ML20065T709: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.
OPERATING DATA REPORT 33 DOCKET NO.
DATE JANUARY 1982 COMPLETED BY    E. ZUitLT 4
TELEPHONE (315)3        63840 OPERATING STATUS FITZPATRICK                                  Notes
: 1. Unit Name:
: 2. Reporting Period:
811201 - 811231
: 3. Licensed Thermal Power (MWt).
2436
: 4. Nameplate Rating (Gross MWe):                      883
: 5. Design Electrical Rating (Net MWe):                821
: 6. Masimum Dependable Capacity (Gross MWe):            830
: 7. Maximum Dependable Capacity (Net MWe):
810
: 8. If Changes Occur in Capacity Ratings (! ems Number 3 Through 7) Since last Report, Give Reasons:
NOIE
: 9. Power Level To Which Restricted,if Any (Net MWe):          NONE
: 10. Reasons For Restrictions,If Any:
This Month              Yr..to.Date        Cumulatise 744                        8760            56377 I1. Hours In Reporting Period 0                      6637.2          39551.2
: 12. Number Of Hours Reactor Was Critical 0                          0                  0
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On.Line 0                      6540.8          38443.6 0                          0                  0
: 15. Unit Reserve Shutdown Hours 0              14217720            78401314
: 16. Gross Thermal Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH) 0                  4o31100          26760610
: 18. Net Electrical Energy Generated (MWH) 0                  4779650          25904730 0%                        74.7%              68.2%
: 19. U. it Service Factor 0%                        74.7%              68.2%
: 20. Unit Availability Factor 0%                        67 4%              61.3%
: 21. Unit Capacity Factor (Using MDC Net) 0%                        66.5%              56.0%
: 22. Unit Capacity Factor (Using DER Net) 0%                        10.1%              16.9%
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
NONE
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:      FEBRUARY              1982
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast            Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION h
R 656 820107 CK 05000333 PDR e
* AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP JAWARY 1982 DATE E. ZUFELT COMPLETED BY TkLEPHONE (315)342-3840 MONDI  DECDEER 1981 AVER AGE DAILY POWER LEVEL            DAY    AVER AGE DAILY POWER LEVEL -
DAY (MWe-Net)
(MWe-Nel) 0                            j7                0 1
0                            ,3                0 2
0                            39 0
3 0                            20 0
4                                                                      ,
0                                                0 21 5
22                0 6
0                                              0 7                                            23 0
0                            24 8
0 9                                            25 0                                              0 10                                            26 0                                                0 11 27 0                                                0 12                                            28 13                                            29 0                                              0 14                                          30 0                            3g                  0 15 16 0
SUBEARY: Fourth refbeling and maintenance outage continued through this.
reporting period.
 
1 DOCKET NO.
50-333            - .
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME JAMIPP
                                                                                                                                        ' DATE JANUARY : 962 __
COMPLETED BY E. ZUFbJi?
REPORT MONTil DFEEMBER 1981                        TELEPilONE (315)342-3840 4
i
!                                                                      w.
e          ei  's ui 5                                Ii
                                                                                  '*"**"                  gj                    Cause & Currective N. i .        Date  E-        k            $  ? EU          Event        I'T"                                  Action to p        33            :]  -5 5 m Report =
n in G        yUo oO          2 3 Ui j                                g                    Prevent Recurrence 1
12        81103r    s        744          C        1        NA            NA          NA      Refueling outage (cumulative hours to date 1486.7)
I j
)
J I                    2                                                      3                                4 F: Forced          Reason:                                                Method:                            Exhibit G Instructions S: Scheduled      A-Equipment Failure (Explain)                            1-Manual                          fus Preparation of Data B Maintenance of Test                                    2 ManualScram.                    Entry Sheets for Licensee C Refucting                                            3 Automatic Scram.                Event Report (LER) File (NUREG-i D Regulatory Restriction                                4 Other (Explain)                  0161)
E-Operatur Training & License Examination F Administrative                  -
5 G. Operational Errur (Explain t                                                            Exhibit I Same Suuree ll.Ot her ( E xplain)
 
POWER AUTHORITY OF THE STATE OF NEW YC3K JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
 
==SUMMARY==
OF OPERATIONAL EXPERIENCES DECEMBER 1981 i
i                      The refueling and maintenance outage which began October 31, 1981, continued throughout this reporting period. The major areas are TORUS modifications, LLRT testing, turbine 7
generator maintenance, feedwater heater replacement and fire                                                                                                          ,
protection modifications. Presently the outage activities are on schedule.
i
]
1
  .--,,. , ,  ,. _m.. - _ . . - -  . _ - , . _ _ _ _ . ~ . , - _ _ . _ . . _ . . , . . . . . _ _ . . . _ .      . . _ _ _ - _ _ _ . . _ _ - . _ , - . . . _ - . . - - - - _ _ _ _ .
 
