ML090690602: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML090690602 | |||
| issue date = 03/09/2009 | |||
| title = William B. Mcguire Nuclear Station - Component Design Bases Inspection - NRC Inspection Report 05000369/2009-006 and 05000370/2009-006 | |||
| author name = Desai B | |||
| author affiliation = NRC/RGN-II/DRS/EB1 | |||
| addressee name = Hamilton B | |||
| addressee affiliation = Duke Energy Carolinas, LLC, Duke Power Co | |||
| docket = 05000369, 05000370 | |||
| license number = NPF-009, NPF-017 | |||
| contact person = | |||
| case reference number = IR-09-006 | |||
| document type = Letter, Request for Additional Information (RAI) | |||
| page count = 5 | |||
}} | |||
See also: [[see also::IR 05000370/2009006]] | |||
=Text= | |||
{{#Wiki_filter:UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION II | |||
SAM NUNN ATLANTA FEDERAL CENTER | |||
61 FORSYTH STREET, SW, SUITE 23T85 | |||
ATLANTA, GEORGIA 30303-8931 | |||
March 9, 2009 | |||
Mr. Bruce H. Hamilton | |||
Vice President | |||
Duke Power Company, LLC | |||
d/b/a Duke Energy Carolinas, LLC | |||
McGuire Nuclear Station | |||
12700 Hagers Ferry Road | |||
Huntersville, NC 28078-8985 | |||
SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - COMPONENT DESIGN BASES | |||
INSPECTION - NRC INSPECTION REPORT 05000369/2009-006 AND | |||
05000370/2009-006 | |||
Dear Mr. Hamilton: | |||
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) | |||
Region II staff will conduct a component design bases inspection at your William B. McGuire | |||
Nuclear Station during the weeks of May 18-22, June 1-5, and June 15-19, 2009. The | |||
inspection team will be led by R. Moore, a Senior Reactor Inspector from the NRC's Region II | |||
Office. This inspection will be conducted in accordance with the baseline inspection procedure, | |||
Procedure 71111.21, Component Design Bases Inspection, issued August 19, 2008. | |||
The inspection will evaluate the capability of risk significant / low margin components to function | |||
as designed and to support proper system operation. The inspection will also include a review | |||
of selected operator actions, operating experience, and modifications. | |||
During a telephone conversation on March 3, 2009, Mr. Moore confirmed with Ms. K. Crane of | |||
your staff, arrangements for an information gathering site visit and the three-week onsite | |||
inspection. The schedule is as follows: | |||
* Information gathering visit: Week of May 4-8, 2009. | |||
* Onsite weeks: May 18-22, June 1-5, and June 15-19, 2009. | |||
The purpose of the information gathering visit is to meet with members of your staff to identify | |||
risk-significant components and operator actions. Information and documentation needed to | |||
support the inspection will also be identified. Mr. R. Bernhard, a Region II Senior Reactor | |||
Analyst, may accompany Mr. Moore during the information gathering visit to review probabilistic | |||
risk assessment data and identify risk significant components which will be examined during the | |||
inspection. | |||
The enclosure lists documents that will be needed prior to the information gathering visit. | |||
Please contact Mr. Moore with any questions prior to preparing materials listed in the enclosure | |||
and provide the referenced information to the Region II office by April 20, 2009. The inspectors | |||
will try to minimize your administrative burden by specifically identifying only those documents | |||
required for the inspection preparation. | |||
DPC, LLC 2 | |||
During the information gathering visit, the team leader will also discuss the following inspection | |||
support administrative details: office space; supplemental documents requested to be made | |||
available to the team in the Region II office prior to the inspection preparation week of | |||
May 11-15, 2009; arrangements for site access; and the availability of knowledgeable plant | |||
engineering and licensing personnel to serve as points of contact during the inspection. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document | |||
Room or from the Publicly Available Records (PARS) component of NRC's document system | |||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | |||
