ML071640131: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:June 18, 2007MEMORANDUM TO:Stacey L. Rosenberg, ChiefSpecial Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor RegulationFROM:Tanya M. Mensah, Senior Project Manager   /RA/   Special Projects BranchDivision of Policy and Rulemaking Office of Nuclear Reactor Regulation
{{#Wiki_filter:June 18, 2007 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:         Tanya M. Mensah, Senior Project Manager /RA/
Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
CATEGORY 2 PUBLIC MEETING WITH THE NUCLEAR ENERGYINSTITUTE (NEI) TO DISCUSS TOPICAL REPORT (TR)
CATEGORY 2 PUBLIC MEETING WITH THE NUCLEAR ENERGY INSTITUTE (NEI) TO DISCUSS TOPICAL REPORT (TR)
WCAP-16308-NP, "PRESSURIZED WATER REACTOR OWNERS GROUP 10 CFR 50.69 PILOT PROGRAM - CATEGORIZATION PROCESS - WOLF CREEK GENERATING STATION" (TAC MD3470)DATE & TIME: Wednesday, July 11, 20079:00 a.m. - 4:00 p.m.LOCATION: US Nuclear Regulatory Commission (NRC)Two White Flint North (Conference Room T-2-B5) 11545 Rockville Pike Rockville, Maryland 20852PURPOSE: Industry representatives will meet with the NRC staff to discuss thepassive categorization guidance contained within TR WCAP-16308-NP.
WCAP-16308-NP, PRESSURIZED WATER REACTOR OWNERS GROUP 10 CFR 50.69 PILOT PROGRAM - CATEGORIZATION PROCESS - WOLF CREEK GENERATING STATION (TAC MD3470)
TR WCAP-16308-NP is available through the NRC's Agencywide Documents Access and Management System (ADAMS) under Accession No. ML062770345. Additional key reference documents include: *Regulatory Guide 1.201, "Guidelines for Categorizing Structures,Systems, and Components in Nuclear Power Plants According To Their Safety Significance" (ADAMS Accession No.
DATE & TIME:   Wednesday, July 11, 2007 9:00 a.m. - 4:00 p.m.
ML061090627).*NEI-00-04, "10 CFR 50.69 SSC Categorization Guideline"(ADAMS Accession No. ML052910035) and American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case. *NRC Comments On the 50.69 Pilot Application Documentation(ADAMS Accession No. ML071640104) CATEGORY 2:* This is a Category 2 public meeting. The public is invited to participate inthis meeting by discussing regulatory issues with the NRC at designated points identified on the agenda. Interested members of the public can participate in this meeting via a toll-free teleconference. Please email the meeting contact by July 5, 2007, to obtain the telephone number and passcode. PARTICIPANTS: Participants from the NRC include members from the Office of NuclearReactor Regulation.
LOCATION:     US Nuclear Regulatory Commission (NRC)
NRC   INDUSTRYM. Rubin B. Bradley, NEID. Harrison M. Dingler, Wolf Creek Nuclear Operating Corp.
Two White Flint North (Conference Room T-2-B5) 11545 Rockville Pike Rockville, Maryland 20852 PURPOSE:       Industry representatives will meet with the NRC staff to discuss the passive categorization guidance contained within TR WCAP-16308-NP.
T. Mensah B. Lutz, Westinghouse J. McHale J. Brown, Westinghouse K. Manoly G. Schinzel, South Texas Project A. Keim P. O'Reagan, Electric Power Research InstituteProject No. 689
TR WCAP-16308-NP is available through the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML062770345. Additional key reference documents include:
* Regulatory Guide 1.201, Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants According To Their Safety Significance (ADAMS Accession No.
ML061090627).
* NEI-00-04, 10 CFR 50.69 SSC Categorization Guideline (ADAMS Accession No. ML052910035) and American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case.
* NRC Comments On the 50.69 Pilot Application Documentation (ADAMS Accession No. ML071640104)
 
CATEGORY 2:*         This is a Category 2 public meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda. Interested members of the public can participate in this meeting via a toll-free teleconference. Please email the meeting contact by July 5, 2007, to obtain the telephone number and passcode.
PARTICIPANTS:       Participants from the NRC include members from the Office of Nuclear Reactor Regulation.
NRC                     INDUSTRY M. Rubin               B. Bradley, NEI D. Harrison             M. Dingler, Wolf Creek Nuclear Operating Corp.
T. Mensah               B. Lutz, Westinghouse J. McHale               J. Brown, Westinghouse K. Manoly               G. Schinzel, South Texas Project A. Keim                 P. OReagan, Electric Power Research Institute Project No. 689