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER FLANT                                          .
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
 
==SUMMARY==
 
DECEMBER 1981 I
DATE  SYSTEM 0 EST                                                                            REPAIR
                      ,      HOW DETECTED  CAUSE OF MALFUNCTION  ACTION TAKEN TO PRECLUDE RECURRENCE  T 11/13    10  11120        Visual,      Leaking pressure seal  Replaced pressure seal                  24 MOV-33 11/19    71  16156        Ops          Fan stalled            Cleaned & lubr1cated                      8 INV-3B 11/9    10  15749                        Limitorque contact out Adjusted contact - Performed            20 MOV-15C        ops          of adjustment          preventative maintenance on Limitorque 11/21    29  16079          LLRT          Incomplete main seat-  Ground seat, lapped disc, lapped      120 AOV-86C                      disc contact          pilot seat disc 11/1    00  15076          P.M.          N/A                    Inspected snubbers                      20 Snubbers 11/27    93  16153          P.M.          N/A                    Performed visual inspection &          217 EDG "B"                                            P.M.
11/27    93    16:155        P.M.          N/A                    Performed visual inspection &          224 EDG "D"                                            P.M.
11/27    13    13540        P.M.          N/A                    Disassembled, inspected,                  6 RCI-40        ISI                                  reassembled 11/28    13  9068          Visual        Bearing cover,          Replaced plug                            8 I                TU-2                        inspection plug l                                            missing 11/30    23  13539          P.M.        d/A                    Disassembled, inspected,                12 HPI-61        ISI                                  reassembled
 
POWER AUTHORITY OF THE STATE OF NEW YORK                                        '
JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                          -
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
 
==SUMMARY==
 
DECEMBER 1981 ATE  SYSTEM Q  I HOW DETEJTED  CAUSE OF MALFUNCTION    ACTION TAKEN TO PRECLUDE RECURRENCE  T ENT
. 2/1    23  12012          Ops  .      Valves leak by seat      Replaced valves                        32 HPI-27C &                  due to erosion                                              .
28C k2/2      23  13604          Ops        Valve leaks by seat      Replaced valve                          20 LS-90                      due to erosion Isolation Valve L2/3      03  15689          Visual      Sightglass hit with      Replaced sightglass                      2 Scram Disc.                wrench Inst. Vol.
2/3    27  1.4597        Ops        Plugged suction filter    Cleaned filter                          15 P-11B 12/4      13  9504          Visual      Steam cut pressure      Replaced pressure seal                  24 A0V-22                      seal 62/4      13  13_541        P.M.        N/A                      Disassembled, inspected            -  12 RCI-12        ISI                                  reassembled R2/5      23  13550          Ops          Tight packing bound      Repacked valve                          12 HP,I-940                    stem R2/7      12 14088          Ops          Worn packing            Repacked                                44 MOV-18 62/15      23  16080        LLRT        Leaking past c'at &      Lapped seat & disc - Formed new        240 HPI-65                      seat ring / body threads body back seat with balzona
                                                .                  super metal
 
POWER AUTHORITY OF THE STATE OF NEW YORK                                            -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                        '.
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
 
==SUMMARY==
 
                                                                                                      ,            DECEMBER 1981 DATE                                SYSTEM  K REQ HOW DETECTED          CAUSE OF MALFUNCTION  ACTION TAKEN TO PRECLUDE RECURRENCE ENT                                                                                                                        T 12/15                                46  13534                                              P.M.-  '
N/A                    Disassembled, inspected,                    12 ESW-9A                                              ISI                                reassembled                      .
12/15                                15  13537                                              P.M.        N/A                    Disassembled, inspected,                      6 RBC-35A                                            ISI                                reassembled 12/15                                46  13536                                              P.M.        N/A                    Disassembled, inspected,                      6 ESW-18A                                            ISI                                reassembled 12/22                                11  14084                                              Ops - Visual Packing gland on valve Replaced valve                              15 SLC-725A                                                        bound up 12/22                                03  15071                                              Ops - Visual Bad seals on valve    Replaced valve                                3 HCU-34-47 111 Valve
(
s
 
w    .
POWER AUTHORITY OF THE STATE OF NEW YORK                                                              '
JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                                                <  .
MAINTENANCE
 
