| {{#Wiki_filter:Re quest for Relief 48 Re quest for Relief 48 q | | {{#Wiki_filter:Requestq for Relief 48 Phased Array Ultrasonic Examination in lieu of Radiography Ari ona P Arizona Publicblic Service Ser ice Compan Company Douglas Hansen Sr Consulting Engineer & Level III |
| q Phased PhasedArray Ultrasonic Examination Array Ultrasonic Examination in lieu of
| |
|
| |
|
| in lieu of Radiography RadiographyArionaPblicSericeCompan ArionaPblicSericeCompan Ari z ona P u blic Ser v ice Compan y Ari z ona P u blic Ser v ice Compan y Douglas HansenSr Consulting Engineer & LevelIII Agenda*Applicable codesRlifRt48S*R e li e f R eques t 48 S cope*Reasonfor Relief Request 48
| | Agenda |
| *CodeCaseN-659-2*Code Case N-659-2 *Paragraph summary comparison (Attachment 2 of Relief Request)P/ThiVlidti
| | * Applicable codes |
| *P rocess/T ec h n i que V a lid a ti on*Samplecomparison graphics
| | * R li f R Relief Requestt 48 Scope S |
| *Conclusion Applicable Codes | | * Reason for Relief Request 48 |
| *Construction Code ASME III | | * Code Case N-659-2 |
| *1974 Edition,Winter 1975 Addenda | | * Paragraph summary comparison (Attachment 2 of Relief Request) |
| *Repairs/Replacements | | P /T h i |
| *ASMEXI2001Edition,2003AddendaASME XI 2001 Edition, 2003 Addenda Scope*ASME Class 2 piping circumferential butt welds | | * Process/Technique V Validation lid ti |
| *Carbon steel base and weld metal | | * Sample comparison graphics |
| *Thickness > | | * Conclusion |
| 0.337" *Diameters > | | |
| 6" NPS*Geometry shall allow 100% coverage | | Applicable Codes |
| *Weldand1/2"basemetaloneachside | | * Construction Code ASME III |
| *Weld and 1/2 base metal on each side*PVNGS Units 1, 2 and 3 forthe 3 rdinterval*Unit 1 thru 7-17-2018
| | * 1974 Edition, Winter 1975 Addenda |
| *Unit 2 thru 3-17-2017 | | * Repairs/Replacements |
| *Unit 3 thru 1-10-2018 | | * ASME XI 2001 Edition, 2003 Addenda |
| | |
| | Scope |
| | * ASME Class 2 piping circumferential butt welds |
| | * Carbon steel base and weld metal |
| | * Thickness > 0.337 |
| | * Diameters > 6 NPS |
| | * Geometry shall allow 100% coverage |
| | * Weld and 1/2 1/2 base metal on each side |
| | * PVNGS Units 1, 2 and 3 for the 3rd interval |
| | * Unit 1 thru 7-17-2018 |
| | * Unit 2 thru 3-17-2017 |
| | * Unit 3 thru 1-10-2018 |
|
| |
|
| ===Reason for Request=== | | ===Reason for Request=== |
| *Personnel-using Phased Array Ultrasonic Examination Technique (PAUT) reduces: | | * Personnel - using Phased Array Ultrasonic Examination Technique (PAUT) reduces: |
| *Exposure risk | | * Exposure risk |
| *Dose*Crew size*Outage-using PAUT:Reducestimeforresults | | * Dose |
| *Reduces time for results*Reduces impact to the schedule | | * Crew size |
| *Allows adjacent work to proceed | | * Outage - using PAUT: |
| *Reduces risk (errors) associated with | | * Reduces time for results |
| ()starting/stopping/rescheduling critical activities
| | * Reduces impact to the schedule |
| *Quality-using PAUT: | | * Allows adjacent work to proceed |
| *Increasescriticalflawdetection Increases critical flaw detection*Provides flaw depths for repairs | | * Reduces risk ((errors)) associated with starting/stopping/rescheduling critical activities |
| *Recorded data for reviews and retention Code Case N-659-2 Inquiry: Under what conditions and limitations may an ultrasonic examination beusedinlieuofradiographywhereradiographyisrequiredbyNB | | * Quality - using PAUT: |
| -5200, be used in lieu of radiography where radiography is required by NB 5200, NC-5200, ND-5200, WB-5200 or WC-5200, and substitution of ultrasonic examination would not otherwise be permitted?Reply: It is the opinion of the Committee that all welds may be examined using the ultrasonic (UT) method in lieu of the radiographic (RT) method, providedthatallofthefollowingrequirementsaremet:
| | * Increases critical flaw detection |
| provided that all of the following requirements are met: | | * Provides flaw depths for repairs |
| | * Recorded data for reviews and retention |
| | |
| | Code Case N-659-2 Inquiry: Under what conditions and limitations may an ultrasonic examination be used in lieu of radiography where radiography is required by NB-5200, NB 5200, NC-5200, ND-5200, WB-5200 or WC-5200, and substitution of ultrasonic examination would not otherwise be permitted? |
| | Reply: It is the opinion of the Committee that all welds may be examined using the ultrasonic (UT) method in lieu of the radiographic (RT) method, provided that all of the following requirements are met: |
| | |
| N-659-2 (a) Examination Area | | N-659-2 (a) Examination Area |
| *Additional restrictions: | | * Additional restrictions: |
