ML17266A204: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17266A204
| number = ML17266A204
| issue date = 05/12/1980
| issue date = 05/12/1980
| title = RO 335-80-25:on 800512,During Planned Secondary Plant Cooldown/Depressurization for Turbine Steam Seal Repair, Main Steam Header Would Not Depressurize Following MSIV Closure.Apparently Caused by Mispositioned Valve
| title = RO 335-80-25:on 800512,during Planned Secondary Plant Cooldown/Depressurization for Turbine Steam Seal Repair, Main Steam Header Would Not Depressurize Following MSIV Closure.Apparently Caused by Mispositioned Valve
| author name = WETHY C M
| author name = WETHY C M
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.

Revision as of 01:43, 27 February 2018

RO 335-80-25:on 800512,during Planned Secondary Plant Cooldown/Depressurization for Turbine Steam Seal Repair, Main Steam Header Would Not Depressurize Following MSIV Closure.Apparently Caused by Mispositioned Valve
ML17266A204
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/12/1980
From: WETHY C M
FLORIDA POWER & LIGHT CO.
To:
References
982, NUDOCS 8005230377
Download: ML17266A204 (1)