to 0.50 L, prior to increasing the Reactor Coolant System temperature above 200 F.
~
WiUin Ehe Acceptance criteria. specih'ed in de Containment     .
('.,2.,SC_..),:.j ACTION: With either (a as ed ove 11 inte te i
Leakage %fe Te~stin   Progrann SURVEILLANCE REQUIREMENTS 4.6.1.2 The containment leakage rates shall be demonstrated at the following test schedule and shall be determined in conformance with the criteria, methods and provisions specified in 10 CFR Part 50, Appendix J:
g o ay==C a0_v.75 % w ".
e
;_C"
: a. Three Type A tests (Overell !atograted Cen ainant Leakage note) shell be n ,d;;ted :t :pp =i=tely Oge:1 interv:1: during-
.,5 y i
                                      -hatd;.;r. :t either P
s p...__.:V or tb) with the measured combine eakage rate for all.
                                    - ,o q            ..y yo, ___
penetrationsandvalvessubjecttoTypesBandCtestsexceedino0.504, L..,. 5 ', E :;;;1 [:b Ji and the lesi _then er; restore th containme Qi t;. 75 ' er. ;...= Or ;;5:
                                          ..______m__
1 combined leakage rate or all penetrations and valves subject to Type B and C tests to less than or equal to 0.50 L, prior to increasing the Reactor Coolant System temperature above 200 F.
L(50iy_ p:ig) ervat P, (25 p:ig)   ~
WiUin Ehe Acceptance criteria. specih'ed in de Containment Leakage %fe Te~stin Progrann SURVEILLANCE REQUIREMENTS 4.6.1.2 The containment leakage rates shall be demonstrated at the following test schedule and shall be determined in conformance with the criteria, methods and provisions specified in 10 CFR Part 50, Appendix J:
during :::h-Perf.ru tapa;ted                                             tesfiny in accoedance with de Centainment leakage       " &fe 7EsthO lbgnam ,
e a.
CALVERT CLIFFS - UNIT 1                     3/4 6-2           Amendment No. 169 9601190134 960116 PDR ADOCK 05000317 p                   PDR
Three Type A tests (Overell !atograted Cen ainant Leakage note) shell be n,d;;ted :t :pp =i=tely Oge:1 interv:1: during-q
..y yo, L(50 p:ig) er at P, (25 p:ig) during :::h-
-hatd;.;r. :t either P
-,o
..______m__
___ iy_
v
~
Perf.ru tapa;ted tesfiny in accoedance with de Centainment leakage &fe 7EsthO lbgnam,
CALVERT CLIFFS - UNIT 1 3/4 6-2 Amendment No. 169 9601190134 960116 PDR ADOCK 05000317 p
PDR


_ . _ _ .  .      . _ . . _ - . _ _ . _ . _ _ _ _ . _ . _ _ _ . _ _ _ . _ . _ . . . . . . _ _ _ . _ . .. _    _._.m . - _ . _ _ _ _ . _ . . - . . . _
_._.m f
f I
INSERT A I
INSERT A                                                                                                                                 !
a.
: a.           A maximum allowable containment leakage rate, La, as specified in the Specification 6.19,-
A maximum allowable containment leakage rate, L, as specified in the Specification 6.19,-
                              " Containment Leakage Rate Testing Program."
a
" Containment Leakage Rate Testing Program."
l
l
                                                                                                                                                          )
)
i l
i


8 3/4.6 CONTAINMENT SYST M OEL ETE SURVEILLANCE REQUIREMENTS (Continued) i                                                                                                                         _
8 OEL ETE 3/4.6 CONTAINMENT SYST M SURVEILLANCE REQUIREMENTS (Continued) i I any rio c Ty At f 1s me t ei er.75 (2
                                                . I any         rio c Ty       At                 f 1s         me t ei     er .75 (2       500 CCM) or 0. 5 L,                   6         S     ), he t st         hed.le r sub quen Type tes s s                             1       rev           nd     pro db th Com sion.           If wo co secui, ve                     pe     tes     fa to et eit r
500 CCM) or 0. 5 L, 6
                                                    .75       (259 00     CM)               0.         L,     6,2     SC   ). Typ A t st s 11         per med at le st a                               no hs       til   wo         nse ti Ty       A t sts et e ther .75 ry(2 500 SC                                     or .75 (46,00S )a whi ti the boy tes sch ule y s     .
S
                                                . T      acc racy f ea         Ty           A t st s 11               ve fie by su leme tal t st w ich:
),
                                                    . C nfi       the accu cy                     the Type       te by eri ing hat th dif renc bet en                                   nta and               te da is wit n 0. 5 L, 86,                       S pp)lo        0.25 L. ( ype4 SC               .
he t st hed.le r
                                                    .      sa urat ns fic nt                               est blis acc ate                 the cha       e
sub quen Type tes s s 1
                                                        .i   leak eb wee the ype                             tes and upp           n 1 te t.
rev nd pro db th Com sion.
: 3. Requ res       eq ntit of as                           ect d in th cont inme t o led om e co tai                       nt urin the supp                 n 1 te t to be e iva nt t at east                                       of he t al           asu d le age ate t P,               50         5igp) rcenr P. (25 sig).
If wo co secui, ve pe tes fa to et eit r
Type B andI tests sliall be conducted with gas at P (50 psig) at s                intervals of 24 months except for tests involving air locks.
.75 (259 00 CM) 0.
Ju(. Air locks shall be tested and demonstrated OPERABLE per Surve 1             Requirement 4.6.1.3.
L, 6,2 SC
                              '            X All tes             ealuFge rates shall be calculated using observed cata converted _ to absolute                                         =:1y::: :n11 h grf                 ...d i n ig . . . . ..,. . . . _, . _. .
).
                                                . Containment purge isolation valves shall be demonstrated OPERABLE
Typ A t st s 11 per med at le st a no hs til wo nse ti ry(2 Ty A t sts et e ther.75 500 SC or.75 (46,00S
                        @'w                      any time upon entering M0DE 5 from power operation modes, unless the last surveillance test has been perfomed within the past 6 months or any time after being opened and prior to entering M0DE 4 from shutdown modes by verifying that when the measured Exemption to 10 CFR Part 50, Appendix J.
)a whi ti the boy tes sch ule y
CALVERT CLIFFS - UNIT 1                                       3/4 6-3                           Amendment No. 169
s T
acc racy f ea Ty A t st s 11 ve fie by su leme tal t st w ich:
C nfi the accu cy the Type te by eri ing hat th dif renc bet en pp)l 0.25 L. ( ype nta and te da is wit n 0. 5 L, 86, S
o 4
SC sa urat ns fic nt est blis acc ate the cha e
.i leak eb wee the ype tes and upp n 1 te t.
3.
Requ res eq ntit of as ect d in th cont inme t o led om e co tai nt urin the supp n 1 te t to be e iva nt t at east 5 p) rcenr P. (25 sig).
of he t al asu d le age ate t P, 50 ig Type B andI tests sliall be conducted with gas at P (50 psig) at intervals of 24 months except for tests involving air locks.
s Ju(. Air locks shall be tested and demonstrated OPERABLE per Surve 1 Requirement 4.6.1.3.
X All tes ealuFge rates shall be calculated using observed cata converted _ to absolute
=:1y::: :n11 h grf...d i n ig......,.... _,. _..
@'w Containment purge isolation valves shall be demonstrated OPERABLE any time upon entering M0DE 5 from power operation modes, unless the last surveillance test has been perfomed within the past 6 months or any time after being opened and prior to entering M0DE 4 from shutdown modes by verifying that when the measured Exemption to 10 CFR Part 50, Appendix J.
CALVERT CLIFFS - UNIT 1 3/4 6-3 Amendment No. 169


        \
4
4    ..    .
\\
,              3/4.6 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)                           g i                         leakage rate is added to the le                   <
3/4.6 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) g i
rates determined pursuant to Technical Specification 4.6.1.2 sfor all other Type B or C                                               j penetrations, the combined leakage rate is less than or equal to 0.50 L       173,000 SCCM). The leakage rate for the containment 2
leakage rate is added to the le rates determined pursuant to j
purge ls(olation valves shall also be compared to the previousl measured leakage rate to detect excessive valve degradation.
Technical Specification 4.6.1.2 sfor all other Type B or C penetrations, the combined leakage rate is less than or equal to purge ls(olation valves shall also be compared to the previousl 0.50 L 173,000 SCCM). The leakage rate for the containment 2
'              .        The containment purge isolation valve seals shall be replaced                                             ;
measured leakage rate to detect excessive valve degradation.
with new seals at a frequency to ensure no individual seal remains in service greater than 2 consecutive fuel reload cycles.                                         i f
The containment purge isolation valve seals shall be replaced with new seals at a frequency to ensure no individual seal remains in service greater than 2 consecutive fuel reload cycles.
CALVERT CLIFFS - UNIT 1                             3/4 6-4                 Amendment No. 169
i f
CALVERT CLIFFS - UNIT 1 3/4 6-4 Amendment No. 169


            -(
-(
3/4.6 CONTAINMENT SYSTEMS 1
3/4.6 CONTAINMENT SYSTEMS 1
SURVEILLANCE REQUIREMENTS (Continued) 4.6.1.6.2 End Anchoraces and Ad.iacent Concrete Surfaces. The structural integrity of the end anchorages and adjacent concrete surfaces shall be demonstrated by detemining through inspection of a representative sample of tendons (reference Specification 4.6.1.6.1) that no apparent changes have occurred in the visual appearance of the end anchorages or their                                                                     I adjacent concrete exterior surfaces. Also, inspections of the pre-selected                                                                 i concrete crack patterns adjacent to end anchorages shall be perfomed during the Type A containment leakage rate tests (reference Specification 4.6.1.2) while the containment is at its maximum test pressure.
SURVEILLANCE REQUIREMENTS (Continued) 4.6.1.6.2 End Anchoraces and Ad.iacent Concrete Surfaces. The structural integrity of the end anchorages and adjacent concrete surfaces shall be demonstrated by detemining through inspection of a representative sample of tendons (reference Specification 4.6.1.6.1) that no apparent changes have occurred in the visual appearance of the end anchorages or their adjacent concrete exterior surfaces. Also, inspections of the pre-selected i
4.6.1.6.3 Containment Surfaces. The exposed accessible interior and exterior surfaces of the containment includina the liner plate shall be visually i     e           d ur ng He sh                                     o   f   ch Ty~p A on i   n7 ka a ~ts (re er nc Sp ci ica io 4. 1.                                                 . Th i spe ti s al be er o d rio t te pe c nt in. t a ge at te t                                                           u o r y id nc o st et r                         d ter or to wh ch                         y ff t ith r   e                                 ,
concrete crack patterns adjacent to end anchorages shall be perfomed during the Type A containment leakage rate tests (reference Specification 4.6.1.2) while the containment is at its maximum test pressure.
4 c t n nt t et a in egr ty r eak tig tn s.                                                                                                 l 4.6.1.6.4 . Reports. Any abnormal degradation of the containment structure detected during the above required tests and inspections shall be reported to the Consission pursuant to Specification 6.9.2 within the next 30 days.
4.6.1.6.3 Containment Surfaces. The exposed accessible interior and exterior surfaces of the containment includina the liner plate shall be visually i e
d ur ng He sh o
f ch Ty~p A on i n7 ka a ~ts (re er nc Sp ci ica io 4.
1.
Th i spe ti s al be er o d rio t te pe c nt in.
t a ge at te t u o r y
id nc o st et r d ter or to wh ch y ff t ith r e
c t n nt t et a in egr ty r eak tig tn s.
4 4.6.1.6.4. Reports. Any abnormal degradation of the containment structure detected during the above required tests and inspections shall be reported to the Consission pursuant to Specification 6.9.2 within the next 30 days.
This report shall include a description of the tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedures, the tolerances on cracking, and the corrective actions taken.
This report shall include a description of the tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedures, the tolerances on cracking, and the corrective actions taken.
_                          ~                       v       v         v in accordance       S with de Contain,,,,,J Leakage                             ~7Rate visL %Q (teference         ycl0cabjon                                      Y.
~
CALVERT CLIFFS - UNIT 1                                                       3/4 6-11           Amendment No. 169
v v
v in accordance with de Contain,,,,,J Leakage Rate visL %Q
~7 (teference S
Y.
ycl0cabjon CALVERT CLIFFS - UNIT 1 3/4 6-11 Amendment No. 169