rm/adams.html (the Public Electronic Reading Room). | |||
Thank you for your cooperation in this matter. If you have any questions regarding the | |||
information requested or the inspection, please contact Mr. Moore at (404) 562-4628 or me at | |||
(404) 562-4519. | |||
Sincerely, | |||
/RA/ | |||
Binoy B. Desai, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket Nos. 50-369, 50-370 | |||
License Nos. NPF-9, NPF-17 | |||
Enclosure: Information Request For William B. McGuire Nuclear Station Component Design | |||
Bases Inspection | |||
cc w/encl: (See page 3) | |||
DPC, LLC 3 | |||
cc w/encl: | |||
Steven D. Capps Kathryn B. Nolan, | |||
Engineering Manager Senior Counsel | |||
Duke Power Company, LLC d/b/a Duke Duke Energy Corporation | |||
Energy Carolinas, LLC 526 South Church Street-EC07H | |||
Electronic Mail Distribution Charlotte, NC 28202 | |||
Scotty L. Bradshaw David A. Repka | |||
Training Manager Winston Strawn LLP | |||
Duke Power Company, LLC d/b/a Duke Electronic Mail Distribution | |||
Energy Carolinas, LLC | |||
Electronic Mail Distribution County Manager of Mecklenburg County | |||
720 East Fourth Street | |||
Kenneth L. Ashe Charlotte, NC 28202 | |||
Regulatory Compliance Manager | |||
Duke Power Company, LLC d/b/a Duke SBeverly O. Hall | |||
Energy Carolinas, LLC Chief, Radiation Protection Section | |||
Electronic Mail Distribution Department of Environmental Health | |||
N.C. Department of Environmental | |||
R. L. Gill, Jr. Commerce & Natural Resources | |||
Manager Electronic Mail Distribution | |||
Nuclear Regulatory Issues & Industry Affairs | |||
Duke Power Company, LLC d/b/a Duke Dhiaa M. Jamil | |||
Energy Carolinas, LLC Group Executive and Chief Nuclear Officer | |||
Electronic Mail Distribution Duke Energy Carolinas, LLC | |||
Electronic Mail Distribution | |||
Lisa F. Vaughn | |||
Associate General Counsel Senior Resident Inspector | |||
Duke Energy Corporation Duke Energy Corporation | |||
526 South Church Street-EC07H William B. McGuire Nuclear Station | |||
Charlotte, NC 28202 U.S. NRC | |||
12700 Hagers Ferry Rd | |||
Huntersville, NC 28078 | |||
_________________________ G SUNSI REVIEW COMPLETE | |||
OFFICE RII:DRS RII:DRS RII:DRP RII:DRS | |||
SIGNATURE RA RA RA RA | |||
NAME RMOORE WROGERS JBARTLEY BDESAI | |||
DATE 3/5/2009 3/5/2009 3/5/2009 3/9/2009 | |||
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
INFORMATION REQUEST FOR WILLIAM B. McGUIRE NUCLEAR STATION | |||
COMPONENT DESIGN BASES INSPECTION | |||
Please provide the information electronically in .pdf files, Excel, or other searchable format on | |||
CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use. Information | |||
in lists should contain enough information to be easily understood to someone who has | |||
knowledge of pressurized water reactor technology. | |||
1. From your most recent probabilistic safety analysis (PSA) excluding external events and | |||
fires, please provide: | |||
a. Two risk rankings of components from your site-specific probabilistic safety | |||
analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other | |||
sorted by Birnbaum Importance. | |||
b. A list of the top 500 cutsets. | |||
2. From your most recent probabilistic safety analysis (PSA) including external events and | |||
fires, please provide: | |||
a. Two risk rankings of components from your site-specific probabilistic safety | |||
analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other | |||
sorted by Birnbaum Importance. | |||
b. A list of the top 500 cutsets. | |||
3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide | |||
copies of your human reliability worksheets for these items. | |||
4. Any pre-existing evaluation or list of components and calculations with low design | |||
margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator | |||
close to design required output, heat exchangers close to rated design heat removal, | |||
MOV risk-margin rankings, etc.). | |||
5. A list of station applicability evaluations/reviews performed and documented in the station | |||
corrective action program in the past two years for industry events, critical equipment | |||
failures, and safety related equipment vulnerabilities (as communicated by NRC generic | |||
