{{#Wiki_filter:Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | {{#Wiki_filter:Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 SIMULATOR JPM NS-1 REACTOR OPERATOR SRO - I 1 of 11 | ||
- 1 | |||
- 1 | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 Facility: Davis-Besse Task No: 002-017-04-0100 Task Title: Isolate SG 1 due to a SGTR K/A | ||
: Isolate SG 1 due to a SGTR K/A | |||
==Reference:== | ==Reference:== | ||
(035) A4.06 Job Performance Measure No | (035) A4.06 Job Performance Measure No: JPM 197 Examinee: | ||
: | NRC Examiner: Date: | ||
Simulated Performance ___ | Method of testing: | ||
Actual Performance | Simulated Performance ___ Actual Performance _X_ | ||
Classroom ___ Simulator _X_ Plant ___ | |||
Simulator | Read to the examinee: | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. | |||
When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | Initial Conditions: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Task Standard: | Task Standard: | ||
Isolate SG Due To A SGTR Required Materials: | Isolate SG Due To A SGTR Required Materials: | ||
DB-OP-02000, EOP, Rev. 25, Attachment 17 General | DB-OP-02000, EOP, Rev. 25, Attachment 17 General | ||
Line 42: | Line 39: | ||
Initiating Cue: | Initiating Cue: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Time Critical Task: | Time Critical Task: No Validation Time: 14 minutes 2 of 11 | ||
No | |||
14 minutes | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 SIMULATOR INSTRUCTIONS TASK DESCRIPTION: | ||
- 1 | Isolate SG 1 due to a SGTR INITIAL CONDITION: | ||
IC that is near 500°F T-hot ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: | |||
Establish a T-hot of <500°F and an RCS pressure of <1000 psig MALFUNCTIONS/FAILURE TO INSERT: | |||
°F T-hot | Enter a SGTR of about 125 gpm, IMF HH50 0.025 Jumper the MSIV interlock to the TBVs, IMF L3M2B 0 ACTION/CUES: | ||
: 16. CUE: ST 39 and ST 132 have been isolated | |||
-hot of <500 | : 18. ACTION:Open the breaker for MS 106, IRF SFE8A OPEN Open the breaker for MS 107A, IRF SFECA OPEN CUE: Breakers D135 on D1NA for MS106 and BF1188 on F11B for MS 107A are OPEN | ||
°F and an RCS pressure of <1000 psig MALFUNCTIONS/FAILURE TO INSERT | : 20. CUE: (If in-plant personnel are contacted) Report no visible signs of steam leakage from AVV 1 3 of 11 | ||
: | |||
: 18. ACTION: Open the breaker for MS 106, IRF SFE8A OPEN Open the breaker for MS 107A, IRF SFECA OPEN CUE: Breakers D135 on D1NA for MS106 and BF1188 on F11B for MS 107A are OPEN | |||
: 20. CUE: (If in-plant personnel are contacted) Report no visible signs of steam leakage from AVV 1 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 EXAMINER COPY INITIAL CONDITIONS: | |||
A Steam Generator tube rupture of approximately 125 gpm has occurred in Steam Generator 1 A plant shutdown was performed in accordance with DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE. | |||
Hot leg temperature is less than 500°F and RCS pressure is less than 1000 psig Main Feedwater Pump 2 is running INITIATING CUES: | |||
The Unit Supervisor has directed you to isolate Steam Generator 1 using Attachment 17 of DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE. | |||
The Auxiliary Steam System is being supplied by the Auxiliary Boiler. | The Auxiliary Steam System is being supplied by the Auxiliary Boiler. | ||
(Provide a copy of Attachment 17 of DB | (Provide a copy of Attachment 17 of DB-OP-02000 to the examinee) 4 of 11 | ||
-OP-02000 to the examinee) | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 CANDIDATE COPY INITIAL CONDITIONS: | ||
- 1 | A Steam Generator tube rupture of approximately 125 gpm has occurred in Steam Generator 1 A plant shutdown was performed in accordance with DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE. | ||
Hot leg temperature is less than 500°F and RCS pressure is less than 1000 psig Main Feedwater Pump 2 is running INITIATING CUES: | |||
-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE. | The Unit Supervisor has directed you to isolate Steam Generator 1 using Attachment 17 of DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE. | ||
Hot leg temperature is less than 500°F and RCS pressure is less than 1000 psig | |||
: | |||
The Unit Supervisor has directed you to isolate Steam Generator 1 using Attachment 17 of DB | |||
-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE. | |||
The Auxiliary Steam System is being supplied by the Auxiliary Boiler. | The Auxiliary Steam System is being supplied by the Auxiliary Boiler. | ||
5 of 11 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments". | ||
- 1 | START TIME: _______ | ||
START TIME: | |||
: 1. PERFORMANCE STEP: Inform Command SRO that #1 SG will be isolated and Aux Steam will be lost if NOT transferred to the Aux Boiler. | : 1. PERFORMANCE STEP: Inform Command SRO that #1 SG will be isolated and Aux Steam will be lost if NOT transferred to the Aux Boiler. | ||
STANDARD: Inform Command SRO #1 SG being isolated. | STANDARD: Inform Command SRO #1 SG being isolated. | ||
COMMENT: Initiating Cues identified Aux Steam being supplied by Aux Boiler CUE: Command SRO acknowledges that #1 SG is being isolated. | COMMENT: Initiating Cues identified Aux Steam being supplied by Aux Boiler CUE: Command SRO acknowledges that #1 SG is being isolated. | ||
SAT UNSAT | SAT UNSAT 2 PERFORMANCE STEP: Transition SG heat transfer from both SG to #2 SG. | ||
..C. | |||
CUE: None | STANDARD: Open #2 SG TBVs by raising demand on PIC ICS 12A toggle switch and close #1 SG TBVs by reducing demand on PIC ICS 12B toggle switch. | ||
CUE: None SAT UNSAT | |||
STANDARD: Verify the Auto/Hand switch into HAND on PIC ICS11B Reduce the demand to ZERO by turning the demand control fully clockwise Comment: PIC ICS11B will be in manual. | : 3. PERFORMANCE STEP: Place ICS 11B (AVV 1) in manual and close | ||
Critical to close the AVV CUE: None | ........C........ | ||
SAT | STANDARD: Verify the Auto/Hand switch into HAND on PIC ICS11B Reduce the demand to ZERO by turning the demand control fully clockwise Comment: PIC ICS11B will be in manual. Critical to close the AVV CUE: None | ||
__________ | |||
SAT UNSAT | |||
: 4. PERFORMANCE STEP: Open MS 107, SG 2 Main Steam supply to AFPT 2 | : 4. PERFORMANCE STEP: Open MS 107, SG 2 Main Steam supply to AFPT 2 | ||
........C........ | |||
STANDARD: Depress the OPEN pushbutton for MS 107 on HIS 107A CUE: None | STANDARD: Depress the OPEN pushbutton for MS 107 on HIS 107A CUE: None | ||
SAT | __________ | ||
SAT UNSAT 6 of 11 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 | ||
- 1 | : 5. PERFORMANCE STEP: Defeat the MSIV interlock to the TBVs | ||
........C........ | |||
STANDARD: Direct the removal of Fuse 14 of ICS Cabinet 1 in C5761 CUE: A second RO has defeated the MSIV interlock to the TBVs by removing Fuse 14 in ICS cabinet 1 of C5761. | STANDARD: Direct the removal of Fuse 14 of ICS Cabinet 1 in C5761 CUE: A second RO has defeated the MSIV interlock to the TBVs by removing Fuse 14 in ICS cabinet 1 of C5761. | ||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 6. PERFORMANCE STEP: Close FW 612, Feedwater line 1 Stop valve | : 6. PERFORMANCE STEP: Close FW 612, Feedwater line 1 Stop valve | ||
........C........ | |||
STANDARD: Depress the close pushbutton for FW 612 on HIS 612 CUE: None | STANDARD: Depress the close pushbutton for FW 612 on HIS 612 CUE: None | ||
SAT | __________ | ||
SAT UNSAT | |||
: 7. PERFORMANCE STEP: Close MS 101, MSIV 1 | : 7. PERFORMANCE STEP: Close MS 101, MSIV 1 | ||
........C........ | |||
STANDARD: Depress the close pushbutton for MS 101 on HIS 101 CUE: None | STANDARD: Depress the close pushbutton for MS 101 on HIS 101 CUE: None | ||
SAT | __________ | ||
: 8. PERFORMANCE STEP: Verify Closed MS 101 | SAT UNSAT | ||
-1, MSIV 1 Bypass valve STANDARD: Verify the Green light is LIT on HIS 101 | : 8. PERFORMANCE STEP: Verify Closed MS 101-1, MSIV 1 Bypass valve STANDARD: Verify the Green light is LIT on HIS 101-1 for MS 101-1 CUE: None | ||
-1 for MS 101 | __________ | ||
-1 | SAT UNSAT | ||
SAT | : 9. PERFORMANCE STEP: Verify Closed MS 394, Main Steam line 1 Warm-up Drain | ||
: 9. PERFORMANCE STEP: Verify Closed MS 394, Main Steam line 1 Warm | ........C........ valve STANDARD: Depress the close pushbutton for MS 394 on HIS 394 CUE: None | ||
-up Drain | __________ | ||
valve | SAT UNSAT 7 of 11 | ||
SAT | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 | ||
- 1 | : 10. PERFORMANCE STEP: Close MS 106, Main Steam line 1 to AFPT 1 STANDARD: Verify the Green light is LIT on HIS 106A for MS 106 CUE: None | ||
__________ | |||
STANDARD: Verify the Green light is LIT on HIS 106A for MS 106 CUE: None | SAT UNSAT | ||
SAT | |||
: 11. PERFORMANCE STEP: Close MS 107A, Main Steam line 1 to AFPT 2 | : 11. PERFORMANCE STEP: Close MS 107A, Main Steam line 1 to AFPT 2 | ||
........C........ | |||
STANDARD: Depress the CLOSE pushbutton on HIS 107E for MS 107A CUE: None | STANDARD: Depress the CLOSE pushbutton on HIS 107E for MS 107A CUE: None | ||
SAT | __________ | ||
SAT UNSAT | |||
: 12. PERFORMANCE STEP: Close AF 608, SG 1 AFW CTMT Isolation valve | : 12. PERFORMANCE STEP: Close AF 608, SG 1 AFW CTMT Isolation valve | ||
........C........ | |||
STANDARD: Place control power on AF 608 by depressing the ON pushbutton on HIS 608E Depress the CLOSE pushbutton on HIS 608A CUE: (If asked) The Unit Supervisor has made an entry in the Locked Valve Log for AF 608 and directs you to continue (If asked) The Shift Manager is reviewing Tech Specs for closing AF 608 | |||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 13. PERFORMANCE STEP: Align Auxiliary Feedwater, if running, to feed #2 SG STANDARD: Verify AFWP speed is zero CUE: None | : 13. PERFORMANCE STEP: Align Auxiliary Feedwater, if running, to feed #2 SG STANDARD: Verify AFWP speed is zero CUE: None SAT UNSAT | ||
: 14. PERFORMANCE STEP: Maintain ability to steam #2 SG to the condenser STANDARD: Verify #1 SG level is less than 220 and/or alarms 12-2-C and 12-2-D are not LIT. | |||
CUE: None SAT UNSAT 8 of 11 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 | |||
: 15. PERFORMANCE STEP: Maintain ability to steam #2 SG to the condenser STANDARD: Verify the Red light is LIT on HIS 100 CUE: None SAT UNSAT | |||
- 1 | : 16. PERFORMANCE STEP: Direct an EO to isolate steam traps in the AFPT 1 steam supply lines STANDARD: Direct an Equipment Operator to isolate ST 39 and ST 132 CUE: None | ||
__________ | |||
STANDARD: Verify the Red light is LIT on HIS 100 CUE: None | SAT UNSAT | ||
SAT | : 17. PERFORMANCE STEP: Remove control power from AF 608, SG 1 AFW CTMT Isolation valve STANDARD: Depress OFF on HIS 608E for AF 608, Blue light will light CUE: None SAT UNSAT | ||
: 17. PERFORMANCE STEP: Remove control power from AF 608, SG 1 AFW CTMT Isolation valve | : 18. PERFORMANCE STEP: Direct an EO to open the breakers for the steam supply to the | ||
........C........ AFPTs from SG 1 STANDARD: Direct an Equipment Operator to open D135 on D1NA for MS 106 and BF1188 on F11B for MS 107A CUE: None | |||
AFPTs from SG 1 STANDARD: Direct an Equipment Operator to open D135 on D1NA for MS 106 and BF1188 on F11B for MS 107A CUE: None | __________ | ||
SAT | SAT UNSAT | ||
: 19. PERFORMANCE STEP: Determine if Main Steam line 1 Warm | : 19. PERFORMANCE STEP: Determine if Main Steam line 1 Warm-up Drain valve is suspected of leaking by STANDARD: Ask the Unit Supervisor if MS 394 is suspected of leaking by CUE: (If asked) Unit Supervisor reports that MS 394 does not have a history of leaking by | ||
-up Drain valve is suspected of leaking by STANDARD: Ask the Unit Supervisor if MS 394 is suspected of leaking by CUE: (If asked) Unit Supervisor reports that MS 394 does not have a history of leaking by | |||
__________ | __________ | ||
SAT UNSAT | SAT UNSAT 9 of 11 | ||
STANDARD: Ask the Unit Supervisor if ICS11B is suspected of leaking by (Security may also be contacted) | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 | ||
CUE: (If asked) | : 20. PERFORMANCE STEP: Determine if AVV 1 is suspected of leaking by STANDARD: Ask the Unit Supervisor if ICS11B is suspected of leaking by (Security may also be contacted) | ||
Unit Supervisor reports that ICS11B does not have a history of leaking by (If in-plant personnel are contacted) Report no visible signs of steam leakage | CUE: (If asked) Unit Supervisor reports that ICS11B does not have a history of leaking by (If in-plant personnel are contacted) Report no visible signs of steam leakage | ||
__________ | __________ | ||
SAT | SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee) | ||
__________ | __________ | ||
END TIME | END TIME 10 of 11 | ||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 Verification of Completion Job Performance Measure No. | |||
Examinees Name: | |||
Examiners Name: | |||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: | ||
Time to Complete: | Time to Complete: | ||
Question Documentation: | Question Documentation: | ||
Question:_____________________________________________________________ | Question:_____________________________________________________________ | ||
____________________________________________________________________________ | ____________________________________________________________________________ | ||
________________________________________________________________ | |||
Response:_____________________________________________________________ | |||
______________________________________________________________________ | |||
______________________________________________________________________ | ______________________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________ | |||
11 of 11 | |||
Result: | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 SIMULATOR JPM NS-2 REACTOR OPERATOR SRO - I 1 of 15 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 Facility: Davis-Besse Task No: 001-033-01-0100 Task Title: Perform Control Rod Exercise K/A | ||
- 2 | |||
Perform Control Rod | |||
==Reference:== | ==Reference:== | ||
(001) A2.03 Job Performance Measure No | (001) A2.03 Job Performance Measure No: NEW Examinee: | ||
: | NRC Examiner: Date: | ||
Simulated Performance ___ | Method of testing: | ||
Actual Performance | Simulated Performance ___ Actual Performance _X_ | ||
Classroom ___ Simulator _X_ Plant ___ | |||
Simulator | Read to the examinee: | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. | |||
When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure | |||
will be satisfied. | |||
Initial Conditions: | Initial Conditions: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Line 215: | Line 189: | ||
Initiating Cue: | Initiating Cue: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Time Critical | Time Critical Task: No Validation Time: 30 minutes 2 of 15 | ||
30 minutes Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | |||
- 2 | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 SIMULATOR INSTRUCTIONS TASK DESCRIPTION: | ||
Perform Control Rod Exercising INITIAL CONDITION: | |||
Mode 1 (RX Pwr <95%) | |||
<95%) | ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: | ||
Place R 790 on 30 second point trend on PPC. | |||
MALFUNCTIONS/FAILURE TO INSERT | MALFUNCTIONS/FAILURE TO INSERT: | ||
Control Rod 1-2 stuck, TFLISR42/T ACTION/CUES: | |||
-2 stuck, TFLISR42/T ACTION/CUES | : 15. CUE: All Group 1 transfer switches have rotated a diamond configuration. | ||
: | |||
: 21. CUE: 100% zone reference lamps are on for all Group 1 rods. | : 21. CUE: 100% zone reference lamps are on for all Group 1 rods. | ||
3 of 15 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 EXAMINER COPY INITIAL CONDITIONS: | ||
- 2 | MODE 1 approximately 95% Rx Power Reactor power has been reduced for turbine control valve testing. | ||
INITIATING CUES | INITIATING CUES: | ||
The Shift Manager has directed you to perform control rod exercising per DB-SC-03272, Control Rod Exercising Test. | |||
-SC-03272, Control Rod Exercising Test. | |||
All Perquisites are complete. | All Perquisites are complete. | ||
An Equipment Operator is standing by at the CRD cabinets, with a key, to verify the transfer switches operate properly. | |||
(Hand Candidate copy of DB-SC-03272) 4 of 15 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 CANDIDATE COPY INITIAL CONDITIONS: | |||
MODE 1 approximately 95% Rx Power | |||
. | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Reactor power has been reduced for turbine control valve testing. | ||
- 2 | INITIATING CUES: | ||
The Shift Manager has directed you to perform control rod exercising per DB-SC-03272, Control Rod Exercising Test. | |||
INITIATING CUES | |||
-SC-03272, Control Rod Exercising Test. | |||
All Perquisites are complete. | All Perquisites are complete. | ||
An Equipment Operator is standing by at the CRD cabinets, with a key, to verify the transfer switches operate properly. | An Equipment Operator is standing by at the CRD cabinets, with a key, to verify the transfer switches operate properly. | ||
5 of 15 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments". | ||
- 2 | START TIME: _______ | ||
START TIME: | : 1. PERFORMANCE STEP: Hand DB-SC-03272 to examinee. | ||
: 1. PERFORMANCE STEP: | STANDARD: Review prerequisites in DB-SC-03272, Control Rod Exercising Test, reviewed. | ||
-SC-03272 to examinee. | CUE: (If asked) Load Dispatcher has been notified; Section 4.5 will NOT be performed. | ||
STANDARD: Review prerequisites in DB | |||
-SC-03272, Control Rod Exercising Test, reviewed. CUE: (If asked) | |||
Load Dispatcher has been notified; Section 4.5 will NOT be performed. | |||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 2. PERFORMANCE STEP: Set the GROUP METER S/R switch on Rod Control Panel HC NI44 to "S" | : 2. PERFORMANCE STEP: Set the GROUP METER S/R switch on Rod Control Panel HC NI44 to "S" STANDARD: Place HC NI44 to "S" CUE: None. | ||
SAT | __________ | ||
: 3. PERFORMANCE STEP: | SAT UNSAT | ||
: 3. PERFORMANCE STEP: Record position of Group 1. | |||
STANDARD: | STANDARD: Group 1 position is recorded in procedure. Individual Grp 1 positions on Attachment 1. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
: 4. PERFORMANCE STEP: | SAT UNSAT | ||
Transfer Group 1 to Auxiliary Power Supply. | : 4. PERFORMANCE STEP: Transfer Group 1 to Auxiliary Power Supply. | ||
STANDARD: | STANDARD: Refer to DB-OP-06402, CRD Operating Procedure, Section 4.1. | ||
-OP-06402, CRD Operating Procedure, Section 4.1. | |||
COMMENT: Sequence is required for all subsequent steps. | COMMENT: Sequence is required for all subsequent steps. | ||
CUE: All prerequisites have been completed. | CUE: All prerequisites have been completed. | ||
__________ | __________ | ||
SAT | SAT UNSAT 6 of 15 | ||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 | |||
: 5. PERFORMANCE STEP: Hand DB-OP-06402 to examinee. | |||
STANDARD: Examinee should find section 4.1. Expected to review then perform prerequisites. | STANDARD: Examinee should find section 4.1. Expected to review then perform prerequisites. | ||
CUE: NONE | CUE: NONE | ||
SAT | __________ | ||
SAT UNSAT | |||
: 6. PERFORMANCE STEP: Verify Rod Control Panel XFR RESET light is ON. | : 6. PERFORMANCE STEP: Verify Rod Control Panel XFR RESET light is ON. | ||
STANDARD: Verify RESET light is GREEN CUE: None | STANDARD: Verify RESET light is GREEN CUE: None | ||
SAT | __________ | ||
: 7. PERFORMANCE STEP: | SAT UNSAT | ||
Place rod control panel in MANUAL. | : 7. PERFORMANCE STEP: Place rod control panel in MANUAL. | ||
.........C........ | |||
STANDARD: | STANDARD: MANUAL button pressed and released on rod control panel. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
: 8. PERFORMANCE STEP: | SAT UNSAT | ||
Place Reactor Demand hand/auto station in HAND. | : 8. PERFORMANCE STEP: Place Reactor Demand hand/auto station in HAND. | ||
.........C........ | |||
STANDARD: | STANDARD: HAND button pressed and released on Reactor Demand hand/auto station. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
: 9. PERFORMANCE STEP: | SAT UNSAT | ||
Verify Rod Control Panel in SEQ BYPASS | : 9. PERFORMANCE STEP: Verify Rod Control Panel in SEQ BYPASS | ||
........C........ | |||
STANDARD: | STANDARD: Press and release SEQ. BYPASS switch. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
: 10. PERFORMANCE STEP: | SAT UNSAT | ||
Verify Rod Control Panel in GROUP. | : 10. PERFORMANCE STEP: Verify Rod Control Panel in GROUP. | ||
........C........ | |||
STANDARD: | STANDARD: Verify GREEN Light for GROUP CUE: None. __________ | ||
SAT | SAT UNSAT 7 of 15 | ||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 | ||
- 2 | : 11. PERFORMANCE STEP: Turn GROUP SELECT switch to group to be transferred. | ||
Turn GROUP SELECT switch to group to be transferred. | ........C........ and record group selected STANDARD: Group Select switch turned to indicate "1" CUE: None. | ||
__________ | |||
and record group selected STANDARD: | SAT UNSAT | ||
SAT | : 12. PERFORMANCE STEP: Select all rods in Group 1 using the SINGLE SELECT | ||
: 12. PERFORMANCE STEP: | ........C........ switch. | ||
Select all rods in Group 1 using the SINGLE SELECT | STANDARD: SINGLE SELECT switch rotated to ALL. | ||
CUE: None. | |||
switch. STANDARD: | __________ | ||