==SUMMARY==
 
I&C DECEMBER 1981
                      #    K HOW DETECTED                                              O DATE    SYSTEM                                                            ML COMPONENT]#                            MALF C ON              CTI              p l                      15635                                                Square rooters      Replaced 74M,                                            +
12/9/81    02-3  SQr-74M & 74N        I&C            AGEIUG          out of Proc. 'Ibl. Recalibrated 74N                    24                  !
t 17193                                                Level detector      Cleaned &
l  12/29/81    03    HCU-02-35            OPS            Dirty rod        switch doesn't      adjusted switch                      2 respond            IS-129 Level detector      Cleaned &                                                ,
12/29/81    03    17194                OPS            Dirty rod        switch doesn't      adjusted switch                      2                  !'
HCU-18-43                                            resnond            LS-129 17195                                                Level switch      -
Replaced switch j    12/28/81    03    HCU--34-39      .;,  OPS            Old age          doesn't work        IE-129                                2
                                                                                ~
02012                                                                    Replaced power 1
12/17/81    07    LPRM                  JIC            Unknown          Inspection          supply                                128                  ,
16972                                Possible seal    Detectors          Replaced LPM 4 12/7/81      07    LPRM-28-21            OPS          leakage          reading              string (A, B, C,                      40 erratically        D) 1o973                                Possible seal    Detectors          Replaced LPRM                                              !
;    12/7/81      07    LPRM-36-45            OPS            leakage        reading              string (A, B, C,                      40 erratically        D) 06047                                Unknown        Valves don't        Calibrated 12/21/81    10    AOV-71                OPS                            open fully          71 A & B                              46 16045                                Defective        Iow penetration 12/02/81    16-1  X-101D                OPS            pressure        pressure            Replaced indicator                    2 indicator logic race      No high alarm on    Checked monitor, 09640                OPS            between light &  09-3 panel          tested o.k.                            2 12/10/81    17    R4-251C                              annunciator Flow anitteu      No output to      Repaired by 11938                OPS            physically      27-FQ/FY-103        manufacturer                            10 12/6/81      27    FT-103A                              broken
 
l                                                      POWER AUTHORITY OF THE STATE OF NEW YORK                                                    .~
;                                                        JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                                  'N
  ;                                                                    MAINTENANCE
 
==SUMMARY==
 
I&C DECEMBER 1981 DATE  SYSTEM
                                    *R    RE    EST #          HOW DETECTED T
CO    NENT                                      LFU C ON      ML    CIN R          H          S Repeatability of 13766 i L2/19/81                    46                                I&C          Age switch gone          Replaced switch      12 DPS-132A 11544 High speed            Recalibrated per                  i i  1.1/30/81                93    EDG "D" Tach                OPS            Relay tach drift indication in        F-IMP-93 3          26          j; control room                                            -
13761 Calibration          Replace &
4 EDG "A"  to ' D"            JIC          Unknown needed to be          calibrate            31 12/29/81                93                                                                checked              indicators                        i Temperature                          -
Replaced &
16984                                                        No temperature                                          3 EDG "A"-TS Iih                I&C switch alarm                calibrated          10.5
:      L2/7/81                93                                                inoperative                            switch i
l W
__ ___}}

Latest revision as of 03:18, 6 January 2021

Monthly Operating Rept for Dec 1981.Narrative Summary Encl
ML20065T709
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/31/1982
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20065T688 List:
References
NUDOCS 8211020656
Download: ML20065T709 (9)


Text

.

OPERATING DATA REPORT 33 DOCKET NO.

DATE JANUARY 1982 COMPLETED BY E. ZUitLT 4

TELEPHONE (315)3 63840 OPERATING STATUS FITZPATRICK Notes

1. Unit Name:
2. Reporting Period:

811201 - 811231

3. Licensed Thermal Power (MWt).

2436

4. Nameplate Rating (Gross MWe): 883
5. Design Electrical Rating (Net MWe): 821
6. Masimum Dependable Capacity (Gross MWe): 830
7. Maximum Dependable Capacity (Net MWe):

810

8. If Changes Occur in Capacity Ratings (! ems Number 3 Through 7) Since last Report, Give Reasons:

NOIE

9. Power Level To Which Restricted,if Any (Net MWe): NONE
10. Reasons For Restrictions,If Any:

This Month Yr..to.Date Cumulatise 744 8760 56377 I1. Hours In Reporting Period 0 6637.2 39551.2

