ML19325C786: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:W | ||
~ | |||
} | |||
'' | |||
} | |||
X v 1 r | |||
l ' : ;;; l r ... | |||
:: Departmeat of Nuclear Engineering fi ' N L Ward Hall E- g Manhattan, Kansas 66506 -2503 p '913-532 5624 | |||
( '' | |||
l b , | |||
9 Oct 1989 | |||
" | |||
. | |||
.U.S. Nuclear-Regulatory Commission | |||
' | |||
' | |||
N Attn:- Document Control Desk | |||
- | |||
Washington, D.C. 20555 Ji Re: Docket 50-188 d License R-88 | |||
{'' | |||
" | |||
Gentlemen: ( | |||
- . . | |||
l | |||
[ Pursuant to 10CFR50.59(b the following items are submitted for the Kansas J | |||
' | |||
- | |||
State University TRIGA ),Mk II Nuclear Reactor Facility for the period ; | |||
'l Oct 88 through 30 Sep 89. , | |||
i l A. Changes in the Facility: NONE ) | |||
B. ' Changes to Procedures: ! | |||
' | |||
Revisions to the following procedures were issued on 29 Mar 89 - and- I approved by ballot of the Reactor Safeguards Committee: 1 Procedure No.1 - Biennial Control Rod Inspection. The revision , | |||
requires 1 inspection and replacement, as necessary, of all ' | |||
electrical (an)d racchanical components within the control rod d l | |||
~ examination of insulation for - deterioration, and examination of 4 | |||
. | |||
' | |||
movable parts for corrosion, dirt, or deterioration,. and (2) examination and replacement, as necessary, of control-rod drive , | |||
switches at the reactor console. | |||
Procedure No. 9 - Entrance to the Reactor Bay - Visitor Contr.ol. | |||
The revision establishes a new mechanism of accountability for J.y Reactor-Ft,cility keys. | |||
C. . Changes to Tests and Experiments: NONE Sincerely, | |||
., | |||
b Richard E. Faw, Director KSU Nuclear Reactor Facility cc: U.S. N.R.C. (Region IV) | |||
KSU Reactor Safeguards Committee 8910170272 FDR 891009 ADOCK 0500018e , | |||
$, , PDC / | |||
.}} |
Revision as of 02:25, 14 December 2019
ML19325C786 | |
Person / Time | |
---|---|
Site: | Kansas State University |
Issue date: | 10/09/1989 |
From: | Faw R KANSAS STATE UNIV., MANHATTAN, KS |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 8910170272 | |
Download: ML19325C786 (1) | |
Text
W
~
}
}
X v 1 r
l ' : ;;; l r ...
- Departmeat of Nuclear Engineering fi ' N L Ward Hall E- g Manhattan, Kansas 66506 -2503 p '913-532 5624
(
l b ,
9 Oct 1989
"
.
.U.S. Nuclear-Regulatory Commission
'
'
N Attn:- Document Control Desk
-
Washington, D.C. 20555 Ji Re: Docket 50-188 d License R-88
{
"
Gentlemen: (
- . .
l
[ Pursuant to 10CFR50.59(b the following items are submitted for the Kansas J
'
-
State University TRIGA ),Mk II Nuclear Reactor Facility for the period ;
'l Oct 88 through 30 Sep 89. ,
i l A. Changes in the Facility: NONE )
B. ' Changes to Procedures: !
'
Revisions to the following procedures were issued on 29 Mar 89 - and- I approved by ballot of the Reactor Safeguards Committee: 1 Procedure No.1 - Biennial Control Rod Inspection. The revision ,
requires 1 inspection and replacement, as necessary, of all '
electrical (an)d racchanical components within the control rod d l
~ examination of insulation for - deterioration, and examination of 4
.
'
movable parts for corrosion, dirt, or deterioration,. and (2) examination and replacement, as necessary, of control-rod drive ,
switches at the reactor console.
Procedure No. 9 - Entrance to the Reactor Bay - Visitor Contr.ol.
The revision establishes a new mechanism of accountability for J.y Reactor-Ft,cility keys.
C. . Changes to Tests and Experiments: NONE Sincerely,
.,
b Richard E. Faw, Director KSU Nuclear Reactor Facility cc: U.S. N.R.C. (Region IV)
KSU Reactor Safeguards Committee 8910170272 FDR 891009 ADOCK 0500018e ,
$, , PDC /
.