CUE: None. | SAT UNSAT | ||
SAT | : 13. PERFORMANCE STEP: Check PI Panel CONTROL ON lights for the selected group "ON" STANDARD: Check Group 1 CONTROL ON lamps are LIT. | ||
: 13. PERFORMANCE STEP: Check PI Panel CONTROL ON lights for the selected group "ON" | CUE: None. | ||
CUE: None. | __________ | ||
SAT | SAT UNSAT | ||
: 14. PERFORMANCE STEP: | : 14. PERFORMANCE STEP: Press and release AUX. | ||
Press and release AUX. | ........C........ | ||
STANDARD: Press and release AUX. switch. Observe amber indication CUE: None. | |||
STANDARD: | __________ | ||
SAT | SAT UNSAT | ||
: 15. PERFORMANCE STEP: | : 15. PERFORMANCE STEP: Check PI Panel CONTROL ON lights for the selected group "OFF" STANDARD: Check Group 1 ON CONTROL lamps NOT LIT. | ||
Check PI Panel CONTROL ON lights for the selected group "OFF" | CUE: None. | ||
CUE: None. | __________ | ||
: 16. PERFORMANCE STEP: | SAT UNSAT | ||
Check Rod Control Panel XFER RESET light is off. | : 16. PERFORMANCE STEP: Check Rod Control Panel XFER RESET light is off. | ||
STANDARD: Check XFER RESET lamp is NOT LIT. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT 8 of 15 | |||
STANDARD: | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 | ||
CUE: None. __________ | : 17. PERFORMANCE STEP: Press and Release JOG SPEED. | ||
SAT | ........C........ | ||
STANDARD: Press and release JOG switch. Observe AMBER light lights CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 18. PERFORMANCE STEP: Check SUPPLY PHASE lights are ON. | |||
STANDARD: Check SUPPLY PHASE lights are on. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 19. PERFORMANCE STEP: Lineup phases of normal and auxiliary power supplies. | |||
........C........ | |||
STANDARD: Move INSERT/WITHDRAW switch in the INSERT direction; Until SUPPLY PHASES lights are lined up. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 20. PERFORMANCE STEP: Verify SYNC CONFIRM is ON. | |||
STANDARD: Verify SYNC CONFIRM is LIT. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 21. PERFORMANCE STEP: Press and release CLAMP. | |||
........C........ | |||
STANDARD: Press and release CLAMP switch. Observe half white half red indication. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 22. PERFORMANCE STEP: Press and release the MANUAL XFR. | |||
........C........ | |||
STANDARD: Press and release MANUAL XFR switch. | |||
CUE: None. __________ | |||
SAT UNSAT 9 of 15 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 | ||
- 2 | : 23. PERFORMANCE STEP: Check PI panel CONTROL-ON for the transferred rod(s). | ||
Press and | STANDARD: Check Group 1 CONTROL-ON lights are LIT. | ||
CUE: None. | |||
SAT | __________ | ||
: | SAT UNSAT | ||
: 24. PERFORMANCE STEP: Verify transfer switches operated properly. | |||
STANDARD: | STANDARD: Direct Equipment Operator to verify Group 1 transfer switches have rotated completely to the aux. position. | ||
CUE: None. | CUE: 4 rods are diamonds. | ||
: | __________ | ||
SAT UNSAT | |||
: 25. PERFORMANCE STEP: Press and release CLAMP REL. | |||
STANDARD: | ........C........ | ||
CUE: None. | STANDARD: Press and release CLAMP REL switch. Observe GREEN light lit CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 26. PERFORMANCE STEP: Press and release RUN SPEED. | |||
STANDARD: Press and release RUN SPEED switch. Observe GREEN Light lit CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 27. PERFORMANCE STEP: Press and release GROUP. | |||
STANDARD: Press and release GROUP switch. Observe the GREEN light lit CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 28. PERFORMANCE STEP: Insert Group 1 approximately 3%. | |||
........C........ | |||
STANDARD: INSERT/WITHDRAW switch placed in INSERT until Group 1 rods inserted 3% (+/- 1%). | |||
CUE: None. | |||
__________ | |||
SAT UNSAT 10 of 15 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 | |||
: 29. PERFORMANCE STEP: Identify and report failure of Rod 1-2 to move. | |||
........C........ | |||
: | STANDARD: Verbal report of rod failure to move to SM/CTRM SRO. | ||
CUE: (When notified) The Shift Manager is investigating. He directs you to return Group 1 to 100% withdrawn. | |||
__________ | |||
STANDARD: | SAT UNSAT | ||
CUE: | : 30. PERFORMANCE STEP: Return Group 1 to the previous position (100%). | ||
SAT | ........C........ | ||
: | STANDARD: INSERT/WITHDRAW switch placed in WITHDRAW until Group 1 rods are at 100% rod index. | ||
CUE: None. | |||
__________ | |||
STANDARD: | SAT UNSAT | ||
: 31. PERFORMANCE STEP: Transfer Group 1 back to the normal power supply. | |||
STANDARD: Refer to DB-OP-06402, CRD Operating Procedure, Section 4.2. | |||
CUE: None. | |||
CUE: None. | |||
SAT | |||
: | |||
CUE: | |||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: | : 32. PERFORMANCE STEP: Verify Rod Control Panel in MANUAL. | ||
STANDARD: Check MANUAL button LIT on rod control panel. | |||
CUE: None. | |||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 33. PERFORMANCE STEP: Verify Reactor Demand hand/auto station in HAND. | |||
: 33. PERFORMANCE STEP: | |||
Verify Reactor Demand hand/auto station in HAND. | |||
STANDARD: Check Reactor Demand hand/auto station white and red lights LIT. | STANDARD: Check Reactor Demand hand/auto station white and red lights LIT. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
: 34. PERFORMANCE STEP: | SAT UNSAT | ||
Verify Rod Control System in SEQ. BYPASS. | : 34. PERFORMANCE STEP: Verify Rod Control System in SEQ. BYPASS. | ||
STANDARD: Check SEQ. BYPASS switch LIT. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT 11 of 15 | |||
STANDARD: | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 | ||
CUE: None. __________ | : 35. PERFORMANCE STEP: Check Group 1 selected on the GROUP SELECT switch. | ||
SAT | STANDARD: Check GROUP SELECT switch selected to Group 1. | ||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 36. PERFORMANCE STEP: Check SINGLE SELECT switch in ALL. | |||
STANDARD: SINGLE SELECT switch selected to ALL. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 37. PERFORMANCE STEP: Press and release AUX. | |||
........C........ | |||
STANDARD: Press and release AUX. switch. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 38. PERFORMANCE STEP: Press and release JOG SPEED. | |||
........C........ | |||
STANDARD: Press and release JOG SPEED switch. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 39. PERFORMANCE STEP: Check SUPPLY PHASE lights are ON. | |||
STANDARD: Check SUPPLY PHASE lights are on. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 40. PERFORMANCE STEP: Lineup phases of normal and auxiliary power supplies. | |||
........C........ | |||
STANDARD: Move INSERT/WITHDRAW switch; SYNC confirm lamp on. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT 12 of 15 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 | ||
- 2 | : 41. PERFORMANCE STEP: Verify SYNC CONFIRM is ON. | ||
Check Group 1 | STANDARD: Verify SYNC CONFIRM is LIT. | ||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 42. PERFORMANCE STEP: Press and release CLAMP. | |||
........C........ | |||
STANDARD: Press and release CLAMP switch. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 43. PERFORMANCE STEP: Press and release MANUAL XFR | |||
........C........ | |||
STANDARD: Press and release MANUAL XFR switch. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 44. PERFORMANCE STEP: Check Group 1 CONTROL ON lamps OFF. | |||
STANDARD: Check Group 1 CONTROL ON lamps NOT LIT. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 45. PERFORMANCE STEP: Press and release CLAMP REL. | |||
........C........ | |||
STANDARD: Press and release CLAMP REL switch. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 46. PERFORMANCE STEP: Press and release RUN SPEED. | |||
STANDARD: Press and release RUN switch. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT 13 of 15 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 | |||
: 47. PERFORMANCE STEP: Press and release GROUP. | |||
........C........ | |||
STANDARD: GROUP switch pressed and released. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 48. PERFORMANCE STEP: Press and release XFR RESET. | |||
........C........ | |||
STANDARD: XFR RESET switch pressed and released. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 49. PERFORMANCE STEP: Check Group 1 CONTROL ON lamps ON. | |||
STANDARD: Check Group 1 CONTROL ON lamps LIT. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT TERMINATING CUES for Reactor Operators: This JPM is complete. | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | |||
- 2 | |||
Press and release GROUP. | |||
STANDARD: | |||
CUE: None. | |||
SAT | |||
: 48. PERFORMANCE STEP: | |||
Press and release XFR RESET. | |||
STANDARD: | |||
CUE: None. | |||
SAT | |||
: 49. PERFORMANCE STEP: | |||
Check Group 1 CONTROL ON lamps ON. | |||
STANDARD: | |||
CUE: None. | |||
SAT | |||
(Terminated by the EVALUATOR.) | (Terminated by the EVALUATOR.) | ||
__________ | __________ | ||
END TIME | END TIME | ||
SRO QUESTION | : 50. PERFORMANCE STEP: SRO QUESTION: I&C has determine the Safety Rod 1-2 is stuck. | ||
: | ........C........ Determine if any Tech Spec apply for the stuck Safety Rod. | ||
Determine if any Tech Spec apply for the stuck Safety Rod. | STANDARD: Apply TS 3.1.4, Condition D: D.1.1 Verify SDM within 1 hour OR D.1.2 Initiate boration to establish SDM within 1 hour, AND D.2 be in Mode 3 within 6 hrs CUE: None. | ||
STANDARD: Apply TS 3.1.4, Condition D: D.1.1 Verify SDM within 1 hour OR D.1.2 Initiate boration to establish SDM within 1 hour, AND D.2 be in Mode 3 within 6 hrs CUE: | SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the EVALUATOR.) | ||
TERMINATING CUES: This JPM is complete. | |||
__________ | __________ | ||
END TIME | END TIME 14 of 15 | ||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 Verification of Completion Job Performance Measure No. | |||
Examinees Name: | |||
Examiners Name: | |||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: | ||
Time to Complete: | Time to Complete: | ||
Question Documentation: | Question Documentation: | ||
Question:_____________________________________________________________ | Question:_____________________________________________________________ | ||
____________________________________________________________________________ | |||
________________________________________________________________ | ________________________________________________________________ | ||
Response:_____________________________________________________________ | Response:_____________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
______________________________________________________________________ | |||
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________ | |||
15 of 15 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 SIMULATOR JPM NS-3 REACTOR OPERATOR 1 of 13 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 Facility: Davis-Besse Task No: 012-001-01-0100 Task Title: Energize RPS Channel 2 K/A | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | |||
- 3 | |||
: Energize RPS Channel 2 K/A | |||
==Reference:== | ==Reference:== | ||
(012) A4.04 Job Performance Measure No | (012) A4.04 Job Performance Measure No: JPM 121 Examinee: | ||
: | NRC Examiner: Date: | ||
Date: | Method of testing: | ||
Simulated Performance ___ | Simulated Performance ___ Actual Performance _X_ | ||
Actual Performance | Classroom ___ Simulator _X_ Plant ___ | ||
Read to the examinee: | |||
Simulator | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. | ||
When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | Initial Conditions: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Task Standard: | Task Standard: | ||
Energize RPS Channel 2 Required Materials: | |||
DB-OP-06403, RPS and NI Operating Procedure, Rev 17, Section 3.4 General | DB-OP-06403, RPS and NI Operating Procedure, Rev 17, Section 3.4 General | ||
Line 599: | Line 543: | ||
Initiating Cue: | Initiating Cue: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Time Critical | Time Critical Task: No Validation Time: 41 minutes 2 of 13 | ||
41 minutes | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 SIMULATOR INSTRUCTIONS TASK DESCRIPTION: | ||
- 3 | Energize RPS Channel 2 INITIAL CONDITION: | ||
Mode 1 ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: | |||
Deenergize RPS Ch. 2 in accordance with Section 3.4 of DB-OP-06403. | |||
: | To open Y206 use IRF E6P4D OPEN. | ||
Deenergize RPS Ch. 2 in accordance with Section 3.4 of DB-OP-06403. To open Y206 use IRF E6P4D OPEN | MALFUNCTIONS/FAILURE TO INSERT: | ||
Fail Reactor trip bistable to reset until BYPASS KEY is rotated by performing the following: | |||
* In the Expert window enter IOR A55FA3A4S1-1 ACTION/CUES: | |||
In the Expert window enter IOR | : 4. ACTION: Close Y206 on Y2. (IRF E6P4D CLOSE) | ||
: | CUE: Y206 on Y2 has been closed. | ||
(IRF E6P4D CLOSE) | 3 of 13 | ||
CUE: | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 EXAMINER COPY INITIAL CONDITIONS The plant is in Mode 1. | ||
- 3 | RPS Channel 2 has been deenergized in accordance with section 3.4 of DB-OP-06403, RPS and NI Operating Procedure. | ||
RPS Channel 2 has been deenergized in accordance with section 3.4 of DB | INITIATING CUES: | ||
-OP-06403, RPS and NI Operating Procedure. | The Unit Supervisor has directed you to re-energize RPS Channel 2 using section 3.1 of DB-OP-06403, RPS and NI Operating Procedure. | ||
INITIATING CUES | (Hand Candidate a copy of DB-OP-06403, Section 3.1) 4 of 13 | ||
-energize RPS Channel 2 using section 3.1 of DB-OP-06403, RPS and NI Operating Procedure. | |||
(Hand Candidate a copy of DB | |||
-OP- | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 CANDIDATE COPY INITIAL CONDITIONS The plant is in Mode 1. | ||
- 3 | RPS Channel 2 has been deenergized in accordance with section 3.4 of DB-OP-06403, RPS and NI Operating Procedure. | ||
RPS Channel 2 has been deenergized in accordance with section 3.4 of DB | INITIATING CUES: | ||
-OP-06403, RPS and NI Operating Procedure. | The Unit Supervisor has directed you to re-energize RPS Channel 2 using section 3.1 of DB-OP-06403, RPS and NI Operating Procedure. | ||
INITIATING CUES | 5 of 13 | ||
-energize RPS Channel 2 using section 3.1 of DB-OP-06403, RPS and NI Operating Procedure. | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments". | ||
- 3 | START TIME: _______ | ||
START TIME: | |||
: 1. PERFORMANCE STEP: Locate the correct procedure section. | : 1. PERFORMANCE STEP: Locate the correct procedure section. | ||
STANDARD: Identifies section 3.1 as the correct procedure section. | STANDARD: Identifies section 3.1 as the correct procedure section. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 2. PERFORMANCE STEP: Verify RCS pressure is greater than 1950 psig. | : 2. PERFORMANCE STEP: Verify RCS pressure is greater than 1950 psig. | ||
STANDARD: Verify RCS pressure is 2155 psig. CUE: None. | STANDARD: Verify RCS pressure is 2155 psig. | ||
SAT | CUE: None. | ||
__________ | |||
SAT UNSAT | |||
: 3. PERFORMANCE STEP: Verify Y2 is energized. | : 3. PERFORMANCE STEP: Verify Y2 is energized. | ||
STANDARD: Verifies Y2 is energized. | STANDARD: Verifies Y2 is energized. | ||
CUE: None. | |||
CUE: None. | __________ | ||
SAT | SAT UNSAT | ||
: 4. PERFORMANCE STEP: Close the 120 VAC essential power supply breaker. | : 4. PERFORMANCE STEP: Close the 120 VAC essential power supply breaker. | ||
........C........ | |||
STANDARD: Contacts EO to close Y206 on Distribution Panel Y2. | STANDARD: Contacts EO to close Y206 on Distribution Panel Y2. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 5. PERFORMANCE STEP: Verify system AC power available. | : 5. PERFORMANCE STEP: Verify system AC power available. | ||
STANDARD: Verify lamp on the Power Distribution Panel (loc 2 | STANDARD: Verify lamp on the Power Distribution Panel (loc 2-0) is ON. | ||
-0) is ON. CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT 6 of 13 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 | ||
- 3 | : 6. PERFORMANCE STEP: Close the SYSTEM AC POWER breaker and verify the | ||
SYSTEM AC POWER ON lamp is ON. | ........C........ SYSTEM AC POWER ON lamp is ON. | ||
STANDARD: Close the AC SYSTEM POWER breaker (loc 2 | STANDARD: Close the AC SYSTEM POWER breaker (loc 2-0) and verify lamp is ON. | ||
-0) and verify lamp is ON. | CUE: None. | ||
CUE: None. | __________ | ||
SAT | SAT UNSAT | ||
: 7. PERFORMANCE STEP: Verify SYSTEM FANS ON. | : 7. PERFORMANCE STEP: Verify SYSTEM FANS ON. | ||
STANDARD: Verify SYSTEMS FANS LEFT and SYSTEMS FANS RIGHT switches in the ON position. | STANDARD: Verify SYSTEMS FANS LEFT and SYSTEMS FANS RIGHT switches in the ON position. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 8. PERFORMANCE STEP: Verify SYSTEM FANS lamps are ON. | : 8. PERFORMANCE STEP: Verify SYSTEM FANS lamps are ON. | ||
STANDARD: Verify SYSTEM FANS RIGHT and LEFT lamps are ON. | STANDARD: Verify SYSTEM FANS RIGHT and LEFT lamps are ON. | ||
CUE: None. | |||
CUE: None. | __________ | ||
SAT | SAT UNSAT | ||
: 9. PERFORMANCE STEP: Close the breakers for +15V and | : 9. PERFORMANCE STEP: Close the breakers for +15V and -15V DC power | ||
-15V DC power | ........C....... supplies. | ||
supplies. STANDARD: Close the +15V (loc 1 | STANDARD: Close the +15V (loc 1-1) and -15V (loc 2-1) breakers simultaneously. | ||
-1) and -15V (loc 2 | CUE: None. | ||
-1) breakers simultaneously. | __________ | ||
CUE: | SAT UNSAT | ||
SAT | |||
: 10. PERFORMANCE STEP: Energize the DC power system. | : 10. PERFORMANCE STEP: Energize the DC power system. | ||
........C........ | |||
STANDARD: Close the system DC power breaker. | STANDARD: Close the system DC power breaker. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 11. PERFORMANCE STEP: Verify Fan failure lights are DIM. | : 11. PERFORMANCE STEP: Verify Fan failure lights are DIM. | ||
STANDARD: Verify left and right fan failure lights are DIM. | STANDARD: Verify left and right fan failure lights are DIM. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT 7 of 13 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 | ||
- 3 | : 12. PERFORMANCE STEP: Check AC power lamps for the +15V and -15V power supply module. | ||
-15V power supply module. STANDARD: Verify +15V and | STANDARD: Verify +15V and -15V AC power amps on the power supply modules (loc 1-1, 2-1) are ON. | ||
-15V AC power amps on the power supply modules (loc 1 | |||
-1, 2-1) are ON. | |||
CUE: Fifteen minutes time has elapsed. | CUE: Fifteen minutes time has elapsed. | ||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 13. PERFORMANCE STEP: Check +15V and | : 13. PERFORMANCE STEP: Check +15V and -15V power supply modules. | ||
-15V power supply modules. | STANDARD: Check +15V and -15V DC power supply readings are 14.5 to 15.5 VDC. | ||
CUE: None. | |||
STANDARD: Check +15V and | __________ | ||
-15V DC power supply readings are 14.5 to 15.5 VDC. | SAT UNSAT | ||
CUE: None. | : 14. PERFORMANCE STEP: Check the DC amp meters on the +15V and -15V power supply modules. | ||
SAT | STANDARD: Check the +15V and -15V power supply module amp meter reading is less than 13 amps. | ||
: 14. PERFORMANCE STEP: Check the DC amp meters on the +15V and | CUE: None. | ||
-15V power | __________ | ||
SAT UNSAT | |||
STANDARD: Check the +15V and | |||
-15V power supply module amp meter reading is less than 13 amps. | |||
CUE: None. | |||
SAT | |||
: 15. PERFORMANCE STEP: Energize Source Range Detector power supply. | : 15. PERFORMANCE STEP: Energize Source Range Detector power supply. | ||
........C........ | |||
STANDARD: Place the ON/OFF switch for the Source Range Detector power supply module in ON. | STANDARD: Place the ON/OFF switch for the Source Range Detector power supply module in ON. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 16. PERFORMANCE STEP: Reset Source Range Detector power supply. | : 16. PERFORMANCE STEP: Reset Source Range Detector power supply. | ||
........C........ | |||
STANDARD: Depress the reset switch on the Source Range Detector power supply module. CUE: None. | STANDARD: Depress the reset switch on the Source Range Detector power supply module. | ||
SAT | CUE: None. | ||
__________ | |||
SAT UNSAT 8 of 13 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 | ||
- 3 | : 17. PERFORMANCE STEP: Energize the contact monitor Aux. power supply | ||
........C........ module. | |||
module. STANDARD: Place the ON/OFF switch for the Aux. power supply module to ON. | STANDARD: Place the ON/OFF switch for the Aux. power supply module to ON. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 18. PERFORMANCE STEP: Reset the contact monitor Aux. power supply. | : 18. PERFORMANCE STEP: Reset the contact monitor Aux. power supply. | ||
........C........ | |||
STANDARD: Depress reset switch and verify 100 to 150 volts on DC volt meter | STANDARD: Depress reset switch and verify 100 to 150 volts on DC volt meter. | ||
CUE: None. | |||
SAT | __________ | ||
SAT UNSAT | |||
: 19. PERFORMANCE STEP: Energize the Power Range Detector power supply. | : 19. PERFORMANCE STEP: Energize the Power Range Detector power supply. | ||
........C....... | |||
STANDARD: Place the ON/OFF switch on the Power Range Detector power supply module to ON. | STANDARD: Place the ON/OFF switch on the Power Range Detector power supply module to ON. | ||
