OPERATING DATA REPORT 33 DOCKET NO. | |||
DATE JANUARY 1982 COMPLETED BY E. ZUitLT 4 | |||
TELEPHONE (315)3 63840 OPERATING STATUS FITZPATRICK Notes | |||
: 1. Unit Name: | |||
: 2. Reporting Period: | |||
811201 - 811231 | |||
: 3. Licensed Thermal Power (MWt). | |||
2436 | |||
: 4. Nameplate Rating (Gross MWe): 883 | |||
: 5. Design Electrical Rating (Net MWe): 821 | |||
: 6. Masimum Dependable Capacity (Gross MWe): 830 | |||
: 7. Maximum Dependable Capacity (Net MWe): | |||
810 | |||
: 8. If Changes Occur in Capacity Ratings (! ems Number 3 Through 7) Since last Report, Give Reasons: | |||
NOIE | |||
: 9. Power Level To Which Restricted,if Any (Net MWe): NONE | |||
: 10. Reasons For Restrictions,If Any: | |||
This Month Yr..to.Date Cumulatise 744 8760 56377 I1. Hours In Reporting Period 0 6637.2 39551.2 | |||
: 12. Number Of Hours Reactor Was Critical 0 0 0 | |||
: 13. Reactor Reserve Shutdown Hours | |||
: 14. Hours Generator On.Line 0 6540.8 38443.6 0 0 0 | |||
: 15. Unit Reserve Shutdown Hours 0 14217720 78401314 | |||
: 16. Gross Thermal Energy Generated (MWH) | |||
: 17. Gross Electrical Energy Generated (MWH) 0 4o31100 26760610 | |||
: 18. Net Electrical Energy Generated (MWH) 0 4779650 25904730 0% 74.7% 68.2% | |||
: 19. U. it Service Factor 0% 74.7% 68.2% | |||
: 20. Unit Availability Factor 0% 67 4% 61.3% | |||
: 21. Unit Capacity Factor (Using MDC Net) 0% 66.5% 56.0% | |||
: 22. Unit Capacity Factor (Using DER Net) 0% 10.1% 16.9% | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1: | |||
NONE | |||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: FEBRUARY 1982 | |||
: 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION h | |||
R 656 820107 CK 05000333 PDR e | |||
* AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP JAWARY 1982 DATE E. ZUFELT COMPLETED BY TkLEPHONE (315)342-3840 MONDI DECDEER 1981 AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL - | |||
DAY (MWe-Net) | |||
(MWe-Nel) 0 j7 0 1 | |||
0 ,3 0 2 | |||
0 39 0 | |||
3 0 20 0 | |||
4 , | |||
0 0 21 5 | |||
22 0 6 | |||
0 0 7 23 0 | |||
0 24 8 | |||
0 9 25 0 0 10 26 0 0 11 27 0 0 12 28 13 29 0 0 14 30 0 3g 0 15 16 0 | |||
SUBEARY: Fourth refbeling and maintenance outage continued through this. | |||
reporting period. | |||
1 DOCKET NO. | |||
50-333 - . | |||
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME JAMIPP | |||
' DATE JANUARY : 962 __ | |||
COMPLETED BY E. ZUFbJi? | |||
REPORT MONTil DFEEMBER 1981 TELEPilONE (315)342-3840 4 | |||
i | |||
! w. | |||
e ei 's ui 5 Ii | |||
'*"**" gj Cause & Currective N. i . Date E- k $ ? EU Event I'T" Action to p 33 :] -5 5 m Report = | |||
n in G yUo oO 2 3 Ui j g Prevent Recurrence 1 | |||
12 81103r s 744 C 1 NA NA NA Refueling outage (cumulative hours to date 1486.7) | |||
I j | |||
) | |||
J I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual fus Preparation of Data B Maintenance of Test 2 ManualScram. Entry Sheets for Licensee C Refucting 3 Automatic Scram. Event Report (LER) File (NUREG-i D Regulatory Restriction 4 Other (Explain) 0161) | |||
E-Operatur Training & License Examination F Administrative - | |||
5 G. Operational Errur (Explain t Exhibit I Same Suuree ll.Ot her ( E xplain) | |||
