=Text=
=Text=
{{#Wiki_filter:I SOUTHERN CALIFORNIA
{{#Wiki_filter:I ~I        SOUTHERN CALIFORNIA                                                     Richard J. St. Onge
:j EDISONAn EDISON INT E R N ATIO NALC ompany U.S.Nuclear Regulatory Commission ATTN: DocumentControlDesk Washington,DC20555-0001 June 27, 2011 Richard J.St.Onge Director Nucl ear RegulatoryAffairs
:j           EDISON                                                                 Director Nuclear Regulatory Affairs An EDI SON INTERNATIONAL  Comp any June 27, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001


==Subject:==
==Subject:==
San Onofre Nuclear Generating Station,Units2and3 DocketNos.50-361and50-362 ExtensionofLeadFuel AssemblyProgramfor SONGSUnit2Cycle17
San Onofre Nuclear Generating Station, Units 2 and 3 Docket Nos. 50-361 and 50-362 Extension of Lead Fuel Assembly Program for SONGS Unit 2 Cycle 17


==Reference:==
==Reference:==
1.LetterfromNRC(Hall)toSCE (Ridenoure) dated December17,2009,Units2and3-Temporary Exemptionfromthe Requirementsof10CFRPart50,Section50.46and AppendixKforLeadFuel Assemblies(TACNos.ME0602and ME0603)," (ADAMS Accession Numbe r ML090860415).
: 1. Letter from NRC (Hall) to SCE (Ridenoure) dated December 17, 2009, Units 2 and 3 - Temporary Exemption from the Requirements of 10 CFR Part 50, Section 50.46 and Appendix K for Lead Fuel Assemblies (TAC Nos. ME0602 and ME0603)," (ADAMS Accession Numbe r ML090860415).


==DearSirorMadam:==
==Dear Sir or Madam:==
Thisletterisprovidedasanupdateofthestatusandplanforthe San Onofre Nuclear Generating Station (SONGS)LeadFuel Assembly(LFA)programandtheSouthern CaliforniaEdison(SCE)planto introduce additionalLFAsintheSONGSUnit2Cycle 17 reactor core.TheReferencedletterprovided Temporary Exemption from specific requirements of10CFRPart50,Part50.46and AppendixKforLeadFuel Assemblies.
The temporary exemptionallowsuptosixteenLFAswith M5Žalloycladding manufactured by AREVANPtobeinsertedintotheSONGSUnit2 reactorcoreorintotheSONGSUnit3reactorcore.Eight AREVALFAswereloadedintotheUnit2coreduringitsCycle16refueling outage.The exemptionallowstheLFAstobeusedforuptothree operating cycles.InadditiontotheeightUnit2 AREVA LFAs currently scheduled for theirsecondcycleof operationinUnit2Cycle17,Southern CaliforniaEdison(SCE)plansto introduce eight additional fresh AREVALFAsintheUnit2Cycle17reactorcore, consistentwiththe referenced exemption.
P.O.Box128 S an Clemente , C A 92674 ,,I DocumentControlDesk June 27, 2011 Additionally, eight fresh Westinghouse Modified StandardDesign(MSD)LFAsare plannedtobeinsertedintheUnit2Cycle17 reactorcore.Thedesignofthe WestinghouseLFAsisin accordancewith10CFR50.46and Appendix K.Therefore, the WestinghouseMSDLFAsdonotrequirean exemption.
The additional AREVA and WestinghouseLFAswillbring the total numberofLFAsintheUnit2Cycle17coreto twenty-four.TheplannedLFA implementationforUnit2Cycle17 continues to meet SONGS2and3 Technical Specifications.
The additional sixteenLFAsare expectedtoresideinthecoreforuptoatotalofthreecyclesof operation (i.e., throughCycle19).Enclosure 1 provides detailsofthisplan.Shouldyouhaveany questions,orrequire additional information, please contactMs.Linda T.Conklinat(949)368-9443.
Sincerely, Enclosure1:Unit2Cycle17LeadFuel Assembly Program cc: E.E.Collins, Regional Administrator,NRCRegionIV R.Hall,NRC ProjectManager,San OnofreUnits2and3
.G.G.Warnick , NRC Senior Resident Inspector ,SanOnofreUnits2and3


