IR 05000397/2010405: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ber 7, 2010 | {{#Wiki_filter:UNITED STATES NUC LEAR REGULATOR Y C OMMISSI ON ber 7, 2010 | ||
==SUBJECT:== | ==SUBJECT:== | ||
Line 24: | Line 24: | ||
==Dear:== | ==Dear:== | ||
Mr. Reddemann: | Mr. Reddemann: | ||
On August 5, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Columbia Generating Station. The inspection covered the NRCs Additional Security Measures for the Physical Protection of Dry Independent Spent Fuel Storage Installation. The enclosed inspection report documents the inspection results, which were discussed on August 5, 2010, with Mr. S. Oxenford, Vice President, Nuclear Generation/Chief Nuclear Officer, and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspection examined activities conducted under your license as they relate to security and compliance with the | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Line 34: | Line 33: | ||
Based on the results of this inspection, no findings were identified. | Based on the results of this inspection, no findings were identified. | ||
In accordance with 10 CFR 2.390 of the | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the publicly available records component of the NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. Energy Northwest -2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-397; 72-035 License No.: NPF-21 | Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-397; 72-035 License No.: NPF-21 Nonpublic Enclosure: Inspection Report 05000397/2010405 w/Attachment: Supplemental Information cc w/o enclosure: | ||
Douglas W. Coleman Manager, Regulatory Programs Energy Northwest P.O. Box 968, Mail Drop PE20 Richland, WA 99352-0968 Energy Northwest -3-Distribution w/enclosure: | |||
Nonpublic Enclosure: Inspection Report 05000397/2010405 w/Attachment: Supplemental Information | |||
cc w/o enclosure: | |||
Douglas W. Coleman Manager, Regulatory Programs Energy Northwest P.O. Box 968, Mail Drop PE20 Richland, WA 99352-0968 Energy Northwest - 3 - Distribution w/enclosure: | |||
Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov) | Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov) | ||
Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov) | Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov) | ||
Branch Chief, RIII DRS/PSB (Eric.Duncan@nrc.gov) Senior Resident Inspector (Ronald.Cohen@nrc.gov) Christopher.Staab@nrc.gov Douglas.Garner@nrc.gov Sanndra.Wastler@nrc.gov | Branch Chief, RIII DRS/PSB (Eric.Duncan@nrc.gov) | ||
Senior Resident Inspector (Ronald.Cohen@nrc.gov) | |||
Electronic distribution by RIV: | Christopher.Staab@nrc.gov Douglas.Garner@nrc.gov Sanndra.Wastler@nrc.gov Electronic distribution by RIV: | ||
Distribution w/o enclosure: | Distribution w/o enclosure: | ||
Regional Administrator (Elmo.Collins@nrc.gov) | |||
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DNMS Director (Art.Howell@nrc.gov) DNMS Deputy Director (Chuck.Cain@nrc.gov) DRP Acting Director (Anton.Vegel@nrc.gov) | Deputy Regional Administrator (Chuck.Casto@nrc.gov) | ||
DNMS Director (Art.Howell@nrc.gov) | |||
DNMS Deputy Director (Chuck.Cain@nrc.gov) | |||
DRP Acting Director (Anton.Vegel@nrc.gov) | |||
DRP Acting Deputy Director (Troy.Pruett@nrc.gov) | DRP Acting Deputy Director (Troy.Pruett@nrc.gov) | ||
DRS Director (Roy.Caniano@nrc.gov) | DRS Director (Roy.Caniano@nrc.gov) | ||
DRS Acting Deputy Director (Jeff.Clark@nrc.gov) | DRS Acting Deputy Director (Jeff.Clark@nrc.gov) | ||
Resident Inspector (Mahdi.Hayes@nrc.gov) Branch Chief, DNMS (Blair Spitzberg@nrc.gov) | Resident Inspector (Mahdi.Hayes@nrc.gov) | ||
Branch Chief, DNMS (Blair Spitzberg@nrc.gov) | |||
Branch Chief, DRP/A (Wayne.Walker@nrc.gov) | Branch Chief, DRP/A (Wayne.Walker@nrc.gov) | ||
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov) | Senior Project Engineer, DRP/A (David.Proulx@nrc.gov) | ||
Line 70: | Line 67: | ||
Regional Counsel (Karla.Fuller@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
OEMail Resource OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov) Energy Northwest - 4 - Report: | OEMail Resource OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov) Energy Northwest -4-Report: | ||
SUNSI Review Completed: ETB ADAMS: Yes G No Initials: ETB G Publicly Available O Non-Publicly Available O Sensitive G Non-Sensitive Letter Only: | SUNSI Review Completed: ETB ADAMS: Yes G No Initials: ETB G Publicly Available O Non-Publicly Available O Sensitive G Non-Sensitive Letter Only: | ||
SUNSI Review Completed: ETB ADAMS: Yes Initials: ETB Publicly Available Non-Sensitive PSI:PSB C:PSB1 C:PBA C:RSFSB C:PSB1 ETByre MPShannon WWalker DBSpitzberg MPShannon /RA/ /RA/ /RA/ /RA/ /RA/ 08/12/10 08/20/10 08/29/10 09/7/10r 09/7/10 OFFICIAL COPY T=Telephone E=E-Mail F=FAX | SUNSI Review Completed: ETB ADAMS: Yes Initials: ETB Publicly Available Non-Sensitive PSI:PSB C:PSB1 C:PBA C:RSFSB C:PSB1 ETByre MPShannon WWalker DBSpitzberg MPShannon | ||
/RA/ /RA/ /RA/ /RA/ /RA/ | |||
08/12/10 08/20/10 08/29/10 09/7/10r 09/7/10 OFFICIAL COPY T=Telephone E=E-Mail F=FAX | |||
}} | }} |
Latest revision as of 13:38, 13 November 2019
ML102500578 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 09/07/2010 |
From: | Shannon M Plant Support Branch-1 |
To: | Reddemann M Energy Northwest |
References | |
IR-10-405 | |
Download: ML102500578 (4) | |
Text
UNITED STATES NUC LEAR REGULATOR Y C OMMISSI ON ber 7, 2010
SUBJECT:
COLUMBIA GENERATING STATION - NRC SECURITY TEMPORARY INSTRUCTION 2690/009 INSPECTION REPORT 05000397/2010405
Dear:
Mr. Reddemann:
On August 5, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Columbia Generating Station. The inspection covered the NRCs Additional Security Measures for the Physical Protection of Dry Independent Spent Fuel Storage Installation. The enclosed inspection report documents the inspection results, which were discussed on August 5, 2010, with Mr. S. Oxenford, Vice President, Nuclear Generation/Chief Nuclear Officer, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the publicly available records component of the NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. Energy Northwest -2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-397;72-035 License No.: NPF-21 Nonpublic Enclosure: Inspection Report 05000397/2010405 w/Attachment: Supplemental Information cc w/o enclosure:
Douglas W. Coleman Manager, Regulatory Programs Energy Northwest P.O. Box 968, Mail Drop PE20 Richland, WA 99352-0968 Energy Northwest -3-Distribution w/enclosure:
Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN 3D43 Branch Chief, RI DRS (James.Trapp@nrc.gov)
Branch Chief, RII DRS/PSB2 (Michael.Ernstes@nrc.gov)
Branch Chief, RIII DRS/PSB (Eric.Duncan@nrc.gov)
Senior Resident Inspector (Ronald.Cohen@nrc.gov)
Christopher.Staab@nrc.gov Douglas.Garner@nrc.gov Sanndra.Wastler@nrc.gov Electronic distribution by RIV:
Distribution w/o enclosure:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DNMS Director (Art.Howell@nrc.gov)
DNMS Deputy Director (Chuck.Cain@nrc.gov)
DRP Acting Director (Anton.Vegel@nrc.gov)
DRP Acting Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Acting Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (Mahdi.Hayes@nrc.gov)
Branch Chief, DNMS (Blair Spitzberg@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
Project Engineer, DRP/A (Nicholas.Hernandez@nrc.gov)
Project Engineer, DRP/A (Laura.Micewski@nrc.gov)
Columbia Administrative Assistant (Crystal.Myers@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov) Energy Northwest -4-Report:
SUNSI Review Completed: ETB ADAMS: Yes G No Initials: ETB G Publicly Available O Non-Publicly Available O Sensitive G Non-Sensitive Letter Only:
SUNSI Review Completed: ETB ADAMS: Yes Initials: ETB Publicly Available Non-Sensitive PSI:PSB C:PSB1 C:PBA C:RSFSB C:PSB1 ETByre MPShannon WWalker DBSpitzberg MPShannon
/RA/ /RA/ /RA/ /RA/ /RA/
08/12/10 08/20/10 08/29/10 09/7/10r 09/7/10 OFFICIAL COPY T=Telephone E=E-Mail F=FAX