| *100% coverage (in all 4 directions) | | * 100% coverage (in all 4 directions) |
| *Weld ground flush | | * Weld ground flush |
| *Surfaceexamination(PTorMT)SfEA B Surface examination (PT or MT)S ur f ace Exam A-B1/2"1/2"AB CDPAUT Exam Volume A-B-C-D N-659-2 (b) Examination Procedure | | * Surface examination (PT or MT) |
| *Additional restrictions:
| | S f Surface EExam A-B AB 1/2 1/2 A B C D PAUT Exam Volume A-B-C-D |
| *ASME Section V Article 4; 2001 Edition, 2003 Addenda
| |
| *PAUT with minimum of 40-70 degrees
| |
| *Volumescannedwith0degreeVolume scanned with 0 degree N 6592()PdDtti*Additional restrictions:
| |
| *Demonstrationforeachnominaldiameterandthickness N-659-2 (c)P roce d ure D emons t ra ti onDemonstration for each nominal diameter and thickness*Essential and non-essential requirements documented N-659-2 (d) Qualification Blocks
| |
| *Additional restrictions:
| |
| *For each nominal diameter and thickness 692()il*Additional restrictions:
| |
| *None;castandausteniticproductsarenotincluded N-6 5 9-2 (e) Mater i a l s*None; cast and austenitic products are not included N-659-2(f)ExaminationPlan
| |
| *Additional restrictions:
| |
| *None; an exam plan and sketch will be provided N-659-2 (f) Examination Plan N-659-2 (g) Acceptance Criteria
| |
| *Additional restrictions:
| |
| *ASME Section III; 2001 Edition, 2003 Addenda N-659-2 (h) Pre-Service Examinations
| |
| *Additional restrictions:
| |
| *Pre-Service Examinations (PSE) will be performed, when required, in addition to the proposed PAUT examinations
| |
| *Additionalrestrictions:N-659-2 (i& j) Acquisition Additional restrictions:
| |
| *None, examinations will be auto (encoded) and recorded
| |
| *Additional restrictions:
| |
| *Noneforacquisitionpersonnel;theywillbequalifiedand N-659-2 (k) Acquisition Personnel
| |
| *None , for acquisition personnel; they will be qualified and trained using the same demonstrated equipment N-659-2 (k) Analysis Personnel
| |
| *Additional restrictions:
| |
| *They will demonstrate their capability to detect and characterize flaws; will utilized data acquired with the demonstrated procedure; and:
| |
| *Detection*ASME XI Table VIII-S2-1
| |
| *Flawed grading units will be 1/4" longerthanactualflaw longer than actual flaw*Unflawed grading units will be a min of 1"*At least 2 of the flaws will meet N-659-2 (d) sizes
| |
| *Sizing*Flaws will be sized as being >
| |
| actual lengthFlillbl*Flaws w ill b e proper l y categorized as surface or
| |
|
| |
|
| subsurface Additiltiti N-659-2 (l) ANII | | N-659-2 (b) Examination Procedure |
| *Additi ona l res t r i c ti ons:*None; review and acceptance of the ANII N 6592(m)Other Requirements | | * Additional restrictions: |
| *Additional restrictions: | | * ASME Section V Article 4; 2001 Edition, 2003 Addenda |
| *None; other related requirements will be met N-659-2 (m) Other Requirements N-659-2 (n) Repairs | | * PAUT with minimum of 40-70 degrees |
| *Additional restrictions: | | * Volume scanned with 0 degree N 659 2 (c) |
| *None; flaws will be repaired and the weld re-examined | | N-659-2 ( ) Procedure P d D Demonstrationt ti |
| *Additional restrictions:
| | * Additional restrictions: |
| *None;theCasenumberwillberecorded N-659-2 (o) Code Case
| | * Demonstration for each nominal diameter and thickness |
| *None; the Case number will be recorded Process/Technique Validation | | * Essential and non-essential requirements documented |
| *PVNGS developed a set of actual weld flawed specimens | | |
| *Flaws totaled over 60 for Carbon Steel | | N-659-2 (d) Qualification Blocks |
| *Porosity*Incomplete fusion | | * Additional restrictions: |
| *Incompletepenetration Incomplete penetration | | * For each nominal diameter and thickness N-659-2 6 9 2 (e) ( ) Materials i l |
| *Slag*CrackingSihbdihd fi*S pec i mens have been ra diograp h e d f or compar i son*Specimens are being digital radiographedfor additional comparison Process/Technique Validation Process/Technique Validation RESULTS RESULTS *PAUT detected all the RT indicated flaws | | * Additional restrictions: |
| *PAUT detected several additional areas of incomplete fusion | | * None; cast and austenitic products are not included N-659-2 (f) Examination Plan |
| *PAUTdetectedallofthecracksintheexamvolume
| | * Additional restrictions: |
| *PAUT detected all of the cracks in the exam volume 14-100-CS SLAGRT ~1" lengthPAUT ~1" length 8-120-CS Incomplete FusionRT ~1" intermittent PAUT~1"length PAUT ~1 length 12-100-CS Incomplete PenetrationRT ~ 3/4" length PAUT~3/4"length PAUT 3/4 length (~1.2" in other direction) 8-120-CS PorosityRT ~1" lengthPAUT ~1" length 10-60-CS ID Crack (PT) | | * None; an exam plan and sketch will be provided |