communications, industry communications, 10 CFR Part 21 notifications, etc.). | |||
6. A list of operability evaluations completed within the last two years, sorted by associated | |||
component or system. | |||
7. A list of common-cause failures of components that have occurred at McGuire Nuclear | |||
Station and have been identified within the last five years. | |||
8. A list of equipment currently on the sites Key Equipment Priorities List, including a | |||
description of the reason(s) why each component (i.e. not a programmatic or system | |||
level concern) is on that list and summaries (if available) of your plans to address those | |||
reasons. | |||
9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1) | |||
status. | |||
10. Contact information for a person to discuss PRA information prior to the information | |||
gathering trip: name, title, phone number, and e-mail address. | |||
Enclosure | |||
}} |
Revision as of 08:21, 14 November 2019
ML090690602 | |
Person / Time | |
---|---|
Site: | McGuire, Mcguire |
Issue date: | 03/09/2009 |
From: | Binoy Desai NRC/RGN-II/DRS/EB1 |
To: | Brandi Hamilton Duke Energy Carolinas, Duke Power Co |
References | |
IR-09-006 | |
Download: ML090690602 (5) | |
See also: IR 05000370/2009006
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
March 9, 2009
Mr. Bruce H. Hamilton
Vice President
Duke Power Company, LLC
d/b/a Duke Energy Carolinas, LLC
McGuire Nuclear Station
12700 Hagers Ferry Road
Huntersville, NC 28078-8985
SUBJECT: WILLIAM B. MCGUIRE NUCLEAR STATION - COMPONENT DESIGN BASES
INSPECTION - NRC INSPECTION REPORT 05000369/2009-006 AND
Dear Mr. Hamilton:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a component design bases inspection at your William B. McGuire
Nuclear Station during the weeks of May 18-22, June 1-5, and June 15-19, 2009. The
inspection team will be led by R. Moore, a Senior Reactor Inspector from the NRC's Region II
Office. This inspection will be conducted in accordance with the baseline inspection procedure,
Procedure 71111.21, Component Design Bases Inspection, issued August 19, 2008.
The inspection will evaluate the capability of risk significant / low margin components to function
as designed and to support proper system operation. The inspection will also include a review
of selected operator actions, operating experience, and modifications.
During a telephone conversation on March 3, 2009, Mr. Moore confirmed with Ms. K. Crane of
your staff, arrangements for an information gathering site visit and the three-week onsite
inspection. The schedule is as follows:
- Information gathering visit: Week of May 4-8, 2009.
- Onsite weeks: May 18-22, June 1-5, and June 15-19, 2009.
The purpose of the information gathering visit is to meet with members of your staff to identify
risk-significant components and operator actions. Information and documentation needed to
support the inspection will also be identified. Mr. R. Bernhard, a Region II Senior Reactor
Analyst, may accompany Mr. Moore during the information gathering visit to review probabilistic
risk assessment data and identify risk significant components which will be examined during the
inspection.
The enclosure lists documents that will be needed prior to the information gathering visit.
Please contact Mr. Moore with any questions prior to preparing materials listed in the enclosure
and provide the referenced information to the Region II office by April 20, 2009. The inspectors
will try to minimize your administrative burden by specifically identifying only those documents
required for the inspection preparation.
During the information gathering visit, the team leader will also discuss the following inspection
support administrative details: office space; supplemental documents requested to be made
available to the team in the Region II office prior to the inspection preparation week of
May 11-15, 2009; arrangements for site access; and the availability of knowledgeable plant
engineering and licensing personnel to serve as points of contact during the inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding the
information requested or the inspection, please contact Mr. Moore at (404) 562-4628 or me at
(404) 562-4519.
