{{#Wiki_filter:Summer Inspection / Activity Plan 03/01/2006
{{#Wiki_filter:Page 1 of 2                                                                                      Summer 03/02/2006    11:48:05                                                                Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit                                                                                                                    No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                  on Site       Start    End              Type PI&R           - PROBLEM IDENTIFICATION AND RESOLUTION                                                               4 1              IP 71152B                Identification and Resolution of Problems                                                      03/13/2006 03/17/2006 Baseline Inspections 1             IP 71152B               Identification and Resolution of Problems                                                       03/27/2006 03/31/2006 Baseline Inspections EB1-CDB       - COMPONENT DESIGN BASES INSPECTION                                                                   5 1              IP 7111121              Component Design Bases Inspection                                                              05/08/2006 05/12/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                               05/22/2006 05/26/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                               06/05/2006 06/09/2006 Baseline Inspections 1             IP 7111121               Component Design Bases Inspection                                                               06/19/2006 06/23/2006 Baseline Inspections PS2-EP         - EP INSP                                                                                             1 1             IP 7111402               Alert and Notification System Testing                                                           07/31/2006 08/04/2006 Baseline Inspections 1             IP 7111403               Emergency Response Organization Augmentation Testing                                           07/31/2006 08/04/2006 Baseline Inspections 1             IP 7111404               Emergency Action Level and Emergency Plan Changes                                               07/31/2006 08/04/2006 Baseline Inspections 1             IP 7111405               Correction of Emergency Preparedness Weaknesses and Deficiencies                               07/31/2006 08/04/2006 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                             07/31/2006 08/04/2006 Baseline Inspections OL RQ         - REQUAL INSPECTION                                                                                   2 1              IP 7111111B              Licensed Operator Requalification Program                                                      08/21/2006 08/25/2006 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP                                                                       2 1              IP 7112101              Access Control to Radiologically Significant Areas                                              10/09/2006 10/13/2006 Baseline Inspections 1             IP 7112102              ALARA Planning and Controls                                                                    10/09/2006 10/13/2006 Baseline Inspections EB3-ISI       - INSERVICE INSPECTION                                                                                 1 1              IP 7111108P              Inservice Inspection Activities - PWR                                                          10/16/2006 10/20/2006 Baseline Inspections EB3TI150       - 2515/150 RPV & VHP NOZZLE                                                                           1 1             IP 2515/150             Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA             10/16/2006 10/19/2006 Safety Issues EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI                                                                           1 1             IP 71111                 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity                         11/05/2006 11/10/2006 Baseline Inspections TFP           - TFP INFO TRIP                                                                                       4 1              IP 7111105T              Fire Protection [Triennial]                                                                    02/27/2007 03/01/2007 Baseline Inspections TFP            - TRIENNIAL FIRE PROTECTION                                                                            4 1             IP 7111105T             Fire Protection [Triennial]                                                                     03/19/2007 03/23/2007 Baseline Inspections 1             IP 7111105T             Fire Protection [Triennial]                                                                     04/02/2007 04/06/2007 Baseline Inspections OL PREP       - INITIAL EXAM PREP                                                                                   3 1                V23249                SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES                                                  05/14/2007 05/18/2007 Not Applicable OL EXAM        - INITIAL EXAM                                                                                        3 1                 V23249               SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES                                                   06/04/2007 06/08/2007 Not Applicable This report does not include INPO and OUTAGE activities.
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 11:48:05 Report 22 4 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 03/13/2006 03/17/2006 1     71152B IP Identification and Resolution of Problems Baseline Inspections 03/27/2006 03/31/2006 1    71152B IP Identification and Resolution of Problems 5 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 05/08/2006 05/12/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 05/22/2006 05/26/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 06/05/2006 06/09/2006 1     7111121 IP Component Design Bases Inspection Baseline Inspections 06/19/2006 06/23/2006 1    7111121 IP Component Design Bases Inspection 1 PS2-EP-EP INSP Baseline Inspections 07/31/2006 08/04/2006 1     7111402 IP A lert and Notification System Testing Baseline Inspections 07/31/2006 08/04/2006 1     7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/31/2006 08/04/2006 1     7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/31/2006 08/04/2006 1     7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/31/2006 08/04/2006 1     71151 IP Performance Indicator Verification 2 OL RQ-REQUAL INSPECTION Baseline Inspections 08/21/2006 08/25/2006 1    7111111B IP Licensed Operator Requalification Program 2 PSB1-RP-RP OCCUPATIONAL BASELINE INSP Baseline Inspections 10/09/2006 10/13/2006 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/09/2006 10/13/2006 1    7112102 IP A LARA Planning and Controls 1 EB3-ISI-INSERVICE INSPECTION Baseline Inspections 10/16/2006 10/20/2006 1    7111108P IP Inservice Inspection Activities - PWR 1 EB3TI150-2515/150 RPV & VHP NOZZLE Safety Issues 10/16/2006 10/19/2006 1     2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 1 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI Baseline Inspections 11/05/2006 11/10/2006 1     71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 4 TFP-TFP INFO TRIP Baseline Inspections 02/27/2007 03/01/2007 1     7111105T IP Fire Protection [Triennial]
4 TFP-TRIENNIAL FIRE PROTECTION Baseline Inspections 03/19/2007 03/23/2007 1     7111105T IP Fire Protection [Triennial]
Baseline Inspections 04/02/2007 04/06/2007 1    7111105T IP Fire Protection [Triennial]
3 OL PREP-INITIAL EXAM PREP Not Applicable 05/14/2007 05/18/2007 1     V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM Not Applicable 06/04/2007 06/08/2007 1    V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Summer Inspection / Activity Plan 03/01/2006
Enclosure
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 11:48:05 Report 22 1 PSB1-RP-RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 06/25/2007 06/29/2007 1    7112101 IP A ccess Control to Radiologically Significant Areas 1 EB3-HS-HEAT SINK Baseline Inspections 07/23/2007 07/27/2007 1    7111107B IP Heat Sink Performance 3 PSB1-RP-RP OCCUPATIONAL BASELINE INSP Baseline Inspections 07/23/2007 07/27/2007 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 07/23/2007 07/27/2007 1     7112102 IP A LARA Planning and Controls Baseline Inspections 07/23/2007 07/27/2007 1     7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 07/23/2007 07/27/2007 1     71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
 