ENCLOSURE 1 Unit 2 Cycle 17 Lead Fuel Assembly Program
This letter is provided as an update of the status and plan for the San Onofre Nuclear Generating Station (SONGS) Lead Fuel Assembly (LFA) program and the Southern California Edison (SCE) plan to introduce additional LFAs in the SONGS Unit 2 Cycle 17 reactor core.
The Referenced letter provided Temporary Exemption from specific requirements of 10 CFR Part 50, Part 50.46 and Appendix K for Lead Fuel Assemblies. The temporary exemption allows up to sixteen LFAs with M5' alloy cladding manufactured by AREVA NP to be inserted into the SONGS Unit 2 reactor core or into the SONGS Unit 3 reactor core. Eight AREVA LFAs were loaded into the Unit 2 core during its Cycle 16 refueling outage. The exemption allows the LFAs to be used for up to three operating cycles.
In addition to the eight Unit 2 AREVA LFAs currently scheduled for their second cycle of operation in Unit 2 Cycle 17, Southern California Edison (SCE) plans to introduce eight additional fresh AREVA LFAs in the Unit 2 Cycle 17 reactor core, consistent with the referenced exemption.
                                                                                                                  ,
                                                                                                                , I P.O . Box 128 San Clemente, CA 92674


1 of 3 Introduction This document provides an updat e of the status of the S an Onofre Nuclear Generating Station (SONGS) Lead Fuel Assembly (LFA) program and the Southern California Edison (SCE) plan to introduce additional LFAs in the SONGS Unit 2 Cycle 17 reactor core.  
Document Control Desk                                            June 27, 2011 Additionally, eight fresh Westinghouse Modified Standard Design (MSD) LFAs are planned to be inserted in the Unit 2 Cycle 17 reactor core. The design of the Westinghouse LFAs is in accordance with 10 CFR 50.46 and Appendix K. Therefore, the Westinghouse MSD LFAs do not require an exemption. The additional AREVA and Westinghouse LFAs will bring the total number of LFAs in the Unit 2 Cycle 17 core to twenty-four.
The planned LFA implementation for Unit 2 Cycle 17 continues to meet SONGS 2 and 3 Technical Specifications. The additional sixteen LFAs are expected to reside in the core for up to a total of three cycles of operation (i.e ., through Cycle 19). Enclosure 1 provides details of this plan.
Should you have any questions, or require additional information, please contact Ms. Linda T. Conklin at (949) 368-9443.
Sincerely, : Unit 2 Cycle 17 Lead Fuel Assembly Program cc:    E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 .
G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3


The SONGS Unit 2 or Unit 3 core consists of 217 fuel assemblies. Each fuel assembly consists of 236 fuel rods. The rods are arranged in a square 16 x 16 array (CE16). The fuel rods consist of slightly enriched uranium dioxide cylindrical ceramic pellets, encapsulated within a cylindrical Zircaloy, ZIRLO
ENCLOSURE 1 Unit 2 Cycle 17 Lead Fuel Assembly Program
, or M5 TM tube. Lead Fuel Assembly Program Summary