POWER AUTHORITY OF THE STATE OF NEW YC3K JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE | |||
==SUMMARY== | |||
OF OPERATIONAL EXPERIENCES DECEMBER 1981 i | |||
i The refueling and maintenance outage which began October 31, 1981, continued throughout this reporting period. The major areas are TORUS modifications, LLRT testing, turbine 7 | |||
generator maintenance, feedwater heater replacement and fire , | |||
protection modifications. Presently the outage activities are on schedule. | |||
i | |||
] | |||
1 | |||
.--,,. , , ,. _m.. - _ . . - - . _ - , . _ _ _ _ . ~ . , - _ _ . _ . . _ . . , . . . . . _ _ . . . _ . . . _ _ _ - _ _ _ . . _ _ - . _ , - . . . _ - . . - - - - _ _ _ _ . | |||
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER FLANT . | |||
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE | |||
==SUMMARY== | |||
DECEMBER 1981 I | |||
DATE SYSTEM 0 EST REPAIR | |||
, HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 11/13 10 11120 Visual, Leaking pressure seal Replaced pressure seal 24 MOV-33 11/19 71 16156 Ops Fan stalled Cleaned & lubr1cated 8 INV-3B 11/9 10 15749 Limitorque contact out Adjusted contact - Performed 20 MOV-15C ops of adjustment preventative maintenance on Limitorque 11/21 29 16079 LLRT Incomplete main seat- Ground seat, lapped disc, lapped 120 AOV-86C disc contact pilot seat disc 11/1 00 15076 P.M. N/A Inspected snubbers 20 Snubbers 11/27 93 16153 P.M. N/A Performed visual inspection & 217 EDG "B" P.M. | |||
11/27 93 16:155 P.M. N/A Performed visual inspection & 224 EDG "D" P.M. | |||
11/27 13 13540 P.M. N/A Disassembled, inspected, 6 RCI-40 ISI reassembled 11/28 13 9068 Visual Bearing cover, Replaced plug 8 I TU-2 inspection plug l missing 11/30 23 13539 P.M. d/A Disassembled, inspected, 12 HPI-61 ISI reassembled | |||
POWER AUTHORITY OF THE STATE OF NEW YORK ' | |||
JAMES A. FITZPATRICK NUCLEAR POWER PLANT - | |||
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE | |||
==SUMMARY== | |||
DECEMBER 1981 ATE SYSTEM Q I HOW DETEJTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ENT | |||
. 2/1 23 12012 Ops . Valves leak by seat Replaced valves 32 HPI-27C & due to erosion . | |||
28C k2/2 23 13604 Ops Valve leaks by seat Replaced valve 20 LS-90 due to erosion Isolation Valve L2/3 03 15689 Visual Sightglass hit with Replaced sightglass 2 Scram Disc. wrench Inst. Vol. | |||
2/3 27 1.4597 Ops Plugged suction filter Cleaned filter 15 P-11B 12/4 13 9504 Visual Steam cut pressure Replaced pressure seal 24 A0V-22 seal 62/4 13 13_541 P.M. N/A Disassembled, inspected - 12 RCI-12 ISI reassembled R2/5 23 13550 Ops Tight packing bound Repacked valve 12 HP,I-940 stem R2/7 12 14088 Ops Worn packing Repacked 44 MOV-18 62/15 23 16080 LLRT Leaking past c'at & Lapped seat & disc - Formed new 240 HPI-65 seat ring / body threads body back seat with balzona | |||
. super metal | |||
POWER AUTHORITY OF THE STATE OF NEW YORK - | |||
JAMES A. FITZPATRICK NUCLEAR POWER PLANT '. | |||
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE | |||
==SUMMARY== | |||
, DECEMBER 1981 DATE SYSTEM K REQ HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE ENT T 12/15 46 13534 P.M.- ' | |||
N/A Disassembled, inspected, 12 ESW-9A ISI reassembled . | |||