Sincerely,
/RA/
Binoy B. Desai, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-369, 50-370
Enclosure: Information Request For William B. McGuire Nuclear Station Component Design
Bases Inspection
cc w/encl: (See page 3)
cc w/encl:
Steven D. Capps Kathryn B. Nolan,
Engineering Manager Senior Counsel
Duke Power Company, LLC d/b/a Duke Duke Energy Corporation
Energy Carolinas, LLC 526 South Church Street-EC07H
Electronic Mail Distribution Charlotte, NC 28202
Scotty L. Bradshaw David A. Repka
Training Manager Winston Strawn LLP
Duke Power Company, LLC d/b/a Duke Electronic Mail Distribution
Energy Carolinas, LLC
Electronic Mail Distribution County Manager of Mecklenburg County
720 East Fourth Street
Kenneth L. Ashe Charlotte, NC 28202
Regulatory Compliance Manager
Duke Power Company, LLC d/b/a Duke SBeverly O. Hall
Energy Carolinas, LLC Chief, Radiation Protection Section
Electronic Mail Distribution Department of Environmental Health
N.C. Department of Environmental
R. L. Gill, Jr. Commerce & Natural Resources
Manager Electronic Mail Distribution
Nuclear Regulatory Issues & Industry Affairs
Duke Power Company, LLC d/b/a Duke Dhiaa M. Jamil
Energy Carolinas, LLC Group Executive and Chief Nuclear Officer
Electronic Mail Distribution Duke Energy Carolinas, LLC
Electronic Mail Distribution
Lisa F. Vaughn
Associate General Counsel Senior Resident Inspector
Duke Energy Corporation Duke Energy Corporation
526 South Church Street-EC07H William B. McGuire Nuclear Station
Charlotte, NC 28202 U.S. NRC
12700 Hagers Ferry Rd
Huntersville, NC 28078
_________________________ G SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS RII:DRP RII:DRS
NAME RMOORE WROGERS JBARTLEY BDESAI
DATE 3/5/2009 3/5/2009 3/5/2009 3/9/2009
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
INFORMATION REQUEST FOR WILLIAM B. McGUIRE NUCLEAR STATION
COMPONENT DESIGN BASES INSPECTION
Please provide the information electronically in .pdf files, Excel, or other searchable format on
CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use. Information
in lists should contain enough information to be easily understood to someone who has
knowledge of pressurized water reactor technology.
1. From your most recent probabilistic safety analysis (PSA) excluding external events and
fires, please provide:
a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other
sorted by Birnbaum Importance.
b. A list of the top 500 cutsets.
2. From your most recent probabilistic safety analysis (PSA) including external events and
fires, please provide:
a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other
sorted by Birnbaum Importance.
b. A list of the top 500 cutsets.
3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide
copies of your human reliability worksheets for these items.
4. Any pre-existing evaluation or list of components and calculations with low design
margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator
close to design required output, heat exchangers close to rated design heat removal,
MOV risk-margin rankings, etc.).
5. A list of station applicability evaluations/reviews performed and documented in the station
corrective action program in the past two years for industry events, critical equipment
failures, and safety related equipment vulnerabilities (as communicated by NRC generic
communications, industry communications, 10 CFR Part 21 notifications, etc.).
6. A list of operability evaluations completed within the last two years, sorted by associated
component or system.
7. A list of common-cause failures of components that have occurred at McGuire Nuclear
Station and have been identified within the last five years.
8. A list of equipment currently on the sites Key Equipment Priorities List, including a
description of the reason(s) why each component (i.e. not a programmatic or system
level concern) is on that list and summaries (if available) of your plans to address those
reasons.
9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1)
status.
10. Contact information for a person to discuss PRA information prior to the information
gathering trip: name, title, phone number, and e-mail address.
Enclosure