12. Number Of Hours Reactor Was Critical 0 0 0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 0 6540.8 38443.6 0 0 0
15. Unit Reserve Shutdown Hours 0 14217720 78401314
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 0 4o31100 26760610
18. Net Electrical Energy Generated (MWH) 0 4779650 25904730 0% 74.7% 68.2%
19. U. it Service Factor 0% 74.7% 68.2%
20. Unit Availability Factor 0% 67 4% 61.3%
21. Unit Capacity Factor (Using MDC Net) 0% 66.5% 56.0%
22. Unit Capacity Factor (Using DER Net) 0% 10.1% 16.9%
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

NONE

25. If Shut Down At End Of Report Period. Estimated Date of Startup: FEBRUARY 1982
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION h

R 656 820107 CK 05000333 PDR e

  • AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP JAWARY 1982 DATE E. ZUFELT COMPLETED BY TkLEPHONE (315)342-3840 MONDI DECDEER 1981 AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL -

DAY (MWe-Net)

(MWe-Nel) 0 j7 0 1

0 ,3 0 2

0 39 0

3 0 20 0

4 ,

0 0 21 5

22 0 6

0 0 7 23 0

0 24 8

0 9 25 0 0 10 26 0 0 11 27 0 0 12 28 13 29 0 0 14 30 0 3g 0 15 16 0

SUBEARY: Fourth refbeling and maintenance outage continued through this.

reporting period.

1 DOCKET NO.

50-333 - .

UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME JAMIPP

' DATE JANUARY : 962 __

COMPLETED BY E. ZUFbJi?

REPORT MONTil DFEEMBER 1981 TELEPilONE (315)342-3840 4

i

! w.

e ei 's ui 5 Ii

'*"**" gj Cause & Currective N. i . Date E- k $  ? EU Event I'T" Action to p 33  :] -5 5 m Report =

n in G yUo oO 2 3 Ui j g Prevent Recurrence 1

12 81103r s 744 C 1 NA NA NA Refueling outage (cumulative hours to date 1486.7)

I j

)

J I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual fus Preparation of Data B Maintenance of Test 2 ManualScram. Entry Sheets for Licensee C Refucting 3 Automatic Scram. Event Report (LER) File (NUREG-i D Regulatory Restriction 4 Other (Explain) 0161)

E-Operatur Training & License Examination F Administrative -

5 G. Operational Errur (Explain t Exhibit I Same Suuree ll.Ot her ( E xplain)

POWER AUTHORITY OF THE STATE OF NEW YC3K JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATIONAL EXPERIENCES DECEMBER 1981 i

i The refueling and maintenance outage which began October 31, 1981, continued throughout this reporting period. The major areas are TORUS modifications, LLRT testing, turbine 7

generator maintenance, feedwater heater replacement and fire ,

protection modifications. Presently the outage activities are on schedule.

i

]

1

.--,,. , , ,. _m.. - _ . . - - . _ - , . _ _ _ _ . ~ . , - _ _ . _ . . _ . . , . . . . . _ _ . . . _ . . . _ _ _ - _ _ _ . . _ _ - . _ , - . . . _ - . . - - - - _ _ _ _ .

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER FLANT .

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DECEMBER 1981 I

DATE SYSTEM 0 EST REPAIR

, HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 11/13 10 11120 Visual, Leaking pressure seal Replaced pressure seal 24 MOV-33 11/19 71 16156 Ops Fan stalled Cleaned & lubr1cated 8 INV-3B 11/9 10 15749 Limitorque contact out Adjusted contact - Performed 20 MOV-15C ops of adjustment preventative maintenance on Limitorque 11/21 29 16079 LLRT Incomplete main seat- Ground seat, lapped disc, lapped 120 AOV-86C disc contact pilot seat disc 11/1 00 15076 P.M. N/A Inspected snubbers 20 Snubbers 11/27 93 16153 P.M. N/A Performed visual inspection & 217 EDG "B" P.M.

11/27 93 16:155 P.M. N/A Performed visual inspection & 224 EDG "D" P.M.

11/27 13 13540 P.M. N/A Disassembled, inspected, 6 RCI-40 ISI reassembled 11/28 13 9068 Visual Bearing cover, Replaced plug 8 I TU-2 inspection plug l missing 11/30 23 13539 P.M. d/A Disassembled, inspected, 12 HPI-61 ISI reassembled

POWER AUTHORITY OF THE STATE OF NEW YORK '

JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

DECEMBER 1981 ATE SYSTEM Q I HOW DETEJTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ENT

. 2/1 23 12012 Ops . Valves leak by seat Replaced valves 32 HPI-27C & due to erosion .