The goal of the LFA program is to provide an alternative fuel design to eliminate grid-to-rod fretting fuel failures. The use of LFAs enables the implementation of a more robust design to eliminate the grid to rod fretting fuel failures seen at SONGS. Eight AREVA LFAs with M5 TM cladding were loaded into the SONG S Unit 2 core during its Cycle 16 refueling outage, and eight Westinghouse M odified Standard Design (MSD) LFAs were loaded into the SONGS Unit 3 core dur ing its Cycle 16 refueling outage.  
Introduction This document provides an update of the status of the San Onofre Nuclear Generating Station (SONGS) Lead Fuel Assembly (LFA) program and the Southern California Edison (SCE) plan to introduce additional LFAs in the SONGS Unit 2 Cycle 17 reactor core.
The SONGS Unit 2 or Unit 3 core consists of 217 fuel assemblies. Each fuel assembly consists of 236 fuel rods. The rods are arranged in a square 16 x 16 array (CE16). The fuel rods consist of slightly enriched uranium dioxide cylindrical ceramic pellets, encapsulated within a cylindrical Zircaloy, ZIRLO, or M5TM tube.
Lead Fuel Assembly Program Summary The goal of the LFA program is to provide an alternative fuel design to eliminate grid-to-rod fretting fuel failures. The use of LFAs enables the implementation of a more robust design to eliminate the grid to rod fretting fuel failures seen at SONGS. Eight AREVA LFAs with M5TM cladding were loaded into the SONGS Unit 2 core during its Cycle 16 refueling outage, and eight Westinghouse Modified Standard Design (MSD) LFAs were loaded into the SONGS Unit 3 core during its Cycle 16 refueling outage.
The end of cycle Unit 3 Cycle 15 post irradiation examination fuel inspections performed in November 2010, revealed grid-to-rod fretting failures in not only twice or thrice burned core peripheral fuel assemblies but also in once burned core peripheral assemblies. As such, SCE has decided to increase the number of LFAs in Unit 2 Cycle 17 (and possibly Unit 3 Cycle 17) to expand grid testing in order to minimize or eliminate grid-to-rod fretting.
In addition to the eight AREVA LFAs currently scheduled for a second cycle of operation in Unit 2 Cycle 17, SCE intends to introduce eight additional fresh AREVA LFAs and eight fresh Westinghouse MSD LFAs in Unit 2 Cycle 17. This will bring the total number of LFAs scheduled to be installed in Unit 2 Cycle 17 to twenty-four. Consistent with the Unit 2 Cycle 16 LFA plan, these 16 new LFAs are expected to reside in the core for up to three cycles of operation.
LFA Mechanical Design Description The eight additional AREVA LFAs to be installed in Unit 2 Cycle 17 are mechanically identical to those described in Reference 2 and approved by the NRC in References 3 and 4. In Reference 3, the NRC approved a temporary exemption for the use of AREVA M5TM cladding for up to 16 AREVA fuel assemblies. SCE will remain compliant with that approval by adding these eight additional AREVA LFAs. SCE will also maintain compliance with the commitments approved by the NRC in Reference 4 for these eight additional AREVA LFAs.
1 of 3


The end of cycle Unit 3 Cycle 15 post irradiati on examination fuel inspections performed in November 2010, revealed grid-to-rod fretting failures in not only twice or thrice burned core peripheral fuel assemblies but also in once burned core peripheral assemblies. As such, SCE has decided to increase the number of LFAs in Unit 2 Cycle 17 (and possibly
The Westinghouse SONGS MSD LFAs is an evolutionary design to the current SONGS 16x16 standard design fuel. The MSD LFAs use ZIRLO cladding material, consistent with the standard SONGS fuel. The MSD LFA design adds grid-to-rod fretting resistant features to the current SONGS standard design. The component areas that differ from SONGS standard design are the mid-grids, the top grid, the guide tubes and the upper end fitting.
 