| | |
| | N-659-2 (g) Acceptance Criteria |
| | * Additional restrictions: |
| | * ASME Section III; 2001 Edition, 2003 Addenda |
| | |
| | N-659-2 (h) Pre-Service Examinations |
| | * Additional restrictions: |
| | * Pre-Service Examinations (PSE) will be performed, when required, in addition to the proposed PAUT examinations N-659-2 (i & j) Acquisition |
| | * Additional restrictions: |
| | * None, examinations will be auto (encoded) and recorded N-659-2 (k) Acquisition Personnel |
| | * Additional restrictions: |
| | None for acquisition personnel; they will be qualified and |
| | * None, trained using the same demonstrated equipment |
| | |
| | N-659-2 (k) Analysis Personnel |
| | * Additional restrictions: |
| | * They will demonstrate their capability to detect and characterize flaws; will utilized data acquired with the demonstrated procedure; and: |
| | * Detection |
| | * ASME XI Table VIII-S2-1 |
| | * Flawed grading units will be 1/4 longer than actual flaw |
| | * Unflawed grading units will be a min of 1 |
| | * At least 2 of the flaws will meet N-659-2 (d) sizes |
| | * Sizing |
| | * Flaws will be sized as being > |
| | actual length Fl |
| | * Flaws will ill b be properly l |
| | categorized as surface or subsurface |
| | |
| | N-659-2 (l) ANII |
| | * Additionall restrictions: |
| | Additi t i ti |
| | * None; review and acceptance of the ANII N 659 2 (m) Other Requirements N-659-2 |
| | * Additional restrictions: |
| | * None; other related requirements will be met N-659-2 (n) Repairs |
| | * Additional restrictions: |
| | * None; flaws will be repaired and the weld re-examined N-659-2 (o) Code Case |
| | * Additional restrictions: |
| | * None; the Case number will be recorded |
| | |
| | Process/Technique Validation |
| | * PVNGS developed a set of actual weld flawed specimens |
| | * Flaws totaled over 60 for Carbon Steel |
| | * Porosity |
| | * Incomplete fusion |
| | * Incomplete penetration |
| | * Slag |
| | * Cracking |
| | * S Specimens i h have been b radiographed di h d for f comparison i |
| | * Specimens are being digital radiographed for additional comparison |
| | |
| | Process/Technique Validation Process/Technique Validation RESULTS |
| | * PAUT detected all the RT indicated flaws |
| | * PAUT detected several additional areas of incomplete fusion |
| | * PAUT detected all of the cracks in the exam volume |
| | |
| | 14-100-CS SLAG RT ~1 length PAUT ~1 length |
| | |
| | 8-120-CS Incomplete Fusion RT ~1 intermittent PAUT ~1 |
| | ~1 length |
| | |
| | 12-100-CS Incomplete Penetration RT ~ 3/4 length PAUT ~3/43/4 length |
| | (~1.2 in other direction) |
| | |
| | 8-120-CS Porosity RT ~1 length PAUT ~1 length |
| | |
| | 10-60-CS ID Crack (PT) |
| RR 48 Summary | | RR 48 Summary |
| *Additional restrictions (requirements) to N-659-2: | | * Additional restrictions (requirements) to N-659-2: |
| *Automated (encoded) Phased Array Ultrasonic Examination | | * Automated (encoded) Phased Array Ultrasonic Examination |
| *Allweldswillreceiveasurface(PTorMT)examination
| | * All welds will receive a surface (PT or MT) examination |
| *All welds will receive a surface (PT or MT) examination | | * Weld caps will be ground flush |
| *Weld caps will be ground flush | | * Volume will be scanned in all 4 directions |
| *Volume will be scanned in all 4 directions | | * 100% coverage |
| *100% coverage | | * Volume will be scanned with a 0 degree |
| *Volume will be scanned with a 0 degree | | * Demonstration for each nominal diameter and thickness |
| *Demonstration for each nominal diameter and thickness | | * Data will be recorded for analysis and retention |
| *Data will be recorded for analysis and retention | | * PSE will be in addition and per ASME Section XI |
| *PSEwillbeinadditionandperASMESectionXI
| | |
| *PSE will be in addition and per ASME Section XI Conclusion ConclusionRR 48 utilizes as a basis Code Case N-659-2RR48 requires additional restrictionsRR 48provides an acceptable level of quality and safety}} | | Conclusion RR 48 utilizes as a basis Code Case N-659-2 RR 48 requires additional restrictions RR 48 provides an acceptable level of quality and safety}} |
Letter Sequence Request |
---|
|
|
