ML062140040: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Dominion Energy Kewaunee, Inc.N490 Highway 42, Kewaunee, WI 54216-9511 JUL 2 4 2006 U. S. Nuclear Regulatory Commission Serial No. 06-573 Attention: | {{#Wiki_filter:Dominion Energy Kewaunee, Inc. | ||
Document Control Desk KPS/LIC/GR: | N490 Highway 42, Kewaunee, WI 54216-9511 JUL 2 4 2006 U. S. Nuclear Regulatory Commission Serial No. 06-573 Attention: Document Control Desk KPS/LIC/GR: R4 Washington, DC 20555 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE. INC. | ||
R4 Washington, DC 20555 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE. | KEWAUNEE POWER STATION INSPECTION REPORT 05000305/2006007 - RESPONSE TO NRC REQUEST On July 3, 2006, the Nuclear Regulatory Commission (NRC) Region III issued an inspection report for the Kewaunee Power Station (Kewaunee) (Reference 1). The inspection was performed pursuant to NRC Inspection Procedure 95002, "Inspection For One Degraded Cornerstone or any Three White Inputs in a Strategic Performance Area." The inspection of the root causes and contributing causes for two performance deficiencies were documented. | ||
INC.KEWAUNEE POWER STATION INSPECTION REPORT 05000305/2006007 | |||
-RESPONSE TO NRC REQUEST On July 3, 2006, the Nuclear Regulatory Commission (NRC) Region III issued an inspection report for the Kewaunee Power Station (Kewaunee) (Reference 1). The inspection was performed pursuant to NRC Inspection Procedure 95002, "Inspection For One Degraded Cornerstone or any Three White Inputs in a Strategic Performance Area." The inspection of the root causes and contributing causes for two performance deficiencies were documented. | |||
In the NRC's letter, the NRC requested the Kewaunee staff inform the NRC once steps have been completed to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the performance deficiencies. | In the NRC's letter, the NRC requested the Kewaunee staff inform the NRC once steps have been completed to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the performance deficiencies. | ||
Dominion Energy Kewaunee, Inc. (DEK) has undertaken the steps necessary to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the performance deficiencies. | Dominion Energy Kewaunee, Inc. (DEK) has undertaken the steps necessary to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the performance deficiencies. Final approval of the updated root causes has been completed. Additionally, DEK requests the NRC perform the additional inspections identified in Reference 1 starting August 7, 2006 or August 14, 2006. An August 2006 inspection schedule optimizes DEK's resources because the Kewaunee Power Station will be shut down for a refueling outage in September 2006. DEK will notify the NRC promptly if there are any changes in the root cause status or requested inspection schedule. | ||
Final approval of the updated root causes has been completed. | Ifyou have questions or require additional information, please feel free to contact Mr. | ||
Additionally, DEK requests the NRC perform the additional inspections identified in Reference 1 starting August 7, 2006 or August 14, 2006. An August 2006 inspection schedule optimizes DEK's resources because the Kewaunee Power Station will be shut down for a refueling outage in September 2006. DEK will notify the NRC promptly if there are any changes in the root cause status or requested inspection schedule. | Thomas L. Breene at 920-388-8599. | ||
Very truly yours, Leslie N. Hartz Site Vice President, Kewaunee Power Station Serial No. 06-573 Docket No. 50-305 Page 2 of 2 Commitments made by this letter: NONE cc: Regional Administrator U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. D. H. Jaffe Project Manager U.S. Nuclear Regulatory Commission Mail Stop O-7-D-1 Washington, D. C. 20555 NRC Senior Resident Inspector Kewaunee Power Station References | Very truly yours, Leslie N. Hartz Site Vice President, Kewaunee Power Station | ||
: 1. Letter from Cynthia D. Pederson (NRC) to David A. Christian (DEK), "Kewaunee Power Station -NRC Supplemental Inspection Report 05000305/2006007," dated July 3, 2006.}} | |||
Serial No. 06-573 Docket No. 50-305 Page 2 of 2 Commitments made by this letter: NONE cc: Regional Administrator U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. D. H. Jaffe Project Manager U.S. Nuclear Regulatory Commission Mail Stop O-7-D-1 Washington, D. C. 20555 NRC Senior Resident Inspector Kewaunee Power Station References | |||
: 1. Letter from Cynthia D. Pederson (NRC) to David A. Christian (DEK), "Kewaunee Power Station - NRC Supplemental Inspection Report 05000305/2006007," | |||
dated July 3, 2006.}} |
Latest revision as of 15:40, 23 November 2019
ML062140040 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 07/24/2006 |
From: | Hartz L Dominion, Dominion Energy Kewaunee |
To: | Document Control Desk, NRC/RGN-III |
References | |
06-573 IR-06-007 | |
Download: ML062140040 (2) | |
Text
Dominion Energy Kewaunee, Inc.
N490 Highway 42, Kewaunee, WI 54216-9511 JUL 2 4 2006 U. S. Nuclear Regulatory Commission Serial No.06-573 Attention: Document Control Desk KPS/LIC/GR: R4 Washington, DC 20555 Docket No. 50-305 License No. DPR-43 DOMINION ENERGY KEWAUNEE. INC.
KEWAUNEE POWER STATION INSPECTION REPORT 05000305/2006007 - RESPONSE TO NRC REQUEST On July 3, 2006, the Nuclear Regulatory Commission (NRC) Region III issued an inspection report for the Kewaunee Power Station (Kewaunee) (Reference 1). The inspection was performed pursuant to NRC Inspection Procedure 95002, "Inspection For One Degraded Cornerstone or any Three White Inputs in a Strategic Performance Area." The inspection of the root causes and contributing causes for two performance deficiencies were documented.
In the NRC's letter, the NRC requested the Kewaunee staff inform the NRC once steps have been completed to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the performance deficiencies.
Dominion Energy Kewaunee, Inc. (DEK) has undertaken the steps necessary to assure that the cause evaluation and corrective actions are of sufficient scope and breadth to address the performance deficiencies. Final approval of the updated root causes has been completed. Additionally, DEK requests the NRC perform the additional inspections identified in Reference 1 starting August 7, 2006 or August 14, 2006. An August 2006 inspection schedule optimizes DEK's resources because the Kewaunee Power Station will be shut down for a refueling outage in September 2006. DEK will notify the NRC promptly if there are any changes in the root cause status or requested inspection schedule.
Ifyou have questions or require additional information, please feel free to contact Mr.
Thomas L. Breene at 920-388-8599.
Very truly yours, Leslie N. Hartz Site Vice President, Kewaunee Power Station
Serial No.06-573 Docket No. 50-305 Page 2 of 2 Commitments made by this letter: NONE cc: Regional Administrator U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. D. H. Jaffe Project Manager U.S. Nuclear Regulatory Commission Mail Stop O-7-D-1 Washington, D. C. 20555 NRC Senior Resident Inspector Kewaunee Power Station References
- 1. Letter from Cynthia D. Pederson (NRC) to David A. Christian (DEK), "Kewaunee Power Station - NRC Supplemental Inspection Report 05000305/2006007,"
dated July 3, 2006.