CUE: None. | CUE: None. | ||
__________ | |||
SAT UNSAT | |||
: 20. PERFORMANCE STEP: Reset the Power Range Detector power supply module. | : 20. PERFORMANCE STEP: Reset the Power Range Detector power supply module. | ||
........C........ | |||
STANDARD: Depress the reset switch on the Power Range Detector power supply module and verify DC volt meter comes on scale. | STANDARD: Depress the reset switch on the Power Range Detector power supply module and verify DC volt meter comes on scale. | ||
CUE: Fifteen minutes has elapsed. | CUE: Fifteen minutes has elapsed. | ||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 21. PERFORMANCE STEP: Verify SHUTDOWN BYPASS key is in normal. | : 21. PERFORMANCE STEP: Verify SHUTDOWN BYPASS key is in normal. | ||
STANDARD: Verify SHUTDOWN BYPASS key is in normal position. | STANDARD: Verify SHUTDOWN BYPASS key is in normal position. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT 9 of 13 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 | ||
- 3 | : 22. PERFORMANCE STEP: Reset TRIP bistables for Power/Pumps. | ||
........C........ | |||
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM.. CUE: None. | STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM.. | ||
SAT | CUE: None. | ||
: 23. PERFORMANCE STEP: | __________ | ||
Reset TRIP bistables for Power/Imbal/flow. | SAT UNSAT | ||
: 23. PERFORMANCE STEP: Reset TRIP bistables for Power/Imbal/flow. | |||
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM. CUE: None. | ........C........ | ||
SAT | STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM. | ||
: 24. PERFORMANCE STEP: | CUE: None. | ||
Reset TRIP bistables for Over Power. | __________ | ||
SAT UNSAT | |||
: 24. PERFORMANCE STEP: Reset TRIP bistables for Over Power. | |||
........C........ | |||
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM. | STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 25. PERFORMANCE STEP: Reset TRIP bistables for Low Press. | : 25. PERFORMANCE STEP: Reset TRIP bistables for Low Press. | ||
........C........ | |||
STANDARD: Momentarily depress the output state and output memory Switches and checking the status lights are DIM. | STANDARD: Momentarily depress the output state and output memory Switches and checking the status lights are DIM. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 26. PERFORMANCE STEP: Reset TRIP bistables for High Press. | : 26. PERFORMANCE STEP: Reset TRIP bistables for High Press. | ||
........C........ | |||
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM. | STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT 10 of 13 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 | ||
- 3 | : 27. PERFORMANCE STEP: Reset TRIP bistables for High Temp. | ||
........C........ | |||
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM. | STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
: 28. PERFORMANCE STEP: Reset TRIP bistables for Press/Temp. | SAT UNSAT | ||
: 28. PERFORMANCE STEP: Reset TRIP bistables for Press/Temp. | |||
........C........ | |||
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM. | STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
: 29. PERFORMANCE STEP: Reset TRIP bistables for High Bldg Press. | SAT UNSAT | ||
STANDARD: Momentarily depress the Reset switch and check both | : 29. PERFORMANCE STEP: Reset TRIP bistables for High Bldg Press. | ||
........C........ | |||
STANDARD: Momentarily depress the Reset switch and check both INPUT STATE lights are OFF. | |||
CUE: None. | |||
CUE: None | |||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 30. PERFORMANCE STEP: Clear the memory of the protective function bistables SUR ROD/WD INH (NI-1) and Flux > 10%. | |||
STANDARD: Momentarily depress the output memory reset switches and check the status lights are DIM. | |||
CUE: None. | |||
__________ | |||
SAT UNSAT | |||
: 31. PERFORMANCE STEP: Recognize failure to energize Channel Trip relay. | |||
........C........ | |||
STANDARD: Recognize that when RESET switch is DEPRESSED, trip relay fails to energize. | |||
CUE: (If asked) Unit Supervisor acknowledges that the Reset switch on the Trip module did NOT function but directs you to reset the channel. | |||
__________ | |||
SAT UNSAT 11 of 13 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 | ||
- 3 | : 32. PERFORMANCE STEP: Energize Channel Trip relay. | ||
........C........ | |||
STANDARD: Rotate MANUAL BYPASS key switch to actuate manual bypass relay and return to normal. | STANDARD: Rotate MANUAL BYPASS key switch to actuate manual bypass relay and return to normal. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
: 33. PERFORMANCE STEP: Verify Protective Sub | SAT UNSAT | ||
-system light. | : 33. PERFORMANCE STEP: Verify Protective Sub-system light. | ||
STANDARD: At top of RPS cabinet, verify Protective Sub-system light DIM. | |||
STANDARD: At top of RPS cabinet, verify Protective Sub | CUE: None. | ||
-system light DIM. | __________ | ||
CUE: None. | SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator.) | ||
SAT | __________ | ||
END TIME 12 of 13 | |||
TERMINATING CUES: | |||
This JPM is complete. (Terminated by the evaluator.) | |||
__________ | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 Verification of Completion Job Performance Measure No. | |||
Examinees Name: | |||
Examiners Name: | |||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Line 835: | Line 782: | ||
____________________________________________________________________________ | ____________________________________________________________________________ | ||
________________________________________________________________ | ________________________________________________________________ | ||
Response: | Response:_____________________________________________________________ | ||
______________________________________________________________________ | |||
______________________________________________________________________ | ______________________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________ | |||
13 of 13 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 SIMULATOR JPM NS-4 REACTOR OPERATOR SRO - I SRO - U 1 of 9 | ||
- 4 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 Facility: Davis-Besse Task No: 071-001-02-0100 Task Title: Containment Pressure Reduction Release K/A | |||
- 4 | |||
Containment Pressure Reduction Release K/A | |||
==Reference:== | ==Reference:== | ||
GEN 2.3.11 2.7/3.2 Job Performance Measure No | GEN 2.3.11 2.7/3.2 Job Performance Measure No: New Examinee: | ||
: | NRC Examiner: Date: | ||
Date: | Method of testing: | ||
Simulated Performance ___ | Simulated Performance ___ Actual Performance _X_ | ||
Actual Performance | Classroom ___ Simulator _X_ Plant ___ | ||
Read to the examinee: | |||
Simulator | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. | ||
When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | Initial Conditions: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Task Standard: | Task Standard: | ||
Initiate a pressure release of Containment and stop the Containment release when the Radwaste Exhaust Fans are found not running. | |||
Required Materials: | Required Materials: | ||
DB-OP-03012 Section 4.6 and Attachment 1 appropriately signed off to allow determination of release sample time and date. | DB-OP-03012 Section 4.6 and Attachment 1 appropriately signed off to allow determination of release sample time and date. | ||
Line 873: | Line 814: | ||
Initiating Cue: | Initiating Cue: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Time Critical Task: | Time Critical Task: No Validation Time: 17 minutes 2 of 9 | ||
No | |||
17 minutes | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 SIMULATOR INSTRUCTIONS TASK DESCRIPTION: | |||
INITIAL CONDITION: | |||
Mode 3 IC (at or near NOT/NOP) | |||
Insert the following to fail PDT 645 to 20 | |||
* IMF CAPCE 0.069 ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet | MALFUNCTIONS/FAILURE TO INSERT: | ||
- 4 | ACTION/CUES: | ||
3 of 9 | |||
Containment to annulus differential pressure has risen to 20 inches | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 EXAMINER COPY INITIAL CONDITIONS: | ||
The plant is in Mode 3. | |||
-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction | A plant heatup is in progress. | ||
Containment to annulus differential pressure has risen to 20 inches H2O. A release permit has been prepared and approved INITIATING CUES: | |||
The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.10 of DB-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction (Hand Candidate a copy of DB-OP-03012 with appropriate sign-offs.) | |||
4 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 CANDIDATE COPY INITIAL CONDITIONS: | ||
- 4 | The plant is in Mode 3 A plant heatup is in progress. | ||
Containment to annulus differential pressure has risen to 20 inches H2O. A release permit has been prepared and approved INITIATING CUES: | |||
The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.10 of DB-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction 5 of 9 | |||
- | |||
COMMENT: Role play to provide the Independent Verification for opening CV 5037 CUE: NONE | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments". | ||
SAT | START TIME: _______ | ||
: 1. PERFORMANCE STEP: Place computer point P318 on trend | |||
........C........ | |||
STANDARD: Use the plant process computer to trend CTMT PRESS DIFF TO ANNULUS Comment: Acceptable to trend on the computer CRT or on the analog trend pens CUE: P318 reads 20 inches. (If asked) The Unit Supervisor requests a 60-second trend | |||
__________ | |||
SAT UNSAT | |||
: 2. PERFORMANCE STEP: Verify less than 24 hours since containment was sampled STANDARD: Determine difference is less than 24 hours between containment sample time in Item 4.e of Attachment 1 and current time CUE: NONE | |||
__________ | |||
SAT UNSAT | |||
: 3. PERFORMANCE STEP: Open CV5037, H2 Purge System Ctmt Isolation | |||
........C........ | |||
STANDARD: Press OPEN on HIS5037 COMMENT: Role play to provide the Independent Verification for opening CV 5037 CUE: NONE | |||
__________ | |||
SAT UNSAT | |||
____________________________________________________________________________ | |||
6 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 | ||
- 4 | : 4. PERFORMANCE STEP: Open CV5038, H2 Purge System Ctmt Isolation | ||
........C........ | |||
STANDARD: Press OPEN on HIS5038 COMMENT: Role play to provide the Independent Verification for opening CV 5038 CUE: NONE | STANDARD: Press OPEN on HIS5038 COMMENT: Role play to provide the Independent Verification for opening CV 5038 CUE: NONE | ||
SAT UNSAT | __________ | ||
SAT UNSAT | |||
release skid discharge gate, to start the skid fan and to maintain flow rate at approximately 1400 on the M&TE | : 5. PERFORMANCE STEP: Direct the Equipment Operator to open the containment | ||
STANDARD: Communicate via the GAI | ........C........ release skid discharge gate, to start the skid fan and to maintain flow rate at approximately 1400 on the M&TE anemometer readout. | ||
-TRONICS or radio CUE: (I/F) The Equipment Operator reports steps 4.6. | STANDARD: Communicate via the GAI-TRONICS or radio CUE: (I/F) The Equipment Operator reports steps 4.6.14, 4.6.15 and 4.6.16 are complete. | ||
(I/F) (If asked) Step 4.6.16 was completed by an I&C Tech | (I/F) (If asked) Step 4.6.16 was completed by an I&C Tech (I/F) Step 4.6.14 has been independently verified. | ||
(I/F) Step 4.6.17 Skid flow rate is 1400 on the local anemometer. | (I/F) Step 4.6.17 Skid flow rate is 1400 on the local anemometer. | ||
__________ | __________ | ||
SAT UNSAT | SAT UNSAT | ||
: 6. PERFORMANCE STEP: Make a Unit Log entry STANDARD: Record start time, release permit number and containment to annulus differential pressure in the Unit Log CUE: The secondary side Reactor Operator has made Unit Log entry for release start time, release permit number and containment to annulus differential pressuure | : 6. PERFORMANCE STEP: Make a Unit Log entry STANDARD: Record start time, release permit number and containment to annulus differential pressure in the Unit Log CUE: The secondary side Reactor Operator has made Unit Log entry for release start time, release permit number and containment to annulus differential pressuure | ||
__________ | __________ | ||
__________ | SAT UNSAT | ||
: 7. PERFORMANCE STEP: Update the release permit STANDARD: Record start date and time and containment to annulus P in Item 6 of Attachment 1 CUE: (I/F) This is the Zone 3 Equipment Operator. Neither one of the Auxiliary Building Radioactive Waste Fans are running. | |||
__________ | |||
SAT UNSAT 7 of 9 | |||
C | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 | ||
: 8. PERFORMANCE STEP: Recognize the release should be stopped | |||
STANDARD: Press CLOSE on HIS5038 | ........C........ | ||
: 11. PERFORMANCE STEP: Notify the Shift Manager the release has been stopped | STANDARD: Communicate to the Equipment Operator the need to stop the Containment Pressure Release Skid Fan Cue: (I/F)The Containment Pressure Release Skid Fan has been stopped. | ||
__________ | __________ | ||
SAT UNSAT | |||
Terminating Cue: This JPM is complete (Terminated by evaluator) | : 9. PERFORMANCE STEP: Close CV5037, H2 Purge System Ctmt Isolation | ||
........C........ | |||
STANDARD: Press CLOSE on HIS5037 CUE: NONE __________ | |||
SAT UNSAT | |||
: 10. PERFORMANCE STEP: Close CV5038, H2 Purge System Ctmt Isolation | |||
........C........ | |||
STANDARD: Press CLOSE on HIS5038 CUE: NONE __________ | |||
SAT UNSAT | |||
: 11. PERFORMANCE STEP: Notify the Shift Manager the release has been stopped STANDARD: Communicate with the Shift Manager CUE: The Shift Manager acknowledges the Containment Pressure Reduction Release has been stopped. | |||
__________ | |||
SAT UNSAT | |||
____________________________________________________________________________ | |||
Terminating Cue: This JPM is complete (Terminated by evaluator) ________ | |||
END TIME 8 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 Verification of Completion Job Performance Measure No. | |||
Examinees Name: | |||
Examiners Name: | |||
Date Performed: | |||
Facility Evaluator: | |||
Number of Attempts: | Number of Attempts: | ||
Time to Complete: | Time to Complete: | ||
Question Documentation: | Question Documentation: | ||
Question:_____________________________________________________________ | Question:_____________________________________________________________ | ||
____________________________________________________________________________ | |||
________________________________________________________________ | ________________________________________________________________ | ||
Response:_____________________________________________________________ | Response:_____________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
Result: | ______________________________________________________________________ | ||
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________ | |||
9 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 SIMULATOR JPM NS-5 REACTOR OPERATOR SRO - I 1 of 8 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 Facility: Davis-Besse Task No: 010-018-01-0100 Task Title: Perform Boron equalization between Pressurizer and the Reactor Coolant System K/A | ||
-5 | |||
Perform Boron equalization between Pressurizer and the Reactor Coolant System K/A | |||
==Reference:== | ==Reference:== | ||
(010) A1.11 Job Performance Measure No: NEW Examinee: | |||
(010) A1.11 Job Performance Measure No: | NRC Examiner: Date: | ||
Date: | Method of testing: | ||
Simulated Performance ___ | Simulated Performance ___ Actual Performance _X_ | ||
Actual Performance | Classroom ___ Simulator _X_ Plant ___ | ||
Read to the examinee: | |||
Simulator | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. | ||
When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
Initial Conditions: | Initial Conditions: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Task Standard: | Task Standard: | ||
Equalize Boron between the RCS and the Pressurizer Required Materials: | Equalize Boron between the RCS and the Pressurizer Required Materials: | ||
DB-OP-06003, Pressurizer Operating Procedure, Rev. 28, Section 4.3 DB-OP-02513, Pressurizer System Abnormal Operation, Rev. 10, Section General | DB-OP-06003, Pressurizer Operating Procedure, Rev. 28, Section 4.3 DB-OP-02513, Pressurizer System Abnormal Operation, Rev. 10, Section General | ||
==References:== | |||
Initiating Cue: | |||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Time Critical Task: | Time Critical Task: No Validation Time: 15 minutes 2 of 8 | ||
No | |||
15 minutes | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 SIMULATOR INSTRUCTIONS TASK DESCRIPTION: | ||
-5 | Perform Boron equalization between Pressurizer and the Reactor Coolant System INITIAL CONDITION: | ||
Mode 1 (RX Pwr >95%) | |||
ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: | |||
>95%) | MALFUNCTIONS/FAILURE TO INSERT: | ||
HV001 fails to 0.041, RC2, Pressurize Spray, will fail to ~40% when RC2 CLOSE (green) light goes off. | |||
H10I21GL==0 ACTION/CUES: | |||
3 of 8 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 EXAMINER COPY INITIAL CONDITIONS: | ||
-5 | The plant is operating at 100% power. | ||
RCS boron is 1300 ppmB Pressurizer boron is 1430 ppmB INITIATING CUES: | |||
RCS boron is 1300 ppmB Pressurizer boron is 1430 ppmB INITIATING CUES | The Unit Supervisor directs you to equalize Boron between the Reactor Coolant System and the Pressurizer using Section 4.3 of DB-OP-06003, Pressurizer Operating Procedure, for 4 hours. | ||
: | (Hand Candidate a copy of DB-OP06003 Section 4.3) 4 of 8 | ||
The Unit Supervisor directs you to equalize Boron between the Reactor Coolant System and the Pressurizer using Section 4.3 of DB | |||
-OP-06003, Pressurizer Operating Procedure, for 4 hours. | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 CANDIDATE COPY INITIAL CONDITIONS The plant is operating at 100% power. | ||
-OP06003 Section 4.3 | RCS boron is 1300 ppmB Pressurizer boron is 1430 ppmB INITIATING CUES The Unit Supervisor directs you to equalize Boron between the Reactor Coolant System and the Pressurizer using Section 4.3 of DB-OP-06003, Pressurizer Operating Procedure, for 4 hours. | ||
5 of 8 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet | |||
-5 | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments". | ||
RCS boron is 1300 ppmB Pressurizer boron is 1430 ppmB INITIATING CUES The Unit Supervisor directs you to equalize Boron between the Reactor Coolant System and the Pressurizer using Section 4.3 of DB | |||
-OP-06003, Pressurizer Operating Procedure, for 4 hours. | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet | |||
-5 | |||
START TIME: | START TIME: | ||
: 1. PERFORMANCE STEP: | : 1. PERFORMANCE STEP: Locate correct procedure section. | ||
Locate correct procedure section. | STANDARD: Reviews prerequisites of DB-OP-06003 Section 4.3 Determines boron difference is >100 ppm from Initial Conditions CUE: None SAT UNSAT | ||
STANDARD: Reviews prerequisites of DB-OP-06003 Section 4.3 Determines boron difference is >100 ppm from Initial Conditions CUE: None | : 2. PERFORMANCE STEP: Place desired Pressurizer (Pzr) heater banks in ON C | ||
: 2. PERFORMANCE STEP: | STANDARD: Rotate selected Pzr heater switches clockwise to ON CUE: None SAT UNSAT | ||
Place desired Pressurizer (Pzr) heater banks in ON | : 3. PERFORMANCE STEP: Throttle open RC2, Pzr Spray, when RCS pressure C Is between 2170 and 2200 psig STANDARD: Rotate HISRC2-1 clockwise momentarily then release HISRC2-1 CUE: None SAT UNSAT | ||
: 3. PERFORMANCE STEP: | : 4. PERFORMANCE STEP: Stabilize RCS pressure C | ||
Throttle open RC2, Pzr Spray, when RCS pressure C | STANDARD: Rotate heaters switches ON and OFF, and/or HISRC2-1 clockwise/counter clockwise CUE: None SAT UNSAT 6 of 8 | ||
-1 clockwise momentarily then release HISRC2-1 | |||
: 4. PERFORMANCE STEP: | |||
Stabilize RCS pressure C | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 | ||
-5 | : 5. PERFORMANCE STEP: Adjust SCR Heaters in HAND for fine adjustment C as needed STANDARD: Toggle PICRC 2 UP or DOWN to adjust SCR Heater demand CUE: None SAT UNSAT | ||
Adjust SCR Heaters in HAND for fine adjustment C | : 6. PERFORMANCE STEP: Recognize RCS pressure is lowering C | ||
: 6. PERFORMANCE STEP: | NOTE: RC2 malfunction may have to be manually inserted. | ||
Recognize RCS pressure is lowering C | Examiner will cue I/F when to insert malfunction. | ||
STANDARD: Observe RCS pressure indication CUE: None | STANDARD: Observe RCS pressure indication CUE: None SAT UNSAT | ||
Close RC 2 STANDARD: Rotate RC2 | : 7. PERFORMANCE STEP: Close RC 2 STANDARD: Rotate RC2-1 counterclockwise and hold until CLOSE light comes ON CUE: None SAT UNSAT | ||
-1 counterclockwise and hold until CLOSE light comes ON | : 8. PERFORMANCE STEP: Close RC 10, Pzr Spray Block valve C | ||
: 8. PERFORMANCE STEP: | STANDARD: Depress HIS RC 10 CLOSE button NOTE: Candidate may go to DB-OP-02513 where the Immediate Actions are to close RC2 and then RC10 CUE: None SAT UNSAT TERMINATING CUES This JPM is complete. (Terminated by the evaluator) | ||