12/15 15 13537 P.M. N/A Disassembled, inspected, 6 RBC-35A ISI reassembled 12/15 46 13536 P.M. N/A Disassembled, inspected, 6 ESW-18A ISI reassembled 12/22 11 14084 Ops - Visual Packing gland on valve Replaced valve 15 SLC-725A bound up 12/22 03 15071 Ops - Visual Bad seals on valve Replaced valve 3 HCU-34-47 111 Valve | |||
( | |||
s | |||
w . | |||
POWER AUTHORITY OF THE STATE OF NEW YORK ' | |||
JAMES A. FITZPATRICK NUCLEAR POWER PLANT < . | |||
MAINTENANCE | |||
==SUMMARY== | |||
I&C DECEMBER 1981 | |||
# K HOW DETECTED O DATE SYSTEM ML COMPONENT]# MALF C ON CTI p l 15635 Square rooters Replaced 74M, + | |||
12/9/81 02-3 SQr-74M & 74N I&C AGEIUG out of Proc. 'Ibl. Recalibrated 74N 24 ! | |||
t 17193 Level detector Cleaned & | |||
l 12/29/81 03 HCU-02-35 OPS Dirty rod switch doesn't adjusted switch 2 respond IS-129 Level detector Cleaned & , | |||
12/29/81 03 17194 OPS Dirty rod switch doesn't adjusted switch 2 !' | |||
HCU-18-43 resnond LS-129 17195 Level switch - | |||
Replaced switch j 12/28/81 03 HCU--34-39 .;, OPS Old age doesn't work IE-129 2 | |||
~ | |||
02012 Replaced power 1 | |||
12/17/81 07 LPRM JIC Unknown Inspection supply 128 , | |||
16972 Possible seal Detectors Replaced LPM 4 12/7/81 07 LPRM-28-21 OPS leakage reading string (A, B, C, 40 erratically D) 1o973 Possible seal Detectors Replaced LPRM ! | |||
; 12/7/81 07 LPRM-36-45 OPS leakage reading string (A, B, C, 40 erratically D) 06047 Unknown Valves don't Calibrated 12/21/81 10 AOV-71 OPS open fully 71 A & B 46 16045 Defective Iow penetration 12/02/81 16-1 X-101D OPS pressure pressure Replaced indicator 2 indicator logic race No high alarm on Checked monitor, 09640 OPS between light & 09-3 panel tested o.k. 2 12/10/81 17 R4-251C annunciator Flow anitteu No output to Repaired by 11938 OPS physically 27-FQ/FY-103 manufacturer 10 12/6/81 27 FT-103A broken | |||
l POWER AUTHORITY OF THE STATE OF NEW YORK .~ | |||
; JAMES A. FITZPATRICK NUCLEAR POWER PLANT 'N | |||
; MAINTENANCE | |||
==SUMMARY== | |||
I&C DECEMBER 1981 DATE SYSTEM | |||
*R RE EST # HOW DETECTED T | |||
CO NENT LFU C ON ML CIN R H S Repeatability of 13766 i L2/19/81 46 I&C Age switch gone Replaced switch 12 DPS-132A 11544 High speed Recalibrated per i i 1.1/30/81 93 EDG "D" Tach OPS Relay tach drift indication in F-IMP-93 3 26 j; control room - | |||
13761 Calibration Replace & | |||
4 EDG "A" to ' D" JIC Unknown needed to be calibrate 31 12/29/81 93 checked indicators i Temperature - | |||
Replaced & | |||
16984 No temperature 3 EDG "A"-TS Iih I&C switch alarm calibrated 10.5 | |||
: L2/7/81 93 inoperative switch i | |||
l W | |||
__ ___}} |
Latest revision as of 03:18, 6 January 2021
ML20065T709 | |
Person / Time | |
---|---|
Site: | FitzPatrick ![]() |
Issue date: | 01/31/1982 |
From: | Zufelt E POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | |
Shared Package | |
ML20065T688 | List: |
References | |
NUDOCS 8211020656 | |
Download: ML20065T709 (9) | |
Text
.
OPERATING DATA REPORT 33 DOCKET NO.
DATE JANUARY 1982 COMPLETED BY E. ZUitLT 4
TELEPHONE (315)3 63840 OPERATING STATUS FITZPATRICK Notes
- 1. Unit Name:
- 2. Reporting Period:
811201 - 811231
- 3. Licensed Thermal Power (MWt).
