NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3
ML16083A472
Person / Time
Site: Palo Verde  
Issue date: 03/24/2016
From:
Arizona Public Service Co
To: Lingham S
Plant Licensing Branch IV
Lingham S, NRR/DORL/LPLIV-1
References
CAC MF7477, CAC MF7478, CAC MF7479
Download: ML16083A472 (9)


Text

NRC Subsequent Pre-Submittal Meeting Next Generation Fuel Palo Verde Units 1, 2, and 3 March 24, 2016

APS/Westinghouse Attendees Thomas Weber - Department Leader, Regulatory Affairs, APS Michael DiLorenzo - Section Leader, Regulatory Affairs, APS Robert Hicks - Sr. Engineer, Transient Analysis, APS Thomas Zalewski - Project Manager, Westinghouse 2

Agenda Introduction Proposed Action to Address IN 2012-09, Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength Proposed Application of Thermal Conductivity Degradation Penalties Use of VIPRE-W in Thermal Hydraulic Analysis NGF License Amendment Request Submittal Timeline 3

Introduction Follow-up Public Meeting for CE16NGF

- Approved in WCAP 16500-P-A (Rev 0 and Supplement 1)

- Successful Lead Assembly Program

- Spent Fuel Pool Criticality LAR

- COLR Methodologies

- Technical Specification DNBR Limit WCAP-16500 Supplement 2

- Three Minor Design Changes to Spacer Grids

- IN 2012-09 4

Action to Address IN 2012-09 APS is proposing the following license condition to address IN 2012-09:

APS will incorporate guidance into the current licensing basis regarding fuel assembly integrity under externally applied forces as described in IN 2012-09 within 2 cycles following Mode 4 entry with the first NGF transition core. APS will notify the NRC when this action is completed.

5

Thermal Conductivity Degradation (TCD)

PVNGS is planning to apply a penalty to the bounding radial fall off curve PVNGS is planning to apply the same FATES TCD related penalty approved for St. Lucie and Waterford-3 6

Use of VIPRE-W in Thermal Hydraulic (T-H) Analysis 7

VIPRE-W is an NRC approved T-H code First time application for CE 16x16 fleet requires a 2-stage VIPRE-W PVNGS will provide additional detail on the implementation of 2-stage VIPRE-W in the LAR

Submittal Timeline Planned submittal by June 30, 2016

- Requires NRC approval of WCAP-16500 Supplement 2 APS is requesting acceptance review within two months APS is requesting approval of the amendment within 12-18 months of submittal This timeline supports the planned first use of NGF in Fall 2018 8

We SAFELY and efficiently generate electricity for the long term 9