==Enclosure:==
==Enclosure:==
Agenda cc w/encl: See next page MEETING CONTACT:Tanya M. Mensah, NRR, 301-415-3610 tme@nrc.gov* Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings,"
Agenda cc w/encl: See next page MEETING CONTACT:             Tanya M. Mensah, NRR, 301-415-3610 tme@nrc.gov
(67 FR 36920), May 28, 2002   CATEGORY 2:* This is a Category 2 public meeting. The public is invited to participate inthis meeting by discussing regulatory issues with the NRC at designatedpoints identified on the agenda. Interested members of the public canparticipate in this meeting via a toll-free teleconference. Please email themeeting contact by July 5, 2007, to obtain the telephone number andpasscode. PARTICIPANTS: Participants from the NRC include members from the Office of NuclearReactor Regulation.
* Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
NRC   INDUSTRYM. Rubin B. Bradley, NEID. Harrison M. Dingler, Wolf Creek Nuclear Operating Corp.T. Mensah B. Lutz, WestinghouseJ. McHale J. Brown, WestinghouseK. Manoly G. Schinzel, South Texas Project A. Keim P. O'Reagan, Electric Power Research InstituteProject No. 689
(67 FR 36920), May 28, 2002
 
CATEGORY 2:*         This is a Category 2 public meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda. Interested members of the public can participate in this meeting via a toll-free teleconference. Please email the meeting contact by July 5, 2007, to obtain the telephone number and passcode.
PARTICIPANTS:       Participants from the NRC include members from the Office of Nuclear Reactor Regulation.
NRC                     INDUSTRY M. Rubin               B. Bradley, NEI D. Harrison             M. Dingler, Wolf Creek Nuclear Operating Corp.
T. Mensah               B. Lutz, Westinghouse J. McHale               J. Brown, Westinghouse K. Manoly               G. Schinzel, South Texas Project A. Keim                 P. OReagan, Electric Power Research Institute Project No. 689


==Enclosure:==
==Enclosure:==
Agenda cc w/encl: See next page MEETING CONTACT:Tanya M. Mensah, NRR, 301-415-3610tme@nrc.gov* Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings,"
Agenda cc w/encl: See next page MEETING CONTACT:             Tanya M. Mensah, NRR, 301-415-3610 tme@nrc.gov
(67 FR 36920), May 28, 2002 DISTRIBUTION
* Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
:See attached pageADAMS ACCESSION NO. ML071640131NRR-001OFFICEPSPB/PMPSPB/LAPSPB/BCNAMETMensahDBaxleySRosenbergDATE6/ 18   /076/15/076/ 18 /07OFFICIAL RECORD COPY DISTRIBUTION FOR FORTHCOMING MEETING WITH NUCLEAR ENERGY INSTITUTEDate:   June 18, 2007 Hard CopyReceptionist (OWFN and TWFN)
(67 FR 36920), May 28, 2002 DISTRIBUTION:
EmailPUBLICPMNSPSPB Reading FileRidsNrrAdroRidsNrrDprRidsNrrDprPspbRidsNrrLADBaxleyRidsNrrPMTMensahRidsOpaMailRidsNrrDeMRubinDHarrisonKManolyEImbro AKeimTScarbroughTChanJMcHaleRidOgcMailRidsAcrsAcnwMailCenterExternal Emailreb@nei.org AGENDA FOR THE JULY 11, 2007, PUBLIC MEETING BETWEEN THE NUCLEAR ENERGY INSTITUTE (NEI) AND THE U.S. NUCLEAR REGULATORY COMMISSION (NRC)REGARDING TOPICAL REPORT (TR) WCAP-16308-NP, "PRESSURIZED WATER REACTOR OWNERS GROUP 10 CFR 50.69 PILOT PROGRAM - CATEGORIZATION PROCESS - WOLF CREEK GENERATING STATION"TimeTopic Lead9:00 a.m. - 9:05 a.m.NRC Opening Remarks &Introductions NRC9:05 a.m. - 9:10 a.m.NEI Opening RemarksNEI9:10 a.m. - 10:20 a.m.Discussion Of The Wolf Creek50.69 Categorization Process andNRC CommentsNEI/NRC10:20 a.m. - 10:30 a.m.Break10:30 a.m. - 11:30 p.m.Continuation Of The DiscussionNEI/NRC 11:30 a.m. - 12:30 p.m.Lunch 12:30 p.m. - 2:00 p.m.Continuation Of The DiscussionNEI/NRC 2:00 p.m. - 2:15 p.m.Break 2:15 p.m. - 3:15 p.m.Continuation Of The DiscussionNEI/NRC 3:15 p.m. - 3:45 p.m.Summary/ConclusionsNRC/NEI 3:45 p.m. - 4:00 p.m.Opportunity For Public CommentClosing and Adjournment NRCENCLOSURE 3/8/07Nuclear Energy InstituteProject No. 689 cc:Mr. Anthony Pietrangelo, Vice PresidentRegulatory AffairsNuclear Energy Institute1776 I Street, NW, Suite 400Washington, DC 20006-3708arp@nei.org Mr. Jack Roe, DirectorOperations SupportNuclear Energy Institute1776 I Street, NW, Suite 400Washington, DC 20006-3708jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc. 12300 Twinbrook Parkway, Suite 330Rockville, MD 20852brinkmcb@westinghouse.com Mr. Gary L. Vine, Executive DirectorFederal and Industry Activities, NuclearSector EPRI2000 L Street, NW, Suite 805Washington, DC 20036gvine@epri.com Mr. James Gresham, ManagerRegulatory Compliance and Plant LicensingWestinghouse Electric CompanyP.O. Box 355Pittsburgh, PA 15230-0355greshaja@westinghouse.com Ms. Barbara Lewis Assistant EditorPlatts, Principal Editorial Office1200 G St., N.W., Suite 1100Washington, DC 20005Barbara_lewis@platts.com Mr. Alexander Marion, Executive DirectorNuclear Operations & EngineeringNuclear Energy Institute1776 I Street, NW, Suite 400Washington, DC 20006-3708am@nei.org Mr. Jay Thayer, Vice PresidentNuclear OperationsNuclear Energy Institute1776 I Street, NW, Suite 400Washington, DC 20006-3708jkt@nei.org Mr. John Butler, DirectorSafety-Focused RegulationNuclear Energy Institute 1776 I Street, NW, Suite 400Washington, DC 20006-3708jcb@nei.org Mike Melton, Senior Project Manager1776 I Street, NW, Suite 400Washington, DC 20006-3708man@nei.org Mr. James H. Riley, DirectorEngineeringNuclear Energy Institute1776 I Street, NWWashington, DC 20006-3708jhr@nei.org}}
See attached page ADAMS ACCESSION NO. ML071640131                                            NRR-001 OFFICE        PSPB/PM          PSPB/LA          PSPB/BC NAME          TMensah          DBaxley          SRosenberg DATE          6/ 18 /07        6/15/07          6/ 18 /07 OFFICIAL RECORD COPY
 