The mid-grids were modified to adopt a vertical I-spring configuration on the outer strap in all perimeter cell locations. In addition, the contact lengths for the interior strap cantilever springs were increased. A straight strip Inconel top grid replaced the standard Zircaloy wavy grid to allow longer spring feature relaxation time. The modifications to the Upper End Fitting and changing guide thimble material to Stress-Relief Annealed (SRA) ZIRLO were done to mitigate the effects of the increase in fuel assembly growth during irradiation.
Unit 3 Cycle 17) to expand grid testing in or der to minimize or eliminate grid-to-rod fretting. 
LFA in Non-limiting Core Regions SONGS Technical Specification (TS) 4.2.1 Fuel Assemblies, states:
 
The reactor shall contain 217 fuel assemblies. Each assembly shall consist of a matrix of Zircaloy or ZIRLOTM clad fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO2) as fuel material. Integral or Discrete Burnable Absorber Rods may be used. They may include: borosilicate glass -
In addition to the eight AREVA LFAs current ly scheduled for a second cycle of operation in Unit 2 Cycle 17, SCE intends to introduce eight additional fresh AREVA LFAs and eight fresh Westinghouse MSD LFAs in Unit 2 Cycle 17. This will bring the total number of LFAs scheduled to be installed in Unit 2 C ycle 17 to twenty-four.
Na2O-B2O3-SiO2 components, boron carbide - B4C, zirconium boride - ZrB2, gadolinium oxide - Gd2O3, erbium oxide - Er2O3. Limited substitutions of zirconium alloy (such as ZIRLOTM or Zircaloy) or stainless steel filler rods for fuel rods, in accordance with approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limited to those fuel designs that have been analyzed with applicable NRC staff approved codes and methods and shown by tests or analyses to comply with all fuel safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in nonlimiting core regions.
Consistent with the Unit 2 Cycle 16 LFA plan, these 16 new LFAs are expected to reside in the core for up to three cycles of operation. 
Per TS 4.2.1, SCE is will place all 24 LFAs in non-limiting core regions. As specified in Reference 4, non-limiting core regions are core locations where the peak integrated radial power peaking factor is 0.95 or less of the core maximum integrated radial power peaking factor at all times in core life. Therefore, the LFAs will not contain the limiting rod in the core and will have margin relative to the bounding peaking factors used in safety analyses. All LFAs will be explicitly modeled in the SONGS core physics models and their impact will be analyzed in the cycle-specific core physics calculations that support the reload analyses.
 
In Unit 2 Cycle 17 all LFAs will be placed exclusively on the core periphery. For subsequent cycles containing the LFAs, SCE will explicitly model and analyze the LFAs in the reload core physics analyses. In addition to being once or twice burned, the reload core design for these subsequent cycles will determine the physical placements 2 of 3
LFA Mechanical Design Description The eight additional AREVA LFAs to be inst alled in Unit 2 Cycle 17 are mechanically identical to those described in Reference 2 and approved by the NRC in References 3 and 4. In Reference 3, the NRC approved a temporary exemption for the use of AREVA M5 TM cladding for up to 16 AREVA fuel assemblies. SCE will remain compliant with that approval by adding these eight add itional AREVA LFAs. SCE will also maintain compliance with the commitments approved by the NRC in Reference 4 for these eight additional AREVA LFAs.
2 of 3 The Westinghouse SONGS MSD LFAs is an ev olutionary design to the current SONGS 16x16 standard design fuel. The MSD LFAs use ZIRLO cladding material, consistent with the standard SONGS fuel.
The MSD LFA design adds grid-to-rod fretting resistant features to the current SONGS standard design. The component areas that differ from SONGS standard design are the mi d-grids, the top grid, t he guide tubes and the upper end fitting.  
 
The mid-grids were modified to adopt a vertic al I-spring configuration on the outer strap in all perimeter cell locations. In addition, the contact lengths for the interior strap cantilever springs were increased. A stra ight strip Inconel top grid replaced the standard Zircaloy wavy grid to allow long er spring feature relaxation time. The modifications to the Upper End Fitting and changing guide thimble material to Stress-Relief Annealed (SRA) ZIRLO were done to mitigate the effect s of the increase in fuel assembly growth during irradiation.  
 