MONTHYEARML12229A0462012-08-0101 August 2012 Relief Request 48 - Proposed Alternative to American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section III - Phased Array Ultrasonic Examination Techniques in Lieu of Radiography Project stage: Request ML12227A8562012-08-17017 August 2012 Notice of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 Project stage: Meeting ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography Project stage: Request ML12243A4382012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT Vs Rt Discussion Project stage: Request ML12243A4662012-08-30030 August 2012 Acceptance Review Results Email - for Relief Request Related to Phased Array Ultrasonic Examination Techniques Project stage: Acceptance Review ML12244A2152012-09-20020 September 2012 8/30/2012 Summary of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 Project stage: Meeting ML12321A3572012-11-16016 November 2012 Email. Request for Additional Information Relief Request No. RR48, Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section Xi.. Project stage: RAI ML12328A0482012-11-21021 November 2012 Email, Request for Additional Information Relief Request 48 - ASME, Boiler and Pressure Vessel Code, Section III - Phased Array Ultrasonic Examination Techniques in Lieu of Radiography Project stage: RAI ML13014A0402013-01-0404 January 2013 Response to Request for Additional Information, Relief Request 48 - Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III - Phased Array Ultrasonic Examination.. Project stage: Response to RAI ML13091A1772013-04-12012 April 2013 Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Exam Techniques in Lieu of Radiography for Remainder of Third 10-Year Inservice Inspection Interval Project stage: Other 2012-08-17
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23090A1392023-04-0404 April 2023 April 4, 2023 Presubmittal Meeting Presentation - LAR to Adopt TSTF-266, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (EPID: L?2023?LRM-0017) ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19192A0972019-07-11011 July 2019 License Amendment Request for Emergency Plan, July 11, 2019 ML18299A0722018-09-26026 September 2018 Ionizing Radiation Factsheet-Veterans - Information for Veterans and Their Families ML17320A1932017-11-15015 November 2017 NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision Making ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML16357A6872016-12-20020 December 2016 One-Time License Amendment Request Unit 3 Train B Diesel Generator ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15156B3522015-06-0404 June 2015 Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage ML13308C3402013-11-0404 November 2013 SG Unit 3 Telephone Call ML13025A2832013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Palo Verde ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography ML12243A4382012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT Vs Rt Discussion ML12243A4472012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT in Lieu of Rt for Nuclear Power Plant Applications ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML11188A0722011-07-0606 July 2011 NRC Meeting with NEI and Licensees June 28, 2011 Workshop Engineering Approach Rev F 2024-02-07
[Table view] Category:Meeting Agenda
MONTHYEARPMNS20240087, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-01-25025 January 2024 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment Request by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20231377, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-12-0707 December 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed License Amendment by Making Use of Risk-Informed Process for Evaluations at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20231177, Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 12023-10-19019 October 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan PMNS20230945, Presubmittal Meeting with Arizona Public Service Company to Discuss Alloy 600 Management Program Plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-08-18018 August 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss Alloy 600 Management Program Plan at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line PMNS20230590, Presubmittal Meeting with Arizona Public Service Company to Discuss ASME Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-05-0404 May 2023 Presubmittal Meeting with Arizona Public Service Company to Discuss ASME Appendix L Alternate Approach to Pressurizer Surge Line Inspections at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230286, Presubmittal Meeting with Arizona Public Service Company Regarding Planned Containment Temperature and Safety Injection Tank Volume License Amendment Request(S) at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-04-0303 April 2023 Presubmittal Meeting with Arizona Public Service Company Regarding Planned Containment Temperature and Safety Injection Tank Volume License Amendment Request(S) at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20230297, Presubmittal Meeting