{{#Wiki_filter:June 5, 2014  
{{#Wiki_filter:June 5, 2014 Ms. Irma Lagomarsino, Assistant Regional Administrator National Oceanic and Atmospheric Administration National Marine Fisheries Service West Coast Region 1655 Heindon Road Arcata, CA 95521-4573
 
Ms. Irma Lagomarsino, Assistant Regional Administrator National Oceanic and Atmospheric   Administration National Marine Fisheries Service West Coast Region 1655 Heindon Road Arcata, CA 95521-4573  


==SUBJECT:==
==SUBJECT:==
Line 24: Line 22:
==Dear Ms. Lagomarsino:==
==Dear Ms. Lagomarsino:==


The U.S. Nuclear Regulatory Commission (NRC) staff currently is reviewing an application submitted by its licensee, Pacific Gas and Electric Company (PG&E), dated May 3, 2013, to terminate the Humboldt Bay Power Plant (HBPP) Unit 3 license on the site of the HBPP in Humboldt County, California. As part of its environmental review, the NRC staff is preparing an Environmental Assessment (EA) in accordance with the requirements of the National Environmental Policy Act of 1969, as amended, as specified in 10 CFR Part 51 of the NRC's regulations. In conjunction with this review, the NRC staff also is considering the potential impact of the proposed action on listed species, in accordance with the Endangered Species Act. In 2004, the National Marine Fisheries Service (NMFS) identified the names of listed species and critical habitat for such species that may occur within the project area. In addition, the NMFS also indicated that Humboldt Bay is designated as Essential Fish Habitat (EFH) under the Magnuson-Stevens Fishery Conservation and Management Act for identified five fish species, including the North American green sturgeon, listed in 2006.
The U.S. Nuclear Regulatory Commission (NRC) staff currently is reviewing an application submitted by its licensee, Pacific Gas and Electric Company (PG&E), dated May 3, 2013, to terminate the Humboldt Bay Power Plant (HBPP) Unit 3 license on the site of the HBPP in Humboldt County, California. As part of its environmental review, the NRC staff is preparing an Environmental Assessment (EA) in accordance with the requirements of the National Environmental Policy Act of 1969, as amended, as specified in 10 CFR Part 51 of the NRCs regulations. In conjunction with this review, the NRC staff also is considering the potential impact of the proposed action on listed species, in accordance with the Endangered Species Act.
In 2004, the National Marine Fisheries Service (NMFS) identified the names of listed species and critical habitat for such species that may occur within the project area. In addition, the NMFS also indicated that Humboldt Bay is designated as Essential Fish Habitat (EFH) under the Magnuson-Stevens Fishery Conservation and Management Act for identified five fish species, including the North American green sturgeon, listed in 2006.
After a review of the potential impacts of the proposed action, including the decommissioning and dismantling of the remaining HBPP Unit 3 facilities, the NRC staff determined that the proposed action would have minimal effect on any of the listed species or the EFH for Humboldt Bay. The supporting basis for this conclusion is provided in the enclosure to this letter, and the recent reports prepared by Stillwater Sciences in support of the Section 404 permit application for work to be performed in the intake and discharge canals.
After a review of the potential impacts of the proposed action, including the decommissioning and dismantling of the remaining HBPP Unit 3 facilities, the NRC staff determined that the proposed action would have minimal effect on any of the listed species or the EFH for Humboldt Bay. The supporting basis for this conclusion is provided in the enclosure to this letter, and the recent reports prepared by Stillwater Sciences in support of the Section 404 permit application for work to be performed in the intake and discharge canals.
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure,a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Av ailable Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html.
I. Lagomarsino 2


If you have any questions, please contact Mr. Alan Bjornsen of my staff. Mr. Bjornsen can be reached at (301) 415-1195 or via email at Alan.Bjornsen@nrc.gov. Sincerely,         /RA/       Andrew Persinko, Deputy Director Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials   and Environmental Management Programs Docket No: 50-133 License No: DPR-7  
I. Lagomarsino                                2 If you have any questions, please contact Mr. Alan Bjornsen of my staff. Mr. Bjornsen can be reached at (301) 415-1195 or via email at Alan.Bjornsen@nrc.gov.
Sincerely,
                                            /RA/
Andrew Persinko, Deputy Director Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No: 50-133 License No: DPR-7


==Enclosure:==
==Enclosure:==
Assessment of Potential Effect


cc: Attached List
Assessment of Potential Effect cc: Attached List


I. Lagomarsino 2  
I. Lagomarsino                                 2 If you have any questions, please contact Mr. Alan Bjornsen of my staff. Mr. Bjornsen can be reached at (301) 415-1195 or via email at Alan.Bjornsen@nrc.gov.
 
