{{#Wiki_filter:June 26, 2007Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097
{{#Wiki_filter:June 26, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097


==SUBJECT:==
==SUBJECT:==
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - WITHDRAWAL OFAMENDMENT REQUEST ASSOCIATED WITH MODE 4 RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING REQUIREMENTS (TAC NO.
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT REQUEST ASSOCIATED WITH MODE 4 RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING REQUIREMENTS (TAC NO.
MD2140)
MD2140)


==Dear Mr. Allen:==
==Dear Mr. Allen:==


By letter dated June 1, 2006, you applied for an amendment to the Perry Nuclear Power PlantUnit No. 1 (Perry), Facility Operating License No. NPF-58. The proposed change would have modified the facility technical specifications (TS) pertaining to TS 3.4.10, "Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown," by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour, an alternate method of decay heat removal cannot be verified to be available. Subsequently, by letter dated June 19, 2007, you withdrew the amendment request. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment toFacility Operating License with the Office of the Federal Register for publication.Sincerely,/RA/Stephen P. Sands, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear ReactorRegulationDocket No. 50-440
By letter dated June 1, 2006, you applied for an amendment to the Perry Nuclear Power Plant Unit No. 1 (Perry), Facility Operating License No. NPF-58. The proposed change would have modified the facility technical specifications (TS) pertaining to TS 3.4.10, Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown, by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour, an alternate method of decay heat removal cannot be verified to be available. Subsequently, by letter dated June 19, 2007, you withdrew the amendment request.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
                                                      /RA/
Stephen P. Sands, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440


==Enclosure:==
==Enclosure:==
Notice of Withdrawal cc w/encl: See next page Mr. Barry S. AllenJune 26, 2007Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097
Notice of Withdrawal cc w/encl: See next page
 
Mr. Barry S. Allen                                    June 26, 2007 Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097


==SUBJECT:==
==SUBJECT:==
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - WITHDRAWAL OFAMENDMENT REQUEST ASSOCIATED WITH MODE 4 RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING REQUIREMENTS (TAC NO.
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT REQUEST ASSOCIATED WITH MODE 4 RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING REQUIREMENTS (TAC NO.
MD2140)
MD2140)


==Dear Mr. Allen:==
==Dear Mr. Allen:==


By letter dated June 1, 2006, you applied for an amendment to the Perry Nuclear Power PlantUnit No. 1 (Perry), Facility Operating License No. NPF-58. The proposed change would have modified the facility technical specifications (TS) pertaining to TS 3.4.10, "Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown," by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour, an alternate method of decay heat removal cannot be verified to be available. Subsequently, by letter dated June 19, 2007, you withdrew the amendment request. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment toFacility Operating License with the Office of the Federal Register for publication.Sincerely,/RA/Stephen P. Sands, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-440
By letter dated June 1, 2006, you applied for an amendment to the Perry Nuclear Power Plant Unit No. 1 (Perry), Facility Operating License No. NPF-58. The proposed change would have modified the facility technical specifications (TS) pertaining to TS 3.4.10, Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown, by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour, an alternate method of decay heat removal cannot be verified to be available. Subsequently, by letter dated June 19, 2007, you withdrew the amendment request.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
                                                      /RA/
Stephen P. Sands, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440