2436
- 4. Nameplate Rating (Gross MWe): 883
- 5. Design Electrical Rating (Net MWe): 821
- 6. Masimum Dependable Capacity (Gross MWe): 830
- 7. Maximum Dependable Capacity (Net MWe):
810
- 8. If Changes Occur in Capacity Ratings (! ems Number 3 Through 7) Since last Report, Give Reasons:
NOIE
- 9. Power Level To Which Restricted,if Any (Net MWe): NONE
- 10. Reasons For Restrictions,If Any:
This Month Yr..to.Date Cumulatise 744 8760 56377 I1. Hours In Reporting Period 0 6637.2 39551.2
- 12. Number Of Hours Reactor Was Critical 0 0 0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 0 6540.8 38443.6 0 0 0
- 15. Unit Reserve Shutdown Hours 0 14217720 78401314
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 0 4o31100 26760610
- 18. Net Electrical Energy Generated (MWH) 0 4779650 25904730 0% 74.7% 68.2%
- 19. U. it Service Factor 0% 74.7% 68.2%
- 20. Unit Availability Factor 0% 67 4% 61.3%
- 21. Unit Capacity Factor (Using MDC Net) 0% 66.5% 56.0%
- 22. Unit Capacity Factor (Using DER Net) 0% 10.1% 16.9%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
NONE
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: FEBRUARY 1982
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COMM ERCIAL OPER ATION h
R 656 820107 CK 05000333 PDR e
- AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT JAFNPP JAWARY 1982 DATE E. ZUFELT COMPLETED BY TkLEPHONE (315)342-3840 MONDI DECDEER 1981 AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL -
DAY (MWe-Net)
(MWe-Nel) 0 j7 0 1
0 ,3 0 2
0 39 0
3 0 20 0
4 ,
0 0 21 5
22 0 6
0 0 7 23 0
0 24 8
0 9 25 0 0 10 26 0 0 11 27 0 0 12 28 13 29 0 0 14 30 0 3g 0 15 16 0
SUBEARY: Fourth refbeling and maintenance outage continued through this.
reporting period.
1 DOCKET NO.
50-333 - .
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME JAMIPP
' DATE JANUARY : 962 __
COMPLETED BY E. ZUFbJi?
REPORT MONTil DFEEMBER 1981 TELEPilONE (315)342-3840 4
i
! w.
e ei 's ui 5 Ii
'*"**" gj Cause & Currective N. i . Date E- k $ ? EU Event I'T" Action to p 33 :] -5 5 m Report =
n in G yUo oO 2 3 Ui j g Prevent Recurrence 1
12 81103r s 744 C 1 NA NA NA Refueling outage (cumulative hours to date 1486.7)
I j
)
J I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual fus Preparation of Data B Maintenance of Test 2 ManualScram. Entry Sheets for Licensee C Refucting 3 Automatic Scram. Event Report (LER) File (NUREG-i D Regulatory Restriction 4 Other (Explain) 0161)
E-Operatur Training & License Examination F Administrative -
5 G. Operational Errur (Explain t Exhibit I Same Suuree ll.Ot her ( E xplain)
POWER AUTHORITY OF THE STATE OF NEW YC3K JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE
SUMMARY
OF OPERATIONAL EXPERIENCES DECEMBER 1981 i
i The refueling and maintenance outage which began October 31, 1981, continued throughout this reporting period. The major areas are TORUS modifications, LLRT testing, turbine 7
generator maintenance, feedwater heater replacement and fire ,
protection modifications. Presently the outage activities are on schedule.
i
]
1
.--,,. , , ,. _m.. - _ . . - - . _ - , . _ _ _ _ . ~ . , - _ _ . _ . . _ . . , . . . . . _ _ . . . _ . . . _ _ _ - _ _ _ . . _ _ - . _ , - . . . _ - . . - - - - _ _ _ _ .
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER FLANT .
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DECEMBER 1981 I
DATE SYSTEM 0 EST REPAIR
, HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 11/13 10 11120 Visual, Leaking pressure seal Replaced pressure seal 24 MOV-33 11/19 71 16156 Ops Fan stalled Cleaned & lubr1cated 8 INV-3B 11/9 10 15749 Limitorque contact out Adjusted contact - Performed 20 MOV-15C ops of adjustment preventative maintenance on Limitorque 11/21 29 16079 LLRT Incomplete main seat- Ground seat, lapped disc, lapped 120 AOV-86C disc contact pilot seat disc 11/1 00 15076 P.M. N/A Inspected snubbers 20 Snubbers 11/27 93 16153 P.M. N/A Performed visual inspection & 217 EDG "B" P.M.
11/27 93 16:155 P.M. N/A Performed visual inspection & 224 EDG "D" P.M.
11/27 13 13540 P.M. N/A Disassembled, inspected, 6 RCI-40 ISI reassembled 11/28 13 9068 Visual Bearing cover, Replaced plug 8 I TU-2 inspection plug l missing 11/30 23 13539 P.M. d/A Disassembled, inspected, 12 HPI-61 ISI reassembled
POWER AUTHORITY OF THE STATE OF NEW YORK '
JAMES A. FITZPATRICK NUCLEAR POWER PLANT -
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
DECEMBER 1981 ATE SYSTEM Q I HOW DETEJTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ENT
. 2/1 23 12012 Ops . Valves leak by seat Replaced valves 32 HPI-27C & due to erosion .