28C k2/2 23 13604 Ops Valve leaks by seat Replaced valve 20 LS-90 due to erosion Isolation Valve L2/3 03 15689 Visual Sightglass hit with Replaced sightglass 2 Scram Disc. wrench Inst. Vol.

2/3 27 1.4597 Ops Plugged suction filter Cleaned filter 15 P-11B 12/4 13 9504 Visual Steam cut pressure Replaced pressure seal 24 A0V-22 seal 62/4 13 13_541 P.M. N/A Disassembled, inspected - 12 RCI-12 ISI reassembled R2/5 23 13550 Ops Tight packing bound Repacked valve 12 HP,I-940 stem R2/7 12 14088 Ops Worn packing Repacked 44 MOV-18 62/15 23 16080 LLRT Leaking past c'at & Lapped seat & disc - Formed new 240 HPI-65 seat ring / body threads body back seat with balzona

. super metal

POWER AUTHORITY OF THE STATE OF NEW YORK -

JAMES A. FITZPATRICK NUCLEAR POWER PLANT '.

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

, DECEMBER 1981 DATE SYSTEM K REQ HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE ENT T 12/15 46 13534 P.M.- '

N/A Disassembled, inspected, 12 ESW-9A ISI reassembled .

12/15 15 13537 P.M. N/A Disassembled, inspected, 6 RBC-35A ISI reassembled 12/15 46 13536 P.M. N/A Disassembled, inspected, 6 ESW-18A ISI reassembled 12/22 11 14084 Ops - Visual Packing gland on valve Replaced valve 15 SLC-725A bound up 12/22 03 15071 Ops - Visual Bad seals on valve Replaced valve 3 HCU-34-47 111 Valve

(

s

w .

POWER AUTHORITY OF THE STATE OF NEW YORK '

JAMES A. FITZPATRICK NUCLEAR POWER PLANT < .

MAINTENANCE

SUMMARY

I&C DECEMBER 1981

  1. K HOW DETECTED O DATE SYSTEM ML COMPONENT]# MALF C ON CTI p l 15635 Square rooters Replaced 74M, +

12/9/81 02-3 SQr-74M & 74N I&C AGEIUG out of Proc. 'Ibl. Recalibrated 74N 24  !

t 17193 Level detector Cleaned &

l 12/29/81 03 HCU-02-35 OPS Dirty rod switch doesn't adjusted switch 2 respond IS-129 Level detector Cleaned & ,

12/29/81 03 17194 OPS Dirty rod switch doesn't adjusted switch 2  !'

HCU-18-43 resnond LS-129 17195 Level switch -

Replaced switch j 12/28/81 03 HCU--34-39 .;, OPS Old age doesn't work IE-129 2

~

02012 Replaced power 1

12/17/81 07 LPRM JIC Unknown Inspection supply 128 ,

16972 Possible seal Detectors Replaced LPM 4 12/7/81 07 LPRM-28-21 OPS leakage reading string (A, B, C, 40 erratically D) 1o973 Possible seal Detectors Replaced LPRM  !

12/7/81 07 LPRM-36-45 OPS leakage reading string (A, B, C, 40 erratically D) 06047 Unknown Valves don't Calibrated 12/21/81 10 AOV-71 OPS open fully 71 A & B 46 16045 Defective Iow penetration 12/02/81 16-1 X-101D OPS pressure pressure Replaced indicator 2 indicator logic race No high alarm on Checked monitor, 09640 OPS between light & 09-3 panel tested o.k. 2 12/10/81 17 R4-251C annunciator Flow anitteu No output to Repaired by 11938 OPS physically 27-FQ/FY-103 manufacturer 10 12/6/81 27 FT-103A broken

l POWER AUTHORITY OF THE STATE OF NEW YORK .~

JAMES A. FITZPATRICK NUCLEAR POWER PLANT 'N
MAINTENANCE

SUMMARY

I&C DECEMBER 1981 DATE SYSTEM

  • R RE EST # HOW DETECTED T

CO NENT LFU C ON ML CIN R H S Repeatability of 13766 i L2/19/81 46 I&C Age switch gone Replaced switch 12 DPS-132A 11544 High speed Recalibrated per i i 1.1/30/81 93 EDG "D" Tach OPS Relay tach drift indication in F-IMP-93 3 26 j; control room -

13761 Calibration Replace &

4 EDG "A" to ' D" JIC Unknown needed to be calibrate 31 12/29/81 93 checked indicators i Temperature -

Replaced &

16984 No temperature 3 EDG "A"-TS Iih I&C switch alarm calibrated 10.5

L2/7/81 93 inoperative switch i

l W

__ ___