6.0 ADMINISTRATIVE CONTR0LS
6.0 ADMINISTRATIVE CONTR0LS
(                         6.17.2 Licensee initiated ~ changes to the ODCM:
(
: a. Shall be submitted to the Commission in the Semiannual                         .
6.17.2 Licensee initiated ~ changes to the ODCM:
Radioactive Effluent Release Report for the period in which the               l change (s) was made effective. This submittal shall contain:
a.
: 1. . Sufficient information to support the rationale for the                 !
Shall be submitted to the Commission in the Semiannual l
change.       Infomation submitted should consist of a package of those pages of the ODCM to be changed with each page numbered           ;
Radioactive Effluent Release Report for the period in which the change (s) was made effective. This submittal shall contain:
and provided with a change number and/or change date together with appropriate analyses or evaluations justifying the change (s);
: 1.. Sufficient information to support the rationale for the change.
: 2. A determination that the change will not reduce the accuracy or reliability of dose calculations or setpoint deteminations; and
Infomation submitted should consist of a package of those pages of the ODCM to be changed with each page numbered and provided with a change number and/or change date together with appropriate analyses or evaluations justifying the change (s);
: 3. Documentation of the fact that the change has been reviewed and found acceptable by the POSRC.
2.
: b. Shall become effective upon review by the POSRC and approval of the Plant General. Manager.-
A determination that the change will not reduce the accuracy or reliability of dose calculations or setpoint deteminations; and 3.
Documentation of the fact that the change has been reviewed and found acceptable by the POSRC.
b.
Shall become effective upon review by the POSRC and approval of the Plant General. Manager.-
6.18 MAJOR CHANGES TO RADI0 ACTIVE LIOUID. GASEOUS AND SOLID WASTE TREATM ENT SYSTEMS 6.18.1 Licensee initiated major changes to the Radioactive Waste Systems (liquid, gaseous and solid) shall be reported to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the modification to the waste system is completed. The discussion of each change shall contain:
6.18 MAJOR CHANGES TO RADI0 ACTIVE LIOUID. GASEOUS AND SOLID WASTE TREATM ENT SYSTEMS 6.18.1 Licensee initiated major changes to the Radioactive Waste Systems (liquid, gaseous and solid) shall be reported to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the modification to the waste system is completed. The discussion of each change shall contain:
: a. A description of the equipment, components and processes involved.
a.
: b. Documentation of the fact that the change including the safety analysis was reviewed and found acceptable by the POSRC.
A description of the equipment, components and processes involved.
b.
Documentation of the fact that the change including the safety analysis was reviewed and found acceptable by the POSRC.
INSEAT* b i
INSEAT* b i
CALVERT CLIFFS - UNIT 1                         6-31             Amendment No. 186           l
CALVERT CLIFFS - UNIT 1 6-31 Amendment No. 186 l


k 1     .
k 1
(NOTE: This Specification will be renumbered 6.5.6 following approval of BGE's Administrative Controls License Amendment Request, dated March 15,1995. Other references to Specification 6.19 will also be changed to 6.5.6 following approval of that License Amendment Request.)
(NOTE: This Specification will be renumbered 6.5.6 following approval of BGE's Administrative Controls License Amendment Request, dated March 15,1995. Other references to Specification 6.19 will also be changed to 6.5.6 following approval of that License Amendment Request.)
INSERT B 6.19     Contamment Leakage Rate Testing Program A program shall be established to implement the leakage testing of the containment as required by 10 CFR 50.54 (o) and 10 CFR Part 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, " Performance-Based Contamment Leak-Test Program," dated September 1995, as modified by approved exceptions.
INSERT B 6.19 Contamment Leakage Rate Testing Program A program shall be established to implement the leakage testing of the containment as required by 10 CFR 50.54 (o) and 10 CFR Part 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, " Performance-Based Contamment Leak-Test Program," dated September 1995, as modified by approved exceptions.
The peak calculated containment internal pressure for the design basis loss-of-coolant accident, Pa.
The peak calculated containment internal pressure for the design basis loss-of-coolant accident, P.a is 49.4 psig. The containment design pressure is 50 psig.
is 49.4 psig. The containment design pressure is 50 psig.
The maximum allowable containment leakage rate, L, shall be 0.20 percent of containment air a
The maximum allowable containment leakage rate, L     a , shall be 0.20 percent of containment air weight per day at Pa-Containment leakage rate acceptance criterion is s 1.0aL . During the first unit startup following testing in accordance with this program, the leakage rate acceptance criteria is s 0.75 aL for Type A tests.
weight per day at P -
a Containment leakage rate acceptance criterion is s 1.0 L. During the first unit startup following a
testing in accordance with this program, the leakage rate acceptance criteria is s 0.75 L for a
Type A tests.
The provisions of Specification 4.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.
The provisions of Specification 4.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.
The provisions of Specification 4.0.3 are applicable to the Containment Leakage Rate Testing Program.
The provisions of Specification 4.0.3 are applicable to the Containment Leakage Rate Testing Program.


..        i 3/4.6 CONTAIMENT SYSTEMS                                                                                                       !
i 3/4.6 CONTAIMENT SYSTEMS i
i BASES 3/4.6.1 PRIMARY CONTAINMENT 3/4.6.1.1 CONTAINMENT INTEGRITY In MODES 1, 2, 3, and 4, primary CONTAIMENT INTEGRITY ensures that the release of radioactive materials from the containment atmosphere will be restricted to those leakage paths and associated leak rates assumed in the                                                     i accident analyses. This restriction, in conjunction with the leakage rate                                                       i limitation, will limit the SITE B0UNDARY radiation doses to within the limits of 10 CFR Part 100 during accident conditions. In MODES 5 and 6,                                                         ;
BASES 3/4.6.1 PRIMARY CONTAINMENT 3/4.6.1.1 CONTAINMENT INTEGRITY In MODES 1, 2, 3, and 4, primary CONTAIMENT INTEGRITY ensures that the release of radioactive materials from the containment atmosphere will be restricted to those leakage paths and associated leak rates assumed in the i
the probability and consequences of these events are reduced because of the Reactor Coolant System (RCS) pressure and temperature limitations of these modes, by preventing operations which could lead to a need for containment isolation, and by providing containment isolation through penetration closure.                                                                                                                        .
accident analyses. This restriction, in conjunction with the leakage rate limitation, will limit the SITE B0UNDARY radiation doses to within the limits of 10 CFR Part 100 during accident conditions.
1 k/ITH                         WSMr 0 3/ 6.1.       Chai                             [bEPLACE co at 11   tat ns\ocont inmewi lenotagexceetes t1 kage vol nsur tha th tot 1 the alue ss                                     d         t cci nt alys at he p ka iden pre ure, %.                                                          a ad d c se       tis     the   as ed o eral int rate lea: ge r e                                                       fu the 11     ted     5 75       or _       (     ap icab )d ing                             rfo anc of he eri   ic t ts       ac unt or p sib               de adat no the                                         nt nme t ,
In MODES 5 and 6, the probability and consequences of these events are reduced because of the Reactor Coolant System (RCS) pressure and temperature limitations of these modes, by preventing operations which could lead to a need for containment isolation, and by providing containment isolation through penetration closure.
1   kag bar ers etwe           le age ests.
1
es vei       anc tes ng       r       suri       le age ates re                                     nsis ent wit th re ir           ts     10 FR       rt     . Ap endi J,                 cep for                                 ep fo anc f     e   and     lea ge     sti     .      ea owa e le kage ate as b en i p po ion ely edu d                   re       n ed i Gen ic                         tte 91-0                         to cc nt for n       ten ds vei R 0.2 anca sch       ule f 24 nt 9 +                                       (r                         !
[bEPLACE k/ITH WSMr 0 3/
I    ec ica on Ap nd        J.             *(s i Th          an    cep on omKCF Part 50                                                       l 3/4.6.1.3 Containment Air Locks l
6.1.
The limitations on closure and leak rate for the containment air locks are                                                       '
Chai ns\\o 11 tat cont inme le age tes nsur tha th tot 1 co at t1 kage vol wi not xcee the alue ss d
required to meet the restrictions on CONTAINMENT INTEGRITY and containment leak rate. Surveillance testing of.the air lock seals provides assurance that the overall air lock leakage will not become excessive due to seal damage during the intervals between air lock leakage tests.
t cci nt alys at he p ka iden pre ure, a ad d c se tis the as ed o eral int rate lea:
i CALVERT CLIFFS - UNIT 1                     B 3/4 6-1                                   Amendment No. 169
ge r e fu the 11 ted 5
75 or _
(
ap icab )d ing rfo anc of he eri ic t ts ac unt or p sib de adat no the nt nme t,
1 kag bar ers etwe le age ests.
es vei anc tes ng r
suri le age ates re nsis ent wit th re ir ts 10 FR rt
. Ap endi J,
cep for ep fo anc f
e and lea ge sti ea owa e le kage ate as b en i p po ion ely edu d
re n ed i Gen ic tte 91-0 to cc nt vei R a for n ten ds anc sch ule f 24 nt 9 +
( r I
ec ica on 0.2 Th an cep on
*(s i omKCF Part 50 Ap nd J.
3/4.6.1.3 Containment Air Locks The limitations on closure and leak rate for the containment air locks are required to meet the restrictions on CONTAINMENT INTEGRITY and containment leak rate. Surveillance testing of.the air lock seals provides assurance that the overall air lock leakage will not become excessive due to seal damage during the intervals between air lock leakage tests.
i CALVERT CLIFFS - UNIT 1 B 3/4 6-1 Amendment No. 169