==Enclosure:==
==Enclosure:==
Notice of Withdrawal cc w/encl: See next pageDISTRIBUTION
Notice of Withdrawal cc w/encl: See next page DISTRIBUTION:
NON-PUBLICLPL3-2 R/FRidsNrrPMTWengertRidsNrrLAEWhitt RidsNrrDorlLpl3-2RidsOgcRpRidsAcrsAcnwMailCenterRidsRgn3MailCenter RidsNrrDorlDprRidsNrrPMSSandsADAMS ACCESSION NO: ML071710589NRR-106OFFICELPL3-2/PMLPL3-2/LALPL3-2/BCNAMETWengertEWhittRGibbs(CGratton for)DATE6/25/07 6/25/076/26/07OFFICIAL RECORD COPY Perry Nuclear Power Plant, Unit No. 1 cc:David W. Jenkins, AttorneyFirstEnergy CorporationMail Stop A-GO-1576 South Main StreetAkron, OH 44308Resident Inspector's OfficeU.S. Nuclear Regulatory CommissionP.O. Box 331Perry, OH 44081-0331Regional Administrator, Region IIIU.S. Nuclear Regulatory Commission2443 Warrenville Road, Suite 210Lisle, IL 60532-4531Sue HiattOCRE Interim Representative8275 MunsonMentor, OH 44060Manager, Site Regulatory ComplianceFirstEnergy Nuclear Operating CompanyPerry Nuclear Power PlantMail Stop A-PY-A200P.O. Box 97, 10 Center RoadPerry, OH 44081-0097Mayor, Village of North PerryNorth Perry Village Hall4449 Lockwood RoadNorth Perry Village, OH 44081Donna Owens, DirectorOhio Department of CommerceDivision of Industrial ComplianceBureau of Operations & Maintenance6606 Tussing RoadP.O. Box 4009Reynoldsburg, OH 43068-9009Carol O'Claire, Chief, Radiological BranchOhio Emergency Management Agency2855 West Dublin Granville RoadColumbus, OH 43235-7150Mayor, Village of PerryP.O. Box 100Perry, OH 44081-0100 Dennis ClumRadiological Assistance Section SupervisorBureau of Radiation ProtectionOhio Department of HealthP.O. Box 118Columbus, OH  43266-0118Zack A. Clayton DERROhio Environmental Protection AgencyATTN:  Mr. Zack A. ClaytonP.O. Box 1049Columbus, OH  43266-0149ChairmanPerry Township Board of Trustees3750 Center Road, Box 65Perry, OH  44081Daniel Z. FisherTransportation DepartmentPublic Utilities Commission180 East Broad StreetColumbus, OH  43215-3793 James H. LashSenior Vice President of Operations and  Chief Operating OfficerFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH  44308Director, Fleet Regulatory AffairsFirstEnergy Nuclear Operating CompanyMail Stop A-GO-276 South Main StreetAkron, OH  44308Joseph J. HaganPresident and Chief Nuclear OfficerFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH  44308 Perry Nuclear Power Plant, Unit No. 1 cc:
NON-PUBLIC              LPL3-2 R/F              RidsNrrPMTWengert            RidsNrrLAEWhitt RidsNrrDorlLpl3-2      RidsOgcRp              RidsAcrsAcnwMailCenter        RidsRgn3MailCenter RidsNrrDorlDpr          RidsNrrPMSSands ADAMS ACCESSION NO: ML071710589                        NRR-106 OFFICE LPL3-2/PM            LPL3-2/LA          LPL3-2/BC NAME TWengert                EWhitt            RGibbs (CGratton for)
Danny L. Pace Senior Vice President, Fleet EngineeringFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308Jeannie M. RinckelVice President, Fleet OversightFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308Manager, Fleet LicensingFirstEnergy Nuclear Operating CompanyMail Stop A-GO-276 South Main StreetAkron, OH 44308Richard AndersonVice President, Nuclear SupportFirstEnergy Nuclear Operating CompanyMail Stop A-GO-1476 South Main StreetAkron, OH 44308 7590-01-PUNITED STATES NUCLEAR REGULATORY COMMISSIONFIRSTENERGY NUCLEAR OPERATING COMPANYDOCKET NO. 50-440 NOTICE OF WITHDRAWAL OF APPLICATION FORAMENDMENT TO FACILITY OPERATING LICENSEThe U.S. Nuclear Regulatory Commission (the Commission) has granted the request ofFirstEnergy Nuclear Operating Company (the licensee), to withdraw its June 1, 2006, application for proposed amendment to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1, located in Lake County, Ohio.                  . The proposed amendment would have modified the facility technical specifications (TS)pertaining to TS 3.4.10, "Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown," by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour, an alternate method of decay heat removal cannot be verified to be available. The Commission had previously issued a Notice of Consideration of Issuance ofAmendment published in the FEDERAL REGISTER on August 15, 2006 (71 FR 46935).
DATE      6/25/07             6/25/07          6/26/07 OFFICIAL RECORD COPY
However, by letter dated June 19, 2007, the licensee withdrew the proposed change.For further details with respect to this action, see the application for amendment datedJune 1, 2006, and the licensee's letter dated June 19, 2007, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or whoencounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov. Dated at Rockville, Maryland, this 26 th day of June 2007.FOR THE NUCLEAR REGULATORY COMMISSION/RA/Stephen P. Sands, Project ManagerPlant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation}}
 