28C k2/2 23 13604 Ops Valve leaks by seat Replaced valve 20 LS-90 due to erosion Isolation Valve L2/3 03 15689 Visual Sightglass hit with Replaced sightglass 2 Scram Disc. wrench Inst. Vol.
2/3 27 1.4597 Ops Plugged suction filter Cleaned filter 15 P-11B 12/4 13 9504 Visual Steam cut pressure Replaced pressure seal 24 A0V-22 seal 62/4 13 13_541 P.M. N/A Disassembled, inspected - 12 RCI-12 ISI reassembled R2/5 23 13550 Ops Tight packing bound Repacked valve 12 HP,I-940 stem R2/7 12 14088 Ops Worn packing Repacked 44 MOV-18 62/15 23 16080 LLRT Leaking past c'at & Lapped seat & disc - Formed new 240 HPI-65 seat ring / body threads body back seat with balzona
. super metal
POWER AUTHORITY OF THE STATE OF NEW YORK -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT '.
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
, DECEMBER 1981 DATE SYSTEM K REQ HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE ENT T 12/15 46 13534 P.M.- '
N/A Disassembled, inspected, 12 ESW-9A ISI reassembled .
12/15 15 13537 P.M. N/A Disassembled, inspected, 6 RBC-35A ISI reassembled 12/15 46 13536 P.M. N/A Disassembled, inspected, 6 ESW-18A ISI reassembled 12/22 11 14084 Ops - Visual Packing gland on valve Replaced valve 15 SLC-725A bound up 12/22 03 15071 Ops - Visual Bad seals on valve Replaced valve 3 HCU-34-47 111 Valve
(
s
w .
POWER AUTHORITY OF THE STATE OF NEW YORK '
JAMES A. FITZPATRICK NUCLEAR POWER PLANT < .
MAINTENANCE
SUMMARY
I&C DECEMBER 1981
- K HOW DETECTED O DATE SYSTEM ML COMPONENT]# MALF C ON CTI p l 15635 Square rooters Replaced 74M, +
12/9/81 02-3 SQr-74M & 74N I&C AGEIUG out of Proc. 'Ibl. Recalibrated 74N 24 !
t 17193 Level detector Cleaned &
l 12/29/81 03 HCU-02-35 OPS Dirty rod switch doesn't adjusted switch 2 respond IS-129 Level detector Cleaned & ,
12/29/81 03 17194 OPS Dirty rod switch doesn't adjusted switch 2 !'
HCU-18-43 resnond LS-129 17195 Level switch -
Replaced switch j 12/28/81 03 HCU--34-39 .;, OPS Old age doesn't work IE-129 2
~
02012 Replaced power 1
12/17/81 07 LPRM JIC Unknown Inspection supply 128 ,
16972 Possible seal Detectors Replaced LPM 4 12/7/81 07 LPRM-28-21 OPS leakage reading string (A, B, C, 40 erratically D) 1o973 Possible seal Detectors Replaced LPRM !
- 12/7/81 07 LPRM-36-45 OPS leakage reading string (A, B, C, 40 erratically D) 06047 Unknown Valves don't Calibrated 12/21/81 10 AOV-71 OPS open fully 71 A & B 46 16045 Defective Iow penetration 12/02/81 16-1 X-101D OPS pressure pressure Replaced indicator 2 indicator logic race No high alarm on Checked monitor, 09640 OPS between light & 09-3 panel tested o.k. 2 12/10/81 17 R4-251C annunciator Flow anitteu No output to Repaired by 11938 OPS physically 27-FQ/FY-103 manufacturer 10 12/6/81 27 FT-103A broken
l POWER AUTHORITY OF THE STATE OF NEW YORK .~
- JAMES A. FITZPATRICK NUCLEAR POWER PLANT 'N
- MAINTENANCE
SUMMARY
I&C DECEMBER 1981 DATE SYSTEM
- R RE EST # HOW DETECTED T
CO NENT LFU C ON ML CIN R H S Repeatability of 13766 i L2/19/81 46 I&C Age switch gone Replaced switch 12 DPS-132A 11544 High speed Recalibrated per i i 1.1/30/81 93 EDG "D" Tach OPS Relay tach drift indication in F-IMP-93 3 26 j; control room -
13761 Calibration Replace &
4 EDG "A" to ' D" JIC Unknown needed to be calibrate 31 12/29/81 93 checked indicators i Temperature -
Replaced &
16984 No temperature 3 EDG "A"-TS Iih I&C switch alarm calibrated 10.5
- L2/7/81 93 inoperative switch i
l W