with Arizona Public Service Company Regarding a Planned License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-03-22022 March 2023 Presubmittal Meeting with Arizona Public Service Company Regarding a Planned License Amendment Request to Adopt TSTF-266 at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) PMNS20230166, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 32023-02-17017 February 2023 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned 10 CFR 20.1703 and 20.1705 Requests to Use Supplied Air Suits at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20221074, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32022-10-13013 October 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-107 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220282, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-487 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32022-03-22022 March 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-487 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML22013B2642022-01-13013 January 2022 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request for Palo Verde Nuclear Generating Station, Unit 2 PMNS20211505, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-567 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-11-29029 November 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Adoption of TSTF-567 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides PMNS20211411, Notice of Second Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-11-16016 November 2021 Notice of Second Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211230, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-10-0606 October 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20211082, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-08-17017 August 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Proposed Exemption Based on Risk-Informed Process for Evaluations for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210743, Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request No. 67 for Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-06-0202 June 2021 Notice of Presubmittal Meeting with Arizona Public Service Company Regarding Planned Relief Request No. 67 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210576, Notice of Meeting with Arizona Public Service Company Regarding a License Transfer Associated with Palo Verde Nuclear Generating Station, Units 1, 2, and 32021-05-0303 May 2021 Notice of Meeting with Arizona Public Service Company Regarding a License Transfer Associated with Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210105, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station2021-02-0303 February 2021 Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station PMNS20210096, Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station2021-01-26026 January 2021 Predecisional Enforcement Conference with Palo Verde Nuclear Generating Station PMNS20201399, Notice of Meeting with Arizona Public Service Company2020-12-15015 December 2020 Notice of Meeting with Arizona Public Service Company ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML14077A3712014-03-18018 March 2014 Notice of Public Meeting with Arizona Public Service Company to Discuss Extension of Authorized Repair to Palo Verde, Unit 3, Bottom-Mounted Instrumentation to End of Unit 3 Operating Life ML13294A3732013-10-21021 October 2013 11/4/13 Notice of Meeting with Arizona Public Service Company to Discuss Non-destructive Examination Efforts, Repairs, and Progress on Root Cause Identified During Inspection of Bottom-Mounted Instrumentation Nozzles at Palo Verde, Unit 3 ML13281A2032013-10-0909 October 2013 11/5/2013 Notice of Preapplication Meeting to Discuss License Amendment Request to Incorporate Nuclear Energy Institute NEI-11-04 Quality Assurance Program at Palo Verde, Units 1, 2, and 3 ML13199A0082013-07-22022 July 2013 Meeting Notice with Arizona Public Service Company Low Pressure Safety Injection Pump Single Failure Analysis for Minimum Required Refueling Water Tank Transfer Volume at Palo Verde, Units 1, 2, and 3 ML13156A2322013-06-13013 June 2013 7/11/13 Notice of Preapplication Meeting with Arizona Public Service Company to Discuss License Amendment Request Related to the Startup Test Activity Reduction Program at Palo Verde, Units 1, 2, and 3 ML13143A0892013-05-23023 May 2013 Meeting Notice with Arizona Public Service Company to Discuss the U.S. Nuclear Regulatory Commission (NRC) Staff'S Draft Request for Additional Information Relating to the February 28, 2013, Submittal ML13135A3702013-05-17017 May 2013 Notice of 