LFA in Non-limiting Core Regions SONGS Technical Specific ation (TS) 4.2.1 "Fuel Assemblies," states:  
"The reactor shall contain 217 fuel assemblies. Each assembly shall consist of a matrix of Zircaloy or ZIRLO TM clad fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO
: 2) as fuel material. Integral or Discrete Burnable Absorber Rods may be used. They may include: borosilicate glass -
Na 2 O-B 2 O 3-SiO 2 components, boron carbide - B 4C, zirconium boride - ZrB 2 , gadolinium oxide - Gd 2 O 3, erbium oxide - Er 2 O 3. Limited substitutions of zirconium alloy (such as ZIRLO TM or Zircaloy) or stainless steel filler rods for fuel rods, in accordance with approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limit ed to those fuel designs that have been analyzed with applicable NRC staff appr oved codes and methods and shown by tests or analyses to comply with all fuel safety design bases. A limited number of lead test assemblies that have not co mpleted representative testing may be placed in nonlimiting core regions."
Per TS 4.2.1, SCE is will place all 24 LFAs in non-limiting core regions. As specified in Reference 4, non-limiting core regions are core locations where the peak integrated radial power peaking factor is 0.95 or less of the core maximum integrated radial power peaking factor at all times in core life. Ther efore, the LFAs will not contain the limiting rod in the core and will have margin relative to the bounding peaking factors used in safety analyses. All LFAs will be explicitly modeled in the SONGS core physics models and their impact will be analyzed in the cycle-specific core physics calculations that support the reload analyses.  
 
In Unit 2 Cycle 17 all LFAs will be placed exclusively on the core periphery. For subsequent cycles containing the LFAs, SCE will explicitly model and analyze the LFAs in the reload core physics analyses. In addition to being once or twice burned, the reload core design for these subsequent cycles will determine the physical placements 3 of 3 of the LFAs such that the LF As will continue to operate at radial power peaking factors lower than the 0.95 criterion, thereby ensuring that the LFAs remain in non-limiting core regions.
 
Poolside LFA Examinations Consistent with Reference 4, poolside LFA examinations to assess key performance measures will include, as a minimum, 4-face inspections of representative LFAs. Based on results of the inspection, the inspection scope may be expanded. Additional scope inspections could include, but are not limited to, additional vi sual inspections, oxide/crud lift-off measurements, fret ting and diameter measurement s, shoulder gap, assembly length and guide tube wear meas urements. These inspecti ons will be performed prior to re-use of the LFA for an additional cycle of operation.


of the LFAs such that the LFAs will continue to operate at radial power peaking factors lower than the 0.95 criterion, thereby ensuring that the LFAs remain in non-limiting core regions.
Poolside LFA Examinations Consistent with Reference 4, poolside LFA examinations to assess key performance measures will include, as a minimum, 4-face inspections of representative LFAs. Based on results of the inspection, the inspection scope may be expanded. Additional scope inspections could include, but are not limited to, additional visual inspections, oxide/crud lift-off measurements, fretting and diameter measurements, shoulder gap, assembly length and guide tube wear measurements. These inspections will be performed prior to re-use of the LFA for an additional cycle of operation.
References
References
: 1. SCE-9801-P-A, "Reload Analysis Me thodology for the San Onofre Nuclear Generating Station Units 2 and 3", June 1999 (proprietary). 2. Letter from SCE (Short) to NRC dated January 30, 2009, "Request for Temporary Exemption from the Provisions of 10 CFR 50.46 and 10 CFR 50, Appendix K for Lead Fuel Assemblies- [for] San Onofre Nuclear Generating St ation, Units 2 and 3", (ADAMS Accession Number ML090360738). 3. Letter from NRC (Hall) to SCE (Ridenoure) dated December 17, 2009, "SONGS, Units 2 and 3 - Temporary Ex emption from the Requirem ents of 10 CFR Part 50, Section 50.46 and Appendix K for Lead Fuel Assemblies (TAC Nos. ME0602 and ME0603), (ADAMS Accession Number ML090860415).
: 1. SCE-9801-P-A, Reload Analysis Methodology for the San Onofre Nuclear Generating Station Units 2 and 3, June 1999 (proprietary).
: 4. Letter from NRC (Hall) to SCE (Ridenoure) dated December 15, 2009, "SONGS Units 2 and 3 - Issuance of Amendments Re vising Technical Specification 5.7.1.5, "Core Operating Limits Report (COLR)" (TAC Nos. ME0604 and ME0605), (ADAMS Accession Number ML093220105).}}
: 2. Letter from SCE (Short) to NRC dated January 30, 2009, Request for Temporary Exemption from the Provisions of 10 CFR 50.46 and 10 CFR 50, Appendix K for Lead Fuel Assemblies [for] San Onofre Nuclear Generating Station, Units 2 and 3, (ADAMS Accession Number ML090360738).
: 3. Letter from NRC (Hall) to SCE (Ridenoure) dated December 17, 2009, SONGS, Units 2 and 3 - Temporary Exemption from the Requirements of 10 CFR Part 50, Section 50.46 and Appendix K for Lead Fuel Assemblies (TAC Nos. ME0602 and ME0603), (ADAMS Accession Number ML090860415).
: 4. Letter from NRC (Hall) to SCE (Ridenoure) dated December 15, 2009, SONGS Units 2 and 3 - Issuance of Amendments Revising Technical Specification 5.7.1.5, Core Operating Limits Report (COLR) (TAC Nos. ME0604 and ME0605), (ADAMS Accession Number ML093220105).
3 of 3}}