DISTRIBUTION FOR FORTHCOMING MEETING WITH NUCLEAR ENERGY INSTITUTE Date: June 18, 2007 Hard Copy Receptionist (OWFN and TWFN)
Email PUBLIC PMNS PSPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPspb RidsNrrLADBaxley RidsNrrPMTMensah RidsOpaMail RidsNrrDe MRubin DHarrison KManoly EImbro AKeim TScarbrough TChan JMcHale RidOgcMail RidsAcrsAcnwMailCenter External Email reb@nei.org
 
AGENDA FOR THE JULY 11, 2007, PUBLIC MEETING BETWEEN THE NUCLEAR ENERGY INSTITUTE (NEI) AND THE U.S. NUCLEAR REGULATORY COMMISSION (NRC)
REGARDING TOPICAL REPORT (TR) WCAP-16308-NP, PRESSURIZED WATER REACTOR OWNERS GROUP 10 CFR 50.69 PILOT PROGRAM -
CATEGORIZATION PROCESS -
WOLF CREEK GENERATING STATION Time                              Topic                          Lead 9:00 a.m. - 9:05 a.m.       NRC Opening Remarks &           NRC
 
===Introductions===
9:05 a.m. - 9:10 a.m.       NEI Opening Remarks              NEI 9:10 a.m. - 10:20 a.m.     Discussion Of The Wolf Creek    NEI/NRC 50.69 Categorization Process and NRC Comments 10:20 a.m. - 10:30 a.m. Break 10:30 a.m. - 11:30 p.m. Continuation Of The Discussion  NEI/NRC 11:30 a.m. - 12:30 p.m. Lunch 12:30 p.m. - 2:00 p.m.     Continuation Of The Discussion  NEI/NRC 2:00 p.m. - 2:15 p.m.       Break 2:15 p.m. - 3:15 p.m.       Continuation Of The Discussion  NEI/NRC 3:15 p.m. - 3:45 p.m.       Summary/Conclusions              NRC/NEI 3:45 p.m. - 4:00 p.m.       Opportunity For Public Comment  NRC Closing and Adjournment ENCLOSURE
 