Close RC 10, Pzr Spray Block valve | END TIME 7 of 8 | ||
-OP-02513 where the Immediate Actions are to close RC2 and then RC10 CUE: None | |||
END TIME | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 Verification of Completion Job Performance Measure No. | |||
Examinees Name: | |||
Examiners Name: | |||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: | ||
Time to Complete: | Time to Complete: | ||
Question Documentation: | Question Documentation: | ||
Line 1,064: | Line 990: | ||
______________________________________________________________________________ | ______________________________________________________________________________ | ||
______________________________________________________________ | ______________________________________________________________ | ||
Response: | Response:_____________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
______________________________________________________________________ | |||
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________ | |||
8 of 8 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 SIMULATOR JPM NS-6 REACTOR OPERATOR SRO - I 1 of 8 | ||
- 6 | |||
- 6 | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 Facility: Davis-Besse Task No: 000-058-05-0100 Task Title: Establish Long Term Boron Dilution K/A | ||
Establish Long Term Boron Dilution K/A | |||
==Reference:== | ==Reference:== | ||
(006) A1.11 Job Performance Measure No | (006) A1.11 Job Performance Measure No: JPM 002 Examinee: | ||
: | NRC Examiner: Date: | ||
Simulated Performance ___ | Method of testing: | ||
Actual Performance | Simulated Performance ___ Actual Performance _X_ | ||
Classroom ___ Simulator _X_ Plant ___ | |||
Simulator | Read to the examinee: | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure | When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
will be satisfied. | |||
Initial Conditions: | Initial Conditions: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Line 1,098: | Line 1,020: | ||
Initiating Cue: | Initiating Cue: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Time Critical Task: | Time Critical Task: No Validation Time: 12 minutes 2 of 8 | ||
No Validation Time: | |||
12 minutes Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 SIMULATOR INSTRUCTIONS TASK DESCRIPTION: | ||
- 6 | Establish Long Term Boron Dilution using the normal method through DH 11 and DH 12 INITIAL CONDITION: | ||
Initiate a large break LOCA (IMF HH40 1.0) | |||
Freeze the simulator after LPI has been transferred to the Emergency Sump ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: | |||
Freeze the simulator after LPI has been transferred to the Emergency Sump ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION | Perform all necessary operator actions of DB-OP-02000, Section 5 When Section 5 routes to Section 10, complete Section 10 up to Step 10.17 Complete Steps 1 through 4 of Attachment 12 MALFUNCTIONS/FAILURE TO INSERT: | ||
Throttle DH 206 (IRF BD206 0.85) | |||
-OP-02000, Section 5 When Section 5 routes to Section 10, complete Section 10 up to Step 10.17 Complete Steps 1 through 4 of Attachment 12 | ACTION/CUES: | ||
Step 7: Acknowledge the communication to the TSC 3 of 8 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 EXAMINER COPY INITIAL CONDITIONS: | |||
A large break LOCA has occurred Both LPI pumps have been transferred to the Emergency Sump INITIATING CUES: | |||
The Unit Supervisor directs you to establish long term boron dilution using Attachment 12 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture Steps 1 through 4 of Attachment 12 have been completed (Provide the Candidate a copy of Attachment 12 of DB-OP-02000) 4 of 8 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 CANDIDATE COPY INITIAL CONDITIONS: | ||
- 6 | A large break LOCA has occurred Both LPI pumps have been transferred to the Emergency Sump INITIATING CUES: | ||
The Unit Supervisor directs you to establish long term boron dilution using Attachment 12 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture Steps 1 through 4 of Attachment 12 have been completed 5 of 8 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments". | ||
- 6 | START TIME: _______ | ||
START TIME: | |||
: 1. PERFORMANCE STEP: Return control power to DH 11 and DH 12 | : 1. PERFORMANCE STEP: Return control power to DH 11 and DH 12 | ||
........C........ | |||
STANDARD: Depress the ON pushbutton on HIS DH11A and HIS DH12A COMMENT: DH 11 and DH 12 must be open to complete the task CUE: None | STANDARD: Depress the ON pushbutton on HIS DH11A and HIS DH12A COMMENT: DH 11 and DH 12 must be open to complete the task CUE: None | ||
SAT | __________ | ||
SAT UNSAT | |||
: 2. PERFORMANCE STEP: Open DH 11, Normal Suction Isolation | : 2. PERFORMANCE STEP: Open DH 11, Normal Suction Isolation | ||
........C........ | |||
STANDARD: Depress the OPEN pushbutton on HIS DH11 CUE: None | STANDARD: Depress the OPEN pushbutton on HIS DH11 CUE: None | ||
SAT | __________ | ||
SAT UNSAT | |||
: 3. PERFORMANCE STEP: Open DH 12, Normal Suction Isolation | : 3. PERFORMANCE STEP: Open DH 12, Normal Suction Isolation | ||
........C........ | |||
STANDARD: Depress the OPEN pushbutton on HIS DH12 CUE: None | STANDARD: Depress the OPEN pushbutton on HIS DH12 CUE: None | ||
SAT | __________ | ||
: 4. PERFORMANCE STEP: Remove control power from DH11 and DH12 STANDARD: Depress the OFF pushbutton on HIS DH11A and HIS DH12A CUE: | SAT UNSAT | ||
SAT | : 4. PERFORMANCE STEP: Remove control power from DH11 and DH12 STANDARD: Depress the OFF pushbutton on HIS DH11A and HIS DH12A CUE: None | ||
__________ | |||
SAT UNSAT 6 of 8 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 | ||
- 6 | : 5. PERFORMANCE STEP: Check FI4909 for Long Term Boron Dilution flowrate STANDARD: Observe FI4909 less than 300 gpm CUE: (If asked). Take appropriate actions per the procedure | ||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 6. PERFORMANCE STEP: Throttle DH 1B | : 6. PERFORMANCE STEP: Throttle DH 1B | ||
........C*........ | |||
STANDARD: *Place control power for DH 1B | |||
*Throttle closed to establish Long Term Boron Dilution flowrate greater than 300 gpm | |||
CUE: None | *Maintain LPI flow greater than 1350 gpm Remove control power from DH 1B (not critical) | ||
SAT | CUE: None | ||
: 7. PERFORMANCE STEP: Communicate with the Technical Support Center | __________ | ||
SAT UNSAT | |||
STANDARD: Inform the TSC that Long Term Boron Dilution via DH 11 and DH 12 has been established CUE: Acknowledge the communication to the TSC | : 7. PERFORMANCE STEP: Communicate with the Technical Support Center STANDARD: Inform the TSC that Long Term Boron Dilution via DH 11 and DH 12 has been established CUE: Acknowledge the communication to the TSC | ||
__________ | |||
SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee) | |||
__________ | __________ | ||
END TIME Refer to NT-OT-07001 for - | |||
END TIME Refer to NT | JPM VERIFICATION OF COMPLETION (DB-0528) | ||
-OT-07001 for | JPM EVALUATION | ||
-0528) | |||
==SUMMARY== | ==SUMMARY== | ||
(DB-0526) 7 of 8 | |||
-0526) | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 Verification of Completion Job Performance Measure No. | |||
Examinees Name: | |||
Examiners Name: | |||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: | ||
Time to Complete: | Time to Complete: | ||
Question Documentation: | Question Documentation: | ||
Question:_____________________________________________________________ | Question:_____________________________________________________________ | ||
____________________________________________________________________________ | |||
________________________________________________________________ | ________________________________________________________________ | ||
Response:_____________________________________________________________ | Response:_____________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
Result: | ______________________________________________________________________ | ||
______________________________________________________________________ | |||
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________ | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | 8 of 8 | ||
- 7 | |||
- 7 | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 SIMULATOR JPM NS-7 REACTOR OPERATOR SRO - I 1 of 9 | ||
: | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 Facility: Davis-Besse Task No: 062-023-01-0100 Task Title: Energize C1 from Bus A K/A | |||
==Reference:== | ==Reference:== | ||
(062) A4.07 Job Performance Measure No: JPM 220 Examinee: | |||
(062) A4.07 Job Performance Measure No | NRC Examiner: Date: | ||
: | Method of testing: | ||
Simulated Performance ___ | Simulated Performance ___ Actual Performance _X_ | ||
Actual Performance | Classroom ___ Simulator _X_ Plant ___ | ||
Read to the examinee: | |||
Simulator | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
Initial Conditions: | Initial Conditions: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Task Standard: | Task Standard: | ||
Energize C1 fro Bus A | Energize C1 fro Bus A Required Materials: | ||
DB-OP-02521, Loss of AC Bus Power Sources, Rev. 17 General | |||
DB-OP-02521, Loss of AC Bus Power Sources, Rev. | |||
17 | |||
==References:== | ==References:== | ||
Line 1,213: | Line 1,123: | ||
Initiating Cue: | Initiating Cue: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Time Critical Task: No Validation Time: 21 minutes 2 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 SIMULATOR INSTRUCTIONS TASK DESCRIPTION: | |||
Energize C1 bus from Bus A INITIAL CONDITION: | |||
Initialize to MODE 5 IC with DH Loop 2 operating ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: | |||
Manually de-energize A and B buses to simulate a loss of offsite power followed by restoration of offsite power Place caution tags on the Hand Switches for both HPI Pumps and both Ctmt Spray Pumps MALFUNCTIONS/FAILURE TO INSERT: | |||
HX01A fail open IMF E101C Fail open DH Pump 2 breaker IMF BDP2C Emergency Shutdown #1 EDG IRF G529G Energize D2 Bus from D1 Bus ACTION/CUES: | |||
Step 9 Equipment Operator cue: | |||
AC 212 is racked out 3 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 EXAMINER COPY INITIAL CONDITIONS: | ||
- 7 | The plant was in MODE 5 with Decay Heat Loop 2 operating A loss of offsite power occurred EDG 1 tripped and efforts to restart it have been unsuccessful EDG 2 is providing power to D1 and D2 Buses Decay Heat Pump 2 breaker would not re-close after D1 power was restored INITIATING CUES: | ||
: | Offsite power has been restored The Unit Supervisor directs you to energize C1 Bus from A Bus in accordance with of DB-OP-02521, Loss of AC Bus Power Sources (Provide Candidate a copy of Attachment 1 of DB-OP-02521) 4 of 9 | ||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 CANDIDATE COPY INITIAL CONDITIONS: | |||
The plant was in MODE 5 with Decay Heat Loop 2 operating A loss of offsite power occurred EDG 1 tripped and efforts to restart it have been unsuccessful EDG 2 is providing power to D1 and D2 Buses Decay Heat Pump 2 breaker would not re-close after D1 power was restored INITIATING CUES: | |||
Offsite power has been restored The Unit Supervisor directs you to energize C1 Bus from A Bus in accordance with of DB-OP-02521, Loss of AC Bus Power Sources 5 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments". | |||
: | START TIME: _______ | ||
: 1. PERFORMANCE STEP: Locate the correct procedure step STANDARD: Finds Attachment 1 step 2.0 CUE: None | |||
__________ | |||
SAT UNSAT | |||
: 2. PERFORMANCE STEP: Verify Bus A large motor breakers OPEN STANDARD: Visual check of hand switches: | |||
RCP 1 HIS RC5B1 Green light LIT RCP 2 HIS RC5A2 Green light LIT Circ Pump 1 - HIS 876 Green light LIT Circ Pump 3 - HIS 928 Green light LIT CUE: None | |||
__________ | |||
SAT UNSAT | |||
: 3. PERFORMANCE STEP: Place BUS A SYNC CHECK in the 01 position STANDARD: HS 6293, BUS A SYNC CHECK, placed in 01 position CUE: None | |||
__________ | |||
SAT UNSAT | |||
: 4. PERFORMANCE STEP: Close Bus A supply from 01 transformer STANDARD: HIS 6203, HX01A, placed to CLOSE COMMENT: HX01A will NOT close due to failure CUE: None | |||
__________ | |||
SAT UNSAT 6 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 | ||
- 7 | : 5. PERFORMANCE STEP: Place BUS A SYNC CHECK switch in OFF STANDARD: HS 6293, BUS A SYNC CHECK, placed in OFF position CUE: (If asked), The Unit Supervisor directs you to energize Bus A from Startup Transformer 02 | ||
: | __________ | ||
SAT UNSAT | |||
: 6. PERFORMANCE STEP: Place BUS A SYNC CHECK in the 02 position C | |||
STANDARD: HS 6293, BUS A SYNC CHECK, placed in 02 position CUE: None | |||
__________ | |||
SAT UNSAT | |||
: 7. PERFORMANCE STEP: Close Bus A supply from 02 transformer C | |||
STANDARD: HIS 6201, HX02A, placed to CLOSE CUE: None | |||
__________ | |||
SAT UNSAT | |||
: 8. PERFORMANCE STEP: Place BUS A SYNC CHECK switch in OFF STANDARD: HS 6293, BUS A SYNC CHECK, placed in OFF position CUE: None | |||
__________ | |||
SAT UNSAT 9.. PERFORMANCE STEP: Close HAAC STANDARD: Verify HIS 6207, HAAC, indicates CLOSED COMMENT: HAAC was already closed Step critical only if HAAC is open at this point CUE: None | |||
__________ | |||
SAT UNSAT 7 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 | |||
: 10. PERFORMANCE STEP: Close AACC2 C | |||
STANDARD: HIS 6218, AACC2, rotated to CLOSE COMMENT: AACC2 was already closed Step critical only if AACC2 is open at this point CUE: None | |||
__________ | |||
SAT UNSAT | |||
: 11. PERFORMANCE STEP: Place SYNC SELECT to BKR TO BUS C2 position C | |||
STANDARD: HS 6221, SYNC SELECT switch, to BKR TO BUS C2 position CUE: None | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | |||
- 7 | |||
STANDARD: | |||
, | |||
SAT | |||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 12. PERFORMANCE STEP: Close AC110 C | : 12. PERFORMANCE STEP: Close AC110 C | ||
STANDARD: HIS 6223 , AC110 , rotated to CLOSE | STANDARD: HIS 6223, AC110, rotated to CLOSE CUE: None | ||
SAT | __________ | ||
: 13. | SAT UNSAT | ||
SAT | : 13. PERFORMANCE STEP: Place SYNC SELECT to the OFF position STANDARD: HS 6221, SYNC SELECT, to the OFF position CUE: None | ||
__________ | |||
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the evaluator) | |||
END TIME 8 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 Verification of Completion Job Performance Measure No. | |||
Examinees Name: | |||
Examiners Name: | |||
Date Performed: | |||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: | ||
Time to Complete: | Time to Complete: | ||
Question Documentation: | Question Documentation: | ||
Line 1,321: | Line 1,206: | ||
Response:_____________________________________________________________ | Response:_____________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
Result: | ______________________________________________________________________ | ||
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________ | |||
9 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 SIMULATOR JPM NS - 8 REACTOR OPERATOR SRO - I Page 1 of 9 | ||
- 8 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 Facility: Davis-Besse Task No: 078-009-04-0100 Task Title: Vacuum and Gland Steam Systems Actions during a Loss of Instrument Air K/A | |||
- 8 | |||
Vacuum and Gland Steam Systems Actions during a Loss of Instrument | |||
==Reference:== | ==Reference:== | ||
(055/056) K3.01 Job Performance Measure No: JPM 113 Examinee: | |||
(055/056) K3.01 | NRC Examiner: Date: | ||
Date: | Method of testing: | ||
Simulated Performance ___ | Simulated Performance ___ Actual Performance _X_ | ||
Actual Performance | Classroom ___ Simulator _X_ Plant ___ | ||
Read to the examinee: | |||
Simulator | I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. | ||
When you complete the task successfully, the objective for this job performance measure will be satisfied. | |||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure | |||
will be satisfied. | |||
Initial Conditions The plant conditions are specified in the Initial Conditions and Initiating Cues. | Initial Conditions The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Task Standard: | Task Standard: | ||
Line 1,357: | Line 1,233: | ||
Initiating Cue: | Initiating Cue: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Time Critical Task: | Time Critical Task: No Validation Time: 8 minutes Page 2 of 9 | ||
No Validation Time: | |||
8 minutes Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 SIMULATOR INSTRUCTIONS TASK DESCRIPTION: | ||
- 8 | Vacuum and Gland Steam Systems Actions during a Loss of Instrument Air INITIAL CONDITION: | ||
Reactor tripped SFRCS manually actuated ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: | |||
Prevent Heater Drain Pumps from automatically tripping IMR DDVIB (2) | |||
IRF DDN5 (2) 0.5 IMF DDVJB (2) | IRF DDN5 (2) 0.5 IMF DDVJB (2) | ||
IRF DDN6 (2) 0.5 IMF DDLGC 0.0 (2) | IRF DDN6 (2) 0.5 IMF DDLGC 0.0 (2) | ||
Prevent EIAC, SAC 1 and SAC 2 from starting IMF KFS1G | Prevent EIAC, SAC 1 and SAC 2 from starting IMF KFS1G IMF KFECE MALFUNCTIONS/FAILURE TO INSERT: | ||
None ACTION/CUES: | |||
None Page 3 of 9 | |||
SFRCS has been manually actuated INITIATING CUES | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 EXAMINER COPY INITIAL CONDITIONS: | ||
The Reactor has been tripped due to a loss of Instrument Air SFRCS has been manually actuated INITIATING CUES: | |||
-OP-02528, Loss of Instrument Air (Provide Candidate a copy of Attachment 13 of DB | The Unit Supervisor directs you to perform Vacuum and Gland Steam System actions in accordance with Attachment 13 of DB-OP-02528, Loss of Instrument Air (Provide Candidate a copy of Attachment 13 of DB-OP-02528) | ||
-OP-02528) | Page 4 of 9 | ||
SFRCS has been manually actuated INITIATING CUES | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 CANDIDATE COPY INITIAL CONDITIONS: | ||
The Reactor has been tripped due to a loss of Instrument Air SFRCS has been manually actuated INITIATING CUES: | |||
-OP-02528, Loss of Instrument Air | The Unit Supervisor directs you to perform Vacuum and Gland Steam System actions in accordance with Attachment 13 of DB-OP-02528, Loss of Instrument Air Page 5 of 9 | ||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments". | ||
- 8 | START TIME: _______ | ||
START TIME: | : 1. PERFORMANCE STEP: Lock out the Mechanical Hogger C | ||
: 1. PERFORMANCE STEP: Lock out the Mechanical Hogger C | STANDARD: HIS 1005 rotated to OFF and pulled CUE: None | ||
SAT | __________ | ||
: 2. PERFORMANCE STEP: Open VS 634 and VS 635, Condenser Vacuum | SAT UNSAT | ||
SAT | : 2. PERFORMANCE STEP: Open VS 634 and VS 635, Condenser Vacuum Breakers C | ||
STANDARD: HIS 634 rotated to the OPEN BOTH position CUE: None | |||
__________ | |||
SAT UNSAT | |||
: 3. PERFORMANCE STEP: Shutdown Steam Packing Exhauster Fans C | : 3. PERFORMANCE STEP: Shutdown Steam Packing Exhauster Fans C | ||
STANDARD: | STANDARD: HIS 2411 (HIS 2412) rotated to the OFF position CUE: None | ||
SAT | __________ | ||
: 4. PERFORMANCE STEP: Check the Gland Steam Header Relief Valves are not lifting STANDARD: Check Gland Steam header pressure at 0 psig CUE: | SAT UNSAT | ||
-OP-02528, Loss of Instrument Air (Provide the examinee a copy of Attachment 11 of DB | : 4. PERFORMANCE STEP: Check the Gland Steam Header Relief Valves are not lifting STANDARD: Check Gland Steam header pressure at 0 psig CUE: (After checking Gland Steam) The Unit Supervisor directs you to perform the Control Room actions for a loss of Instrument Air to the Condensate System in accordance with Attachment 11 of DB-OP-02528, Loss of Instrument Air (Provide the examinee a copy of Attachment 11 of DB-OP-02528) | ||
-OP-02528) | __________ | ||
SAT | SAT UNSAT Page 6 of 9 | ||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 | ||
- 8 | : 5. PERFORMANCE STEP: Verify a Condensate Pump is running STANDARD: Check RED light LIT on HIS for Condensate Pump 1 CUE: None | ||
SAT | __________ | ||
: 6. PERFORMANCE STEP: Verify Heater Drain Pump 1 is shutdown C | SAT UNSAT | ||
: 6. PERFORMANCE STEP: Verify Heater Drain Pump 1 is shutdown C | |||
STANDARD: Recognize RED light is LIT on HIS for Heater Drain Pump 1 Rotate Heater Drain Pump 1 HIS to STOP CUE: (If asked), Command SRO directs you to trip the Heater Drain Pump | |||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 7. PERFORMANCE STEP: Verify Heater Drain Pump 2 is shutdown | : 7. PERFORMANCE STEP: Verify Heater Drain Pump 2 is shutdown C | ||
STANDARD: Recognize RED light is LIT on HIS for Heater Drain Pump 2 Rotate Heater Drain Pump 2 HIS to STOP CUE: (If asked), Command SRO directs you to trip the Heater Drain Pump | |||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 8. PERFORMANCE STEP: Verify CD 420 has failed closed STANDARD: Check CD 420 position indicator CUE: None | : 8. PERFORMANCE STEP: Verify CD 420 has failed closed STANDARD: Check CD 420 position indicator CUE: None __________ | ||
SAT | SAT UNSAT | ||
: 9. PERFORMANCE STEP: Verify CD 421 has failed closed STANDARD: Check CD 421 position indicator CUE: | : 9. PERFORMANCE STEP: Verify CD 421 has failed closed STANDARD: Check CD 421 position indicator CUE: None __________ | ||