Revision as of 18:06, 12 November 2019

Extension of Lead Fuel Assembly Program for SONGS Unit 2 Cycle 17
ML111791481
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/27/2011
From: St.Onge R
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML111791481 (6)


Text

I ~I SOUTHERN CALIFORNIA Richard J. St. Onge

j EDISON Director Nuclear Regulatory Affairs An EDI SON INTERNATIONAL Comp any June 27, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

San Onofre Nuclear Generating Station, Units 2 and 3 Docket Nos. 50-361 and 50-362 Extension of Lead Fuel Assembly Program for SONGS Unit 2 Cycle 17

Reference:

1. Letter from NRC (Hall) to SCE (Ridenoure) dated December 17, 2009, Units 2 and 3 - Temporary Exemption from the Requirements of 10 CFR Part 50, Section 50.46 and Appendix K for Lead Fuel Assemblies (TAC Nos. ME0602 and ME0603)," (ADAMS Accession Numbe r ML090860415).

Dear Sir or Madam:

This letter is provided as an update of the status and plan for the San Onofre Nuclear Generating Station (SONGS) Lead Fuel Assembly (LFA) program and the Southern California Edison (SCE) plan to introduce additional LFAs in the SONGS Unit 2 Cycle 17 reactor core.

The Referenced letter provided Temporary Exemption from specific requirements of 10 CFR Part 50, Part 50.46 and Appendix K for Lead Fuel Assemblies. The temporary exemption allows up to sixteen LFAs with M5' alloy cladding manufactured by AREVA NP to be inserted into the SONGS Unit 2 reactor core or into the SONGS Unit 3 reactor core. Eight AREVA LFAs were loaded into the Unit 2 core during its Cycle 16 refueling outage. The exemption allows the LFAs to be used for up to three operating cycles.

In addition to the eight Unit 2 AREVA LFAs currently scheduled for their second cycle of operation in Unit 2 Cycle 17, Southern California Edison (SCE) plans to introduce eight additional fresh AREVA LFAs in the Unit 2 Cycle 17 reactor core, consistent with the referenced exemption.

,

, I P.O . Box 128 San Clemente, CA 92674

Document Control Desk June 27, 2011 Additionally, eight fresh Westinghouse Modified Standard Design (MSD) LFAs are planned to be inserted in the Unit 2 Cycle 17 reactor core. The design of the Westinghouse LFAs is in accordance with 10 CFR 50.46 and Appendix K. Therefore, the Westinghouse MSD LFAs do not require an exemption. The additional AREVA and Westinghouse LFAs will bring the total number of LFAs in the Unit 2 Cycle 17 core to twenty-four.

