ML20101D073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,
1 Duane Amoc Energy Center e
      'h                                                                                                      3277 CAEC P:aa
                ,      ,                                                                                      Pato. A 5233 Telephone 319 8517611 Fat 319 8517511 March 11,1996                                                            I NG-96-0624 UTILITIES Mr. Ifubert J. Miller Regional Administrator                                                                                                i Region 111 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351
 
==Subject:==
Duane Arnold Energy Center                                                                                  I Docket No: 50-331 Operating License DPR-49 February 1996 Monthly Operating Report
 
==Dear Mr. Miller:==
l l
Please find enclosed the Duane Arnold Energy Center Mammy Operating Report for February 1996. The report has been prepared in accordance with the guidelines of NUREG-0020 and distribution has been made in accordance with DAEC Technical Specifications, Section 6.ll.l.c.
Very truly yours, M                      %
G    Van Middlesworth                                        I Plant Manager, Nuclear GDV/RBW                                                                                                                i Enclosures File A ll8d cc:
U.S. Nuclear Regulafory Commission                  Mr. Dennis Murdock Attn: Document Control Desk                          Centrallowa Power Cooperative Mail Station PI-37                                  Box 2517 Washington, DC 20555-0001 (Origa                    Cedar Rapids, IA 52406 Mr. Glenn Kelly                                      Dr. William A. Jacobs, Jr.
Project Manager                                      GDS Associates,Inc.
I Whiteflint North                                  Suite 720 Mail Stop 13E21                                      1850 Parkway Place i1555 Rockville Pike                                  Marietta, GA 30068-8237 Rockville, MD 20852 Document Control Desk                                Mr. Dale Arends INPO Records Center                                  Corn Belt Power Cooperative 700 Galleria Parkway                                  130013th Street North Atlanta, GA 30339-5957                                ilumboldt. IA 50548 Ms. Lisa Stump                                        DOCU Iowa State Utilities Boscd Lucas State Office Building                          NRC Resident inspector l                              Des Moines, IA 50319 I
I Mr. Fred Yost                                        Ms. Kathleen Shea Director, Research Services                          Morgan, Lewis, Bochius                          ,
Utility Data Institute                                1800 M St. NW 1700 K St. NW, Suite 400 190043 Washington, DC 20006 Washington, DC 20036-5859
[ /(h#
                                                                                                                                /
l 9603190362 960229 l          PDR    ADOCK 05000331
!          R                          PDR l                                                                                                              4,es<= s.m.:como. ,
 
l OPERATING DATA REPORT DOCKET NO:                  50-0331 DATE:            03/11/96 Unit:        Duane Arnold Energy Cgntgr COMPLETED BY:                  Richard Woodward TELEPHONE:                  (319)851-7318 OPERATING STATUS Average Daily Power Level
: 1. Unit Name: Duane Arnold Energy Center 500
: 2. Reporting Period: Februarv 199Jl                                                                          _
400 1
: 3. Licensed Thermal Power (MW ):th EiiE                                        ;E
                                                                                        ,  300 v
: 4. Nameplate Rating (Gross MWe DER): 565.7 (Turbine)
                                                                                    .a 200
: 5. Design Electrical Rating (Net MWe DER): 118                                      100 0
: 6. Maximum Dependable Capacity (Gross MW            e MDC): 510 1            6    11      16      21 26
: 7. Maximum Dependable Capacity (Net MWe MDC): 520
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through
: 7) since the last report, Give Reasons: Items #fi and #1 reflect 5 % increased canacity credit resulting from heat rate imorovement. Ihe change officiallv took effect .Ianuary L.192fi,
: 9. Power Level to Which Restricted, If Any (Net MWe): Not Aeolicable
: 10.      Reasons for Restrictions,if Any: No.1 Anolicable February-96                      1996              Cummutative
: 11. Hours in Reporting Period                                          696.0                1,440.0                    184,776.0
: 12. Number of Hours Reactor Was Critical                              696.0                1,440.0                    139,965.8
: 13. Reactor Reserve Shutdown Hours                                        0.0                    0.0                        192.8
: 14. Hours Generator On-Line                                            696.0                  1,440.0                  136,553.8
: 15. Unit Reserve Shutdown Hours                                          0.0                    0.0                          0.0
: 16. Gross Thermal Energy Generated (MWH)                        1,106,221.6          2,282,978.5                  191,544,192.9
: 17. Gross Electrical Energy Generated (MWH)                      376,754.0            779,425.0                  64,191,395.6
: 18. Net Electrical Energy Generated (MWH)                        355,493.7              735,489.0                  60,212,503.6            l l
: 19. Unit Service Factor                                              100.0 %                100.0 %                      73.9 %
: 20. Unit Availability Factor                                        100.0 %                100.0 %                      73.9 %
: 21. Unit Capacity Fa: tor (Using MDC Net)                            98.2%                  98.2 %                      68.8 %
: 22. Unit Capacity Factor (Using DER Net)                              94.9 %                  94.9 %                      65.9 %
: 23. Unit Forced Outage I. ate
                                .                                            0.0%                    0.0%                        10.7 %
: 24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of each): N!%
: 25. If Shutdown at End of Report Period, Estimated Date of Startup: N!%
 
      . AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-0331 DATE: 03/11/96 Unit: Duane Arnold Energy Center COMPLETED BY: Richard Woodward TELEPHONE: (319) 851-7318 MONTH February 1996 Day    Average Daily Power 12 vel (MWe-Ne0 1            534.4 2            530.4 3            532.2 4            531.9 5            534.8 6            532.3 7            528.9 8            519.6 9            492.1 TO            254.9 11            361.7 12            502.9 13            521.3 14            513.9 15            511.7 16            519.1 17            523.1 18            523.4 19            525.1 20            526.7 21            529.6 22            528.5 23            529.4 24            531.1 25            533.3 26            534.2 27            534.6 28            535.2 29            536.2
                                                                                ]
 
DOCKET NO: 50-0331 DATE: 03/11/96                                                                                        -
Unit: Duane Arnold Fnercy Center COMPLETED BY: Richard Woodward                                                                                      ,
TELEPIIONE: (319)851-7318 UNIT SIIUTDOWNS AND POWER REDUCTIONS REPORT MONTil: February 1996 No.      Date -  Type    Duration    Reason  Method of Licensee Event System Code Comp. Code                                                                                                                          Cause (1)    (llours)    (2)      Shutting    Report #                (4)                    (5)
Down Reactor (3) 2    Feb. 7 - 27  S          0        B          5          n/a                TA                    V, FCV      Turbine Control Valve Testing, Control Rod Sequence (28.0 full                                        (Main Turbine (Valve, Flow Exchange,"A" Motor-Generator Set Maintenance, maintain power                                            System,                    Control    margin to thermal limits hours                                            various)                    Valve) equivalent) 1 - F: Forced          2 - Reason                                    3 - Method:                                4 - Exhibit G- Instructions for S: Scheduled          A-Equipment Failure (Explain)                  1-Manual                                    Preparation of Data Entry B-Maintenance or Test                          2-Manual        Scram                      Sheets for Licensee Event C-Refueling                                    3-Automatic      Scram                    Report (LER) File (NUREG-D-Regulatory Restriction                      4-Continued                                0161)
E-Operator Training & License Examination      5-Reduced Load F-Administrative                              9-Other (Explain)                      5 - Exhibit I (Same Source)
G-Operational Error (Explain)
II-Other (Explain)
..                                      _                                      =  _ _ _ _        _ _ _ _ _            _ - _ - _ _ _ _ _ - _ _ _ _ _ - _ _ - _ _ _ - _ _ _ _ _ _ - -- _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _
 
        ,                                    REFUELING INFORMATION
          ,        .                                              DOCKET NO: 50-0331 DATE: 03/11/96 Unit: Duane Arnold Energy Center COMPLETED BY: Richard Woodward TELEPHONE: (3191 851-7318
: 1. Name of facility.
Duane Arnold Energy Center
: 2. Scheduled date for next refueling shutdown.
Refuel Outage XIV to begin October 10,1996.
: 3. Actual date for restart following refueling.
November 14,1996
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes RTS 269, T.S. 3.2, " Plant Containment Systems" RTS 288, T.S. 2.1,3.2," Reactor Water Clean-up Systems Vessel Level isolation Set-Point Change"
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
RTS 269, submitted December 22,1995 RTS 288, submitted January 18,1996
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
No
: 7. Current and projected fuel assemblies inventory:
l Number of          Projected date oflast Fuel            refueling that can be i Assemblies                      discharged Installed in reactor core (following refueling)              368      j                n/a Previously discharged from core to Spent Fuel Storage  ,    1408                        n/a Pool (following refueling)                              i Under present physical capacity of Spent Fuel Storage        2411                        2007 Pool Under Licensed Capacity of Spent Fuel Storage Pool          3152      ,                2014
 
  ,  e                                                                                                                                            j DOCKET NO.: 50-0331 DATE: 03/11/96                                                  i Unit: Duane Arnold Enerev Center                            l COMPLETED BY: Richard Woodward                                                j TELEPilONE: (319) 851-7318 Monthly Operational Overview for February 1996:
The DAEC operated at full thermal power throughout the month except:
* February 7 - 8, to perform scheduled turbine control valve surveillance testing and a control rod sequence exchange,0.9 full-power-hours lost.
* February 9 - 10, to perform maintenance on the "A" Recirculation Pump Motor-Generator Set.14.1 full-power-hours lost.
* February 11 - 27, to maintain margin to thermal limits,14.9 full-power-hours lost.
Total forgone production (including other small planned losses) was the equivalent of 32.0 full-power hours of operation.
At the end of the month the Duane Arnold Energy Center had operated 269 consecutive days, its best-ever continuous operating run.
Allocation of Production & Losses:                                                          Electncal Capacity Factor Full Power Output        %of 565.7 Equivaleni MWe              MWe      Hours (Design Gross Rating)            ,
Actual Metered Net Electnc Output                                                              510.8            90.3 %      628.4  l Actual Metered Plant Electnc Loads                                                                30.5            5.4%      37.6 Load Following                                                                                      0.0            0.0%        0.0 Off-Line                                                                                            0.0            0.0%        0.0
(-) Weather losses, ie., condenser pressure < 2.75 in lig / Cire Water Temp < 74.5 'F              -2.1          -0.3%        -2.6 Planned Capacity Losses: Turbine Control Valve Testing Seq. Exchange, Thermal Linut              22.8            4.0%      28.0 l
Unplanned Capacity Losses                                                                          0.0            0.0%        0.0 Normal Capacity Losses (Avg MWth < 1658)                                                            0.2            0.0%        0.2 Metering Losses (Avg indic MWe - Avg MWHe)                                                          2.7            0.5%        3.4 Etriciency Losses (Weather Norm-Full-Power-MWe < 565.7)                                            DJi            Ol%          L.Q ;
Design Gross Electric Output        565.7          100 0 %      6960 There were no Licensee Event Reports.
Licensine Action Summary:
Plant Availability:                      100.0 %  Unplanned Auto Scrams (while/ critical) this month:                  0 Number of reportable events:            0        Unplanned Auto Scrams (while/ critical)last 12 months:                1 i
I
.}}

Revision as of 03:08, 12 May 2020

Monthly Operating Rept for Feb 1996 for DAEC
ML20101D073
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/29/1996
From: Middlesworth G, Woodward R
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NG-96-0624, NG-96-624, NUDOCS 9603190362
Download: ML20101D073 (6)


Text

,

1 Duane Amoc Energy Center e

'h 3277 CAEC P:aa

, , Pato. A 5233 Telephone 319 8517611 Fat 319 8517511 March 11,1996 I NG-96-0624 UTILITIES Mr. Ifubert J. Miller Regional Administrator i Region 111 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351

Subject:

Duane Arnold Energy Center I Docket No: 50-331 Operating License DPR-49 February 1996 Monthly Operating Report

Dear Mr. Miller:

l l

Please find enclosed the Duane Arnold Energy Center Mammy Operating Report for February 1996. The report has been prepared in accordance with the guidelines of NUREG-0020 and distribution has been made in accordance with DAEC Technical Specifications, Section 6.ll.l.c.

Very truly yours, M  %

G Van Middlesworth I Plant Manager, Nuclear GDV/RBW i Enclosures File A ll8d cc:

U.S. Nuclear Regulafory Commission Mr. Dennis Murdock Attn: Document Control Desk Centrallowa Power Cooperative Mail Station PI-37 Box 2517 Washington, DC 20555-0001 (Origa Cedar Rapids, IA 52406 Mr. Glenn Kelly Dr. William A. Jacobs, Jr.

Project Manager GDS Associates,Inc.