Nuclear Energy Institute                                        Project No. 689 cc:
Mr. Anthony Pietrangelo, Vice President  Mr. Alexander Marion, Executive Director Regulatory Affairs                        Nuclear Operations & Engineering Nuclear Energy Institute                  Nuclear Energy Institute 1776 I Street, NW, Suite 400              1776 I Street, NW, Suite 400 Washington, DC 20006-3708                Washington, DC 20006-3708 arp@nei.org                              am@nei.org Mr. Jack Roe, Director                    Mr. Jay Thayer, Vice President Operations Support                        Nuclear Operations Nuclear Energy Institute                  Nuclear Energy Institute 1776 I Street, NW, Suite 400              1776 I Street, NW, Suite 400 Washington, DC 20006-3708                Washington, DC 20006-3708 jwr@nei.org                              jkt@nei.org Mr. Charles B. Brinkman                   Mr. John Butler, Director Washington Operations                     Safety-Focused Regulation ABB-Combustion Engineering, Inc.         Nuclear Energy Institute 12300 Twinbrook Parkway, Suite 330        1776 I Street, NW, Suite 400 Rockville, MD 20852                      Washington, DC 20006-3708 brinkmcb@westinghouse.com                 jcb@nei.org Mr. Gary L. Vine, Executive Director      Mike Melton, Senior Project Manager Federal and Industry Activities, Nuclear  1776 I Street, NW, Suite 400 Sector                                    Washington, DC 20006-3708 EPRI                                      man@nei.org 2000 L Street, NW, Suite 805 Washington, DC 20036                      Mr. James H. Riley, Director gvine@epri.com                           Engineering Nuclear Energy Institute Mr. James Gresham, Manager                1776 I Street, NW Regulatory Compliance and Plant Licensing Washington, DC 20006-3708 Westinghouse Electric Company            jhr@nei.org P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com 3/8/07}}

Revision as of 06:24, 23 November 2019

07/11/2007, Category 2 Public Meeting with the Nuclear Energy Institute (NEI) to Discuss Topical Report WCAP-16308-NP, Pressurized Water Reactor Owners Group 10 CFR 50.69 Pilot Program - Categorization Process - Wolf Creek Generating Statio
ML071640131
Person / Time
Site: Wolf Creek, Nuclear Energy Institute  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/18/2007
From: Tanya Mensah
NRC/NRR/ADRA/DPR/PSPB
To: Rosenberg S
NRC/NRR/ADRA/DPR/PSPB
Mensah T
References
TAC MD3470
Download: ML071640131 (6)


Text

June 18, 2007 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM: Tanya M. Mensah, Senior Project Manager /RA/

Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

CATEGORY 2 PUBLIC MEETING WITH THE NUCLEAR ENERGY INSTITUTE (NEI) TO DISCUSS TOPICAL REPORT (TR)

WCAP-16308-NP, PRESSURIZED WATER REACTOR OWNERS GROUP 10 CFR 50.69 PILOT PROGRAM - CATEGORIZATION PROCESS - WOLF CREEK GENERATING STATION (TAC MD3470)

DATE & TIME: Wednesday, July 11, 2007 9:00 a.m. - 4:00 p.m.

LOCATION: US Nuclear Regulatory Commission (NRC)

Two White Flint North (Conference Room T-2-B5) 11545 Rockville Pike Rockville, Maryland 20852 PURPOSE: Industry representatives will meet with the NRC staff to discuss the passive categorization guidance contained within TR WCAP-16308-NP.

TR WCAP-16308-NP is available through the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML062770345. Additional key reference documents include:

  • Regulatory Guide 1.201, Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants According To Their Safety Significance (ADAMS Accession No.

ML061090627).

  • NRC Comments On the 50.69 Pilot Application Documentation (ADAMS Accession No. ML071640104)

CATEGORY 2:* This is a Category 2 public meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda. Interested members of the public can participate in this meeting via a toll-free teleconference. Please email the meeting contact by July 5, 2007, to obtain the telephone number and passcode.

PARTICIPANTS: Participants from the NRC include members from the Office of Nuclear Reactor Regulation.

NRC INDUSTRY M. Rubin B. Bradley, NEI D. Harrison M. Dingler, Wolf Creek Nuclear Operating Corp.

T. Mensah B. Lutz, Westinghouse J. McHale J. Brown, Westinghouse K. Manoly G. Schinzel, South Texas Project A. Keim P. OReagan, Electric Power Research Institute Project No. 689

Enclosure:

Agenda cc w/encl: See next page MEETING CONTACT: Tanya M. Mensah, NRR, 301-415-3610 tme@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

CATEGORY 2:* This is a Category 2 public meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda. Interested members of the public can participate in this meeting via a toll-free teleconference. Please email the meeting contact by July 5, 2007, to obtain the telephone number and passcode.