The planned LFA implementation for Unit 2 Cycle 17 continues to meet SONGS 2 and 3 Technical Specifications. The additional sixteen LFAs are expected to reside in the core for up to a total of three cycles of operation (i.e ., through Cycle 19). Enclosure 1 provides details of this plan.

Should you have any questions, or require additional information, please contact Ms. Linda T. Conklin at (949) 368-9443.

Sincerely, : Unit 2 Cycle 17 Lead Fuel Assembly Program cc: E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 .

G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3

ENCLOSURE 1 Unit 2 Cycle 17 Lead Fuel Assembly Program

Introduction This document provides an update of the status of the San Onofre Nuclear Generating Station (SONGS) Lead Fuel Assembly (LFA) program and the Southern California Edison (SCE) plan to introduce additional LFAs in the SONGS Unit 2 Cycle 17 reactor core.

The SONGS Unit 2 or Unit 3 core consists of 217 fuel assemblies. Each fuel assembly consists of 236 fuel rods. The rods are arranged in a square 16 x 16 array (CE16). The fuel rods consist of slightly enriched uranium dioxide cylindrical ceramic pellets, encapsulated within a cylindrical Zircaloy, ZIRLO, or M5TM tube.

Lead Fuel Assembly Program Summary The goal of the LFA program is to provide an alternative fuel design to eliminate grid-to-rod fretting fuel failures. The use of LFAs enables the implementation of a more robust design to eliminate the grid to rod fretting fuel failures seen at SONGS. Eight AREVA LFAs with M5TM cladding were loaded into the SONGS Unit 2 core during its Cycle 16 refueling outage, and eight Westinghouse Modified Standard Design (MSD) LFAs were loaded into the SONGS Unit 3 core during its Cycle 16 refueling outage.

The end of cycle Unit 3 Cycle 15 post irradiation examination fuel inspections performed in November 2010, revealed grid-to-rod fretting failures in not only twice or thrice burned core peripheral fuel assemblies but also in once burned core peripheral assemblies. As such, SCE has decided to increase the number of LFAs in Unit 2 Cycle 17 (and possibly Unit 3 Cycle 17) to expand grid testing in order to minimize or eliminate grid-to-rod fretting.

In addition to the eight AREVA LFAs currently scheduled for a second cycle of operation in Unit 2 Cycle 17, SCE intends to introduce eight additional fresh AREVA LFAs and eight fresh Westinghouse MSD LFAs in Unit 2 Cycle 17. This will bring the total number of LFAs scheduled to be installed in Unit 2 Cycle 17 to twenty-four. Consistent with the Unit 2 Cycle 16 LFA plan, these 16 new LFAs are expected to reside in the core for up to three cycles of operation.

LFA Mechanical Design Description The eight additional AREVA LFAs to be installed in Unit 2 Cycle 17 are mechanically identical to those described in Reference 2 and approved by the NRC in References 3 and 4. In Reference 3, the NRC approved a temporary exemption for the use of AREVA M5TM cladding for up to 16 AREVA fuel assemblies. SCE will remain compliant with that approval by adding these eight additional AREVA LFAs. SCE will also maintain compliance with the commitments approved by the NRC in Reference 4 for these eight additional AREVA LFAs.

1 of 3

The Westinghouse SONGS MSD LFAs is an evolutionary design to the current SONGS 16x16 standard design fuel. The MSD LFAs use ZIRLO cladding material, consistent with the standard SONGS fuel. The MSD LFA design adds grid-to-rod fretting resistant features to the current SONGS standard design. The component areas that differ from SONGS standard design are the mid-grids, the top grid, the guide tubes and the upper end fitting.