I Whiteflint North Suite 720 Mail Stop 13E21 1850 Parkway Place i1555 Rockville Pike Marietta, GA 30068-8237 Rockville, MD 20852 Document Control Desk Mr. Dale Arends INPO Records Center Corn Belt Power Cooperative 700 Galleria Parkway 130013th Street North Atlanta, GA 30339-5957 ilumboldt. IA 50548 Ms. Lisa Stump DOCU Iowa State Utilities Boscd Lucas State Office Building NRC Resident inspector l Des Moines, IA 50319 I

I Mr. Fred Yost Ms. Kathleen Shea Director, Research Services Morgan, Lewis, Bochius ,

Utility Data Institute 1800 M St. NW 1700 K St. NW, Suite 400 190043 Washington, DC 20006 Washington, DC 20036-5859

[ /(h#

/

l 9603190362 960229 l PDR ADOCK 05000331

! R PDR l 4,es<= s.m.:como. ,

l OPERATING DATA REPORT DOCKET NO: 50-0331 DATE: 03/11/96 Unit: Duane Arnold Energy Cgntgr COMPLETED BY: Richard Woodward TELEPHONE: (319)851-7318 OPERATING STATUS Average Daily Power Level

1. Unit Name: Duane Arnold Energy Center 500
2. Reporting Period: Februarv 199Jl _

400 1

3. Licensed Thermal Power (MW ):th EiiE ;E

, 300 v

4. Nameplate Rating (Gross MWe DER): 565.7 (Turbine)

.a 200

5. Design Electrical Rating (Net MWe DER): 118 100 0
6. Maximum Dependable Capacity (Gross MW e MDC): 510 1 6 11 16 21 26
7. Maximum Dependable Capacity (Net MWe MDC): 520
8. If Changes Occur in Capacity Ratings (Items Number 3 through
7) since the last report, Give Reasons: Items #fi and #1 reflect 5 % increased canacity credit resulting from heat rate imorovement. Ihe change officiallv took effect .Ianuary L.192fi,
9. Power Level to Which Restricted, If Any (Net MWe): Not Aeolicable
10. Reasons for Restrictions,if Any: No.1 Anolicable February-96 1996 Cummutative
11. Hours in Reporting Period 696.0 1,440.0 184,776.0
12. Number of Hours Reactor Was Critical 696.0 1,440.0 139,965.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 192.8
14. Hours Generator On-Line 696.0 1,440.0 136,553.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,106,221.6 2,282,978.5 191,544,192.9
17. Gross Electrical Energy Generated (MWH) 376,754.0 779,425.0 64,191,395.6
18. Net Electrical Energy Generated (MWH) 355,493.7 735,489.0 60,212,503.6 l l
19. Unit Service Factor 100.0 % 100.0 % 73.9 %
20. Unit Availability Factor 100.0 % 100.0 % 73.9 %
21. Unit Capacity Fa: tor (Using MDC Net) 98.2% 98.2 % 68.8 %
22. Unit Capacity Factor (Using DER Net) 94.9 % 94.9 % 65.9 %
23. Unit Forced Outage I. ate

. 0.0% 0.0% 10.7 %

24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of each): N!%
25. If Shutdown at End of Report Period, Estimated Date of Startup: N!%

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-0331 DATE: 03/11/96 Unit: Duane Arnold Energy Center COMPLETED BY: Richard Woodward TELEPHONE: (319) 851-7318 MONTH February 1996 Day Average Daily Power 12 vel (MWe-Ne0 1 534.4 2 530.4 3 532.2 4 531.9 5 534.8 6 532.3 7 528.9 8 519.6 9 492.1 TO 254.9 11 361.7 12 502.9 13 521.3 14 513.9 15 511.7 16 519.1 17 523.1 18 523.4 19 525.1 20 526.7 21 529.6 22 528.5 23 529.4 24 531.1 25 533.3 26 534.2 27 534.6 28 535.2 29 536.2

]

DOCKET NO: 50-0331 DATE: 03/11/96 -

Unit: Duane Arnold Fnercy Center COMPLETED BY: Richard Woodward ,

TELEPIIONE: (319)851-7318 UNIT SIIUTDOWNS AND POWER REDUCTIONS REPORT MONTil: February 1996 No. Date - Type Duration Reason Method of Licensee Event System Code Comp. Code Cause (1) (llours) (2) Shutting Report # (4) (5)