  .      .    . . .    .                  -                                    -    ..      --                    . - . ~ - --
. -. ~
..        .i INSERT C 3/4.6.1.2       Containment Leakane Maintaining the containment OPERABLE requires compliance with the visual examinations and leakage rate test requirements of the Containment Leakage Rate Testing Program for Type A tests, and 10 CFR Part 50, Appendix J, Option A for Type B and C tests. As-left leakage prior to the first startup after performing a required leakage test is required to be s 0.75 L. for overall Type A leakage. At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of s 1.0 L.. At s 1.0 L the offsite dose consequences are bounded by the assumptions of the safety analysis. 'Ihe frequency of Type A testmg is specified in the Containment Leakage Rate Testing Program.
.i INSERT C 3/4.6.1.2 Containment Leakane Maintaining the containment OPERABLE requires compliance with the visual examinations and leakage rate test requirements of the Containment Leakage Rate Testing Program for Type A tests, and 10 CFR Part 50, Appendix J, Option A for Type B and C tests. As-left leakage prior to the first startup after performing a required leakage test is required to be s 0.75 L. for overall Type A leakage. At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of s 1.0 L.. At s 1.0 L the offsite dose consequences are bounded by the assumptions of the safety analysis. 'Ihe frequency of Type A testmg is specified in the Containment Leakage Rate Testing Program.
                'Ihe surveillance testing for measuring leakage rates are consistent with the requirements of 10 CFR Part 50, Appendix J, Option B for Type A tests. For Type B and C testing, the allowable leakage rate has been proportionately reduced, as recommended in Generic Letter 91-04, to account for an extended surveillance schedule of 24 months + 25% (per Specification 4.0.2).         This is an exception from 10 CFR Part 50, Appendix J.
'Ihe surveillance testing for measuring leakage rates are consistent with the requirements of 10 CFR Part 50, Appendix J, Option B for Type A tests. For Type B and C testing, the allowable leakage rate has been proportionately reduced, as recommended in Generic Letter 91-04, to account for an extended surveillance schedule of 24 months + 25% (per Specification 4.0.2).
This is an exception from 10 CFR Part 50, Appendix J.


l ' L:.     .                                                                                  l j     ..
l ' L:.
3/4.6 CONTAINMENT SYSTDt$
j 3/4.6 CONTAINMENT SYSTDt$
l.s i
l.s gg3g i
gg3g                                                                        !
i 1
i 1
i t
i 3/4.6.1.4 Internal Pressure t
3/4.6.1.4 Internal Pressure i
i The limitations on containment internal pressure ensure that 1) the containment structure is prevented from exceeding it design negative i
The limitations on containment internal pressure ensure that 1) the
pressure differential with respect to the outside atmosphere of 3.0 psig and 2) the containment peak pressure does not exceed the design pressure of l
!                  containment structure is prevented from exceeding it design negative i                 pressure differential with respect to the outside atmosphere of 3.0 psig and 2) the containment peak pressure does not exceed the design pressure of l                 50 psig during LOCA or steam line break conditions.
50 psig during LOCA or steam line break conditions.
4
4
]                 The maximum peak pressure expected to be obtained from a LOCA event is 47.6 l                 psig assuming an initial containment pressure of 14.7 psia. The limit of
]
;                  1.8 psig for initial positive containment pressure will limit the total pressure to 49.4 psig which is less than the design pressure and is
The maximum peak pressure expected to be obtained from a LOCA event is 47.6 l
psig assuming an initial containment pressure of 14.7 psia. The limit of 1.8 psig for initial positive containment pressure will limit the total pressure to 49.4 psig which is less than the design pressure and is
?
?
4 consistent with the accident analyses. The maximum peak pressure expected to be obtained from a steam line break event is 49.2 psig assuming an
consistent with the accident analyses. The maximum peak pressure expected 4
;                  initial containment pressure of 16.5 psia (1.8 psig).
to be obtained from a steam line break event is 49.2 psig assuming an initial containment pressure of 16.5 psia (1.8 psig).
;                  3/4.6.1.5 Air Temocrature j                 The limitation on containment average air temperature ensures that the containment peak air temperature does not exceed the design temperature of 4
3/4.6.1.5 Air Temocrature j
1 276 F during LOCA conditions. The containment temperature limit is consistent with the accident analyses.
The limitation on containment average air temperature ensures that the containment peak air temperature does not exceed the design temperature of 4
276 F during LOCA conditions. The containment temperature limit is 1
consistent with the accident analyses.
f 3/4.6.1.6 Containment Structural Intearity i
f 3/4.6.1.6 Containment Structural Intearity i
The limitation ensures that the structural integrity of the containment
The limitation ensures that the structural integrity of the containment
{                 will be maintained comparable to the original design standards for the life i i
{
j of the facility. Structural integrity is required to ensure that the containment will withstand the maximum pressure of 47.6 psig in the event 1
will be maintained comparable to the original design standards for the life i
i of a LOCA. The measurement of containment tendon lift off force, the visual and metallurgical examination of tendons, anchorages and liner and   i the Type A leakage tests are sufficient to demonstrate this capability.
i of the facility. Structural integrity is required to ensure that the j
I                 The surveillance requirements for demonstrating the containment's
containment will withstand the maximum pressure of 47.6 psig in the event 1
!                  structural integrity are consistent with the intent of the reconmendations
of a LOCA. The measurement of containment tendon lift off force, the i
!                  of Regulatory Guide 1.-35 " Inservice Surveillance of Ungrouted Tendons in j                 Prestressed Concrete Containment Structures". January 1976.
visual and metallurgical examination of tendons, anchorages and liner and the Type A leakage tests are sufficient to demonstrate this capability.
I The surveillance requirements for demonstrating the containment's structural integrity are consistent with the intent of the reconmendations of Regulatory Guide 1.-35 " Inservice Surveillance of Ungrouted Tendons in j
Prestressed Concrete Containment Structures". January 1976.
The end anchorage concrete exterior surfaces are checked visually for indications of abnormal material behavior during tendon surveillance.
The end anchorage concrete exterior surfaces are checked visually for indications of abnormal material behavior during tendon surveillance.
Inspections of pre-selected concrete crack patterns are perfomed during the Type A containment leakage rate tests, consistent with the Structural Integrity Test.,
Inspections of pre-selected concrete crack patterns are perfomed during the Type A containment leakage rate tests, consistent with the Structural Integrity Test.,
s           -
s
                                                          ~                           v
~
]               f Yisaa,I Inspections of lbe accessible infeti*t ud ederier sur)$aes of fbe con fajn,,,ent are perhemed to allm &t ese) uncovering of evidence Ava   :
v
n .9 st~.tu,ai .teka.nas.n. # rr.p.ncy .r >Aasa ins, e.ne is in 1
]
ape,,,ad wilf Ap ahm   l        Gde 1.145, dded syk,,k MS A         -            A CALVERT CLIFFS - UNIT 1           B 3/4 6-2             Amendment No. 169
f Yisaa,I Inspections of lbe accessible infeti*t ud ederier sur)$aes of fbe co fajn,,,ent are perhemed to allm &t ese) uncovering of evidence n
Ava n.9 st~.tu,ai.teka.nas.n. # rr.p.ncy.r >Aasa ins, e.ne is in 1 ape,,,ad wilf Ap ahm de 1.145, dded syk,,k MS l
G A
A CALVERT CLIFFS - UNIT 1 B 3/4 6-2 Amendment No. 169


ATTACHMENT (4)
ATTACHMENT (4)
UNIT 2 MARKED-UP TECHNICAL SPECIFICATION PAGES 3/4 6-2 3/4 6-3 3/46-4 3/4 6-10 6-31 B 3/4 6-1 B 3/4 6-2 l
UNIT 2 MARKED-UP TECHNICAL SPECIFICATION PAGES 3/4 6-2 3/4 6-3 3/46-4 3/4 6-10 6-31 B 3/4 6-1 B 3/4 6-2 Ealtimore Gas a id Electric Company License Ame;:dment Request January 16,1996
Ealtimore Gas a id Electric Company License Ame;:dment Request January 16,1996


3/4.6 CONTAINMENT SYSTEMS 3/4.6.1             PRIMARY CONTAINMENT Containment Leakaae LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to:                                                       REmcE wrW Ov:=11 int ;nt d 10:h:;: nt: Of:                                                               INSEAT A
3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT Containment Leakaae LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to:
                                          -1.                  ?? 000 000"), 0.20 p: n;at by ::isht Of th:
REmcE wrW Ov:=11 int ;nt d 10:h:;: nt: Of:
2:: 'E.:(ic ;;t mir ;:r 24 b-5 t P., 50 p:!;. er
INSEAT A 2 'E.:(ic ;;t mir ;:r 24 b-5 t P., 50 p:!;. er
                                          -2.
?? 000 000"), 0.20 p: n;at by ::isht Of th:
                                                  ...        .-- _... . . . . u, S.CL".,).,.
-1.
2.._'".1.,(,44,5^^
2.._'".1.,(,44,5^^ S.CL".,).,. 0.^'2 ;;r:: t by ::!;ht of th:
6.. . ..
-2.
                                                                                                                    .+.w....a._r_.......,
.-- _....... u, 6......+.w....a._r_.......,
0.^'2 ;;r:: t by ::!;ht of th:
.. -- y b.
                                                  . . -- y
A combined leakage rate of < 0.50 L (173,000 SCCM), for all penetrations and valves subTect to type B and C tests when pressurized to P.
: b. A combined leakage rate of < 0.50 L (173,000 SCCM), for all penetrations and valves subTect to type B and C tests when pressurized to P .
be accepfance criferia. specibeol in lbs APPLICABILITY: MODES 1, 2, 3 and 4.
be accepfance criferia. specibeol in lbs APPLICABILITY: MODES 1, 2, 3 and 4.
CeJay.n dleakage hte 7isk,,g % yam, ACTION: With either                                                                                                              j grate aufadind(a[g,overall             ,._,,s                  2 .,,,      ingcontainment$_001. Or 0.75, J33,400
CeJay. dleakage hte 7isk,,g % yam, n
                            ,. . ... .: or to) w1T.n the niiasured combined leakage rate for all' pene rat ons and valves subject to Types B and C tests exceo. ding                                           i      0.50 L ,
grate aufadind(a[g,overall ingcontainment$_001. Or 0.75, J33,400 ACTION: With either j
::: Tht: w C;5;l30           f.7"7   -f 10:t tatetr.!r.for        f:q;;;rall          10 penetrations 0~.Z5 4,_::             and        n valves e
,._,,s 2.,,,
subl c6mbinedleaia                                                                                                     o Type B and C tests to less than or equal to 0.50 L, prior to increasing the Reactor                                                             i' Coolant System temperature above 200 F.
,......: or to) w1T.n the niiasured combined leakage rate for all' pene rat ons and valves subject to Types B and C tests exceo. ding 0.50 L,
j WY In Ebe accepbtnce cdkvia specIAodin ] e Con %ed leahap 2?afe Tsh,9 % gen,n ,
i C;5;l30 f.7"7 tate for all penetrations and valves sub
SURVEILLANCE REQUIREMENTS 4.6.1.2 The containment leakage rates shall be demonstrated at the                                                                     i following test schedule and shall be determined in confomance with the criteria, methods and provisions specified in 10 CFR Part 50 Appendix J:
::: Tht: w
: a.      Ty      ^ t::t:
-f 10:t tr.!r. f:q;;;r 10 0~.Z5 4,_::
b ;;:: d::t:d derta; :h tdr. :t either P. (50 p;ig, e-et-(0=n11 Ir.t:;nte) l P (25 p;ig). The in gt:r.:y Of the Ty p A t::t: :h:11 be ir,J
n e
                                        /:: e=dence with 10 CFR Pert 50. Appen M L es =a m i ,4 by app- :d e--ti:::.
c6mbinedleaia o Type B and C tests to less than or equal to 0.50 L, prior to increasing the Reactor i
1 Nerin               uired visaal exantinkiens anol 5pe A fedin                                               in accordance with lbe           entainme CALVERT CLIFFS - UNIT 2                                                   3/4 6-2                   Amendment No. 183
Coolant System temperature above 200 F.
j WY In Ebe accepbtnce cdkvia specIAodin ] e Con %ed leahap 2?afe Tsh,9 % gen,n,
SURVEILLANCE REQUIREMENTS 4.6.1.2 The containment leakage rates shall be demonstrated at the following test schedule and shall be determined in confomance with the criteria, methods and provisions specified in 10 CFR Part 50 Appendix J:
b ;;:: d::t:d derta; :h tdr. :t either P. (50 p;ig, e-et-(0=n11 Ir.t:;nte Ty
^ t::t:
a.
l P (25 p;ig). The in gt:r.:y Of the Typ A t::t: :h:11 be ir,J
/:: e=dence with 10 CFR Pert 50. Appen M L es =a m i,4 by app- :d e--ti:::.
1 Nerin uired visaal exantinkiens anol 5pe A fedin in accordance with lbe entainme CALVERT CLIFFS - UNIT 2 3/4 6-2 Amendment No. 183