PARTICIPANTS: Participants from the NRC include members from the Office of Nuclear Reactor Regulation.

NRC INDUSTRY M. Rubin B. Bradley, NEI D. Harrison M. Dingler, Wolf Creek Nuclear Operating Corp.

T. Mensah B. Lutz, Westinghouse J. McHale J. Brown, Westinghouse K. Manoly G. Schinzel, South Texas Project A. Keim P. OReagan, Electric Power Research Institute Project No. 689

Enclosure:

Agenda cc w/encl: See next page MEETING CONTACT: Tanya M. Mensah, NRR, 301-415-3610 tme@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002 DISTRIBUTION:

See attached page ADAMS ACCESSION NO. ML071640131 NRR-001 OFFICE PSPB/PM PSPB/LA PSPB/BC NAME TMensah DBaxley SRosenberg DATE 6/ 18 /07 6/15/07 6/ 18 /07 OFFICIAL RECORD COPY

DISTRIBUTION FOR FORTHCOMING MEETING WITH NUCLEAR ENERGY INSTITUTE Date: June 18, 2007 Hard Copy Receptionist (OWFN and TWFN)

Email PUBLIC PMNS PSPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPspb RidsNrrLADBaxley RidsNrrPMTMensah RidsOpaMail RidsNrrDe MRubin DHarrison KManoly EImbro AKeim TScarbrough TChan JMcHale RidOgcMail RidsAcrsAcnwMailCenter External Email reb@nei.org

AGENDA FOR THE JULY 11, 2007, PUBLIC MEETING BETWEEN THE NUCLEAR ENERGY INSTITUTE (NEI) AND THE U.S. NUCLEAR REGULATORY COMMISSION (NRC)

REGARDING TOPICAL REPORT (TR) WCAP-16308-NP, PRESSURIZED WATER REACTOR OWNERS GROUP 10 CFR 50.69 PILOT PROGRAM -

CATEGORIZATION PROCESS -

WOLF CREEK GENERATING STATION Time Topic Lead 9:00 a.m. - 9:05 a.m. NRC Opening Remarks & NRC

Introductions

9:05 a.m. - 9:10 a.m. NEI Opening Remarks NEI 9:10 a.m. - 10:20 a.m. Discussion Of The Wolf Creek NEI/NRC 50.69 Categorization Process and NRC Comments 10:20 a.m. - 10:30 a.m. Break 10:30 a.m. - 11:30 p.m. Continuation Of The Discussion NEI/NRC 11:30 a.m. - 12:30 p.m. Lunch 12:30 p.m. - 2:00 p.m. Continuation Of The Discussion NEI/NRC 2:00 p.m. - 2:15 p.m. Break 2:15 p.m. - 3:15 p.m. Continuation Of The Discussion NEI/NRC 3:15 p.m. - 3:45 p.m. Summary/Conclusions NRC/NEI 3:45 p.m. - 4:00 p.m. Opportunity For Public Comment NRC Closing and Adjournment ENCLOSURE

Nuclear Energy Institute Project No. 689 cc:

Mr. Anthony Pietrangelo, Vice President Mr. Alexander Marion, Executive Director Regulatory Affairs Nuclear Operations & Engineering Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 arp@nei.org am@nei.org Mr. Jack Roe, Director Mr. Jay Thayer, Vice President Operations Support Nuclear Operations Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 jwr@nei.org jkt@nei.org Mr. Charles B. Brinkman Mr. John Butler, Director Washington Operations Safety-Focused Regulation ABB-Combustion Engineering, Inc. Nuclear Energy Institute 12300 Twinbrook Parkway, Suite 330 1776 I Street, NW, Suite 400 Rockville, MD 20852 Washington, DC 20006-3708 brinkmcb@westinghouse.com jcb@nei.org Mr. Gary L. Vine, Executive Director Mike Melton, Senior Project Manager Federal and Industry Activities, Nuclear 1776 I Street, NW, Suite 400 Sector Washington, DC 20006-3708 EPRI man@nei.org 2000 L Street, NW, Suite 805 Washington, DC 20036 Mr. James H. Riley, Director gvine@epri.com Engineering Nuclear Energy Institute Mr. James Gresham, Manager 1776 I Street, NW Regulatory Compliance and Plant Licensing Washington, DC 20006-3708 Westinghouse Electric Company jhr@nei.org P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com 3/8/07