Down Reactor (3) 2 Feb. 7 - 27 S 0 B 5 n/a TA V, FCV Turbine Control Valve Testing, Control Rod Sequence (28.0 full (Main Turbine (Valve, Flow Exchange,"A" Motor-Generator Set Maintenance, maintain power System, Control margin to thermal limits hours various) Valve) equivalent) 1 - F: Forced 2 - Reason 3 - Method: 4 - Exhibit G- Instructions for S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry B-Maintenance or Test 2-Manual Scram Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File (NUREG-D-Regulatory Restriction 4-Continued 0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 9-Other (Explain) 5 - Exhibit I (Same Source)

G-Operational Error (Explain)

II-Other (Explain)

.. _ = _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ - _ _ _ _ _ - _ _ - _ _ _ - _ _ _ _ _ _ - -- _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _

, REFUELING INFORMATION

, . DOCKET NO: 50-0331 DATE: 03/11/96 Unit: Duane Arnold Energy Center COMPLETED BY: Richard Woodward TELEPHONE: (3191 851-7318

1. Name of facility.

Duane Arnold Energy Center

2. Scheduled date for next refueling shutdown.

Refuel Outage XIV to begin October 10,1996.

3. Actual date for restart following refueling.

November 14,1996

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes RTS 269, T.S. 3.2, " Plant Containment Systems" RTS 288, T.S. 2.1,3.2," Reactor Water Clean-up Systems Vessel Level isolation Set-Point Change"

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

RTS 269, submitted December 22,1995 RTS 288, submitted January 18,1996

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

No

7. Current and projected fuel assemblies inventory:

l Number of Projected date oflast Fuel refueling that can be i Assemblies discharged Installed in reactor core (following refueling) 368 j n/a Previously discharged from core to Spent Fuel Storage , 1408 n/a Pool (following refueling) i Under present physical capacity of Spent Fuel Storage 2411 2007 Pool Under Licensed Capacity of Spent Fuel Storage Pool 3152 , 2014

, e j DOCKET NO.: 50-0331 DATE: 03/11/96 i Unit: Duane Arnold Enerev Center l COMPLETED BY: Richard Woodward j TELEPilONE: (319) 851-7318 Monthly Operational Overview for February 1996:

The DAEC operated at full thermal power throughout the month except:

  • February 7 - 8, to perform scheduled turbine control valve surveillance testing and a control rod sequence exchange,0.9 full-power-hours lost.
  • February 9 - 10, to perform maintenance on the "A" Recirculation Pump Motor-Generator Set.14.1 full-power-hours lost.
  • February 11 - 27, to maintain margin to thermal limits,14.9 full-power-hours lost.

Total forgone production (including other small planned losses) was the equivalent of 32.0 full-power hours of operation.

At the end of the month the Duane Arnold Energy Center had operated 269 consecutive days, its best-ever continuous operating run.

Allocation of Production & Losses: Electncal Capacity Factor Full Power Output %of 565.7 Equivaleni MWe MWe Hours (Design Gross Rating) ,

Actual Metered Net Electnc Output 510.8 90.3 % 628.4 l Actual Metered Plant Electnc Loads 30.5 5.4% 37.6 Load Following 0.0 0.0% 0.0 Off-Line 0.0 0.0% 0.0

(-) Weather losses, ie., condenser pressure < 2.75 in lig / Cire Water Temp < 74.5 'F -2.1 -0.3% -2.6 Planned Capacity Losses: Turbine Control Valve Testing Seq. Exchange, Thermal Linut 22.8 4.0% 28.0 l

Unplanned Capacity Losses 0.0 0.0% 0.0 Normal Capacity Losses (Avg MWth < 1658) 0.2 0.0% 0.2 Metering Losses (Avg indic MWe - Avg MWHe) 2.7 0.5% 3.4 Etriciency Losses (Weather Norm-Full-Power-MWe < 565.7) DJi Ol% L.Q ;

Design Gross Electric Output 565.7 100 0 % 6960 There were no Licensee Event Reports.

Licensine Action Summary:

Plant Availability: 100.0 % Unplanned Auto Scrams (while/ critical) this month: 0 Number of reportable events: 0 Unplanned Auto Scrams (while/ critical)last 12 months: 1 i