Line 2: Line 2:
| number = ML061150551
| number = ML061150551
| issue date = 04/12/2006
| issue date = 04/12/2006
| title = 04/12/2006 Slides for Annual Assessment Meeting Cy 2005
| title = Slides for Annual Assessment Meeting Cy 2005
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II

Latest revision as of 19:23, 7 December 2019

Slides for Annual Assessment Meeting Cy 2005
ML061150551
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/12/2006
From:
NRC/RGN-II
To:
Shared Package
ML061150533 List:
References
Download: ML061150551 (17)


Text

Annual Assessment Meeting CY 2005 Edwin I. Hatch Nuclear Plant Baxley, GA April 12, 2006

Purpose of Todays Meeting

! A public forum for discussion of plant performance

! NRC will address performance issues identified in the annual assessment letter

! Licensee will be given the opportunity to respond to the information in the assessment letter and discuss new or existing programs to maintain or improve their performance

Agenda

! Introduction

! Review of Reactor Oversight Process

! National Summary of Plant Performance

! Discussion of Plant Performance Results

! Licensee Response/Remarks

! Closing Remarks

! NRC available to address public questions

Region II Organization Dr. Willam Travers Regional Administrator Loren Plisco Deputy Regional Administrator Charles Casto Victor McCree Director Division of Reactor Projects Director Division of Reactor Safety Joseph Shea Harold Christensen Deputy Director Deputy Director Joe Brady (acting)

Branch Chief Resident Inspectors (RIs) Project Engineers (PEs)

Douglas Simpkins - Sr. RI Curt Rapp - Sr. PE James Hickey - RI Robert Carrion - PE

NRC Performance Goals PRIMARY GOALS

! Ensure protection of the public health and safety and of the environment

! Ensure the secure use and management of radioactive materials OTHER GOALS

! Openness in the regulatory process

! Regulatory actions are effective, efficient, realistic, and timely

! Excellence in carrying out the NRCs mission

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Examples of Baseline Inspections

! Equipment Alignment ~80 hrs/yr

! Fire Protection Program -200 hrs triennially

! Operator Response -125 hrs/yr

! Emergency Preparedness -80 hrs/yr

! Rad Release Controls -110 hrs biennially

! Worker Radiation Protection -90 hrs/yr

! Corrective Action Program -250 hrs biennially

! Corrective Action Case Reviews -60 hrs/yr

Performance Thresholds Safety Significance Green: Very Low Safety Issue White: Low to Moderate Safety Issue Yellow: Substantial Safety Issue Red: High Safety Issue NRC Inspection Efforts Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Increased NRC oversight Red: Increased NRC oversight and other actions

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2005 Licensee Response 84 Regulatory Response 12 Degraded Cornerstone 4 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103

2005 Inspection Activities 3800 hours0.044 days <br />1.056 hours <br />0.00628 weeks <br />0.00145 months <br /> of inspection related activities

! Emergency Preparedness

! Radiation Protection

! Problem Identification and Resolution

! Reactor Operator Licensing Examinations

! Independent Spent Fuel Storage Installation

! Nuclear Material Accountability

Assessment Results Plant Performance was within the Regulatory Response Column of the NRCs Action Matrix

! One White Finding in Emergency Prepardness Cornerstone

< Technical Support Center was removed from service for greater than seven days without obtaining NRC approval.

! All other Findings were Green

! All Performance Indicators were Green

Assessment Summary

! Southern Nuclear Operating Company operated Hatch in a manner that preserved public health and safety

! All cornerstone objectives were met

! NRC plans baseline inspections for the remainder of 2006

Hatch 2006 Scheduled Inspection Activities

! In-Service Inspection

! Triennial Fire Protection

! Radiation Protection

! Biennial Component Design Basis

! Emergency Preparedness

! Independent Spent Fuel Storage Installation

! Licensed Operator Requalification

Annual Assessment Meeting Licensee Response/Remarks

Contacting the NRC

! Report an emergency

< (301) 816-5100 (call collect)

! Report a safety concern

< (912) 367-9881, 9882 (Resident Inspectors)

< (800) 695-7403

< Allegation@nrc.gov

! General information or questions

< www.nrc.gov

< Select What We Do for Public Affairs

Reference Sources

! Reactor Oversight Process

< www.nrc.gov

< Select Nuclear Reactors, Operating Reactors, Oversight, Reactor Oversight Process

! Public Electronic Reading Room

< www.nrc.gov

< Select Electronic Reading Room

! Public Document Room

< 1-800-397-4209 (Toll Free)