SAT | SAT UNSAT | ||
: 10. PERFORMANCE STEP: Verify CD 550B has failed closed STANDARD: Check CD 550B position indicator indicates 0% open CUE: None | |||
__________ | |||
SAT UNSAT Page 7 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 | |||
: 11. PERFORMANCE STEP: Verify CD 550A has failed closed STANDARD: Check CD 550A position indicator indicates 0% open CUE: None | |||
__________ | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | SAT UNSAT | ||
- 8 | : 12. PERFORMANCE STEP: Verify CD 578 has failed open STANDARD: Check RED light LIT on HIS for CD 578 CUE: None | ||
SAT | __________ | ||
: 12. PERFORMANCE STEP: Verify CD 578 has failed open STANDARD: Check RED light LIT on HIS for CD 578 CUE: None | SAT UNSAT | ||
SAT | : 13. PERFORMANCE STEP: Verify CD 2796 has failed open STANDARD: Check RED light LIT on CUE: None | ||
: 13. PERFORMANCE STEP: Verify CD 2796 has failed open STANDARD: Check RED light LIT on CUE: None | __________ | ||
SAT | SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator) | ||
TERMINATING CUES: | |||
This JPM is complete. (Terminated by the evaluator) | |||
__________ | __________ | ||
END TIME | END TIME Page 8 of 9 | ||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 Verification of Completion Job Performance Measure No. | |||
Examinees Name: | |||
Examiners Name: | |||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: | ||
Time to Complete: | Time to Complete: | ||
Question Documentation: | Question Documentation: | ||
Question:_____________________________________________________________ | Question:_____________________________________________________________ | ||
____________________________________________________________________________ | ____________________________________________________________________________ | ||
________________________________________________________________ | ________________________________________________________________ | ||
Response: | Response:_____________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
Result: | ______________________________________________________________________ | ||
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________ | |||
Page 9 of 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 SIMULATOR JPM NS - 9 SRO - U 1 of 11 | ||
- 9 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 Facility: Davis-Besse Task No: 005-012-04-0100 Task Title: Start High Pressure Injection Pump upon a Loss of One Decay Heat Pump K/A | |||
- 9 | |||
Start High Pressure Injection Pump upon a Loss of One Decay Heat Pump K/A | |||
==Reference:== | ==Reference:== | ||
(005) A2.03 Job Performance Measure No: JPM 187 Examinee: | |||
(005) A2.03 Job Performance Measure No | NRC Examiner: Date: | ||
: | Method of testing: | ||
Date: | Simulated Performance ___ Actual Performance _X_ | ||
Simulated Performance ___ | Classroom ___ Simulator _X_ Plant ___ | ||
Actual Performance | Read to the examinee: | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. | |||
Simulator | When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure | |||
will be satisfied. | |||
Initial Conditions The plant conditions are specified in the Initial Conditions and Initiating Cues. | Initial Conditions The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
Task | Task Standard: | ||
DB-OP-02527,Loss of Decay Heat Removal, Rev. 14 | Start a High Pressure Injection Pump upon a loss of a Decay Heat Pump Required Materials: | ||
DB-OP-02527,Loss of Decay Heat Removal, Rev. 14 General | |||
==References:== | ==References:== | ||
Initiating Cue: | Initiating Cue: | ||
The plant conditions are specified in the Initial Conditions and Initiating Cues. Time Critical Task: | The plant conditions are specified in the Initial Conditions and Initiating Cues. | ||
No Validation Time: | Time Critical Task: No Validation Time: 20 minutes 2 of 11 | ||
20 minutes | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 SIMULATOR INSTRUCTIONS TASK DESCRIPTION: | |||
Start High Pressure Injection Pump upon a Loss of One Decay Heat Pump INITIAL CONDITION: | |||
RCS Drained to 80 inches, DH Loop 2 in Service ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION: | |||
* Remove breaker open placards from DH7A and DH7B. | |||
* SPDS Decay Heat Removal Screen is not working. | |||
* Verify DH14A, DH14B, DH13A, and DH13B are closed. | |||
* Hang Red Tags on HPI Pumps 1 & 2 control switches. | |||
* Place Ops Info tags on DH 1517, DH 1518, DH 63, DH 64, DH 2733, and DH 2734 stating breaker open per DB-OP-06012. | |||
* Place OPEN placards on DH 1517 and DH 1518. | |||
* Place CLOSED placards on DH 63, DH 64, DH 2733, and DH 2734. | |||
MALFUNCTIONS/FAILURE TO INSERT: | |||
Insert malfunction to fail Decay Heat Pump 2s breaker open (IMF BDP2C). | |||
Insert malfunction to fail Decay Heat Pump 1s breaker open (IMF BDP1C). | |||
ACTION/CUES: | |||
NOTE: Use proper three-part communication for any necessary cues. | |||
: 1. Step 1: (if sent) Breaker AD112 indicates 50/51 phases A and C relays tripped. | |||
: 2. Step 1: (if sent) DH Pump 2 shows no abnormal indications. | |||
: 3. Step 12: Breaker BE 1157-A on E11A for DH7B has been closed. (IRF BD7B) | |||
: 4. Step 13: All tags have been removed from breaker AC111. Breaker AC111 has been racked in (IRF BFP1A OPERATE). Breaker AC111 close power fuses have been installed (IRF BFP1C FALSE). | |||
3 of 11 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 EXAMINER COPY INITIAL CONDITIONS: | ||
- 9 | The plant has been in Mode 5 for 25 days. | ||
RCS temperature is 108°F. | RCS temperature is 108°F. | ||
RCS level is 80 inches on LI 10577A and B, RCS level indication, for maintenance activities. | RCS level is 80 inches on LI 10577A and B, RCS level indication, for maintenance activities. | ||
Line 1,516: | Line 1,377: | ||
No RCS boron dilution is in progress. | No RCS boron dilution is in progress. | ||
The SPDS Decay Heat Removal Screen is not functioning. | The SPDS Decay Heat Removal Screen is not functioning. | ||
INITIATING | INITIATING CUES: | ||
Decay Heat Pump 2 has tripped on overcurrent. | |||
CTMT has been evacuated, CTMT closure has been established. | CTMT has been evacuated, CTMT closure has been established. | ||
The Shift Manager directs you to start Decay Heat Pump 1 in the decay heat mode using DB-OP-02527. You have permission to operate any locked valves required. | The Shift Manager directs you to start Decay Heat Pump 1 in the decay heat mode using DB-OP-02527. | ||
You have permission to operate any locked valves required. | |||
Desired decay heat flow is 1500 gpm. | Desired decay heat flow is 1500 gpm. | ||
(Provide copy of DB | (Provide copy of DB-OP-02527 to Candidate) 4 of 11 | ||
-OP-02527 to Candidate) | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 CANDIDIATE COPY NITIAL CONDITIONS: | ||
- 9 | The plant has been in Mode 5 for 25 days. | ||
RCS temperature is 108°F. | |||
RCS level is 80 inches on LI 10577A and B, RCS level indication, for maintenance activities. | |||
RCS temperature is 108°F. RCS level is 80 inches on LI 10577A and B, RCS level indication, for maintenance activities. | |||
Time to boil is 30 minutes. | Time to boil is 30 minutes. | ||
Decay Heat Train 2 is in service. | |||
Decay Heat Train 2 is in service. | |||
Decay Heat Train 1 is in standby. | Decay Heat Train 1 is in standby. | ||
No RCS boron dilution is in progress. | No RCS boron dilution is in progress. | ||
The SPDS Decay Heat Removal Screen is not functioning. | The SPDS Decay Heat Removal Screen is not functioning. | ||
INITIATING CUES: | |||
INITIATING CUES | Decay Heat Pump 2 has tripped on overcurrent. | ||
CTMT has been evacuated, CTMT closure has been established. | |||
CTMT has been evacuated, | |||
The Shift Manager directs you to start Decay Heat Pump 1 in the decay heat mode using DB-OP-02527. | The Shift Manager directs you to start Decay Heat Pump 1 in the decay heat mode using DB-OP-02527. | ||
You have permission to operate any locked valves required. | You have permission to operate any locked valves required. | ||
Desired decay heat flow is 1500 gpm. | Desired decay heat flow is 1500 gpm. | ||
5 of 11 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments". | ||
- 9 | START TIME: _______ | ||
START TIME: | : 1. PERFORMANCE STEP: Locate the correct procedure attachment. | ||
: 1. PERFORMANCE STEP: | |||
Locate the correct procedure attachment. | |||
STANDARD: Identify Attachment 1, as the correct procedure attachment. | STANDARD: Identify Attachment 1, as the correct procedure attachment. | ||
COMMENT: Examinee will route through Section 4.1 of the procedure to Step 4.1.7 | COMMENT: Examinee will route through Section 4.1 of the procedure to Step 4.1.7, which sends Candidate to Attachment 1. Repeat initiating cues as necessary. | ||
, which sends Candidate to Attachment 1. Repeat initiating cues as necessary. | Use proper three-part communication for cues. | ||
Use proper three | CUE: (If asked) No signs of pump cavitation existed before the pump tripped. | ||
-part communication for cues. | __________ | ||
CUE: (If asked) No signs of pump cavitation existed before the pump tripped. | SAT UNSAT | ||
__________ | |||
: 2. PERFORMANCE STEP: Close DH 14B. | : 2. PERFORMANCE STEP: Close DH 14B. | ||
STANDARD: Depress auto on HIS DH 14B and verify zero demand is indicated on HIC DH14B and/or Green light comes ON. | STANDARD: Depress auto on HIS DH 14B and verify zero demand is indicated on HIC DH14B and/or Green light comes ON. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
: 3. PERFORMANCE STEP: Close DH | SAT UNSAT | ||
: 3. PERFORMANCE STEP: Close DH 13B. | |||
STANDARD: Depress auto on HIS DH 13B and verify zero demand is indicated on HIC DH1B and/or Green light is ON. | |||
COMMENT: Operator should route to step 6. If not, provide appropriate cues. | COMMENT: Operator should route to step 6. If not, provide appropriate cues. | ||
CUE: If asked, No signs of cavitation present. | CUE: If asked, No signs of cavitation present. | ||
__________ | __________ | ||
SAT UNSAT 6 of 11 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 | ||
- 9 | : 4. PERFORMANCE STEP: Verify open DH 1517 STANDARD: Using HIS 1517, depress open pushbutton looking for red light. | ||
CUE: None. | |||
STANDARD: Using HIS 1517, depress open pushbutton looking for red light. | _________ | ||
CUE: None. | SAT UNSAT | ||
: 5. PERFORMANCE STEP: Verify closed DH 10. | : 5. PERFORMANCE STEP: Verify closed DH 10. | ||
STANDARD: Turn handwheel in closed direction with no movement | STANDARD: Turn handwheel in closed direction with no movement CUE: (I/F) Plant Operator will report DH 10 is closed SAT UNSAT | ||
CUE: (I/F) Plant Operator will report DH 10 is closed SAT | |||
: 6. PERFORMANCE STEP: Verify open DH 11 and DH 12 or DH 21 and DH 23. | : 6. PERFORMANCE STEP: Verify open DH 11 and DH 12 or DH 21 and DH 23. | ||
STANDARD: Visual verification of Red light on HIS DH11 and HIS DH12. | STANDARD: Visual verification of Red light on HIS DH11 and HIS DH12. | ||
COMMENT: Use proper three | COMMENT: Use proper three-part communication for cues. | ||
-part communication for cues. | CUE: If asked: DH 21 and DH 23 are not to be used per SM discretion. | ||
CUE: If asked: | |||
DH 21 and DH 23 are not to be used per SM discretion. | |||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 7. PERFORMANCE STEP: Verify CCW and SW cooling is available. | : 7. PERFORMANCE STEP: Verify CCW and SW cooling is available. | ||
STANDARD: Verify CCW Pump 1 and SW Pump 1 are running and CC 1467 Red indicating light is LIT. | STANDARD: Verify CCW Pump 1 and SW Pump 1 are running and CC 1467 Red indicating light is LIT. | ||
COMMENT: May also check SW36 open by placard and/or SW1424 is open or throttled. | COMMENT: May also check SW36 open by placard and/or SW1424 is open or throttled. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 8. PERFORMANCE STEP: Verify open DH 1B STANDARD: Visual verification of Red light is LIT on HIS DH1B. | : 8. PERFORMANCE STEP: Verify open DH 1B STANDARD: Visual verification of Red light is LIT on HIS DH1B. | ||
COMMENT: Only critical if DH 1B is closed. | COMMENT: Only critical if DH 1B is closed. | ||
CUE: None. | |||
SAT UNSAT 7 of 11 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 | |||
: 9. PERFORMANCE STEP: Start DH Pump 1 using HIS DH 6B. | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | |||
- 9 | |||
STANDARD: Recognize DH Pump 1 does not start. | STANDARD: Recognize DH Pump 1 does not start. | ||
COMMENT: Examinee should route back to procedure step 4.1.7 and perform RNO | COMMENT: Examinee should route back to procedure step 4.1.7 and perform RNO CUE: (If asked) The Shift Manager directs you to continue in the Loss of Decay Heat Removal procedure while he investigates the failure of DH Pump 1. | ||
CUE: (If asked) The Shift Manager directs you to continue in the Loss of Decay Heat Removal procedure while he investigates the failure of DH Pump 1. | |||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 10. PERFORMANCE STEP: Determine if either SG is functional. | |||
STANDARD: Determine if RCS is intact. | STANDARD: Determine if RCS is intact. | ||
CUE: (If asked) The SGs are not available. | |||
CUE: (If asked) | SAT UNSAT | ||
SAT | : 11. PERFORMANCE STEP: Establish a feed flowpath using Attachment 5 | ||
........C........ | |||
STANDARD: Determine that an HPI Pump is the available feed flowpath. | STANDARD: Determine that an HPI Pump is the available feed flowpath. | ||
CUE: (If asked) The Shift Manager directs you to establish a feed flowpath using HPI Pump 1. | CUE: (If asked) The Shift Manager directs you to establish a feed flowpath using HPI Pump 1. | ||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 12. PERFORMANCE STEP: Locate the correct procedure attachment. | : 12. PERFORMANCE STEP: Locate the correct procedure attachment. | ||
........C........ | |||
STANDARD: Identify Attachment 7, as the correct procedure attachment. | STANDARD: Identify Attachment 7, as the correct procedure attachment. | ||
CUE: (If asked) The Shift Manager has verified the System Status File and Safety Tagging file for HPI show the system valve lineup is complete for Mode 3 entry. | CUE: (If asked) The Shift Manager has verified the System Status File and Safety Tagging file for HPI show the system valve lineup is complete for Mode 3 entry. | ||
SAT | __________ | ||
SAT UNSAT 8 of 11 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 | ||
- 9 | : 13. PERFORMANCE STEP: Establish a flowpath from the BWST through the HPI Pump into the RCS. | ||
: Establish a flowpath from the BWST through the HPI Pump into | STANDARD: Refer to Attachment 10 for flowpaths available. | ||
COMMENT: Examinee may refer to OS 003 and OS 004 or Attachment 9. Examinee may also direct an Equipment Operator to verify the position of DH and HPI valves in the flowpath. | COMMENT: Examinee may refer to OS 003 and OS 004 or Attachment 9. Examinee may also direct an Equipment Operator to verify the position of DH and HPI valves in the flowpath. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
: 14. PERFORMANCE STEP: | SAT UNSAT | ||
: 14. PERFORMANCE STEP: Verify DH 7B or DH 7A are open | |||
........C........ | |||
STANDARD: Verify indication using appropriate switch CUE: None SAT UNSAT | |||
: 15. PERFORMANCE STEP: Restore HPI Pump 1 breaker to service, if necessary. | : 15. PERFORMANCE STEP: Restore HPI Pump 1 breaker to service, if necessary. | ||
........C........ | |||
STANDARD: Communicate with an EO to remove tags, rack in, and insert close power fuses on 4160 VAC breaker AC111. | STANDARD: Communicate with an EO to remove tags, rack in, and insert close power fuses on 4160 VAC breaker AC111. | ||
CUE: (If asked) The Shift Manager has given permission to remove the Safety tag from AC111 breaker for HPI pump 1. | CUE: (If asked) The Shift Manager has given permission to remove the Safety tag from AC111 breaker for HPI pump 1. | ||
__________ | __________ | ||
SAT | SAT UNSAT | ||
: 16. PERFORMANCE STEP: Close High Pressure Injection valves HP 2C, and 2D. STANDARD: Visual verification of Green light is LIT on HIS HP2C and HIS HP2D. | : 16. PERFORMANCE STEP: Close High Pressure Injection valves HP 2C, and 2D. | ||
CUE: None. | STANDARD: Visual verification of Green light is LIT on HIS HP2C and HIS HP2D. | ||
SAT | CUE: None. | ||
__________ | |||
SAT UNSAT 9 of 11 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM | Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 | ||
- 9 | : 17. PERFORMANCE STEP: Start HPI Pump 1. | ||
........C........ | |||
STANDARD: Place HIS 1524 to START, then release. Observe the Red light goes ON and the Green light goes OFF. | STANDARD: Place HIS 1524 to START, then release. Observe the Red light goes ON and the Green light goes OFF. | ||
CUE: None. | |||
CUE: None. | __________ | ||
SAT | SAT UNSAT | ||
: 18. PERFORMANCE STEP: Throttle HP 2C, and 2D to establish injection flow | : 18. PERFORMANCE STEP: Throttle HP 2C, and 2D to establish injection flow | ||
........C........ | |||
STANDARD: Press the open pushbutton on HP 2C and HP 2D using HIS HP2C and HIS HP2D until flow is established. | STANDARD: Press the open pushbutton on HP 2C and HP 2D using HIS HP2C and HIS HP2D until flow is established. | ||
COMMENT: Actual flow rate is not critical at this step, provided some flow is provided. | COMMENT: Actual flow rate is not critical at this step, provided some flow is provided. | ||
CUE: None. | CUE: None. | ||
SAT | __________ | ||
SAT UNSAT | |||
: 19. PERFORMANCE STEP: Monitor incore thermocouples. | : 19. PERFORMANCE STEP: Monitor incore thermocouples. | ||
STANDARD: Examine incore thermocouple temperatures on the PAM Panels. | STANDARD: Examine incore thermocouple temperatures on the PAM Panels. | ||
CUE: None | CUE: None. | ||
__________ | __________ | ||
END TIME | SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator). | ||
__________ | |||
END TIME 10 of 11 | |||
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 Verification of Completion Job Performance Measure No. | |||
Examinees Name: | |||
Examiners Name: | |||
Date Performed: | Date Performed: | ||
Facility Evaluator: | Facility Evaluator: | ||
Number of Attempts: | Number of Attempts: | ||
Time to Complete: | Time to Complete: | ||
Question Documentation: | Question Documentation: | ||
Question: | Question:_____________________________________________________________ | ||
____________________________________________________________________________ | ____________________________________________________________________________ | ||
________________________________________________________________ | ________________________________________________________________ | ||
Response: | Response:_____________________________________________________________ | ||
______________________________________________________________________ | |||
______________________________________________________________________ | ______________________________________________________________________ | ||
______________________________________________________________________ | ______________________________________________________________________ | ||
Result: | Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________ | ||
11 of 11}} |
Revision as of 10:28, 12 November 2019
ML12020A265 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 12/27/2011 |
From: | Operations Branch III |
To: | |
Shared Package | |
ML11354A075 | List: |
References | |
Download: ML12020A265 (93) | |
Text
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 SIMULATOR JPM NS-1 REACTOR OPERATOR SRO - I 1 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 Facility: Davis-Besse Task No: 002-017-04-0100 Task Title: Isolate SG 1 due to a SGTR K/A
Reference:
(035) A4.06 Job Performance Measure No: JPM 197 Examinee:
NRC Examiner: Date:
Method of testing:
Simulated Performance ___ Actual Performance _X_
Classroom ___ Simulator _X_ Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Isolate SG Due To A SGTR Required Materials:
DB-OP-02000, EOP, Rev. 25, Attachment 17 General
References:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Validation Time: 14 minutes 2 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Isolate SG 1 due to a SGTR INITIAL CONDITION:
IC that is near 500°F T-hot ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Establish a T-hot of <500°F and an RCS pressure of <1000 psig MALFUNCTIONS/FAILURE TO INSERT:
Enter a SGTR of about 125 gpm, IMF HH50 0.025 Jumper the MSIV interlock to the TBVs, IMF L3M2B 0 ACTION/CUES:
- 18. ACTION:Open the breaker for MS 106, IRF SFE8A OPEN Open the breaker for MS 107A, IRF SFECA OPEN CUE: Breakers D135 on D1NA for MS106 and BF1188 on F11B for MS 107A are OPEN
- 20. CUE: (If in-plant personnel are contacted) Report no visible signs of steam leakage from AVV 1 3 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 EXAMINER COPY INITIAL CONDITIONS:
A Steam Generator tube rupture of approximately 125 gpm has occurred in Steam Generator 1 A plant shutdown was performed in accordance with DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE.