  ,              g a
g a
INSERT A i
INSERT A i
: a.     A maximum allowable containment leakage rate, La, as specified in the Specification 6.19,                             i
a.
                            " Containment Leakage Rate Testing Program."
A maximum allowable containment leakage rate, L, as specified in the Specification 6.19, i
l I
a
i i
" Containment Leakage Rate Testing Program."
I l
I i
f m - . _ - -,
i I
f m
7


3/4.6 CONTAllMENT SYSTEMS it               SURVEILUDICE REQUIREMENTS (Continued) 3 i                        I.'
3/4.6 CONTAllMENT SYSTEMS it SURVEILUDICE REQUIREMENTS (Continued) 3 I.'
b            any eri                 ic T eA est                         ils o me         eit r 0.       L 4
any eri ic T eA est ils o me eit r 0.
( 9,5               SCCM or                           75 L (33, 00 S ), e te t se dtIlefor
L b
.                              sub quen Typ A te ts s 11                                                 rey     ed     d ap rove by t e
i
:                              Comm sion. If                                         c sec ive           pe A test fail o me t ei er
( 9,5 SCCM or 75 L (33, 00 S
                                    .75 L. (259 00                               CM)           0. L,   3,4 SC           ,a pe A test s 11 b per                                   d t le te                         son     s un   1t     con cut er        ry(25                    r 0.
),
Ty (33, At ts                           t ei                   75 L           500    CM)            L,     ek j                                                SC ) at whic time the ove est hedu e ma be i                                   es       .
e te t se dtIlefor 4
3 Th accu cy o each Type                                             tes sha         be eri       db a i                               supp             nt 1 tes whi :
sub quen Typ A te ts s 11 rey ed d ap rove by t e Comm sion.
1        Con ims he a urac of t e Ty e A                                               st     ver fyin that the           ffer' ce                           twee supp       n 1a         Typ At t da       is ithin 0.25                               (8 500           CM)     0.     L,   11,1     SC   ).
If c sec ive pe A test fail o me t ei er
Ha a du tion uffi                                       ent o es bli           ac rate y th chan in 1           kage etwe                           th Type       tes an supp emen. 1 te t.
.75 L. (259 00 CM) 0.
                                    . R uire the uant                                         of as i ect           in th cont inme or bl         f             the               ntai       nt urin the -Jpp               nt 1 te to e equi lent to at leas                                                               to 1      sure rat at P. (50 25igp) cent                          of5pt g).        -
L, 3,4 SC
aka                                                              P.
,a pe A test s 11 b per d t le te son s un 1t con cut 500 CM) r 0.
L, ek ry(25 Ty At ts t ei er 75 L j
(33, SC ) at whic time the ove est hedu e ma be i
es Th accu cy o each Type tes sha be eri db a 3
i supp nt 1 tes whi 1
Con ims he a urac of t e Ty e A st ver fyin that the ffer' ce twee supp n 1a Typ At t da is ithin 0.25 (8 500 CM) 0.
L, 11,1 SC
).
Ha a du tion uffi ent o es bli ac rate y th chan in 1 kage etwe th Type tes an supp emen. 1 te t.
R uire the uant of as i ect in th cont inme or bl f
the ntai nt urin the -Jpp nt 1 te to e 25 p) cent of t to 1 sure equi lent to at leas aka rat at P. (50 ig P.
5p g).
(
(
Type B and C tests shall be conducted with gas at P (50 psig) at intervals of 24 months except for tests involving air locks.
Type B and C tests shall be conducted with gas at P (50 psig) at intervals of 24 months except for tests involving air locks.
C.         . Air locks shall be tested and demonstrated OPERABLE per Surve             ance equirement 4.6.1.3.
C.
cd.        .
Air locks shall be tested and demonstrated OPERABLE per Surve ance equirement 4.6.1.3.
All convertedte ^Teakage     to absolute'value        rates shall be calculated                 usingteobserveh.
cd.
r.:ly :: f;;11       n       . era j
All te ^Teakage rates shall be calculated using observeh.. era j converted to absolute'value r.:ly :: f;;11 te n
:1 f.:Q:yed 1::k;;;; 2 ;;r;nr.t :ystag;;;.
:1 f.:Q:yed 1::k;;;; 2 ;;r;nr.t :ystag;;;.
                              . Containment purge isolation valves shall be demonstrated OPERABLE any time upon entering M0DE 5 from POWER OPERATION MODES, unless the last surveillance test has been perfomed within the past 6 months or any time after being opened and prior to entering MODE 4 from shutdown modes by verifying that when the measured t
Containment purge isolation valves shall be demonstrated OPERABLE any time upon entering M0DE 5 from POWER OPERATION MODES, unless the last surveillance test has been perfomed within the past 6 months or any time after being opened and prior to entering MODE 4 from shutdown modes by verifying that when the measured t
Exemption to 10 CFR Part 50, Appendix J.
Exemption to 10 CFR Part 50, Appendix J.
CALVERT CLIFFS - UNIT 2                                                   3/4 6-3                     Amendment No. 149
CALVERT CLIFFS - UNIT 2 3/4 6-3 Amendment No. 149


4
4 s
  .*.    * , s                                                                                        l 3/4.6 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)           h                                   )
3/4.6 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) h
leakage rate is added to the lea a rates determined pursuant to Technical Specification 4.6.1.2     or all other Type B or C penetrations, the combined leakage rate is less than or equal to 0.50 L (173,000 SCCM). The leakage rate for the containment purge isolation valves shall also be compared to the previously measured leakage rate to detect excessive valve degradation.               !
)
{,         The containment purge isolation valve seals shall be replaced with new seals at a frequency to ensure no individual seal remains in service greater than 2 consecutive fuel reload cycles.
leakage rate is added to the lea a rates determined pursuant to Technical Specification 4.6.1.2 or all other Type B or C penetrations, the combined leakage rate is less than or equal to 0.50 L (173,000 SCCM). The leakage rate for the containment purge isolation valves shall also be compared to the previously measured leakage rate to detect excessive valve degradation.
                                                                            \
{,
I l
The containment purge isolation valve seals shall be replaced with new seals at a frequency to ensure no individual seal remains in service greater than 2 consecutive fuel reload cycles.
CALVERT CLIFFS - UNIT 2             3/4 6-4               Amendment No. 149
\\
I CALVERT CLIFFS - UNIT 2 3/4 6-4 Amendment No. 149


3/4.6 CONTAINMENT SYSTEMS 4
3/4.6 CONTAINMENT SYSTEMS 4
SURVEILLANCE REQUIREMENTS (Continued) l 4.6.1.6.3 Containment Surfaces. The exposed accessible' interior lan                                                             l exterior surfaces of the containment including the liner late shall bel                                                         I VLsually insne ed u in t                             u o                   r ch yp A o ai                     e ae fite e                 e r nc S ec fi at on 4. 1. ). Th i sp t n ha 1 e se fo               p o t te yp A co ta                           nt lea ge at t t o ne ve ay Ivi en             e f t et ra t to at o wh ch ay ff t it r he                                                                 ,
SURVEILLANCE REQUIREMENTS (Continued) 4.6.1.6.3 Containment Surfaces. The exposed accessible' interior lan exterior surfaces of the containment including the liner late shall bel VLsually insne ed u in t u o r
l c nt_ i             n s ru t al i e it                 ak ti htn ss.                                                   '
ch yp A o ai e ae fite e e r nc S ec fi at on 4.
4.6.1.6.4 Reports. Any abnomal degradation of the containment structure detected during the above required tests and inspections shall be reported to the Consnission pursuant to Specification 6.9.2 within the next 30 days.                                                       ,
: 1. ).
This report shall include a description of the _ tendon condition, the                                                           '
Th i sp t n ha 1 e se fo p o t te yp A co ta nt lea ge at t t o ne ve ay Ivi en e f t et ra t to at o wh ch ay ff t it r he c nt_ i n s ru t al i e it ak ti htn ss.
condition of the concrete (especially at tendon anchorages), the inspection                                                       ;
4.6.1.6.4 Reports. Any abnomal degradation of the containment structure detected during the above required tests and inspections shall be reported to the Consnission pursuant to Specification 6.9.2 within the next 30 days.
procedures, the tolerances on cracking, and the corrective actions taken.                                                         1 in accotNance             /           ConlainXd les h am gf  (referey Speeihedian Y.4.V l
This report shall include a description of the _ tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedures, the tolerances on cracking, and the corrective actions taken.
l
1 in accotNance
                                                                                                                                                                  \
/
l l
ConlainXd les h am (referey Speeihedian Y.4.V gf
\\
l j
l j
CALVERT CLIFFS - UNIT 2                                 3/4 6-10                         Amendment No. 149
CALVERT CLIFFS - UNIT 2 3/4 6-10 Amendment No. 149