5/30/13 Conference Call with Arizona Public Service Company to Discuss Draft Requests for Additional Information for Palo Verde, Units 1, 2, and 3 NRC Order Number EA-12-049 Related to Mitigation Strategies (TAC Nos. MF0829-MF0831 ML13127A2432013-05-0808 May 2013 5/29/13 Meeting Via Conference Call with Arizona Public Service Company to Discuss Palo Verde Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 (TAC ME8160-ME81 ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography ML12227A8562012-08-17017 August 2012 Notice of Meeting with Arizona Public Service Company to Discuss Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Examination Techniques for Palo Verde, Units 1, 2, and 3 ML1108803052011-03-29029 March 2011 Notice of Special Open Meeting with Arizona Corporation Commission ML1030900182010-11-0505 November 2010 Notice of Meeting with Arizona Public Service Company to Discuss Palo Verde, Units 1, 2, and 3 License Amendment Request to Revise Technical Specification 3.7.4, Atmospheric Dump Valves. ML1023102542010-08-24024 August 2010 Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement (Dseis) for Palo Verde Nuclear Generating Station ML1012703882010-06-25025 June 2010 License Renewal - May 6, 2010 Public Meeting - Arizona Public Service Handout ML1009804822010-04-20020 April 2010 05/06/10 Notice of Public Working Meeting with Arizona Public Service to Discuss Issues Related to the Palo Verde Nuclear Generating Station License Renewal Application ML0919001382009-08-0404 August 2009 06/25/09 Summary of Public Environmental Scoping Meetings Related to the Review of the Palo Verde License Renewal Application ML0914803482009-06-0303 June 2009 06/25/2009 Meeting Notice to Discuss the License Renewal Process and Environmental Scoping for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 License Renewal Application Review ML0904204802009-02-11011 February 2009 Ltr to the Honorable Andy Rash, Hood County Judge, Invite to Observe NRC Participation in a Radiological Emergency Preparedness Exercise Involving the Palo Verde Nuclear Generating Station, 02/11/2009 ML0904204642009-02-11011 February 2009 Ltr to the Honorable Walter Maynard, Somervell County Judge, Invite to Observe Region IV Participation in a Radiological Emergency Preparedness Exercise Involving Palo Verde Nuclear Generating Station, 02/11/2009 ML0807100082008-03-11011 March 2008 Notice of Meeting with Arizona Public Service, Entergy Operations, Inc., Exelon Generation Co., FPL Energy, Luminant Generation Co., South Carolina Electric & Gas Co., STP Electric Generating Co., & Southern Nuclear Operating Co ML0807010162008-03-0606 March 2008 Meeting with Arizona Public Service Company to Discuss an Inspection Finding Associated with the Identification and Timely Correction of an Emergency Preparedness Performance Weakness in Classifying Emergency Actions at Palo Verde ML0729204682007-10-29029 October 2007 09/25/2007, Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Strategic Teaming and Resource Sharing Representatives to Discuss License Renewal Activities ML0724904812007-09-11011 September 2007 Notice of Meeting with Strategic Teaming and Resource Sharing (Stars) for Licensees of Comanche Peak, Diablo Canyon, Palo Verde, South Texas, and Wolf Creek Plants 2024-01-25
[Table view] |
Text
Requestq for Relief 48 Phased Array Ultrasonic Examination in lieu of Radiography Ari ona P Arizona Publicblic Service Ser ice Compan Company Douglas Hansen Sr Consulting Engineer & Level III
Agenda
- R li f R Relief Requestt 48 Scope S
- Reason for Relief Request 48
- Paragraph summary comparison (Attachment 2 of Relief Request)
P /T h i
- Process/Technique V Validation lid ti
- Sample comparison graphics
Applicable Codes
- Construction Code ASME III
- 1974 Edition, Winter 1975 Addenda
- ASME XI 2001 Edition, 2003 Addenda
Scope
- Carbon steel base and weld metal
- Geometry shall allow 100% coverage
- Weld and 1/2 1/2 base metal on each side
- PVNGS Units 1, 2 and 3 for the 3rd interval
Reason for Request
- Personnel - using Phased Array Ultrasonic Examination Technique (PAUT) reduces:
- Reduces impact to the schedule
- Allows adjacent work to proceed
- Reduces risk ((errors)) associated with starting/stopping/rescheduling critical activities
- Increases critical flaw detection
- Provides flaw depths for repairs
- Recorded data for reviews and retention
Code Case N-659-2 Inquiry: Under what conditions and limitations may an ultrasonic examination be used in lieu of radiography where radiography is required by NB-5200, NB 5200, NC-5200, ND-5200, WB-5200 or WC-5200, and substitution of ultrasonic examination would not otherwise be permitted?