Hot leg temperature is less than 500°F and RCS pressure is less than 1000 psig Main Feedwater Pump 2 is running INITIATING CUES:
The Unit Supervisor has directed you to isolate Steam Generator 1 using Attachment 17 of DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE.
The Auxiliary Steam System is being supplied by the Auxiliary Boiler.
(Provide a copy of Attachment 17 of DB-OP-02000 to the examinee) 4 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 CANDIDATE COPY INITIAL CONDITIONS:
A Steam Generator tube rupture of approximately 125 gpm has occurred in Steam Generator 1 A plant shutdown was performed in accordance with DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE.
Hot leg temperature is less than 500°F and RCS pressure is less than 1000 psig Main Feedwater Pump 2 is running INITIATING CUES:
The Unit Supervisor has directed you to isolate Steam Generator 1 using Attachment 17 of DB-OP-02000, RPS, SFAS, SFRCS TRIP, OR SG TUBE RUPTURE.
The Auxiliary Steam System is being supplied by the Auxiliary Boiler.
5 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
- 1. PERFORMANCE STEP: Inform Command SRO that #1 SG will be isolated and Aux Steam will be lost if NOT transferred to the Aux Boiler.
STANDARD: Inform Command SRO #1 SG being isolated.
COMMENT: Initiating Cues identified Aux Steam being supplied by Aux Boiler CUE: Command SRO acknowledges that #1 SG is being isolated.
SAT UNSAT 2 PERFORMANCE STEP: Transition SG heat transfer from both SG to #2 SG.
..C.
STANDARD: Open #2 SG TBVs by raising demand on PIC ICS 12A toggle switch and close #1 SG TBVs by reducing demand on PIC ICS 12B toggle switch.
CUE: None SAT UNSAT
- 3. PERFORMANCE STEP: Place ICS 11B (AVV 1) in manual and close
........C........
STANDARD: Verify the Auto/Hand switch into HAND on PIC ICS11B Reduce the demand to ZERO by turning the demand control fully clockwise Comment: PIC ICS11B will be in manual. Critical to close the AVV CUE: None
__________
SAT UNSAT
- 4. PERFORMANCE STEP: Open MS 107, SG 2 Main Steam supply to AFPT 2
........C........
STANDARD: Depress the OPEN pushbutton for MS 107 on HIS 107A CUE: None
__________
SAT UNSAT 6 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1
........C........
STANDARD: Direct the removal of Fuse 14 of ICS Cabinet 1 in C5761 CUE: A second RO has defeated the MSIV interlock to the TBVs by removing Fuse 14 in ICS cabinet 1 of C5761.
__________
SAT UNSAT
........C........
STANDARD: Depress the close pushbutton for FW 612 on HIS 612 CUE: None
__________
SAT UNSAT
- 7. PERFORMANCE STEP: Close MS 101, MSIV 1
........C........
STANDARD: Depress the close pushbutton for MS 101 on HIS 101 CUE: None
__________
SAT UNSAT
- 8. PERFORMANCE STEP: Verify Closed MS 101-1, MSIV 1 Bypass valve STANDARD: Verify the Green light is LIT on HIS 101-1 for MS 101-1 CUE: None
__________
SAT UNSAT
- 9. PERFORMANCE STEP: Verify Closed MS 394, Main Steam line 1 Warm-up Drain
........C........ valve STANDARD: Depress the close pushbutton for MS 394 on HIS 394 CUE: None
__________
SAT UNSAT 7 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1
- 10. PERFORMANCE STEP: Close MS 106, Main Steam line 1 to AFPT 1 STANDARD: Verify the Green light is LIT on HIS 106A for MS 106 CUE: None
__________
SAT UNSAT
- 11. PERFORMANCE STEP: Close MS 107A, Main Steam line 1 to AFPT 2
........C........
STANDARD: Depress the CLOSE pushbutton on HIS 107E for MS 107A CUE: None
__________
SAT UNSAT
........C........
STANDARD: Place control power on AF 608 by depressing the ON pushbutton on HIS 608E Depress the CLOSE pushbutton on HIS 608A CUE: (If asked) The Unit Supervisor has made an entry in the Locked Valve Log for AF 608 and directs you to continue (If asked) The Shift Manager is reviewing Tech Specs for closing AF 608
__________
SAT UNSAT
- 13. PERFORMANCE STEP: Align Auxiliary Feedwater, if running, to feed #2 SG STANDARD: Verify AFWP speed is zero CUE: None SAT UNSAT
- 14. PERFORMANCE STEP: Maintain ability to steam #2 SG to the condenser STANDARD: Verify #1 SG level is less than 220 and/or alarms 12-2-C and 12-2-D are not LIT.
CUE: None SAT UNSAT 8 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1
- 15. PERFORMANCE STEP: Maintain ability to steam #2 SG to the condenser STANDARD: Verify the Red light is LIT on HIS 100 CUE: None SAT UNSAT
- 16. PERFORMANCE STEP: Direct an EO to isolate steam traps in the AFPT 1 steam supply lines STANDARD: Direct an Equipment Operator to isolate ST 39 and ST 132 CUE: None
__________
SAT UNSAT
- 17. PERFORMANCE STEP: Remove control power from AF 608, SG 1 AFW CTMT Isolation valve STANDARD: Depress OFF on HIS 608E for AF 608, Blue light will light CUE: None SAT UNSAT
- 18. PERFORMANCE STEP: Direct an EO to open the breakers for the steam supply to the
........C........ AFPTs from SG 1 STANDARD: Direct an Equipment Operator to open D135 on D1NA for MS 106 and BF1188 on F11B for MS 107A CUE: None
__________
SAT UNSAT
- 19. PERFORMANCE STEP: Determine if Main Steam line 1 Warm-up Drain valve is suspected of leaking by STANDARD: Ask the Unit Supervisor if MS 394 is suspected of leaking by CUE: (If asked) Unit Supervisor reports that MS 394 does not have a history of leaking by
__________
SAT UNSAT 9 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1
- 20. PERFORMANCE STEP: Determine if AVV 1 is suspected of leaking by STANDARD: Ask the Unit Supervisor if ICS11B is suspected of leaking by (Security may also be contacted)
CUE: (If asked) Unit Supervisor reports that ICS11B does not have a history of leaking by (If in-plant personnel are contacted) Report no visible signs of steam leakage
__________
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)
__________
END TIME 10 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 1 Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
____________________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
11 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 SIMULATOR JPM NS-2 REACTOR OPERATOR SRO - I 1 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 Facility: Davis-Besse Task No: 001-033-01-0100 Task Title: Perform Control Rod Exercise K/A
Reference:
(001) A2.03 Job Performance Measure No: NEW Examinee:
NRC Examiner: Date:
Method of testing:
Simulated Performance ___ Actual Performance _X_
Classroom ___ Simulator _X_ Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Perform Control Rod Exercise Required Materials:
DB-SC-03272, Control Rod Exercising Test DB-OP-06402, CRD Operating Procedure General
References:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Validation Time: 30 minutes 2 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Perform Control Rod Exercising INITIAL CONDITION:
Mode 1 (RX Pwr <95%)
ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Place R 790 on 30 second point trend on PPC.
MALFUNCTIONS/FAILURE TO INSERT:
Control Rod 1-2 stuck, TFLISR42/T ACTION/CUES:
- 15. CUE: All Group 1 transfer switches have rotated a diamond configuration.
- 21. CUE: 100% zone reference lamps are on for all Group 1 rods.
3 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 EXAMINER COPY INITIAL CONDITIONS:
MODE 1 approximately 95% Rx Power Reactor power has been reduced for turbine control valve testing.
INITIATING CUES:
The Shift Manager has directed you to perform control rod exercising per DB-SC-03272, Control Rod Exercising Test.
All Perquisites are complete.
An Equipment Operator is standing by at the CRD cabinets, with a key, to verify the transfer switches operate properly.
(Hand Candidate copy of DB-SC-03272) 4 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 CANDIDATE COPY INITIAL CONDITIONS:
MODE 1 approximately 95% Rx Power
.
Reactor power has been reduced for turbine control valve testing.
INITIATING CUES:
The Shift Manager has directed you to perform control rod exercising per DB-SC-03272, Control Rod Exercising Test.
All Perquisites are complete.
An Equipment Operator is standing by at the CRD cabinets, with a key, to verify the transfer switches operate properly.
5 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
- 1. PERFORMANCE STEP: Hand DB-SC-03272 to examinee.
STANDARD: Review prerequisites in DB-SC-03272, Control Rod Exercising Test, reviewed.
CUE: (If asked) Load Dispatcher has been notified; Section 4.5 will NOT be performed.
__________
SAT UNSAT
- 2. PERFORMANCE STEP: Set the GROUP METER S/R switch on Rod Control Panel HC NI44 to "S" STANDARD: Place HC NI44 to "S" CUE: None.
__________
SAT UNSAT
- 3. PERFORMANCE STEP: Record position of Group 1.
STANDARD: Group 1 position is recorded in procedure. Individual Grp 1 positions on Attachment 1.
CUE: None.
__________
SAT UNSAT
- 4. PERFORMANCE STEP: Transfer Group 1 to Auxiliary Power Supply.
STANDARD: Refer to DB-OP-06402, CRD Operating Procedure, Section 4.1.
COMMENT: Sequence is required for all subsequent steps.
CUE: All prerequisites have been completed.
__________
SAT UNSAT 6 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2
- 5. PERFORMANCE STEP: Hand DB-OP-06402 to examinee.
STANDARD: Examinee should find section 4.1. Expected to review then perform prerequisites.
CUE: NONE
__________
SAT UNSAT
- 6. PERFORMANCE STEP: Verify Rod Control Panel XFR RESET light is ON.
STANDARD: Verify RESET light is GREEN CUE: None
__________
SAT UNSAT
- 7. PERFORMANCE STEP: Place rod control panel in MANUAL.
.........C........
STANDARD: MANUAL button pressed and released on rod control panel.
CUE: None.
__________
SAT UNSAT
- 8. PERFORMANCE STEP: Place Reactor Demand hand/auto station in HAND.
.........C........
STANDARD: HAND button pressed and released on Reactor Demand hand/auto station.
CUE: None.
__________
SAT UNSAT
- 9. PERFORMANCE STEP: Verify Rod Control Panel in SEQ BYPASS
........C........
STANDARD: Press and release SEQ. BYPASS switch.
CUE: None.
__________
SAT UNSAT
- 10. PERFORMANCE STEP: Verify Rod Control Panel in GROUP.
........C........
STANDARD: Verify GREEN Light for GROUP CUE: None. __________
SAT UNSAT 7 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2
- 11. PERFORMANCE STEP: Turn GROUP SELECT switch to group to be transferred.
........C........ and record group selected STANDARD: Group Select switch turned to indicate "1" CUE: None.
__________
SAT UNSAT
- 12. PERFORMANCE STEP: Select all rods in Group 1 using the SINGLE SELECT
........C........ switch.
STANDARD: SINGLE SELECT switch rotated to ALL.
CUE: None.
__________
SAT UNSAT
- 13. PERFORMANCE STEP: Check PI Panel CONTROL ON lights for the selected group "ON" STANDARD: Check Group 1 CONTROL ON lamps are LIT.
CUE: None.
__________
SAT UNSAT
- 14. PERFORMANCE STEP: Press and release AUX.
........C........
STANDARD: Press and release AUX. switch. Observe amber indication CUE: None.
__________
SAT UNSAT
- 15. PERFORMANCE STEP: Check PI Panel CONTROL ON lights for the selected group "OFF" STANDARD: Check Group 1 ON CONTROL lamps NOT LIT.
CUE: None.
__________
SAT UNSAT
- 16. PERFORMANCE STEP: Check Rod Control Panel XFER RESET light is off.
STANDARD: Check XFER RESET lamp is NOT LIT.
CUE: None.
__________
SAT UNSAT 8 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2
- 17. PERFORMANCE STEP: Press and Release JOG SPEED.
........C........
STANDARD: Press and release JOG switch. Observe AMBER light lights CUE: None.
__________
SAT UNSAT
- 18. PERFORMANCE STEP: Check SUPPLY PHASE lights are ON.
STANDARD: Check SUPPLY PHASE lights are on.
CUE: None.
__________
SAT UNSAT
- 19. PERFORMANCE STEP: Lineup phases of normal and auxiliary power supplies.
........C........
STANDARD: Move INSERT/WITHDRAW switch in the INSERT direction; Until SUPPLY PHASES lights are lined up.
CUE: None.
__________
SAT UNSAT
- 20. PERFORMANCE STEP: Verify SYNC CONFIRM is ON.
STANDARD: Verify SYNC CONFIRM is LIT.
CUE: None.
__________
SAT UNSAT
- 21. PERFORMANCE STEP: Press and release CLAMP.
........C........
STANDARD: Press and release CLAMP switch. Observe half white half red indication.
CUE: None.
__________
SAT UNSAT
- 22. PERFORMANCE STEP: Press and release the MANUAL XFR.
........C........
STANDARD: Press and release MANUAL XFR switch.
CUE: None. __________
SAT UNSAT 9 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2
- 23. PERFORMANCE STEP: Check PI panel CONTROL-ON for the transferred rod(s).
STANDARD: Check Group 1 CONTROL-ON lights are LIT.
CUE: None.
__________
SAT UNSAT
- 24. PERFORMANCE STEP: Verify transfer switches operated properly.
STANDARD: Direct Equipment Operator to verify Group 1 transfer switches have rotated completely to the aux. position.
CUE: 4 rods are diamonds.
__________
SAT UNSAT
- 25. PERFORMANCE STEP: Press and release CLAMP REL.
........C........
STANDARD: Press and release CLAMP REL switch. Observe GREEN light lit CUE: None.
__________
SAT UNSAT
- 26. PERFORMANCE STEP: Press and release RUN SPEED.
STANDARD: Press and release RUN SPEED switch. Observe GREEN Light lit CUE: None.
__________
SAT UNSAT
- 27. PERFORMANCE STEP: Press and release GROUP.
STANDARD: Press and release GROUP switch. Observe the GREEN light lit CUE: None.
__________
SAT UNSAT
- 28. PERFORMANCE STEP: Insert Group 1 approximately 3%.
........C........
STANDARD: INSERT/WITHDRAW switch placed in INSERT until Group 1 rods inserted 3% (+/- 1%).
CUE: None.
__________
SAT UNSAT 10 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2
- 29. PERFORMANCE STEP: Identify and report failure of Rod 1-2 to move.
........C........
STANDARD: Verbal report of rod failure to move to SM/CTRM SRO.
CUE: (When notified) The Shift Manager is investigating. He directs you to return Group 1 to 100% withdrawn.
__________
SAT UNSAT
- 30. PERFORMANCE STEP: Return Group 1 to the previous position (100%).
........C........
STANDARD: INSERT/WITHDRAW switch placed in WITHDRAW until Group 1 rods are at 100% rod index.
CUE: None.
__________
SAT UNSAT
- 31. PERFORMANCE STEP: Transfer Group 1 back to the normal power supply.
STANDARD: Refer to DB-OP-06402, CRD Operating Procedure, Section 4.2.
CUE: None.
__________
SAT UNSAT
- 32. PERFORMANCE STEP: Verify Rod Control Panel in MANUAL.
STANDARD: Check MANUAL button LIT on rod control panel.
CUE: None.
__________
SAT UNSAT
- 33. PERFORMANCE STEP: Verify Reactor Demand hand/auto station in HAND.
STANDARD: Check Reactor Demand hand/auto station white and red lights LIT.
CUE: None.
__________
SAT UNSAT
- 34. PERFORMANCE STEP: Verify Rod Control System in SEQ. BYPASS.
STANDARD: Check SEQ. BYPASS switch LIT.
CUE: None.
__________
SAT UNSAT 11 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2
- 35. PERFORMANCE STEP: Check Group 1 selected on the GROUP SELECT switch.
STANDARD: Check GROUP SELECT switch selected to Group 1.
CUE: None.
__________
SAT UNSAT
- 36. PERFORMANCE STEP: Check SINGLE SELECT switch in ALL.
STANDARD: SINGLE SELECT switch selected to ALL.
CUE: None.
__________
SAT UNSAT
- 37. PERFORMANCE STEP: Press and release AUX.
........C........
STANDARD: Press and release AUX. switch.
CUE: None.
__________
SAT UNSAT
- 38. PERFORMANCE STEP: Press and release JOG SPEED.
........C........
STANDARD: Press and release JOG SPEED switch.
CUE: None.
__________
SAT UNSAT
- 39. PERFORMANCE STEP: Check SUPPLY PHASE lights are ON.
STANDARD: Check SUPPLY PHASE lights are on.
CUE: None.
__________
SAT UNSAT
- 40. PERFORMANCE STEP: Lineup phases of normal and auxiliary power supplies.
........C........
STANDARD: Move INSERT/WITHDRAW switch; SYNC confirm lamp on.
CUE: None.
__________
SAT UNSAT 12 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2
- 41. PERFORMANCE STEP: Verify SYNC CONFIRM is ON.
STANDARD: Verify SYNC CONFIRM is LIT.
CUE: None.
__________
SAT UNSAT
- 42. PERFORMANCE STEP: Press and release CLAMP.
........C........
STANDARD: Press and release CLAMP switch.
CUE: None.
__________
SAT UNSAT
- 43. PERFORMANCE STEP: Press and release MANUAL XFR
........C........
STANDARD: Press and release MANUAL XFR switch.
CUE: None.
__________
SAT UNSAT
- 44. PERFORMANCE STEP: Check Group 1 CONTROL ON lamps OFF.
STANDARD: Check Group 1 CONTROL ON lamps NOT LIT.
CUE: None.
__________
SAT UNSAT
- 45. PERFORMANCE STEP: Press and release CLAMP REL.
........C........
STANDARD: Press and release CLAMP REL switch.
CUE: None.
__________
SAT UNSAT
- 46. PERFORMANCE STEP: Press and release RUN SPEED.
STANDARD: Press and release RUN switch.
CUE: None.
__________
SAT UNSAT 13 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2
- 47. PERFORMANCE STEP: Press and release GROUP.
........C........
STANDARD: GROUP switch pressed and released.
CUE: None.
__________
SAT UNSAT
- 48. PERFORMANCE STEP: Press and release XFR RESET.
........C........
STANDARD: XFR RESET switch pressed and released.
CUE: None.
__________
SAT UNSAT
- 49. PERFORMANCE STEP: Check Group 1 CONTROL ON lamps ON.
STANDARD: Check Group 1 CONTROL ON lamps LIT.
CUE: None.
__________
SAT UNSAT TERMINATING CUES for Reactor Operators: This JPM is complete.
(Terminated by the EVALUATOR.)
__________
END TIME
........C........ Determine if any Tech Spec apply for the stuck Safety Rod.
STANDARD: Apply TS 3.1.4, Condition D: D.1.1 Verify SDM within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> OR D.1.2 Initiate boration to establish SDM within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, AND D.2 be in Mode 3 within 6 hrs CUE: None.
SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the EVALUATOR.)
