NRC / NEI / UTILITY MTG 6/11/14 4" & 6" RD/CH Drain Piping Inspection at the Palo Verde Nuclear Generating Station Utilizing Quest's HYDRA' Intelligent Pigging Technology
- Dan Wittas -
NRC / NEI / UTILITY MTG 6/11/14 1
WHY IN-LINE INSPECTION?
- Consequence of a leak on these drain lines
- Location of the piping
- Between 3 large tanks
- Under other utilities
- Relatively accessible for deployment and retrieval inside the lines NRC / NEI / UTILITY MTG 6/11/14 2
NRC / NEI / UTILITY MTG 6/11/14 3
WHY IN-LINE INSPECTION?
Location of the RD/CH piping
NRC / NEI / UTILITY MTG 6/11/14 4
WHY IN-LINE INSPECTION?
REFUELING WATER TANK
NRC / NEI / UTILITY MTG 6/11/14 5
WHY IN-LINE INSPECTION?
HOLDUP TANK REACTOR MAKEUP WATER TANK
NRC / NEI / UTILITY MTG 6/11/14 6
WHY IN-LINE INSPECTION?
HOLDUPTANK SUMP
NRC / NEI / UTILITY MTG 6/11/14 7
WHY IN-LINE INSPECTION?
NRC / NEI / UTILITY MTG 6/11/14 8
WHY IN-LINE INSPECTION?
RD LINES 4" THREADED CAP AND FLOOR DRAIN
NRC / NEI / UTILITY MTG 6/11/14 9
IN-LINE INSPECTION PLAN
- Build a team - BP Engr / Ops / Proj Mgr /
- Select vendor and technology
- Site visits to 2 potential vendors
- Consideration of NDE technology, FME, equipment decontamination
- Quest's HYDRA' Intelligent Pigging Ultrasonic Technology was selected
NRC / NEI / UTILITY MTG 6/11/14 10 IN-LINE INSPECTION PLAN
- Full scale mockup for deployment, retrieval and blind flaw detection capability
- The inspection tool could be deployed and retrieved, thru 90s and a tee.
- The Quest Hydra' UT inspection tool detected 26 of 34 flaws. All 8 undetected flaws were below the published detection threshold. 10 flaws below the threshold were detected, including 2 - 1/8 diameter flaws.
NRC / NEI / UTILITY MTG 6/11/14 11 IN-LINE INSPECTION PLAN
- Contingencies / Lessons Learned -
- Design engineering T-min acceptance criteria
- Sump pumps need to be removed for access
- 2 Launchers
- Backup water pump & inspection pig
- Pre-req for hot water flush to dilute boric acid
- Leak test ILI piping and use catch basins
NRC / NEI / UTILITY MTG 6/11/14 12 IN-LINE INSPECTION PLAN FG-47 Pump House Floor Drain Ground Penetration FG-46 Ground Penetration Valve Pit Sump Pit
NRC / NEI / UTILITY MTG 6/11/14 13 IN-LINE INSPECTION PLAN FULL SCALE MOCK-UP W/ 32 FLAWS PRIOR TO BURIAL
NRC / NEI / UTILITY MTG 6/11/14 14 IN-LINE INSPECTION PLAN
- Work and inspection instructions, with
- Initial conditions, such as, remove sump pumps, remove 90° elbow in sump, disconnect tank overflow pipes, cap HUT pump skid and floor drains
- Connection of ILI equip, pump, launcher, pipe and valves
- Operate the ILI, evaluate the results and restore systems