6.0 ADMINISTRATIVE CONTROLS b           6.17 0FFSITE DOSE CALCULATION MANUAL (0DCM) 6.17.1 The ODCM shall be approved by the Comission prior to implementation.
6.0 ADMINISTRATIVE CONTROLS b
6.17 0FFSITE DOSE CALCULATION MANUAL (0DCM) 6.17.1 The ODCM shall be approved by the Comission prior to implementation.
6.17.2 Licensee initiated changes to the ODCM:
6.17.2 Licensee initiated changes to the ODCM:
: a. Shall be submitted to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the change (s) was made effective. This submittal shall contain:
a.
: 1. Sufficient information to support the rationale for the change. Information submitted should consist of a package of those pages of the ODCM to be changed with each page numbered and provided with a change number and/or change date together with appropriate analyses or evaluations justifying the change (s);
Shall be submitted to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the change (s) was made effective. This submittal shall contain:
: 2. A determination that the change will not reduce the accuracy or reliability of dose calculations or setpoint determinations; and
1.
: 3. Documentation of the fact that the change has been reviewed
Sufficient information to support the rationale for the change.
    ,                          and found acceptable by the POSRC.
Information submitted should consist of a package of those pages of the ODCM to be changed with each page numbered and provided with a change number and/or change date together with appropriate analyses or evaluations justifying the change (s);
: b. Shall become effective upon review by the POSRC and approval of
2.
'(                        the Plant General Manager.
A determination that the change will not reduce the accuracy or reliability of dose calculations or setpoint determinations; and 3.
Documentation of the fact that the change has been reviewed and found acceptable by the POSRC.
'(
Shall become effective upon review by the POSRC and approval of b.
the Plant General Manager.
6.18 MAJOR CHANGES TO RADI0 ACTIVE LIQUID. GASE0US AND SOLID WASTE TREATMENT SYSTEMS 6.18.1 Licensee initiated major changes to the Radioactive Waste Systems (liquid, gaseous and solid) shall be reported to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the modification to the waste system is completed. The discussion of each change shall contain:
6.18 MAJOR CHANGES TO RADI0 ACTIVE LIQUID. GASE0US AND SOLID WASTE TREATMENT SYSTEMS 6.18.1 Licensee initiated major changes to the Radioactive Waste Systems (liquid, gaseous and solid) shall be reported to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the modification to the waste system is completed. The discussion of each change shall contain:
: a. A description of the equipment, components and processes involved,
a.
: b. Documentation of the fact that the change including the safety
A description of the equipment, components and processes
                        , analysis was reviewed and found acceptable by the POSRC.
: involved, b.
Documentation of the fact that the change including the safety
, analysis was reviewed and found acceptable by the POSRC.
Inssxr 8
Inssxr 8
(
(
CALVERT CLIFFS - UNIT 2                   6-31                   Amendment No. 163                     l
CALVERT CLIFFS - UNIT 2 6-31 Amendment No. 163 l


i
i
.      . a                                                                                                                 !
. a
    .s ,-  ,
.s l
l (NOTE: This Specification will be renumbered 6.5.6 following approval of BGE's Administrative                   l Controis License Amendment Request, dated March 15,1995. Other references to Specification 6.19 will also be changed to 6.5.6 following approval of that License Amendment Request.)
(NOTE: This Specification will be renumbered 6.5.6 following approval of BGE's Administrative Controis License Amendment Request, dated March 15,1995. Other references to Specification 6.19 will also be changed to 6.5.6 following approval of that License Amendment Request.)
INSERT B 6.19     Containment Leakage Rate Testing Program A program shall be established to implement the leakage testing of the containment as required by 10 CFR 50.54 (o) and 10 CFR Part 50, Appendix J, Option B. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, " Performance-Based                 l Containment Leak-Test Program," dated September 1995.
INSERT B 6.19 Containment Leakage Rate Testing Program A program shall be established to implement the leakage testing of the containment as required by 10 CFR 50.54 (o) and 10 CFR Part 50, Appendix J, Option B.
The peak calculated containment internal pressure for the design basis loss-of-coolant accident, Pa.
This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, " Performance-Based Containment Leak-Test Program," dated September 1995.
is 49.4 psig. The containment design pressure is 50 psig.
The peak calculated containment internal pressure for the design basis loss-of-coolant accident, P.a is 49.4 psig. The containment design pressure is 50 psig.
The maximum allowable containment leakage rate, La , shall be 0.20 percent of containment air weight per day at Pa-                                                                                   ;
The maximum allowable containment leakage rate, L, shall be 0.20 percent of containment air a
Containment leakage rate acceptance criterion is s 1.0aL . During the first unit startup following testing in accordance with this program, the leakage rate acceptance criteria is s 0.75 aL for Type A tests.
weight per day at P -a Containment leakage rate acceptance criterion is s 1.0 L. During the first unit startup following a
testing in accordance with this program, the leakage rate acceptance criteria is s 0.75 L for a
Type A tests.
He provisions of Specification 4.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.
He provisions of Specification 4.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.
He provisions of Specification 4.0.3 are applicable to the Containment Leakage Rate Testing Program.
He provisions of Specification 4.0.3 are applicable to the Containment Leakage Rate Testing Program.
l
l


    '.s
'.s
        ''? ,
''?
3/4.6 CONTAINMENT SYSTEMS                                                                   i RASES 3/4.6.1 PRIMARY CONTAINMENT 3/4.6.1.1 CONTAINMENT INTEGRITY In MODES 1, 2, 3, and 4, primary CONTAIMENT INTEGRITY ensures that the release of radioactive materials from the containment atmosphere will be                     l restricted to those leakage paths and associated leak rates assumed in the                   l accident analyses. This restriction, in conjunction with the leakage rate                   I limitation, will limit the SITE B0UNDARY radiation doses to within the limits of 10 CFR Part 100 during accident conditions. In MODES 5 and 6, the probability and consequences of these events are reduced because of the                 '
3/4.6 CONTAINMENT SYSTEMS i
Reactor Coolant System (RCS) pressure and temperature limitations of these modes, by preventing operations which could lead to a need for containment isolation, and by providing containment isolation through penetration RgnAcs wirn fasEA'r 0 3     .6. 2     nta       nt Leak e
RASES 3/4.6.1 PRIMARY CONTAINMENT 3/4.6.1.1 CONTAINMENT INTEGRITY In MODES 1, 2, 3, and 4, primary CONTAIMENT INTEGRITY ensures that the release of radioactive materials from the containment atmosphere will be restricted to those leakage paths and associated leak rates assumed in the accident analyses. This restriction, in conjunction with the leakage rate limitation, will limit the SITE B0UNDARY radiation doses to within the limits of 10 CFR Part 100 during accident conditions.
( he       mit ion on c ta           nt eak e r tes nsu                 th th to 1 nt leak ey ume ill ot e cee the valu ass (cactai dent ana ses t th pea acc ent res ure P.. As d nte ad d ons vat m,         e     sur ov all nteg ate lea age ate s                       th 1   ite to _ 0. L,   5   75   (as ppl ab )d in er rma e
In MODES 5 and 6, the probability and consequences of these events are reduced because of the Reactor Coolant System (RCS) pressure and temperature limitations of these modes, by preventing operations which could lead to a need for containment isolation, and by providing containment isolation through penetration RgnAcs wirn fasEA'r 0 3
{pe odi tes to cco tf po ible egr dat no th con i nt eak eb rie           be ween leak et ts.
.6.
The ur ill         ce     sti   fo mea rin lea ge         te are con ste t w h e     gaiettan o O RP t5                 App dix   ,    ep fo th per rma ce             j to Typ BadC eaka e t tin                   T     al wab     le ag ra ha be
2 nta nt Leak e
                ' ro rt         at     r uce as ec           n     in ene c L tte 91 4, o a cou ra ex nde sur ill ce che le                   24   nth +             %  er p cif ati       4. 2). Th       is n e empt nt 10                 RP t 0, pe ix         .
( he mit ion on c ta nt eak e r tes nsu th th to 1 (c tai nt leak ey ume ill ot e cee the valu ass d nte ac dent ana ses t th pea acc ent res ure P..
3/4.6.1.3 Containment Air Locks The limitations on closure and leak rate for the containment air locks are required to meet the restrictions on CONTAINMENT INTEGRITY and containment leak rate. Surveillance testing of the air lock seals provides assurance                     I that the overall air lock leakage will not become excessive due to seal damage during the intervals between air lock leakage tests.
As ad d ons vat m,
i CALVERT CLIFFS - UNIT 2                 B 3/4 6-1                         Amendment No. 149
e sur ov all nteg ate lea age ate s th
{pe 1
ite to _ 0.
L, 5
75 (as ppl ab )d in er rma e odi tes to cco tf po ible egr dat no th con i nt eak eb rie be ween leak et ts.
The ur ill ce sti fo mea rin lea ge te are con ste t w h e
gaiettan o
O RP t5 App dix ep fo th per rma ce j
to Typ BadC eaka e t tin T
al wab le ag ra ha be
' ro rt at r uce as ec n
in ene c L tte 91 4,
o a cou ra ex nde sur ill ce che le 24 nth +
er p cif ati 4.
2). Th is n e empt nt 10 RP t 0,
pe ix 3/4.6.1.3 Containment Air Locks The limitations on closure and leak rate for the containment air locks are required to meet the restrictions on CONTAINMENT INTEGRITY and containment leak rate.
Surveillance testing of the air lock seals provides assurance that the overall air lock leakage will not become excessive due to seal damage during the intervals between air lock leakage tests.
i CALVERT CLIFFS - UNIT 2 B 3/4 6-1 Amendment No. 149


.o 4 ,
.o 4
INSERT C 3/4.6.1.2         Containment Leakane Maintaining the containment OPERABLE requires compliance with the visual examinations and leakage rate test requirements of the Containment Leakage Rate Testing Program for Type A tests, and 10 CFR Part 50, Appendix J, Option A for Type B and C tests. As-left leakage prior to the first startup after performing a required leakage test is required to be s 0.75 L. for overall Type A leakage. At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of s 1.0 L.. At s 1.0 L. the offsite dose consequences are bounded by the assumptions of the safety analysis. 'Ihe frequency of Type A testing is specified in the Containment Leakage Rate Testing Program.
INSERT C 3/4.6.1.2 Containment Leakane Maintaining the containment OPERABLE requires compliance with the visual examinations and leakage rate test requirements of the Containment Leakage Rate Testing Program for Type A tests, and 10 CFR Part 50, Appendix J, Option A for Type B and C tests. As-left leakage prior to the first startup after performing a required leakage test is required to be s 0.75 L. for overall Type A leakage. At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of s 1.0 L.. At s 1.0 L. the offsite dose consequences are bounded by the assumptions of the safety analysis. 'Ihe frequency of Type A testing is specified in the Containment Leakage Rate Testing Program.
The surveillance testing for measuring leakage rates are consistent with the requirements of 10 CFR Part 50, Appendix J, Option B for Type A tests. For Type B and C testing, the allowable leakage rate has been proportionately reduced, as recommended in Generic Letter 91-04, to account for an extended surveillance schedule of 24 months + 25% (per Specification 4.0.2).           This is an exception from 10 CFR Part 50, Appendix J.
The surveillance testing for measuring leakage rates are consistent with the requirements of 10 CFR Part 50, Appendix J, Option B for Type A tests. For Type B and C testing, the allowable leakage rate has been proportionately reduced, as recommended in Generic Letter 91-04, to account for an extended surveillance schedule of 24 months + 25% (per Specification 4.0.2).
I 1
This is an exception from 10 CFR Part 50, Appendix J.


J
-}
  -}   .,                      .
J f
3/4.6 CONTAIlptENT SYSTEMS f
3/4.6 CONTAIlptENT SYSTEMS usEs 3/4.6.1.4 Internal Pressure The limitations on containment internal pressure ensure that 1) the containment structure is prevented from exceeding it design negative pressure differential with respect to the outside atmosphere of 3.0 psig and 2) the containment peak pressure does not exceed the design pressure of 50 psig during LOCA or steam line break conditions.
:                                      usEs 3/4.6.1.4 Internal Pressure The limitations on containment internal pressure ensure that 1) the containment structure is prevented from exceeding it design negative pressure differential with respect to the outside atmosphere of 3.0 psig and 2) the containment peak pressure does not exceed the design pressure of 50 psig during LOCA or steam line break conditions.
The maximum peak pressure expected to be obtained from a LOCA event is 47.6 psig assuming an initial containment pressure of 14.7 psia. The limit of 1.8 psig for initial positive containment pressure will limit the total pressure to 49.4 psig which is less than the design pressure and is consistent with the accident analyses. The maximum peak pressure expected to be obtained from a steam line break event is 49.2 psig assuming an initial containment pressure of 16.5 psia (1.8 psig).
The maximum peak pressure expected to be obtained from a LOCA event is 47.6 psig assuming an initial containment pressure of 14.7 psia. The limit of 1.8 psig for initial positive containment pressure will limit the total pressure to 49.4 psig which is less than the design pressure and is consistent with the accident analyses. The maximum peak pressure expected to be obtained from a steam line break event is 49.2 psig assuming an initial containment pressure of 16.5 psia (1.8 psig).
3/4.6.1.5 Air Temocrature The limitation on containment average air temperature ensures that the containment peak air temperature does not exceed the design temperature of 276'F during LOCA conditions. The containment temperature limit is censistent with the accident analyses.
3/4.6.1.5 Air Temocrature The limitation on containment average air temperature ensures that the containment peak air temperature does not exceed the design temperature of 276'F during LOCA conditions. The containment temperature limit is censistent with the accident analyses.
l 3/4.6.1.6 Containment Structural Intecrity                                         '
l 3/4.6.1.6 Containment Structural Intecrity The limitation ensures that the structural integrity of the containment will be maintained comparable to the original design standards for the life of the facility. Structural integrity is required to ensure that the containment will withstand the maximum pressure of 47.6 psig in the event of a LOCA. The measurement of containment tendon lift off force,-the visual and metallurgical examination of tendons, anchorages and liner and the Type A leakage tests are sufficient to demonstrate this capability.
The limitation ensures that the structural integrity of the containment will be maintained comparable to the original design standards for the life of the facility. Structural integrity is required to ensure that the containment will withstand the maximum pressure of 47.6 psig in the event of a LOCA. The measurement of containment tendon lift off force,-the visual and metallurgical examination of tendons, anchorages and liner and the Type A leakage tests are sufficient to demonstrate this capability.
The surveillance requirements for demonstrating the containment's structural integrity are consistent with the intent of the recommendations of Regulatory Guide 1.35 " Inservice Surveillance of Ungrouted Tendons in Prestressed Concrete Containment Structures", January 1976.
The surveillance requirements for demonstrating the containment's structural integrity are consistent with the intent of the recommendations         !
The end anchorage concrete exterior surfaces are checked visually for indications of abnormal material behavior during tendon surveillance.
of Regulatory Guide 1.35 " Inservice Surveillance of Ungrouted Tendons in           '
Inspections of pre-selected concrete crack patterns are performed during 3
Prestressed Concrete Containment Structures", January 1976.
the Type A containment leakage rate tests, consistent with the Structural Integrity Test.
The end anchorage concrete exterior surfaces are checked visually for indications of abnormal material behavior during tendon surveillance.               3 Inspections of pre-selected concrete crack patterns are performed during the Type A containment leakage rate tests, consistent with the Structural Integrity Test.                                                                .
Visual inspeelians of be acca.ssible mferior and exkrier. surfaces of conb;nmeni m perf,,4 h allow F., emel uneeva,;ng d evidanee,9 y
Visual inspeelians of be acca.ssible mferior and exkrier . surfaces of conb;nmeni m perf,,4 h allow F., emely uneeva,;ng d evidanee ,9 hov-                 = stulwal Jakieuhan. 7Ce fneguency .P dese inspachons is in 1
hov-
ayeement wdA %ulahm Saata C163, lated September 1995.
= stulwal Jakieuhan. 7Ce fneguency
A M-CALVERT CLIFFS - UNIT 2             B 3/4 6-2             Amendment No. 149}}
.P dese inspachons is in 1 ayeement wdA %ulahm Saata C163, lated Sep ember 1995.
t A
M-CALVERT CLIFFS - UNIT 2 B 3/4 6-2 Amendment No. 149}}

Latest revision as of 08:01, 13 December 2024

Proposed Tech Specs,Adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule
ML20096D446
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/16/1996
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20096D432 List:
References
NUDOCS 9601190134
Download: ML20096D446 (21)


Text

\\

3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT Containment Leakaae i

i LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be. limited to:

TEr4 ace Wir#

2 INSE4 i

a.

M ever:ll integr:ted 1::k g: r:t: cfr i

4.

2 L. (ne,000 scen), 0.20 3:r= t by =ight f th: /

= t:in nt :f r p:r 21 heer: :t P., 50 p:is, er 4.

2 'g -(*51,000 S00"), 0.050 per::;t by =ight of the 4

per 21 5:cr: :t : 7:d =d prn:;r: ef P,

-25 peig.

e A

b.

A combined leakage rate of 5 0.50 L (173,000 SCCM), for all penetrations and valves subject to type B and C tests when pressurized to P..

de etccephnnce c.eiferia. spesiRed in de.

APPLICABILITY: MODES 1, 2, 3 and 4.

Conb41 ament leakaye. Wafe 7Es//ng 3*) fem > i

~

\\

~

('.,2.,SC_..),:.j ACTION: With either (a as ed ove 11 inte te i

g o ay==C a0_v.75 % w ".

_C"

.,5 y i

s p...__.:V or tb) with the measured combine eakage rate for all.

penetrationsandvalvessubjecttoTypesBandCtestsexceedino0.504, L..,. 5 ', E :;;;1 [:b Ji and the lesi _then er; restore th containme Qi t;. 75 ' er. ;...= Or ;;5:

1 combined leakage rate or all penetrations and valves subject to Type B and C tests to less than or equal to 0.50 L, prior to increasing the Reactor Coolant System temperature above 200 F.

WiUin Ehe Acceptance criteria. specih'ed in de Containment Leakage %fe Te~stin Progrann SURVEILLANCE REQUIREMENTS 4.6.1.2 The containment leakage rates shall be demonstrated at the following test schedule and shall be determined in conformance with the criteria, methods and provisions specified in 10 CFR Part 50, Appendix J:

e a.

Three Type A tests (Overell !atograted Cen ainant Leakage note) shell be n,d;;ted :t :pp =i=tely Oge:1 interv:1: during-q

..y yo, L(50 p:ig) er at P, (25 p:ig) during :::h-

-hatd;.;r. :t either P

-,o

..______m__

___ iy_

v

~

Perf.ru tapa;ted tesfiny in accoedance with de Centainment leakage &fe 7EsthO lbgnam,

CALVERT CLIFFS - UNIT 1 3/4 6-2 Amendment No. 169 9601190134 960116 PDR ADOCK 05000317 p

PDR

_._.m f

INSERT A I

a.

A maximum allowable containment leakage rate, L, as specified in the Specification 6.19,-

a

" Containment Leakage Rate Testing Program."

l

)

i

8 OEL ETE 3/4.6 CONTAINMENT SYST M SURVEILLANCE REQUIREMENTS (Continued) i I any rio c Ty At f 1s me t ei er.75 (2

500 CCM) or 0. 5 L, 6

S

),

he t st hed.le r

sub quen Type tes s s 1

rev nd pro db th Com sion.

If wo co secui, ve pe tes fa to et eit r

.75 (259 00 CM) 0.

L, 6,2 SC

).

Typ A t st s 11 per med at le st a no hs til wo nse ti ry(2 Ty A t sts et e ther.75 500 SC or.75 (46,00S

)a whi ti the boy tes sch ule y

s T

acc racy f ea Ty A t st s 11 ve fie by su leme tal t st w ich:

C nfi the accu cy the Type te by eri ing hat th dif renc bet en pp)l 0.25 L. ( ype nta and te da is wit n 0. 5 L, 86, S

o 4

SC sa urat ns fic nt est blis acc ate the cha e

.i leak eb wee the ype tes and upp n 1 te t.

3.

Requ res eq ntit of as ect d in th cont inme t o led om e co tai nt urin the supp n 1 te t to be e iva nt t at east 5 p) rcenr P. (25 sig).

of he t al asu d le age ate t P, 50 ig Type B andI tests sliall be conducted with gas at P (50 psig) at intervals of 24 months except for tests involving air locks.

s Ju(. Air locks shall be tested and demonstrated OPERABLE per Surve 1 Requirement 4.6.1.3.

X All tes ealuFge rates shall be calculated using observed cata converted _ to absolute

=:1y::: :n11 h grf...d i n ig......,.... _,. _..

@'w Containment purge isolation valves shall be demonstrated OPERABLE any time upon entering M0DE 5 from power operation modes, unless the last surveillance test has been perfomed within the past 6 months or any time after being opened and prior to entering M0DE 4 from shutdown modes by verifying that when the measured Exemption to 10 CFR Part 50, Appendix J.

CALVERT CLIFFS - UNIT 1 3/4 6-3 Amendment No. 169

4

\\

3/4.6 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) g i

leakage rate is added to the le rates determined pursuant to j

Technical Specification 4.6.1.2 sfor all other Type B or C penetrations, the combined leakage rate is less than or equal to purge ls(olation valves shall also be compared to the previousl 0.50 L 173,000 SCCM). The leakage rate for the containment 2

measured leakage rate to detect excessive valve degradation.

The containment purge isolation valve seals shall be replaced with new seals at a frequency to ensure no individual seal remains in service greater than 2 consecutive fuel reload cycles.

i f

CALVERT CLIFFS - UNIT 1 3/4 6-4 Amendment No. 169

-(

3/4.6 CONTAINMENT SYSTEMS 1

SURVEILLANCE REQUIREMENTS (Continued) 4.6.1.6.2 End Anchoraces and Ad.iacent Concrete Surfaces. The structural integrity of the end anchorages and adjacent concrete surfaces shall be demonstrated by detemining through inspection of a representative sample of tendons (reference Specification 4.6.1.6.1) that no apparent changes have occurred in the visual appearance of the end anchorages or their adjacent concrete exterior surfaces. Also, inspections of the pre-selected i

concrete crack patterns adjacent to end anchorages shall be perfomed during the Type A containment leakage rate tests (reference Specification 4.6.1.2) while the containment is at its maximum test pressure.

4.6.1.6.3 Containment Surfaces. The exposed accessible interior and exterior surfaces of the containment includina the liner plate shall be visually i e

d ur ng He sh o

f ch Ty~p A on i n7 ka a ~ts (re er nc Sp ci ica io 4.

1.

Th i spe ti s al be er o d rio t te pe c nt in.

t a ge at te t u o r y

id nc o st et r d ter or to wh ch y ff t ith r e

c t n nt t et a in egr ty r eak tig tn s.

4 4.6.1.6.4. Reports. Any abnormal degradation of the containment structure detected during the above required tests and inspections shall be reported to the Consission pursuant to Specification 6.9.2 within the next 30 days.

This report shall include a description of the tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedures, the tolerances on cracking, and the corrective actions taken.

~

v v

v in accordance with de Contain,,,,,J Leakage Rate visL %Q

~7 (teference S

Y.

ycl0cabjon CALVERT CLIFFS - UNIT 1 3/4 6-11 Amendment No. 169

6.0 ADMINISTRATIVE CONTR0LS

(

6.17.2 Licensee initiated ~ changes to the ODCM:

a.

Shall be submitted to the Commission in the Semiannual l

Radioactive Effluent Release Report for the period in which the change (s) was made effective. This submittal shall contain:

1.. Sufficient information to support the rationale for the change.

Infomation submitted should consist of a package of those pages of the ODCM to be changed with each page numbered and provided with a change number and/or change date together with appropriate analyses or evaluations justifying the change (s);

2.

A determination that the change will not reduce the accuracy or reliability of dose calculations or setpoint deteminations; and 3.

Documentation of the fact that the change has been reviewed and found acceptable by the POSRC.

b.

Shall become effective upon review by the POSRC and approval of the Plant General. Manager.-

6.18 MAJOR CHANGES TO RADI0 ACTIVE LIOUID. GASEOUS AND SOLID WASTE TREATM ENT SYSTEMS 6.18.1 Licensee initiated major changes to the Radioactive Waste Systems (liquid, gaseous and solid) shall be reported to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the modification to the waste system is completed. The discussion of each change shall contain:

a.

A description of the equipment, components and processes involved.

b.

Documentation of the fact that the change including the safety analysis was reviewed and found acceptable by the POSRC.

INSEAT* b i

CALVERT CLIFFS - UNIT 1 6-31 Amendment No. 186 l

k 1

(NOTE: This Specification will be renumbered 6.5.6 following approval of BGE's Administrative Controls License Amendment Request, dated March 15,1995. Other references to Specification 6.19 will also be changed to 6.5.6 following approval of that License Amendment Request.)

INSERT B 6.19 Contamment Leakage Rate Testing Program A program shall be established to implement the leakage testing of the containment as required by 10 CFR 50.54 (o) and 10 CFR Part 50, Appendix J, Option B, as modified by approved exemptions. This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, " Performance-Based Contamment Leak-Test Program," dated September 1995, as modified by approved exceptions.

The peak calculated containment internal pressure for the design basis loss-of-coolant accident, P.a is 49.4 psig. The containment design pressure is 50 psig.

The maximum allowable containment leakage rate, L, shall be 0.20 percent of containment air a

weight per day at P -

a Containment leakage rate acceptance criterion is s 1.0 L. During the first unit startup following a

testing in accordance with this program, the leakage rate acceptance criteria is s 0.75 L for a

Type A tests.

The provisions of Specification 4.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.

The provisions of Specification 4.0.3 are applicable to the Containment Leakage Rate Testing Program.

i 3/4.6 CONTAIMENT SYSTEMS i

BASES 3/4.6.1 PRIMARY CONTAINMENT 3/4.6.1.1 CONTAINMENT INTEGRITY In MODES 1, 2, 3, and 4, primary CONTAIMENT INTEGRITY ensures that the release of radioactive materials from the containment atmosphere will be restricted to those leakage paths and associated leak rates assumed in the i

accident analyses. This restriction, in conjunction with the leakage rate limitation, will limit the SITE B0UNDARY radiation doses to within the limits of 10 CFR Part 100 during accident conditions.

In MODES 5 and 6, the probability and consequences of these events are reduced because of the Reactor Coolant System (RCS) pressure and temperature limitations of these modes, by preventing operations which could lead to a need for containment isolation, and by providing containment isolation through penetration closure.

1

[bEPLACE k/ITH WSMr 0 3/

6.1.

Chai ns\\o 11 tat cont inme le age tes nsur tha th tot 1 co at t1 kage vol wi not xcee the alue ss d

t cci nt alys at he p ka iden pre ure, a ad d c se tis the as ed o eral int rate lea:

ge r e fu the 11 ted 5

75 or _

(

ap icab )d ing rfo anc of he eri ic t ts ac unt or p sib de adat no the nt nme t,

1 kag bar ers etwe le age ests.

es vei anc tes ng r

suri le age ates re nsis ent wit th re ir ts 10 FR rt

. Ap endi J,

cep for ep fo anc f

e and lea ge sti ea owa e le kage ate as b en i p po ion ely edu d

re n ed i Gen ic tte 91-0 to cc nt vei R a for n ten ds anc sch ule f 24 nt 9 +

( r I

ec ica on 0.2 Th an cep on

  • (s i omKCF Part 50 Ap nd J.

3/4.6.1.3 Containment Air Locks The limitations on closure and leak rate for the containment air locks are required to meet the restrictions on CONTAINMENT INTEGRITY and containment leak rate. Surveillance testing of.the air lock seals provides assurance that the overall air lock leakage will not become excessive due to seal damage during the intervals between air lock leakage tests.

i CALVERT CLIFFS - UNIT 1 B 3/4 6-1 Amendment No. 169

. -. ~

.i INSERT C 3/4.6.1.2 Containment Leakane Maintaining the containment OPERABLE requires compliance with the visual examinations and leakage rate test requirements of the Containment Leakage Rate Testing Program for Type A tests, and 10 CFR Part 50, Appendix J, Option A for Type B and C tests. As-left leakage prior to the first startup after performing a required leakage test is required to be s 0.75 L. for overall Type A leakage. At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of s 1.0 L.. At s 1.0 L the offsite dose consequences are bounded by the assumptions of the safety analysis. 'Ihe frequency of Type A testmg is specified in the Containment Leakage Rate Testing Program.

'Ihe surveillance testing for measuring leakage rates are consistent with the requirements of 10 CFR Part 50, Appendix J, Option B for Type A tests. For Type B and C testing, the allowable leakage rate has been proportionately reduced, as recommended in Generic Letter 91-04, to account for an extended surveillance schedule of 24 months + 25% (per Specification 4.0.2).

This is an exception from 10 CFR Part 50, Appendix J.

l ' L:.

j 3/4.6 CONTAINMENT SYSTDt$

l.s gg3g i

i 1

i 3/4.6.1.4 Internal Pressure t

i The limitations on containment internal pressure ensure that 1) the containment structure is prevented from exceeding it design negative i

pressure differential with respect to the outside atmosphere of 3.0 psig and 2) the containment peak pressure does not exceed the design pressure of l

50 psig during LOCA or steam line break conditions.

4

]

The maximum peak pressure expected to be obtained from a LOCA event is 47.6 l

psig assuming an initial containment pressure of 14.7 psia. The limit of 1.8 psig for initial positive containment pressure will limit the total pressure to 49.4 psig which is less than the design pressure and is

?

consistent with the accident analyses. The maximum peak pressure expected 4

to be obtained from a steam line break event is 49.2 psig assuming an initial containment pressure of 16.5 psia (1.8 psig).

3/4.6.1.5 Air Temocrature j

The limitation on containment average air temperature ensures that the containment peak air temperature does not exceed the design temperature of 4

276 F during LOCA conditions. The containment temperature limit is 1

consistent with the accident analyses.

f 3/4.6.1.6 Containment Structural Intearity i

The limitation ensures that the structural integrity of the containment

{

will be maintained comparable to the original design standards for the life i

i of the facility. Structural integrity is required to ensure that the j

containment will withstand the maximum pressure of 47.6 psig in the event 1

of a LOCA. The measurement of containment tendon lift off force, the i

visual and metallurgical examination of tendons, anchorages and liner and the Type A leakage tests are sufficient to demonstrate this capability.

I The surveillance requirements for demonstrating the containment's structural integrity are consistent with the intent of the reconmendations of Regulatory Guide 1.-35 " Inservice Surveillance of Ungrouted Tendons in j

Prestressed Concrete Containment Structures". January 1976.

The end anchorage concrete exterior surfaces are checked visually for indications of abnormal material behavior during tendon surveillance.

Inspections of pre-selected concrete crack patterns are perfomed during the Type A containment leakage rate tests, consistent with the Structural Integrity Test.,

s

~

v

]

f Yisaa,I Inspections of lbe accessible infeti*t ud ederier sur)$aes of fbe co fajn,,,ent are perhemed to allm &t ese) uncovering of evidence n

Ava n.9 st~.tu,ai.teka.nas.n. # rr.p.ncy.r >Aasa ins, e.ne is in 1 ape,,,ad wilf Ap ahm de 1.145, dded syk,,k MS l

G A

A CALVERT CLIFFS - UNIT 1 B 3/4 6-2 Amendment No. 169

ATTACHMENT (4)

UNIT 2 MARKED-UP TECHNICAL SPECIFICATION PAGES 3/4 6-2 3/4 6-3 3/46-4 3/4 6-10 6-31 B 3/4 6-1 B 3/4 6-2 Ealtimore Gas a id Electric Company License Ame;:dment Request January 16,1996

3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT Containment Leakaae LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakage rates shall be limited to:

REmcE wrW Ov:=11 int ;nt d 10:h:;: nt: Of:

INSEAT A 2 'E.:(ic ;;t mir ;:r 24 b-5 t P., 50 p:!;. er

?? 000 000"), 0.20 p: n;at by ::isht Of th:

-1.

2.._'".1.,(,44,5^^ S.CL".,).,. 0.^'2 ;;r:: t by ::!;ht of th:

-2.

.-- _....... u, 6......+.w....a._r_.......,

.. -- y b.

A combined leakage rate of < 0.50 L (173,000 SCCM), for all penetrations and valves subTect to type B and C tests when pressurized to P.

be accepfance criferia. specibeol in lbs APPLICABILITY: MODES 1, 2, 3 and 4.

CeJay. dleakage hte 7isk,,g % yam, n

grate aufadind(a[g,overall ingcontainment$_001. Or 0.75, J33,400 ACTION: With either j

,._,,s 2.,,,

,......: or to) w1T.n the niiasured combined leakage rate for all' pene rat ons and valves subject to Types B and C tests exceo. ding 0.50 L,

i C;5;l30 f.7"7 tate for all penetrations and valves sub

Tht: w

-f 10:t tr.!r. f:q;;;r 10 0~.Z5 4,_::

n e

c6mbinedleaia o Type B and C tests to less than or equal to 0.50 L, prior to increasing the Reactor i

Coolant System temperature above 200 F.

j WY In Ebe accepbtnce cdkvia specIAodin ] e Con %ed leahap 2?afe Tsh,9 % gen,n,

SURVEILLANCE REQUIREMENTS 4.6.1.2 The containment leakage rates shall be demonstrated at the following test schedule and shall be determined in confomance with the criteria, methods and provisions specified in 10 CFR Part 50 Appendix J:

b ;;:: d::t:d derta; :h tdr. :t either P. (50 p;ig, e-et-(0=n11 Ir.t:;nte Ty

^ t::t:

a.

l P (25 p;ig). The in gt:r.:y Of the Typ A t::t: :h:11 be ir,J

/:: e=dence with 10 CFR Pert 50. Appen M L es =a m i,4 by app- :d e--ti:::.

1 Nerin uired visaal exantinkiens anol 5pe A fedin in accordance with lbe entainme CALVERT CLIFFS - UNIT 2 3/4 6-2 Amendment No. 183

g a

INSERT A i

a.

A maximum allowable containment leakage rate, L, as specified in the Specification 6.19, i

a

" Containment Leakage Rate Testing Program."

I i

i I

f m

7

3/4.6 CONTAllMENT SYSTEMS it SURVEILUDICE REQUIREMENTS (Continued) 3 I.'

any eri ic T eA est ils o me eit r 0.

L b

i

( 9,5 SCCM or 75 L (33, 00 S

),

e te t se dtIlefor 4

sub quen Typ A te ts s 11 rey ed d ap rove by t e Comm sion.

If c sec ive pe A test fail o me t ei er

.75 L. (259 00 CM) 0.

L, 3,4 SC

,a pe A test s 11 b per d t le te son s un 1t con cut 500 CM) r 0.

L, ek ry(25 Ty At ts t ei er 75 L j

(33, SC ) at whic time the ove est hedu e ma be i

es Th accu cy o each Type tes sha be eri db a 3

i supp nt 1 tes whi 1

Con ims he a urac of t e Ty e A st ver fyin that the ffer' ce twee supp n 1a Typ At t da is ithin 0.25 (8 500 CM) 0.

L, 11,1 SC

).

Ha a du tion uffi ent o es bli ac rate y th chan in 1 kage etwe th Type tes an supp emen. 1 te t.

R uire the uant of as i ect in th cont inme or bl f

the ntai nt urin the -Jpp nt 1 te to e 25 p) cent of t to 1 sure equi lent to at leas aka rat at P. (50 ig P.

5p g).

(

Type B and C tests shall be conducted with gas at P (50 psig) at intervals of 24 months except for tests involving air locks.

C.

Air locks shall be tested and demonstrated OPERABLE per Surve ance equirement 4.6.1.3.

cd.

All te ^Teakage rates shall be calculated using observeh.. era j converted to absolute'value r.:ly :: f;;11 te n

1 f.:Q:yed 1::k;;;; 2 ;;r;nr.t :ystag;;;.

Containment purge isolation valves shall be demonstrated OPERABLE any time upon entering M0DE 5 from POWER OPERATION MODES, unless the last surveillance test has been perfomed within the past 6 months or any time after being opened and prior to entering MODE 4 from shutdown modes by verifying that when the measured t

Exemption to 10 CFR Part 50, Appendix J.

CALVERT CLIFFS - UNIT 2 3/4 6-3 Amendment No. 149

4 s

3/4.6 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) h

)

leakage rate is added to the lea a rates determined pursuant to Technical Specification 4.6.1.2 or all other Type B or C penetrations, the combined leakage rate is less than or equal to 0.50 L (173,000 SCCM). The leakage rate for the containment purge isolation valves shall also be compared to the previously measured leakage rate to detect excessive valve degradation.

{,

The containment purge isolation valve seals shall be replaced with new seals at a frequency to ensure no individual seal remains in service greater than 2 consecutive fuel reload cycles.

\\

I CALVERT CLIFFS - UNIT 2 3/4 6-4 Amendment No. 149

3/4.6 CONTAINMENT SYSTEMS 4

SURVEILLANCE REQUIREMENTS (Continued) 4.6.1.6.3 Containment Surfaces. The exposed accessible' interior lan exterior surfaces of the containment including the liner late shall bel VLsually insne ed u in t u o r

ch yp A o ai e ae fite e e r nc S ec fi at on 4.

1. ).

Th i sp t n ha 1 e se fo p o t te yp A co ta nt lea ge at t t o ne ve ay Ivi en e f t et ra t to at o wh ch ay ff t it r he c nt_ i n s ru t al i e it ak ti htn ss.

4.6.1.6.4 Reports. Any abnomal degradation of the containment structure detected during the above required tests and inspections shall be reported to the Consnission pursuant to Specification 6.9.2 within the next 30 days.

This report shall include a description of the _ tendon condition, the condition of the concrete (especially at tendon anchorages), the inspection procedures, the tolerances on cracking, and the corrective actions taken.

1 in accotNance

/

ConlainXd les h am (referey Speeihedian Y.4.V gf

\\

l j

CALVERT CLIFFS - UNIT 2 3/4 6-10 Amendment No. 149

6.0 ADMINISTRATIVE CONTROLS b

6.17 0FFSITE DOSE CALCULATION MANUAL (0DCM) 6.17.1 The ODCM shall be approved by the Comission prior to implementation.

6.17.2 Licensee initiated changes to the ODCM:

a.

Shall be submitted to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the change (s) was made effective. This submittal shall contain:

1.

Sufficient information to support the rationale for the change.

Information submitted should consist of a package of those pages of the ODCM to be changed with each page numbered and provided with a change number and/or change date together with appropriate analyses or evaluations justifying the change (s);

2.

A determination that the change will not reduce the accuracy or reliability of dose calculations or setpoint determinations; and 3.

Documentation of the fact that the change has been reviewed and found acceptable by the POSRC.

'(

Shall become effective upon review by the POSRC and approval of b.

the Plant General Manager.

6.18 MAJOR CHANGES TO RADI0 ACTIVE LIQUID. GASE0US AND SOLID WASTE TREATMENT SYSTEMS 6.18.1 Licensee initiated major changes to the Radioactive Waste Systems (liquid, gaseous and solid) shall be reported to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the modification to the waste system is completed. The discussion of each change shall contain:

a.

A description of the equipment, components and processes

involved, b.

Documentation of the fact that the change including the safety

, analysis was reviewed and found acceptable by the POSRC.

Inssxr 8

(

CALVERT CLIFFS - UNIT 2 6-31 Amendment No. 163 l

i

. a

.s l

(NOTE: This Specification will be renumbered 6.5.6 following approval of BGE's Administrative Controis License Amendment Request, dated March 15,1995. Other references to Specification 6.19 will also be changed to 6.5.6 following approval of that License Amendment Request.)

INSERT B 6.19 Containment Leakage Rate Testing Program A program shall be established to implement the leakage testing of the containment as required by 10 CFR 50.54 (o) and 10 CFR Part 50, Appendix J, Option B.

This program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, " Performance-Based Containment Leak-Test Program," dated September 1995.

The peak calculated containment internal pressure for the design basis loss-of-coolant accident, P.a is 49.4 psig. The containment design pressure is 50 psig.

The maximum allowable containment leakage rate, L, shall be 0.20 percent of containment air a

weight per day at P -a Containment leakage rate acceptance criterion is s 1.0 L. During the first unit startup following a

testing in accordance with this program, the leakage rate acceptance criteria is s 0.75 L for a

Type A tests.

He provisions of Specification 4.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.

He provisions of Specification 4.0.3 are applicable to the Containment Leakage Rate Testing Program.

l

'.s

?

3/4.6 CONTAINMENT SYSTEMS i

RASES 3/4.6.1 PRIMARY CONTAINMENT 3/4.6.1.1 CONTAINMENT INTEGRITY In MODES 1, 2, 3, and 4, primary CONTAIMENT INTEGRITY ensures that the release of radioactive materials from the containment atmosphere will be restricted to those leakage paths and associated leak rates assumed in the accident analyses. This restriction, in conjunction with the leakage rate limitation, will limit the SITE B0UNDARY radiation doses to within the limits of 10 CFR Part 100 during accident conditions.

In MODES 5 and 6, the probability and consequences of these events are reduced because of the Reactor Coolant System (RCS) pressure and temperature limitations of these modes, by preventing operations which could lead to a need for containment isolation, and by providing containment isolation through penetration RgnAcs wirn fasEA'r 0 3

.6.

2 nta nt Leak e

( he mit ion on c ta nt eak e r tes nsu th th to 1 (c tai nt leak ey ume ill ot e cee the valu ass d nte ac dent ana ses t th pea acc ent res ure P..

As ad d ons vat m,

e sur ov all nteg ate lea age ate s th

{pe 1

ite to _ 0.

L, 5

75 (as ppl ab )d in er rma e odi tes to cco tf po ible egr dat no th con i nt eak eb rie be ween leak et ts.

The ur ill ce sti fo mea rin lea ge te are con ste t w h e

gaiettan o

O RP t5 App dix ep fo th per rma ce j

to Typ BadC eaka e t tin T

al wab le ag ra ha be

' ro rt at r uce as ec n

in ene c L tte 91 4,

o a cou ra ex nde sur ill ce che le 24 nth +

er p cif ati 4.

2). Th is n e empt nt 10 RP t 0,

pe ix 3/4.6.1.3 Containment Air Locks The limitations on closure and leak rate for the containment air locks are required to meet the restrictions on CONTAINMENT INTEGRITY and containment leak rate.

Surveillance testing of the air lock seals provides assurance that the overall air lock leakage will not become excessive due to seal damage during the intervals between air lock leakage tests.

i CALVERT CLIFFS - UNIT 2 B 3/4 6-1 Amendment No. 149

.o 4

INSERT C 3/4.6.1.2 Containment Leakane Maintaining the containment OPERABLE requires compliance with the visual examinations and leakage rate test requirements of the Containment Leakage Rate Testing Program for Type A tests, and 10 CFR Part 50, Appendix J, Option A for Type B and C tests. As-left leakage prior to the first startup after performing a required leakage test is required to be s 0.75 L. for overall Type A leakage. At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of s 1.0 L.. At s 1.0 L. the offsite dose consequences are bounded by the assumptions of the safety analysis. 'Ihe frequency of Type A testing is specified in the Containment Leakage Rate Testing Program.

The surveillance testing for measuring leakage rates are consistent with the requirements of 10 CFR Part 50, Appendix J, Option B for Type A tests. For Type B and C testing, the allowable leakage rate has been proportionately reduced, as recommended in Generic Letter 91-04, to account for an extended surveillance schedule of 24 months + 25% (per Specification 4.0.2).

This is an exception from 10 CFR Part 50, Appendix J.

-}

J f

3/4.6 CONTAIlptENT SYSTEMS usEs 3/4.6.1.4 Internal Pressure The limitations on containment internal pressure ensure that 1) the containment structure is prevented from exceeding it design negative pressure differential with respect to the outside atmosphere of 3.0 psig and 2) the containment peak pressure does not exceed the design pressure of 50 psig during LOCA or steam line break conditions.

The maximum peak pressure expected to be obtained from a LOCA event is 47.6 psig assuming an initial containment pressure of 14.7 psia. The limit of 1.8 psig for initial positive containment pressure will limit the total pressure to 49.4 psig which is less than the design pressure and is consistent with the accident analyses. The maximum peak pressure expected to be obtained from a steam line break event is 49.2 psig assuming an initial containment pressure of 16.5 psia (1.8 psig).

3/4.6.1.5 Air Temocrature The limitation on containment average air temperature ensures that the containment peak air temperature does not exceed the design temperature of 276'F during LOCA conditions. The containment temperature limit is censistent with the accident analyses.

l 3/4.6.1.6 Containment Structural Intecrity The limitation ensures that the structural integrity of the containment will be maintained comparable to the original design standards for the life of the facility. Structural integrity is required to ensure that the containment will withstand the maximum pressure of 47.6 psig in the event of a LOCA. The measurement of containment tendon lift off force,-the visual and metallurgical examination of tendons, anchorages and liner and the Type A leakage tests are sufficient to demonstrate this capability.

The surveillance requirements for demonstrating the containment's structural integrity are consistent with the intent of the recommendations of Regulatory Guide 1.35 " Inservice Surveillance of Ungrouted Tendons in Prestressed Concrete Containment Structures", January 1976.

The end anchorage concrete exterior surfaces are checked visually for indications of abnormal material behavior during tendon surveillance.

Inspections of pre-selected concrete crack patterns are performed during 3

the Type A containment leakage rate tests, consistent with the Structural Integrity Test.

Visual inspeelians of be acca.ssible mferior and exkrier. surfaces of conb;nmeni m perf,,4 h allow F., emel uneeva,;ng d evidanee,9 y

hov-

= stulwal Jakieuhan. 7Ce fneguency

.P dese inspachons is in 1 ayeement wdA %ulahm Saata C163, lated Sep ember 1995.

t A

M-CALVERT CLIFFS - UNIT 2 B 3/4 6-2 Amendment No. 149