__________
END TIME 14 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 2 Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
____________________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
15 of 15
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 SIMULATOR JPM NS-3 REACTOR OPERATOR 1 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 Facility: Davis-Besse Task No: 012-001-01-0100 Task Title: Energize RPS Channel 2 K/A
Reference:
(012) A4.04 Job Performance Measure No: JPM 121 Examinee:
NRC Examiner: Date:
Method of testing:
Simulated Performance ___ Actual Performance _X_
Classroom ___ Simulator _X_ Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Energize RPS Channel 2 Required Materials:
DB-OP-06403, RPS and NI Operating Procedure, Rev 17, Section 3.4 General
References:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Validation Time: 41 minutes 2 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Energize RPS Channel 2 INITIAL CONDITION:
Mode 1 ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Deenergize RPS Ch. 2 in accordance with Section 3.4 of DB-OP-06403.
To open Y206 use IRF E6P4D OPEN.
MALFUNCTIONS/FAILURE TO INSERT:
Fail Reactor trip bistable to reset until BYPASS KEY is rotated by performing the following:
- In the Expert window enter IOR A55FA3A4S1-1 ACTION/CUES:
- 4. ACTION: Close Y206 on Y2. (IRF E6P4D CLOSE)
CUE: Y206 on Y2 has been closed.
3 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 EXAMINER COPY INITIAL CONDITIONS The plant is in Mode 1.
RPS Channel 2 has been deenergized in accordance with section 3.4 of DB-OP-06403, RPS and NI Operating Procedure.
INITIATING CUES:
The Unit Supervisor has directed you to re-energize RPS Channel 2 using section 3.1 of DB-OP-06403, RPS and NI Operating Procedure.
(Hand Candidate a copy of DB-OP-06403, Section 3.1) 4 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 CANDIDATE COPY INITIAL CONDITIONS The plant is in Mode 1.
RPS Channel 2 has been deenergized in accordance with section 3.4 of DB-OP-06403, RPS and NI Operating Procedure.
INITIATING CUES:
The Unit Supervisor has directed you to re-energize RPS Channel 2 using section 3.1 of DB-OP-06403, RPS and NI Operating Procedure.
5 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
START TIME: _______
- 1. PERFORMANCE STEP: Locate the correct procedure section.
STANDARD: Identifies section 3.1 as the correct procedure section.
CUE: None.
__________
SAT UNSAT
- 2. PERFORMANCE STEP: Verify RCS pressure is greater than 1950 psig.
STANDARD: Verify RCS pressure is 2155 psig.
CUE: None.
__________
SAT UNSAT
- 3. PERFORMANCE STEP: Verify Y2 is energized.
STANDARD: Verifies Y2 is energized.
CUE: None.
__________
SAT UNSAT
- 4. PERFORMANCE STEP: Close the 120 VAC essential power supply breaker.
........C........
STANDARD: Contacts EO to close Y206 on Distribution Panel Y2.
CUE: None.
__________
SAT UNSAT
- 5. PERFORMANCE STEP: Verify system AC power available.
STANDARD: Verify lamp on the Power Distribution Panel (loc 2-0) is ON.
CUE: None.
__________
SAT UNSAT 6 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3
- 6. PERFORMANCE STEP: Close the SYSTEM AC POWER breaker and verify the
........C........ SYSTEM AC POWER ON lamp is ON.
STANDARD: Close the AC SYSTEM POWER breaker (loc 2-0) and verify lamp is ON.
CUE: None.
__________
SAT UNSAT
- 7. PERFORMANCE STEP: Verify SYSTEM FANS ON.
STANDARD: Verify SYSTEMS FANS LEFT and SYSTEMS FANS RIGHT switches in the ON position.
CUE: None.
__________
SAT UNSAT
- 8. PERFORMANCE STEP: Verify SYSTEM FANS lamps are ON.
STANDARD: Verify SYSTEM FANS RIGHT and LEFT lamps are ON.
CUE: None.
__________
SAT UNSAT
- 9. PERFORMANCE STEP: Close the breakers for +15V and -15V DC power
........C....... supplies.
STANDARD: Close the +15V (loc 1-1) and -15V (loc 2-1) breakers simultaneously.
CUE: None.
__________
SAT UNSAT
- 10. PERFORMANCE STEP: Energize the DC power system.
........C........
STANDARD: Close the system DC power breaker.
CUE: None.
__________
SAT UNSAT
- 11. PERFORMANCE STEP: Verify Fan failure lights are DIM.
STANDARD: Verify left and right fan failure lights are DIM.
CUE: None.
__________
SAT UNSAT 7 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3
- 12. PERFORMANCE STEP: Check AC power lamps for the +15V and -15V power supply module.
STANDARD: Verify +15V and -15V AC power amps on the power supply modules (loc 1-1, 2-1) are ON.
CUE: Fifteen minutes time has elapsed.
__________
SAT UNSAT
- 13. PERFORMANCE STEP: Check +15V and -15V power supply modules.
STANDARD: Check +15V and -15V DC power supply readings are 14.5 to 15.5 VDC.
CUE: None.
__________
SAT UNSAT
- 14. PERFORMANCE STEP: Check the DC amp meters on the +15V and -15V power supply modules.
STANDARD: Check the +15V and -15V power supply module amp meter reading is less than 13 amps.
CUE: None.
__________
SAT UNSAT
- 15. PERFORMANCE STEP: Energize Source Range Detector power supply.
........C........
STANDARD: Place the ON/OFF switch for the Source Range Detector power supply module in ON.
CUE: None.
__________
SAT UNSAT
- 16. PERFORMANCE STEP: Reset Source Range Detector power supply.
........C........
STANDARD: Depress the reset switch on the Source Range Detector power supply module.
CUE: None.
__________
SAT UNSAT 8 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3
- 17. PERFORMANCE STEP: Energize the contact monitor Aux. power supply
........C........ module.
STANDARD: Place the ON/OFF switch for the Aux. power supply module to ON.
CUE: None.
__________
SAT UNSAT
- 18. PERFORMANCE STEP: Reset the contact monitor Aux. power supply.
........C........
STANDARD: Depress reset switch and verify 100 to 150 volts on DC volt meter.
CUE: None.
__________
SAT UNSAT
- 19. PERFORMANCE STEP: Energize the Power Range Detector power supply.
........C.......
STANDARD: Place the ON/OFF switch on the Power Range Detector power supply module to ON.
CUE: None.
__________
SAT UNSAT
- 20. PERFORMANCE STEP: Reset the Power Range Detector power supply module.
........C........
STANDARD: Depress the reset switch on the Power Range Detector power supply module and verify DC volt meter comes on scale.
CUE: Fifteen minutes has elapsed.
__________
SAT UNSAT
- 21. PERFORMANCE STEP: Verify SHUTDOWN BYPASS key is in normal.
STANDARD: Verify SHUTDOWN BYPASS key is in normal position.
CUE: None.
__________
SAT UNSAT 9 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3
- 22. PERFORMANCE STEP: Reset TRIP bistables for Power/Pumps.
........C........
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM..
CUE: None.
__________
SAT UNSAT
- 23. PERFORMANCE STEP: Reset TRIP bistables for Power/Imbal/flow.
........C........
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM.
CUE: None.
__________
SAT UNSAT
- 24. PERFORMANCE STEP: Reset TRIP bistables for Over Power.
........C........
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM.
CUE: None.
__________
SAT UNSAT
- 25. PERFORMANCE STEP: Reset TRIP bistables for Low Press.
........C........
STANDARD: Momentarily depress the output state and output memory Switches and checking the status lights are DIM.
CUE: None.
__________
SAT UNSAT
- 26. PERFORMANCE STEP: Reset TRIP bistables for High Press.
........C........
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM.
CUE: None.
__________
SAT UNSAT 10 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3
- 27. PERFORMANCE STEP: Reset TRIP bistables for High Temp.
........C........
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM.
CUE: None.
__________
SAT UNSAT
- 28. PERFORMANCE STEP: Reset TRIP bistables for Press/Temp.
........C........
STANDARD: Momentarily depress the output state and output memory switches and checking the status lights are DIM.
CUE: None.
__________
SAT UNSAT
- 29. PERFORMANCE STEP: Reset TRIP bistables for High Bldg Press.
........C........
STANDARD: Momentarily depress the Reset switch and check both INPUT STATE lights are OFF.
CUE: None.
__________
SAT UNSAT
- 30. PERFORMANCE STEP: Clear the memory of the protective function bistables SUR ROD/WD INH (NI-1) and Flux > 10%.
STANDARD: Momentarily depress the output memory reset switches and check the status lights are DIM.
CUE: None.
__________
SAT UNSAT
- 31. PERFORMANCE STEP: Recognize failure to energize Channel Trip relay.
........C........
STANDARD: Recognize that when RESET switch is DEPRESSED, trip relay fails to energize.
CUE: (If asked) Unit Supervisor acknowledges that the Reset switch on the Trip module did NOT function but directs you to reset the channel.
__________
SAT UNSAT 11 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3
- 32. PERFORMANCE STEP: Energize Channel Trip relay.
........C........
STANDARD: Rotate MANUAL BYPASS key switch to actuate manual bypass relay and return to normal.
CUE: None.
__________
SAT UNSAT
- 33. PERFORMANCE STEP: Verify Protective Sub-system light.
STANDARD: At top of RPS cabinet, verify Protective Sub-system light DIM.
CUE: None.
__________
SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator.)
__________
END TIME 12 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 3 Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
____________________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
13 of 13
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 SIMULATOR JPM NS-4 REACTOR OPERATOR SRO - I SRO - U 1 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 Facility: Davis-Besse Task No: 071-001-02-0100 Task Title: Containment Pressure Reduction Release K/A
Reference:
GEN 2.3.11 2.7/3.2 Job Performance Measure No: New Examinee:
NRC Examiner: Date:
Method of testing:
Simulated Performance ___ Actual Performance _X_
Classroom ___ Simulator _X_ Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Initiate a pressure release of Containment and stop the Containment release when the Radwaste Exhaust Fans are found not running.
Required Materials:
DB-OP-03012 Section 4.6 and Attachment 1 appropriately signed off to allow determination of release sample time and date.
General
References:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Validation Time: 17 minutes 2 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
INITIAL CONDITION:
Mode 3 IC (at or near NOT/NOP)
Insert the following to fail PDT 645 to 20
- IMF CAPCE 0.069 ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
MALFUNCTIONS/FAILURE TO INSERT:
ACTION/CUES:
3 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 EXAMINER COPY INITIAL CONDITIONS:
The plant is in Mode 3.
A plant heatup is in progress.
Containment to annulus differential pressure has risen to 20 inches H2O. A release permit has been prepared and approved INITIATING CUES:
The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.10 of DB-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction (Hand Candidate a copy of DB-OP-03012 with appropriate sign-offs.)
4 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 CANDIDATE COPY INITIAL CONDITIONS:
The plant is in Mode 3 A plant heatup is in progress.
Containment to annulus differential pressure has risen to 20 inches H2O. A release permit has been prepared and approved INITIATING CUES:
The Unit Supervisor directs you to perform a Containment pressure reduction release beginning with step 4.6.10 of DB-OP-03012, Radioactive Gaseous Batch Release. An Equipment Operator is standing by in the Auxiliary Building with a working copy of the release procedure to take actions at your direction 5 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
- 1. PERFORMANCE STEP: Place computer point P318 on trend
........C........
STANDARD: Use the plant process computer to trend CTMT PRESS DIFF TO ANNULUS Comment: Acceptable to trend on the computer CRT or on the analog trend pens CUE: P318 reads 20 inches. (If asked) The Unit Supervisor requests a 60-second trend
__________
SAT UNSAT
- 2. PERFORMANCE STEP: Verify less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> since containment was sampled STANDARD: Determine difference is less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> between containment sample time in Item 4.e of Attachment 1 and current time CUE: NONE
__________
SAT UNSAT
- 3. PERFORMANCE STEP: Open CV5037, H2 Purge System Ctmt Isolation
........C........
STANDARD: Press OPEN on HIS5037 COMMENT: Role play to provide the Independent Verification for opening CV 5037 CUE: NONE
__________
SAT UNSAT
____________________________________________________________________________
6 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4
- 4. PERFORMANCE STEP: Open CV5038, H2 Purge System Ctmt Isolation
........C........
STANDARD: Press OPEN on HIS5038 COMMENT: Role play to provide the Independent Verification for opening CV 5038 CUE: NONE
__________
SAT UNSAT
- 5. PERFORMANCE STEP: Direct the Equipment Operator to open the containment
........C........ release skid discharge gate, to start the skid fan and to maintain flow rate at approximately 1400 on the M&TE anemometer readout.
STANDARD: Communicate via the GAI-TRONICS or radio CUE: (I/F) The Equipment Operator reports steps 4.6.14, 4.6.15 and 4.6.16 are complete.
(I/F) (If asked) Step 4.6.16 was completed by an I&C Tech (I/F) Step 4.6.14 has been independently verified.
(I/F) Step 4.6.17 Skid flow rate is 1400 on the local anemometer.
__________
SAT UNSAT
- 6. PERFORMANCE STEP: Make a Unit Log entry STANDARD: Record start time, release permit number and containment to annulus differential pressure in the Unit Log CUE: The secondary side Reactor Operator has made Unit Log entry for release start time, release permit number and containment to annulus differential pressuure
__________
SAT UNSAT
- 7. PERFORMANCE STEP: Update the release permit STANDARD: Record start date and time and containment to annulus P in Item 6 of Attachment 1 CUE: (I/F) This is the Zone 3 Equipment Operator. Neither one of the Auxiliary Building Radioactive Waste Fans are running.
__________
SAT UNSAT 7 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4
- 8. PERFORMANCE STEP: Recognize the release should be stopped
........C........
STANDARD: Communicate to the Equipment Operator the need to stop the Containment Pressure Release Skid Fan Cue: (I/F)The Containment Pressure Release Skid Fan has been stopped.
__________
SAT UNSAT
- 9. PERFORMANCE STEP: Close CV5037, H2 Purge System Ctmt Isolation
........C........
STANDARD: Press CLOSE on HIS5037 CUE: NONE __________
SAT UNSAT
- 10. PERFORMANCE STEP: Close CV5038, H2 Purge System Ctmt Isolation
........C........
STANDARD: Press CLOSE on HIS5038 CUE: NONE __________
SAT UNSAT
- 11. PERFORMANCE STEP: Notify the Shift Manager the release has been stopped STANDARD: Communicate with the Shift Manager CUE: The Shift Manager acknowledges the Containment Pressure Reduction Release has been stopped.
__________
SAT UNSAT
____________________________________________________________________________
Terminating Cue: This JPM is complete (Terminated by evaluator) ________
END TIME 8 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 4 Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
____________________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
9 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 SIMULATOR JPM NS-5 REACTOR OPERATOR SRO - I 1 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 Facility: Davis-Besse Task No: 010-018-01-0100 Task Title: Perform Boron equalization between Pressurizer and the Reactor Coolant System K/A
Reference:
(010) A1.11 Job Performance Measure No: NEW Examinee:
NRC Examiner: Date:
Method of testing:
Simulated Performance ___ Actual Performance _X_
Classroom ___ Simulator _X_ Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Equalize Boron between the RCS and the Pressurizer Required Materials:
DB-OP-06003, Pressurizer Operating Procedure, Rev. 28, Section 4.3 DB-OP-02513, Pressurizer System Abnormal Operation, Rev. 10, Section General
References:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Validation Time: 15 minutes 2 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Perform Boron equalization between Pressurizer and the Reactor Coolant System INITIAL CONDITION:
Mode 1 (RX Pwr >95%)
ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
MALFUNCTIONS/FAILURE TO INSERT:
HV001 fails to 0.041, RC2, Pressurize Spray, will fail to ~40% when RC2 CLOSE (green) light goes off.
H10I21GL==0 ACTION/CUES:
3 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 EXAMINER COPY INITIAL CONDITIONS:
The plant is operating at 100% power.
RCS boron is 1300 ppmB Pressurizer boron is 1430 ppmB INITIATING CUES:
The Unit Supervisor directs you to equalize Boron between the Reactor Coolant System and the Pressurizer using Section 4.3 of DB-OP-06003, Pressurizer Operating Procedure, for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
(Hand Candidate a copy of DB-OP06003 Section 4.3) 4 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 CANDIDATE COPY INITIAL CONDITIONS The plant is operating at 100% power.
RCS boron is 1300 ppmB Pressurizer boron is 1430 ppmB INITIATING CUES The Unit Supervisor directs you to equalize Boron between the Reactor Coolant System and the Pressurizer using Section 4.3 of DB-OP-06003, Pressurizer Operating Procedure, for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
5 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME:
- 1. PERFORMANCE STEP: Locate correct procedure section.
STANDARD: Reviews prerequisites of DB-OP-06003 Section 4.3 Determines boron difference is >100 ppm from Initial Conditions CUE: None SAT UNSAT
- 2. PERFORMANCE STEP: Place desired Pressurizer (Pzr) heater banks in ON C
STANDARD: Rotate selected Pzr heater switches clockwise to ON CUE: None SAT UNSAT
- 3. PERFORMANCE STEP: Throttle open RC2, Pzr Spray, when RCS pressure C Is between 2170 and 2200 psig STANDARD: Rotate HISRC2-1 clockwise momentarily then release HISRC2-1 CUE: None SAT UNSAT
- 4. PERFORMANCE STEP: Stabilize RCS pressure C
STANDARD: Rotate heaters switches ON and OFF, and/or HISRC2-1 clockwise/counter clockwise CUE: None SAT UNSAT 6 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5
- 5. PERFORMANCE STEP: Adjust SCR Heaters in HAND for fine adjustment C as needed STANDARD: Toggle PICRC 2 UP or DOWN to adjust SCR Heater demand CUE: None SAT UNSAT
- 6. PERFORMANCE STEP: Recognize RCS pressure is lowering C
NOTE: RC2 malfunction may have to be manually inserted.
Examiner will cue I/F when to insert malfunction.
STANDARD: Observe RCS pressure indication CUE: None SAT UNSAT
- 7. PERFORMANCE STEP: Close RC 2 STANDARD: Rotate RC2-1 counterclockwise and hold until CLOSE light comes ON CUE: None SAT UNSAT
- 8. PERFORMANCE STEP: Close RC 10, Pzr Spray Block valve C
STANDARD: Depress HIS RC 10 CLOSE button NOTE: Candidate may go to DB-OP-02513 where the Immediate Actions are to close RC2 and then RC10 CUE: None SAT UNSAT TERMINATING CUES This JPM is complete. (Terminated by the evaluator)
END TIME 7 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM -5 Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
______________________________________________________________________________
______________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
8 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 SIMULATOR JPM NS-6 REACTOR OPERATOR SRO - I 1 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 Facility: Davis-Besse Task No: 000-058-05-0100 Task Title: Establish Long Term Boron Dilution K/A
Reference:
(006) A1.11 Job Performance Measure No: JPM 002 Examinee:
NRC Examiner: Date:
Method of testing:
Simulated Performance ___ Actual Performance _X_
Classroom ___ Simulator _X_ Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Establish Long Term Boron Dilution Required Materials:
DB-OP-02000, EOP, Rev. 25, Attachment 12 General
References:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Validation Time: 12 minutes 2 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Establish Long Term Boron Dilution using the normal method through DH 11 and DH 12 INITIAL CONDITION:
Initiate a large break LOCA (IMF HH40 1.0)
Freeze the simulator after LPI has been transferred to the Emergency Sump ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Perform all necessary operator actions of DB-OP-02000, Section 5 When Section 5 routes to Section 10, complete Section 10 up to Step 10.17 Complete Steps 1 through 4 of Attachment 12 MALFUNCTIONS/FAILURE TO INSERT:
Throttle DH 206 (IRF BD206 0.85)
ACTION/CUES:
Step 7: Acknowledge the communication to the TSC 3 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 EXAMINER COPY INITIAL CONDITIONS:
A large break LOCA has occurred Both LPI pumps have been transferred to the Emergency Sump INITIATING CUES:
The Unit Supervisor directs you to establish long term boron dilution using Attachment 12 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture Steps 1 through 4 of Attachment 12 have been completed (Provide the Candidate a copy of Attachment 12 of DB-OP-02000) 4 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 CANDIDATE COPY INITIAL CONDITIONS:
A large break LOCA has occurred Both LPI pumps have been transferred to the Emergency Sump INITIATING CUES:
The Unit Supervisor directs you to establish long term boron dilution using Attachment 12 of DB-OP-02000, RPS, SFAS, SFRCS Trip and SG Tube Rupture Steps 1 through 4 of Attachment 12 have been completed 5 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME: _______
- 1. PERFORMANCE STEP: Return control power to DH 11 and DH 12
........C........
STANDARD: Depress the ON pushbutton on HIS DH11A and HIS DH12A COMMENT: DH 11 and DH 12 must be open to complete the task CUE: None
__________
SAT UNSAT
- 2. PERFORMANCE STEP: Open DH 11, Normal Suction Isolation
........C........
STANDARD: Depress the OPEN pushbutton on HIS DH11 CUE: None
__________
SAT UNSAT
- 3. PERFORMANCE STEP: Open DH 12, Normal Suction Isolation
........C........
STANDARD: Depress the OPEN pushbutton on HIS DH12 CUE: None
__________
SAT UNSAT
- 4. PERFORMANCE STEP: Remove control power from DH11 and DH12 STANDARD: Depress the OFF pushbutton on HIS DH11A and HIS DH12A CUE: None
__________
SAT UNSAT 6 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6
- 5. PERFORMANCE STEP: Check FI4909 for Long Term Boron Dilution flowrate STANDARD: Observe FI4909 less than 300 gpm CUE: (If asked). Take appropriate actions per the procedure
__________
SAT UNSAT
- 6. PERFORMANCE STEP: Throttle DH 1B
........C*........