Perry Nuclear Power Plant, Unit No. 1 cc:
David W. Jenkins, Attorney                Dennis Clum FirstEnergy Corporation                    Radiological Assistance Section Supervisor Mail Stop A-GO-15                          Bureau of Radiation Protection 76 South Main Street                      Ohio Department of Health Akron, OH 44308                            P.O. Box 118 Columbus, OH 43266-0118 Resident Inspector's Office U.S. Nuclear Regulatory Commission        Zack A. Clayton P.O. Box 331                              DERR Perry, OH 44081-0331                      Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton Regional Administrator, Region III        P.O. Box 1049 U.S. Nuclear Regulatory Commission        Columbus, OH 43266-0149 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4531                      Chairman Perry Township Board of Trustees Sue Hiatt                                  3750 Center Road, Box 65 OCRE Interim Representative                Perry, OH 44081 8275 Munson Mentor, OH 44060                          Daniel Z. Fisher Transportation Department Manager, Site Regulatory Compliance        Public Utilities Commission FirstEnergy Nuclear Operating Company      180 East Broad Street Perry Nuclear Power Plant                  Columbus, OH 43215-3793 Mail Stop A-PY-A200 P.O. Box 97, 10 Center Road                James H. Lash Perry, OH 44081-0097                      Senior Vice President of Operations and Chief Operating Officer Mayor, Village of North Perry              FirstEnergy Nuclear Operating Company North Perry Village Hall                  Mail Stop A-GO-14 4449 Lockwood Road                        76 South Main Street North Perry Village, OH 44081              Akron, OH 44308 Donna Owens, Director                      Director, Fleet Regulatory Affairs Ohio Department of Commerce                FirstEnergy Nuclear Operating Company Division of Industrial Compliance          Mail Stop A-GO-2 Bureau of Operations & Maintenance        76 South Main Street 6606 Tussing Road                          Akron, OH 44308 P.O. Box 4009 Reynoldsburg, OH 43068-9009                Joseph J. Hagan President and Chief Nuclear Officer Carol OClaire, Chief, Radiological Branch FirstEnergy Nuclear Operating Company Ohio Emergency Management Agency          Mail Stop A-GO-14 2855 West Dublin Granville Road            76 South Main Street Columbus, OH 43235-7150                    Akron, OH 44308 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100
 
Perry Nuclear Power Plant, Unit No. 1 cc:
Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308
 
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION FIRSTENERGY NUCLEAR OPERATING COMPANY DOCKET NO. 50-440 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of FirstEnergy Nuclear Operating Company (the licensee), to withdraw its June 1, 2006, application for proposed amendment to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1, located in Lake County, Ohio.                  .
The proposed amendment would have modified the facility technical specifications (TS) pertaining to TS 3.4.10, Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown, by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour, an alternate method of decay heat removal cannot be verified to be available.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on August 15, 2006 (71 FR 46935).
However, by letter dated June 19, 2007, the licensee withdrew the proposed change.
For further details with respect to this action, see the application for amendment dated June 1, 2006, and the licensee's letter dated June 19, 2007, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site,
 
http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this 26th day of June 2007.
FOR THE NUCLEAR REGULATORY COMMISSION
                                              /RA/
Stephen P. Sands, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation}}

Latest revision as of 06:11, 23 November 2019

Withdrawal of Amendment Request Associated with Mode 4 Residual Heat Removal (RHR) Shutdown Cooling Requirements
ML071710589
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/26/2007
From: Sands S
NRC/NRR/ADRO/DORL/LPLIII-2
To: Allen B
FirstEnergy Nuclear Operating Co
Wengert, Thomas NRR/DORL 415-4037
References
TAC MD2140
Download: ML071710589 (6)


Text

June 26, 2007 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT REQUEST ASSOCIATED WITH MODE 4 RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING REQUIREMENTS (TAC NO.

MD2140)

Dear Mr. Allen:

By letter dated June 1, 2006, you applied for an amendment to the Perry Nuclear Power Plant Unit No. 1 (Perry), Facility Operating License No. NPF-58. The proposed change would have modified the facility technical specifications (TS) pertaining to TS 3.4.10, Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown, by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, an alternate method of decay heat removal cannot be verified to be available. Subsequently, by letter dated June 19, 2007, you withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/RA/

Stephen P. Sands, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Notice of Withdrawal cc w/encl: See next page

Mr. Barry S. Allen June 26, 2007 Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - WITHDRAWAL OF AMENDMENT REQUEST ASSOCIATED WITH MODE 4 RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING REQUIREMENTS (TAC NO.

