|
---|
Category:ANNUAL OPERATING REPORT
MONTHYEARML20211H9651997-10-0101 October 1997 Annual Operating Rept for Kansas State Univ Triga Mark II Nuclear Reactor Facility for Period 961001-970930 ML20078A2291995-01-12012 January 1995 Changes in Facility,Procedures & Tests & Experiments for Period 931001-940930,per 10CFR50.59(b) ML20059D0341993-10-26026 October 1993 Changes in Facility,Procedures & Tests & Experiements for Period 921001-930930,per 10CFR50.59(b) ML20118D1711992-10-0202 October 1992 Annual Rept for Kansas State Univ Triga Mk II Nuclear Facility for Oct 1991 Through Sept 1992 ML20085D5311991-10-0404 October 1991 Annual Operating Rept for Kansas State Univ Triga Mark II Nuclear Reactor Facility for Oct 1990 to Sept 1991 ML20058B8101990-10-0909 October 1990 Submits Annual Rept for Oct 1989 - Sept 1990.Procedure 21 Re Alpha Particle Assay of Reactor Liquids Revised ML19325C7861989-10-0909 October 1989 Operating Rept for Oct 1988 - Sept 1989 ML20205L2581988-10-25025 October 1988 Submits Changes to Facility & Procedures for Oct 1987 to Sept 1988 ML20235Y5371987-10-16016 October 1987 Annual Operating Rept for Oct 1986 - Sept 1987 ML20211B3351986-10-0606 October 1986 Annual Operating Rept Fo Triga Mark II Nuclear Reactor Facility for Oct 1985 - Sept 1986 ML20133H4771985-10-0707 October 1985 Annual Rept of Changes in Facility,Procedures & Experiments, Oct 1984 - Sept 1985 ML20093K1161984-10-0303 October 1984 Annual Operating Rept,Oct 1983 - Sept 1984 ML20085J3761983-10-0707 October 1983 Annual Operating Rept for Oct 1982 - Sept 1983 ML20069H0741982-10-11011 October 1982 Submits List of Facility Procedure Changes,Tests & Experiments for Oct 1981-Sept 1982,per 10CFR50.59(b) 1997-10-01
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N7471999-10-18018 October 1999 Ro:On 990923,overpower Operation.Caused by Malfunction in Percent Power Channel.Channel Repaired & Returned to Service on 991007 ML20198K8331998-12-21021 December 1998 Safety Evaluation Supporting Amend 12 to License R-88 ML20155C5421998-10-28028 October 1998 Safety Evaluation Supporting Amend 11 to License R-88 ML20211H9651997-10-0101 October 1997 Annual Operating Rept for Kansas State Univ Triga Mark II Nuclear Reactor Facility for Period 961001-970930 ML20134F1421996-10-30030 October 1996 Safety Evaluation Supporting Amend 10 to License R-88 ML20078A2291995-01-12012 January 1995 Changes in Facility,Procedures & Tests & Experiments for Period 931001-940930,per 10CFR50.59(b) ML20059D0341993-10-26026 October 1993 Changes in Facility,Procedures & Tests & Experiements for Period 921001-930930,per 10CFR50.59(b) ML20118D1711992-10-0202 October 1992 Annual Rept for Kansas State Univ Triga Mk II Nuclear Facility for Oct 1991 Through Sept 1992 ML20085D5311991-10-0404 October 1991 Annual Operating Rept for Kansas State Univ Triga Mark II Nuclear Reactor Facility for Oct 1990 to Sept 1991 ML20058B8101990-10-0909 October 1990 Submits Annual Rept for Oct 1989 - Sept 1990.Procedure 21 Re Alpha Particle Assay of Reactor Liquids Revised ML19325C7861989-10-0909 October 1989 Operating Rept for Oct 1988 - Sept 1989 ML20236B8831989-03-0202 March 1989 Ro:On 890301,as Second to Two Std Control Rods Being Withdrawn,Other Two Rods Automatically Scrammed.Caused by Frayed Wires on Rod Drive Mechanism Resulting in Short Circuit.Electromagnetic Assembly May Be Replaced ML20205L2581988-10-25025 October 1988 Submits Changes to Facility & Procedures for Oct 1987 to Sept 1988 ML20235Y5371987-10-16016 October 1987 Annual Operating Rept for Oct 1986 - Sept 1987 ML20213G9331986-10-30030 October 1986 Ro:On 861028,while Performing Routine Monthly Surveillance Tests,Alarm Condition in Circuit Activated Visual Annunciation at Police Dept Indicator Panel But Failed to Activate Audible Annunciation.Caused by Dirty Contacts ML20211B3351986-10-0606 October 1986 Annual Operating Rept Fo Triga Mark II Nuclear Reactor Facility for Oct 1985 - Sept 1986 ML20133H4771985-10-0707 October 1985 Annual Rept of Changes in Facility,Procedures & Experiments, Oct 1984 - Sept 1985 ML20129E7121985-05-23023 May 1985 Ro:On 850522,reactor Operated W/O Continuous Air Monitor Operating.Caused by Monitor Being Manually Switched Off Before Reactor Startup.Breaker Reset ML20093K1161984-10-0303 October 1984 Annual Operating Rept,Oct 1983 - Sept 1984 ML20085J3761983-10-0707 October 1983 Annual Operating Rept for Oct 1982 - Sept 1983 ML20069H0741982-10-11011 October 1982 Submits List of Facility Procedure Changes,Tests & Experiments for Oct 1981-Sept 1982,per 10CFR50.59(b) 1999-10-18
[Table view] |
Text
W
~
}
}
X v 1 r
l ' : ;;; l r ...
- Departmeat of Nuclear Engineering fi ' N L Ward Hall E- g Manhattan, Kansas 66506 -2503 p '913-532 5624
(
l b ,
9 Oct 1989
.U.S. Nuclear-Regulatory Commission N Attn:- Document Control Desk Washington, D.C. 20555 Ji Re: Docket 50-188 d License R-88
{
Gentlemen: (
l
[ Pursuant to 10CFR50.59(b the following items are submitted for the Kansas J State University TRIGA ),Mk II Nuclear Reactor Facility for the period ;
'l Oct 88 through 30 Sep 89. ,
i l A. Changes in the Facility: NONE )
B. ' Changes to Procedures: !
Revisions to the following procedures were issued on 29 Mar 89 - and- I approved by ballot of the Reactor Safeguards Committee: 1 Procedure No.1 - Biennial Control Rod Inspection. The revision ,
requires 1 inspection and replacement, as necessary, of all '
electrical (an)d racchanical components within the control rod d l
~ examination of insulation for - deterioration, and examination of 4 movable parts for corrosion, dirt, or deterioration,. and (2) examination and replacement, as necessary, of control-rod drive ,
switches at the reactor console.
Procedure No. 9 - Entrance to the Reactor Bay - Visitor Contr.ol.
The revision establishes a new mechanism of accountability for J.y Reactor-Ft,cility keys.
C. . Changes to Tests and Experiments: NONE Sincerely, b
Richard E. Faw, Director KSU Nuclear Reactor Facility cc: U.S. N.R.C. (Region IV)
KSU Reactor Safeguards Committee 8910170272 FDR 891009 ADOCK 0500018e ,
$, , PDC /
.