STANDARD: *Place control power for DH 1B
- Throttle closed to establish Long Term Boron Dilution flowrate greater than 300 gpm
- Maintain LPI flow greater than 1350 gpm Remove control power from DH 1B (not critical)
CUE: None
__________
SAT UNSAT
- 7. PERFORMANCE STEP: Communicate with the Technical Support Center STANDARD: Inform the TSC that Long Term Boron Dilution via DH 11 and DH 12 has been established CUE: Acknowledge the communication to the TSC
__________
SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee)
__________
END TIME Refer to NT-OT-07001 for -
JPM VERIFICATION OF COMPLETION (DB-0528)
JPM EVALUATION
SUMMARY
(DB-0526) 7 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 6 Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
____________________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
8 of 8
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 SIMULATOR JPM NS-7 REACTOR OPERATOR SRO - I 1 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 Facility: Davis-Besse Task No: 062-023-01-0100 Task Title: Energize C1 from Bus A K/A
Reference:
(062) A4.07 Job Performance Measure No: JPM 220 Examinee:
NRC Examiner: Date:
Method of testing:
Simulated Performance ___ Actual Performance _X_
Classroom ___ Simulator _X_ Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Energize C1 fro Bus A Required Materials:
DB-OP-02521, Loss of AC Bus Power Sources, Rev. 17 General
References:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Validation Time: 21 minutes 2 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Energize C1 bus from Bus A INITIAL CONDITION:
Initialize to MODE 5 IC with DH Loop 2 operating ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Manually de-energize A and B buses to simulate a loss of offsite power followed by restoration of offsite power Place caution tags on the Hand Switches for both HPI Pumps and both Ctmt Spray Pumps MALFUNCTIONS/FAILURE TO INSERT:
HX01A fail open IMF E101C Fail open DH Pump 2 breaker IMF BDP2C Emergency Shutdown #1 EDG IRF G529G Energize D2 Bus from D1 Bus ACTION/CUES:
Step 9 Equipment Operator cue:
AC 212 is racked out 3 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 EXAMINER COPY INITIAL CONDITIONS:
The plant was in MODE 5 with Decay Heat Loop 2 operating A loss of offsite power occurred EDG 1 tripped and efforts to restart it have been unsuccessful EDG 2 is providing power to D1 and D2 Buses Decay Heat Pump 2 breaker would not re-close after D1 power was restored INITIATING CUES:
Offsite power has been restored The Unit Supervisor directs you to energize C1 Bus from A Bus in accordance with of DB-OP-02521, Loss of AC Bus Power Sources (Provide Candidate a copy of Attachment 1 of DB-OP-02521) 4 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 CANDIDATE COPY INITIAL CONDITIONS:
The plant was in MODE 5 with Decay Heat Loop 2 operating A loss of offsite power occurred EDG 1 tripped and efforts to restart it have been unsuccessful EDG 2 is providing power to D1 and D2 Buses Decay Heat Pump 2 breaker would not re-close after D1 power was restored INITIATING CUES:
Offsite power has been restored The Unit Supervisor directs you to energize C1 Bus from A Bus in accordance with of DB-OP-02521, Loss of AC Bus Power Sources 5 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT required unless denoted in the "Comments".
START TIME: _______
- 1. PERFORMANCE STEP: Locate the correct procedure step STANDARD: Finds Attachment 1 step 2.0 CUE: None
__________
SAT UNSAT
- 2. PERFORMANCE STEP: Verify Bus A large motor breakers OPEN STANDARD: Visual check of hand switches:
RCP 1 HIS RC5B1 Green light LIT RCP 2 HIS RC5A2 Green light LIT Circ Pump 1 - HIS 876 Green light LIT Circ Pump 3 - HIS 928 Green light LIT CUE: None
__________
SAT UNSAT
- 3. PERFORMANCE STEP: Place BUS A SYNC CHECK in the 01 position STANDARD: HS 6293, BUS A SYNC CHECK, placed in 01 position CUE: None
__________
SAT UNSAT
- 4. PERFORMANCE STEP: Close Bus A supply from 01 transformer STANDARD: HIS 6203, HX01A, placed to CLOSE COMMENT: HX01A will NOT close due to failure CUE: None
__________
SAT UNSAT 6 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7
- 5. PERFORMANCE STEP: Place BUS A SYNC CHECK switch in OFF STANDARD: HS 6293, BUS A SYNC CHECK, placed in OFF position CUE: (If asked), The Unit Supervisor directs you to energize Bus A from Startup Transformer 02
__________
SAT UNSAT
- 6. PERFORMANCE STEP: Place BUS A SYNC CHECK in the 02 position C
STANDARD: HS 6293, BUS A SYNC CHECK, placed in 02 position CUE: None
__________
SAT UNSAT
- 7. PERFORMANCE STEP: Close Bus A supply from 02 transformer C
STANDARD: HIS 6201, HX02A, placed to CLOSE CUE: None
__________
SAT UNSAT
- 8. PERFORMANCE STEP: Place BUS A SYNC CHECK switch in OFF STANDARD: HS 6293, BUS A SYNC CHECK, placed in OFF position CUE: None
__________
SAT UNSAT 9.. PERFORMANCE STEP: Close HAAC STANDARD: Verify HIS 6207, HAAC, indicates CLOSED COMMENT: HAAC was already closed Step critical only if HAAC is open at this point CUE: None
__________
SAT UNSAT 7 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7
- 10. PERFORMANCE STEP: Close AACC2 C
STANDARD: HIS 6218, AACC2, rotated to CLOSE COMMENT: AACC2 was already closed Step critical only if AACC2 is open at this point CUE: None
__________
SAT UNSAT
- 11. PERFORMANCE STEP: Place SYNC SELECT to BKR TO BUS C2 position C
STANDARD: HS 6221, SYNC SELECT switch, to BKR TO BUS C2 position CUE: None
__________
SAT UNSAT
- 12. PERFORMANCE STEP: Close AC110 C
STANDARD: HIS 6223, AC110, rotated to CLOSE CUE: None
__________
SAT UNSAT
- 13. PERFORMANCE STEP: Place SYNC SELECT to the OFF position STANDARD: HS 6221, SYNC SELECT, to the OFF position CUE: None
__________
SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the evaluator)
END TIME 8 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 7 Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
9 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 SIMULATOR JPM NS - 8 REACTOR OPERATOR SRO - I Page 1 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 Facility: Davis-Besse Task No: 078-009-04-0100 Task Title: Vacuum and Gland Steam Systems Actions during a Loss of Instrument Air K/A
Reference:
(055/056) K3.01 Job Performance Measure No: JPM 113 Examinee:
NRC Examiner: Date:
Method of testing:
Simulated Performance ___ Actual Performance _X_
Classroom ___ Simulator _X_ Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Vacuum and Gland Steam Actions during a Loss of Instrument Air Required Materials:
DB-OP-02528, Loss of Instrument Air, Rev. 14, Attachments 13 and 11 General
References:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Validation Time: 8 minutes Page 2 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Vacuum and Gland Steam Systems Actions during a Loss of Instrument Air INITIAL CONDITION:
Reactor tripped SFRCS manually actuated ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
Prevent Heater Drain Pumps from automatically tripping IMR DDVIB (2)
IRF DDN5 (2) 0.5 IMF DDVJB (2)
IRF DDN6 (2) 0.5 IMF DDLGC 0.0 (2)
Prevent EIAC, SAC 1 and SAC 2 from starting IMF KFS1G IMF KFECE MALFUNCTIONS/FAILURE TO INSERT:
None ACTION/CUES:
None Page 3 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 EXAMINER COPY INITIAL CONDITIONS:
The Reactor has been tripped due to a loss of Instrument Air SFRCS has been manually actuated INITIATING CUES:
The Unit Supervisor directs you to perform Vacuum and Gland Steam System actions in accordance with Attachment 13 of DB-OP-02528, Loss of Instrument Air (Provide Candidate a copy of Attachment 13 of DB-OP-02528)
Page 4 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 CANDIDATE COPY INITIAL CONDITIONS:
The Reactor has been tripped due to a loss of Instrument Air SFRCS has been manually actuated INITIATING CUES:
The Unit Supervisor directs you to perform Vacuum and Gland Steam System actions in accordance with Attachment 13 of DB-OP-02528, Loss of Instrument Air Page 5 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
- 1. PERFORMANCE STEP: Lock out the Mechanical Hogger C
STANDARD: HIS 1005 rotated to OFF and pulled CUE: None
__________
SAT UNSAT
- 2. PERFORMANCE STEP: Open VS 634 and VS 635, Condenser Vacuum Breakers C
STANDARD: HIS 634 rotated to the OPEN BOTH position CUE: None
__________
SAT UNSAT
- 3. PERFORMANCE STEP: Shutdown Steam Packing Exhauster Fans C
STANDARD: HIS 2411 (HIS 2412) rotated to the OFF position CUE: None
__________
SAT UNSAT
- 4. PERFORMANCE STEP: Check the Gland Steam Header Relief Valves are not lifting STANDARD: Check Gland Steam header pressure at 0 psig CUE: (After checking Gland Steam) The Unit Supervisor directs you to perform the Control Room actions for a loss of Instrument Air to the Condensate System in accordance with Attachment 11 of DB-OP-02528, Loss of Instrument Air (Provide the examinee a copy of Attachment 11 of DB-OP-02528)
__________
SAT UNSAT Page 6 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8
- 5. PERFORMANCE STEP: Verify a Condensate Pump is running STANDARD: Check RED light LIT on HIS for Condensate Pump 1 CUE: None
__________
SAT UNSAT
- 6. PERFORMANCE STEP: Verify Heater Drain Pump 1 is shutdown C
STANDARD: Recognize RED light is LIT on HIS for Heater Drain Pump 1 Rotate Heater Drain Pump 1 HIS to STOP CUE: (If asked), Command SRO directs you to trip the Heater Drain Pump
__________
SAT UNSAT
- 7. PERFORMANCE STEP: Verify Heater Drain Pump 2 is shutdown C
STANDARD: Recognize RED light is LIT on HIS for Heater Drain Pump 2 Rotate Heater Drain Pump 2 HIS to STOP CUE: (If asked), Command SRO directs you to trip the Heater Drain Pump
__________
SAT UNSAT
- 8. PERFORMANCE STEP: Verify CD 420 has failed closed STANDARD: Check CD 420 position indicator CUE: None __________
SAT UNSAT
- 9. PERFORMANCE STEP: Verify CD 421 has failed closed STANDARD: Check CD 421 position indicator CUE: None __________
SAT UNSAT
- 10. PERFORMANCE STEP: Verify CD 550B has failed closed STANDARD: Check CD 550B position indicator indicates 0% open CUE: None
__________
SAT UNSAT Page 7 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8
- 11. PERFORMANCE STEP: Verify CD 550A has failed closed STANDARD: Check CD 550A position indicator indicates 0% open CUE: None
__________
SAT UNSAT
- 12. PERFORMANCE STEP: Verify CD 578 has failed open STANDARD: Check RED light LIT on HIS for CD 578 CUE: None
__________
SAT UNSAT
- 13. PERFORMANCE STEP: Verify CD 2796 has failed open STANDARD: Check RED light LIT on CUE: None
__________
SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator)
__________
END TIME Page 8 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 8 Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
____________________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
Page 9 of 9
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 SIMULATOR JPM NS - 9 SRO - U 1 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 Facility: Davis-Besse Task No: 005-012-04-0100 Task Title: Start High Pressure Injection Pump upon a Loss of One Decay Heat Pump K/A
Reference:
(005) A2.03 Job Performance Measure No: JPM 187 Examinee:
NRC Examiner: Date:
Method of testing:
Simulated Performance ___ Actual Performance _X_
Classroom ___ Simulator _X_ Plant ___
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Start a High Pressure Injection Pump upon a loss of a Decay Heat Pump Required Materials:
DB-OP-02527,Loss of Decay Heat Removal, Rev. 14 General
References:
Initiating Cue:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Time Critical Task: No Validation Time: 20 minutes 2 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 SIMULATOR INSTRUCTIONS TASK DESCRIPTION:
Start High Pressure Injection Pump upon a Loss of One Decay Heat Pump INITIAL CONDITION:
RCS Drained to 80 inches, DH Loop 2 in Service ADDITIONAL SETUP/DEVIATION FROM INITIAL CONDITION:
- Remove breaker open placards from DH7A and DH7B.
- SPDS Decay Heat Removal Screen is not working.
- Verify DH14A, DH14B, DH13A, and DH13B are closed.
- Hang Red Tags on HPI Pumps 1 & 2 control switches.
- Place Ops Info tags on DH 1517, DH 1518, DH 63, DH 64, DH 2733, and DH 2734 stating breaker open per DB-OP-06012.
- Place OPEN placards on DH 1517 and DH 1518.
- Place CLOSED placards on DH 63, DH 64, DH 2733, and DH 2734.
MALFUNCTIONS/FAILURE TO INSERT:
Insert malfunction to fail Decay Heat Pump 2s breaker open (IMF BDP2C).
Insert malfunction to fail Decay Heat Pump 1s breaker open (IMF BDP1C).
ACTION/CUES:
NOTE: Use proper three-part communication for any necessary cues.
- 1. Step 1: (if sent) Breaker AD112 indicates 50/51 phases A and C relays tripped.
- 2. Step 1: (if sent) DH Pump 2 shows no abnormal indications.
- 3. Step 12: Breaker BE 1157-A on E11A for DH7B has been closed. (IRF BD7B)
- 4. Step 13: All tags have been removed from breaker AC111. Breaker AC111 has been racked in (IRF BFP1A OPERATE). Breaker AC111 close power fuses have been installed (IRF BFP1C FALSE).
3 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 EXAMINER COPY INITIAL CONDITIONS:
The plant has been in Mode 5 for 25 days.
RCS temperature is 108°F.
RCS level is 80 inches on LI 10577A and B, RCS level indication, for maintenance activities.
Time to boil is 30 minutes.
Decay Heat Train 2 is in service.
Decay Heat Train 1 is in standby.
No RCS boron dilution is in progress.
The SPDS Decay Heat Removal Screen is not functioning.
INITIATING CUES:
Decay Heat Pump 2 has tripped on overcurrent.
CTMT has been evacuated, CTMT closure has been established.
The Shift Manager directs you to start Decay Heat Pump 1 in the decay heat mode using DB-OP-02527.
You have permission to operate any locked valves required.
Desired decay heat flow is 1500 gpm.
(Provide copy of DB-OP-02527 to Candidate) 4 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 CANDIDIATE COPY NITIAL CONDITIONS:
The plant has been in Mode 5 for 25 days.
RCS temperature is 108°F.
RCS level is 80 inches on LI 10577A and B, RCS level indication, for maintenance activities.
Time to boil is 30 minutes.
Decay Heat Train 2 is in service.
Decay Heat Train 1 is in standby.
No RCS boron dilution is in progress.
The SPDS Decay Heat Removal Screen is not functioning.
INITIATING CUES:
Decay Heat Pump 2 has tripped on overcurrent.
CTMT has been evacuated, CTMT closure has been established.
The Shift Manager directs you to start Decay Heat Pump 1 in the decay heat mode using DB-OP-02527.
You have permission to operate any locked valves required.
Desired decay heat flow is 1500 gpm.
5 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT assumed unless denoted in the "Comments".
START TIME: _______
- 1. PERFORMANCE STEP: Locate the correct procedure attachment.
STANDARD: Identify Attachment 1, as the correct procedure attachment.
COMMENT: Examinee will route through Section 4.1 of the procedure to Step 4.1.7, which sends Candidate to Attachment 1. Repeat initiating cues as necessary.
Use proper three-part communication for cues.
CUE: (If asked) No signs of pump cavitation existed before the pump tripped.
__________
SAT UNSAT
- 2. PERFORMANCE STEP: Close DH 14B.
STANDARD: Depress auto on HIS DH 14B and verify zero demand is indicated on HIC DH14B and/or Green light comes ON.
CUE: None.
__________
SAT UNSAT
- 3. PERFORMANCE STEP: Close DH 13B.
STANDARD: Depress auto on HIS DH 13B and verify zero demand is indicated on HIC DH1B and/or Green light is ON.
COMMENT: Operator should route to step 6. If not, provide appropriate cues.
CUE: If asked, No signs of cavitation present.
__________
SAT UNSAT 6 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9
- 4. PERFORMANCE STEP: Verify open DH 1517 STANDARD: Using HIS 1517, depress open pushbutton looking for red light.
CUE: None.
_________
SAT UNSAT
- 5. PERFORMANCE STEP: Verify closed DH 10.
STANDARD: Turn handwheel in closed direction with no movement CUE: (I/F) Plant Operator will report DH 10 is closed SAT UNSAT
- 6. PERFORMANCE STEP: Verify open DH 11 and DH 12 or DH 21 and DH 23.
STANDARD: Visual verification of Red light on HIS DH11 and HIS DH12.
COMMENT: Use proper three-part communication for cues.
CUE: If asked: DH 21 and DH 23 are not to be used per SM discretion.
__________
SAT UNSAT
STANDARD: Verify CCW Pump 1 and SW Pump 1 are running and CC 1467 Red indicating light is LIT.
COMMENT: May also check SW36 open by placard and/or SW1424 is open or throttled.
CUE: None.
__________
SAT UNSAT
- 8. PERFORMANCE STEP: Verify open DH 1B STANDARD: Visual verification of Red light is LIT on HIS DH1B.
COMMENT: Only critical if DH 1B is closed.
CUE: None.
SAT UNSAT 7 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9
- 9. PERFORMANCE STEP: Start DH Pump 1 using HIS DH 6B.
STANDARD: Recognize DH Pump 1 does not start.
COMMENT: Examinee should route back to procedure step 4.1.7 and perform RNO CUE: (If asked) The Shift Manager directs you to continue in the Loss of Decay Heat Removal procedure while he investigates the failure of DH Pump 1.
__________
SAT UNSAT
- 10. PERFORMANCE STEP: Determine if either SG is functional.
STANDARD: Determine if RCS is intact.
CUE: (If asked) The SGs are not available.
SAT UNSAT
- 11. PERFORMANCE STEP: Establish a feed flowpath using Attachment 5
........C........
STANDARD: Determine that an HPI Pump is the available feed flowpath.
CUE: (If asked) The Shift Manager directs you to establish a feed flowpath using HPI Pump 1.
__________
SAT UNSAT
- 12. PERFORMANCE STEP: Locate the correct procedure attachment.
........C........
STANDARD: Identify Attachment 7, as the correct procedure attachment.
CUE: (If asked) The Shift Manager has verified the System Status File and Safety Tagging file for HPI show the system valve lineup is complete for Mode 3 entry.
__________
SAT UNSAT 8 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9
STANDARD: Refer to Attachment 10 for flowpaths available.
COMMENT: Examinee may refer to OS 003 and OS 004 or Attachment 9. Examinee may also direct an Equipment Operator to verify the position of DH and HPI valves in the flowpath.
CUE: None.
__________
SAT UNSAT
- 14. PERFORMANCE STEP: Verify DH 7B or DH 7A are open
........C........
STANDARD: Verify indication using appropriate switch CUE: None SAT UNSAT
- 15. PERFORMANCE STEP: Restore HPI Pump 1 breaker to service, if necessary.
........C........
STANDARD: Communicate with an EO to remove tags, rack in, and insert close power fuses on 4160 VAC breaker AC111.
CUE: (If asked) The Shift Manager has given permission to remove the Safety tag from AC111 breaker for HPI pump 1.
__________
SAT UNSAT
- 16. PERFORMANCE STEP: Close High Pressure Injection valves HP 2C, and 2D.
STANDARD: Visual verification of Green light is LIT on HIS HP2C and HIS HP2D.
CUE: None.
__________
SAT UNSAT 9 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9
- 17. PERFORMANCE STEP: Start HPI Pump 1.
........C........
STANDARD: Place HIS 1524 to START, then release. Observe the Red light goes ON and the Green light goes OFF.
CUE: None.
__________
SAT UNSAT
- 18. PERFORMANCE STEP: Throttle HP 2C, and 2D to establish injection flow
........C........
STANDARD: Press the open pushbutton on HP 2C and HP 2D using HIS HP2C and HIS HP2D until flow is established.
COMMENT: Actual flow rate is not critical at this step, provided some flow is provided.
CUE: None.
__________
SAT UNSAT
- 19. PERFORMANCE STEP: Monitor incore thermocouples.
STANDARD: Examine incore thermocouple temperatures on the PAM Panels.
CUE: None.
__________
SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the evaluator).
__________
END TIME 10 of 11
Appendix C, Rev. 9 Job Performance Measure Form ES-C-1 Worksheet SIMULATOR JPM - 9 Verification of Completion Job Performance Measure No.
Examinees Name:
Examiners Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:_____________________________________________________________
____________________________________________________________________________
________________________________________________________________
Response:_____________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________________
11 of 11