Reply: It is the opinion of the Committee that all welds may be examined using the ultrasonic (UT) method in lieu of the radiographic (RT) method, provided that all of the following requirements are met:
N-659-2 (a) Examination Area
- 100% coverage (in all 4 directions)
- Surface examination (PT or MT)
S f Surface EExam A-B AB 1/2 1/2 A B C D PAUT Exam Volume A-B-C-D
N-659-2 (b) Examination Procedure
- PAUT with minimum of 40-70 degrees
- Volume scanned with 0 degree N 659 2 (c)
N-659-2 ( ) Procedure P d D Demonstrationt ti
- Demonstration for each nominal diameter and thickness
- Essential and non-essential requirements documented
N-659-2 (d) Qualification Blocks
- For each nominal diameter and thickness N-659-2 6 9 2 (e) ( ) Materials i l
- None; cast and austenitic products are not included N-659-2 (f) Examination Plan
- None; an exam plan and sketch will be provided
N-659-2 (g) Acceptance Criteria
N-659-2 (h) Pre-Service Examinations
- Pre-Service Examinations (PSE) will be performed, when required, in addition to the proposed PAUT examinations N-659-2 (i & j) Acquisition
- None, examinations will be auto (encoded) and recorded N-659-2 (k) Acquisition Personnel
None for acquisition personnel; they will be qualified and
- None, trained using the same demonstrated equipment
N-659-2 (k) Analysis Personnel
- They will demonstrate their capability to detect and characterize flaws; will utilized data acquired with the demonstrated procedure; and:
- Flawed grading units will be 1/4 longer than actual flaw
- Unflawed grading units will be a min of 1
- At least 2 of the flaws will meet N-659-2 (d) sizes
- Flaws will be sized as being >
actual length Fl
- Flaws will ill b be properly l
categorized as surface or subsurface
N-659-2 (l) ANII
- Additionall restrictions:
Additi t i ti
- None; review and acceptance of the ANII N 659 2 (m) Other Requirements N-659-2
- None; other related requirements will be met N-659-2 (n) Repairs
- None; flaws will be repaired and the weld re-examined N-659-2 (o) Code Case
- None; the Case number will be recorded
Process/Technique Validation
- PVNGS developed a set of actual weld flawed specimens
- Flaws totaled over 60 for Carbon Steel
- S Specimens i h have been b radiographed di h d for f comparison i
- Specimens are being digital radiographed for additional comparison
Process/Technique Validation Process/Technique Validation RESULTS
- PAUT detected all the RT indicated flaws
- PAUT detected several additional areas of incomplete fusion
- PAUT detected all of the cracks in the exam volume
14-100-CS SLAG RT ~1 length PAUT ~1 length
8-120-CS Incomplete Fusion RT ~1 intermittent PAUT ~1
~1 length
12-100-CS Incomplete Penetration RT ~ 3/4 length PAUT ~3/43/4 length
(~1.2 in other direction)
8-120-CS Porosity RT ~1 length PAUT ~1 length
10-60-CS ID Crack (PT)
RR 48 Summary
- Additional restrictions (requirements) to N-659-2:
- Automated (encoded) Phased Array Ultrasonic Examination
- All welds will receive a surface (PT or MT) examination
- Weld caps will be ground flush
- Volume will be scanned in all 4 directions
- Volume will be scanned with a 0 degree
- Demonstration for each nominal diameter and thickness
- Data will be recorded for analysis and retention
Conclusion RR 48 utilizes as a basis Code Case N-659-2 RR 48 requires additional restrictions RR 48 provides an acceptable level of quality and safety