MD2140)

Dear Mr. Allen:

By letter dated June 1, 2006, you applied for an amendment to the Perry Nuclear Power Plant Unit No. 1 (Perry), Facility Operating License No. NPF-58. The proposed change would have modified the facility technical specifications (TS) pertaining to TS 3.4.10, Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown, by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, an alternate method of decay heat removal cannot be verified to be available. Subsequently, by letter dated June 19, 2007, you withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/RA/

Stephen P. Sands, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Notice of Withdrawal cc w/encl: See next page DISTRIBUTION:

NON-PUBLIC LPL3-2 R/F RidsNrrPMTWengert RidsNrrLAEWhitt RidsNrrDorlLpl3-2 RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn3MailCenter RidsNrrDorlDpr RidsNrrPMSSands ADAMS ACCESSION NO: ML071710589 NRR-106 OFFICE LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME TWengert EWhitt RGibbs (CGratton for)

DATE 6/25/07 6/25/07 6/26/07 OFFICIAL RECORD COPY

Perry Nuclear Power Plant, Unit No. 1 cc:

David W. Jenkins, Attorney Dennis Clum FirstEnergy Corporation Radiological Assistance Section Supervisor Mail Stop A-GO-15 Bureau of Radiation Protection 76 South Main Street Ohio Department of Health Akron, OH 44308 P.O. Box 118 Columbus, OH 43266-0118 Resident Inspector's Office U.S. Nuclear Regulatory Commission Zack A. Clayton P.O. Box 331 DERR Perry, OH 44081-0331 Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton Regional Administrator, Region III P.O. Box 1049 U.S. Nuclear Regulatory Commission Columbus, OH 43266-0149 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4531 Chairman Perry Township Board of Trustees Sue Hiatt 3750 Center Road, Box 65 OCRE Interim Representative Perry, OH 44081 8275 Munson Mentor, OH 44060 Daniel Z. Fisher Transportation Department Manager, Site Regulatory Compliance Public Utilities Commission FirstEnergy Nuclear Operating Company 180 East Broad Street Perry Nuclear Power Plant Columbus, OH 43215-3793 Mail Stop A-PY-A200 P.O. Box 97, 10 Center Road James H. Lash Perry, OH 44081-0097 Senior Vice President of Operations and Chief Operating Officer Mayor, Village of North Perry FirstEnergy Nuclear Operating Company North Perry Village Hall Mail Stop A-GO-14 4449 Lockwood Road 76 South Main Street North Perry Village, OH 44081 Akron, OH 44308 Donna Owens, Director Director, Fleet Regulatory Affairs Ohio Department of Commerce FirstEnergy Nuclear Operating Company Division of Industrial Compliance Mail Stop A-GO-2 Bureau of Operations & Maintenance 76 South Main Street 6606 Tussing Road Akron, OH 44308 P.O. Box 4009 Reynoldsburg, OH 43068-9009 Joseph J. Hagan President and Chief Nuclear Officer Carol OClaire, Chief, Radiological Branch FirstEnergy Nuclear Operating Company Ohio Emergency Management Agency Mail Stop A-GO-14 2855 West Dublin Granville Road 76 South Main Street Columbus, OH 43235-7150 Akron, OH 44308 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100

Perry Nuclear Power Plant, Unit No. 1 cc:

Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION FIRSTENERGY NUCLEAR OPERATING COMPANY DOCKET NO. 50-440 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of FirstEnergy Nuclear Operating Company (the licensee), to withdraw its June 1, 2006, application for proposed amendment to Facility Operating License No. NPF-58 for the Perry Nuclear Power Plant, Unit No. 1, located in Lake County, Ohio. .

The proposed amendment would have modified the facility technical specifications (TS) pertaining to TS 3.4.10, Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown, by adding a default Condition to address situations when an RHR Shutdown Cooling subsystem becomes inoperable in MODE 4 and, within the Completion Time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, an alternate method of decay heat removal cannot be verified to be available.

The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on August 15, 2006 (71 FR 46935).

However, by letter dated June 19, 2007, the licensee withdrew the proposed change.

For further details with respect to this action, see the application for amendment dated June 1, 2006, and the licensee's letter dated June 19, 2007, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site,

http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.

Dated at Rockville, Maryland, this 26th day of June 2007.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Stephen P. Sands, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation