ML17266A158: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17266A158
| number = ML17266A158
| issue date = 03/17/1980
| issue date = 03/17/1980
| title = LER 80-010/03L-0:on 800217,During 100% Power Operation, Control Element Assembly 65 Dropped to Full Insertion When Selected to Manual Insertion for A.S.I. Damping.Cause Undetermined.Assembly Operated Properly in Normal Position
| title = LER 80-010/03L-0:on 800217,during 100% Power Operation, Control Element Assembly 65 Dropped to Full Insertion When Selected to Manual Insertion for A.S.I. Damping.Cause Undetermined.Assembly Operated Properly in Normal Position
| author name = SCHOPPMAN M A
| author name = SCHOPPMAN M A
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Revision as of 01:44, 27 February 2018

LER 80-010/03L-0:on 800217,during 100% Power Operation, Control Element Assembly 65 Dropped to Full Insertion When Selected to Manual Insertion for A.S.I. Damping.Cause Undetermined.Assembly Operated Properly in Normal Position
ML17266A158
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/17/1980
From: SCHOPPMAN M A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17208A358 List:
References
LER-80-010-03L, LER-80-10-3L, NUDOCS 8003310317
Download: ML17266A158 (2)