Page 2 of 2                                                                                    Summer 03/02/2006    11:48:05                                                                Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit                                                                                                          No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                                    Title                        on Site       Start    End            Type PSB1-RP       - RP OCCUPATIONAL PRE-INSP VISIT                                                             1 1              IP 7112101              Access Control to Radiologically Significant Areas                                    06/25/2007 06/29/2007 Baseline Inspections EB3-HS         - HEAT SINK                                                                                 1 1              IP 7111107B              Heat Sink Performance                                                                07/23/2007 07/27/2007 Baseline Inspections PSB1-RP       - RP OCCUPATIONAL BASELINE INSP                                                             3 1             IP 7112101               Access Control to Radiologically Significant Areas                                   07/23/2007 07/27/2007 Baseline Inspections 1             IP 7112102               ALARA Planning and Controls                                                           07/23/2007 07/27/2007 Baseline Inspections 1             IP 7112202               Radioactive Material Processing and Transportation                                   07/23/2007 07/27/2007 Baseline Inspections 1             IP 71151                 Performance Indicator Verification                                                   07/23/2007 07/27/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 21:38, 23 November 2019

Inspection / Activity Plan, 03/01/2006 - 09/30/2007
ML060610412
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II/DRP/RPB5
To:
Shared Package
ML060610408 List:
References
IR-06-001
Download: ML060610412 (2)


Text

Page 1 of 2 Summer 03/02/2006 11:48:05 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1 IP 71152B Identification and Resolution of Problems 03/13/2006 03/17/2006 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 03/27/2006 03/31/2006 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 5 1 IP 7111121 Component Design Bases Inspection 05/08/2006 05/12/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 05/22/2006 05/26/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 06/05/2006 06/09/2006 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 06/19/2006 06/23/2006 Baseline Inspections PS2-EP - EP INSP 1 1 IP 7111402 Alert and Notification System Testing 07/31/2006 08/04/2006 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 07/31/2006 08/04/2006 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/31/2006 08/04/2006 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/31/2006 08/04/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/31/2006 08/04/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1 IP 7111111B Licensed Operator Requalification Program 08/21/2006 08/25/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP 2 1 IP 7112101 Access Control to Radiologically Significant Areas 10/09/2006 10/13/2006 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 10/09/2006 10/13/2006 Baseline Inspections EB3-ISI - INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/16/2006 10/20/2006 Baseline Inspections EB3TI150 - 2515/150 RPV & VHP NOZZLE 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 10/16/2006 10/19/2006 Safety Issues EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI 1 1 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 11/05/2006 11/10/2006 Baseline Inspections TFP - TFP INFO TRIP 4 1 IP 7111105T Fire Protection [Triennial] 02/27/2007 03/01/2007 Baseline Inspections TFP - TRIENNIAL FIRE PROTECTION 4 1 IP 7111105T Fire Protection [Triennial] 03/19/2007 03/23/2007 Baseline Inspections 1 IP 7111105T Fire Protection [Triennial] 04/02/2007 04/06/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES 05/14/2007 05/18/2007 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23249 SUMMER/DECEMBER 2005 EXAM AT POWER FACILITIES 06/04/2007 06/08/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 2 Summer 03/02/2006 11:48:05 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 06/25/2007 06/29/2007 Baseline Inspections EB3-HS - HEAT SINK 1 1 IP 7111107B Heat Sink Performance 07/23/2007 07/27/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP 3 1 IP 7112101 Access Control to Radiologically Significant Areas 07/23/2007 07/27/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 07/23/2007 07/27/2007 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 07/23/2007 07/27/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/23/2007 07/27/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.