The mid-grids were modified to adopt a vertical I-spring configuration on the outer strap in all perimeter cell locations. In addition, the contact lengths for the interior strap cantilever springs were increased. A straight strip Inconel top grid replaced the standard Zircaloy wavy grid to allow longer spring feature relaxation time. The modifications to the Upper End Fitting and changing guide thimble material to Stress-Relief Annealed (SRA) ZIRLO were done to mitigate the effects of the increase in fuel assembly growth during irradiation.

LFA in Non-limiting Core Regions SONGS Technical Specification (TS) 4.2.1 Fuel Assemblies, states:

The reactor shall contain 217 fuel assemblies. Each assembly shall consist of a matrix of Zircaloy or ZIRLOTM clad fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO2) as fuel material. Integral or Discrete Burnable Absorber Rods may be used. They may include: borosilicate glass -

Na2O-B2O3-SiO2 components, boron carbide - B4C, zirconium boride - ZrB2, gadolinium oxide - Gd2O3, erbium oxide - Er2O3. Limited substitutions of zirconium alloy (such as ZIRLOTM or Zircaloy) or stainless steel filler rods for fuel rods, in accordance with approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limited to those fuel designs that have been analyzed with applicable NRC staff approved codes and methods and shown by tests or analyses to comply with all fuel safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in nonlimiting core regions.

Per TS 4.2.1, SCE is will place all 24 LFAs in non-limiting core regions. As specified in Reference 4, non-limiting core regions are core locations where the peak integrated radial power peaking factor is 0.95 or less of the core maximum integrated radial power peaking factor at all times in core life. Therefore, the LFAs will not contain the limiting rod in the core and will have margin relative to the bounding peaking factors used in safety analyses. All LFAs will be explicitly modeled in the SONGS core physics models and their impact will be analyzed in the cycle-specific core physics calculations that support the reload analyses.

In Unit 2 Cycle 17 all LFAs will be placed exclusively on the core periphery. For subsequent cycles containing the LFAs, SCE will explicitly model and analyze the LFAs in the reload core physics analyses. In addition to being once or twice burned, the reload core design for these subsequent cycles will determine the physical placements 2 of 3

of the LFAs such that the LFAs will continue to operate at radial power peaking factors lower than the 0.95 criterion, thereby ensuring that the LFAs remain in non-limiting core regions.

Poolside LFA Examinations Consistent with Reference 4, poolside LFA examinations to assess key performance measures will include, as a minimum, 4-face inspections of representative LFAs. Based on results of the inspection, the inspection scope may be expanded. Additional scope inspections could include, but are not limited to, additional visual inspections, oxide/crud lift-off measurements, fretting and diameter measurements, shoulder gap, assembly length and guide tube wear measurements. These inspections will be performed prior to re-use of the LFA for an additional cycle of operation.

References

1. SCE-9801-P-A, Reload Analysis Methodology for the San Onofre Nuclear Generating Station Units 2 and 3, June 1999 (proprietary).
2. Letter from SCE (Short) to NRC dated January 30, 2009, Request for Temporary Exemption from the Provisions of 10 CFR 50.46 and 10 CFR 50, Appendix K for Lead Fuel Assemblies [for] San Onofre Nuclear Generating Station, Units 2 and 3, (ADAMS Accession Number ML090360738).
3. Letter from NRC (Hall) to SCE (Ridenoure) dated December 17, 2009, SONGS, Units 2 and 3 - Temporary Exemption from the Requirements of 10 CFR Part 50, Section 50.46 and Appendix K for Lead Fuel Assemblies (TAC Nos. ME0602 and ME0603), (ADAMS Accession Number ML090860415).
4. Letter from NRC (Hall) to SCE (Ridenoure) dated December 15, 2009, SONGS Units 2 and 3 - Issuance of Amendments Revising Technical Specification 5.7.1.5, Core Operating Limits Report (COLR) (TAC Nos. ME0604 and ME0605), (ADAMS Accession Number ML093220105).

3 of 3