Sincerely,
If you have any questions, please contact Mr. Alan Bjornsen of my staff. Mr. Bjornsen can be reached at (301) 415-1195 or via email at Alan.Bjornsen@nrc.gov. Sincerely,         /RA/     Andrew Persinko, Deputy Director Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials   and Environmental Management Programs Docket No: 50-133 License No: DPR-7  
                                              /RA/
Andrew Persinko, Deputy Director Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No: 50-133 License No: DPR-7


==Enclosure:==
==Enclosure:==
Assessment of Potential Effect
cc:  Attached List
DISTRIBUTION
: JHickman BWatson AMohseni


ML14129A345 OFC FSME/DWMEP FSME/DWMEP OGC FSME/DWMEP FSME/DWMEP NAME ABjornsen AWalker-Smith APesin (via email) KHsueh APersinko DATE 05/09/2014 05/12/2014 05/23/2014 06/2/2014 06/     /2014 OFFICIAL RECORD COPY
Assessment of Potential Effect cc: Attached List DISTRIBUTION:
JHickman      BWatson      AMohseni ML14129A345 OFC     FSME/DWMEP       FSME/DWMEP                 OGC           FSME/DWMEP       FSME/DWMEP NAME       ABjornsen     AWalker-Smith     APesin (via email)       KHsueh         APersinko DATE     05/09/2014       05/12/2014           05/23/2014           06/2/2014       06/   /2014 OFFICIAL RECORD COPY


Assessment of Potential Effect Ecological Assessment The vicinity within 8.0 km (5 mi) of the Humboldt Bay Power Plant (HBPP) Unit 3 site provides a wide array of habitats for plants and animals. Terrestrial ecological surveys identified more than 200 vascular plants and 12 vegetation communities in the area. Additionally, an extensive list of birds, mammals, reptiles, and amphibians is provided in Tables 2.3-3 through 2.3-5 of the Humboldt Bay ISFSI Environmental Report, Pacific Gas and Electric Company (PG&E 2003).
Assessment of Potential Effect Ecological Assessment The vicinity within 8.0 km (5 mi) of the Humboldt Bay Power Plant (HBPP) Unit 3 site provides a wide array of habitats for plants and animals. Terrestrial ecological surveys identified more than 200 vascular plants and 12 vegetation communities in the area. Additionally, an extensive list of birds, mammals, reptiles, and amphibians is provided in Tables 2.3-3 through 2.3-5 of the Humboldt Bay ISFSI Environmental Report, Pacific Gas and Electric Company (PG&E 2003).
Numerous special status terrestrial wildlife species occur within the ecologically diverse and productive habitats in the vicinity of the project site. Inventories conducted in 1999, 2002 and 2013 on PG&E property did not indicate the presence of any of these species and found that the lack of suitable habitat made their presence unlikely (PG&E 2003 & 2013).
Numerous special status terrestrial wildlife species occur within the ecologically diverse and productive habitats in the vicinity of the project site. Inventories conducted in 1999, 2002 and 2013 on PG&E property did not indicate the presence of any of these species and found that the lack of suitable habitat made their presence unlikely (PG&E 2003 & 2013).
In the vicinity of the project, five listed species of fish (tidewater goby, Chinook salmon, Coho salmon, steelhead, and green sturgeon) occur or have the potential to occur based on the presence of suitable habitat in the Humboldt Bay region. An inventory of PG&E-owned land at the HBPP Unit 3 site, in 1999, 2002 and 2013, did not observe these species on PG&E property. Harbor seals (Phoca vitulina) do not have official status as a listed endangered or threatened species, but they are protected under the Marine Mammal Protection Act. Harbor seals are year-round residents of the Humboldt Bay region. The seals haul out on tidal flats in areas remote from human activity to rest and bear their young. The Humboldt Bay National Wildlife Refuge in the southern part of Humboldt Bay is a key breeding and hauling out area used by harbor seals (PG&E 2003).
In the vicinity of the project, five listed species of fish (tidewater goby, Chinook salmon, Coho salmon, steelhead, and green sturgeon) occur or have the potential to occur based on the presence of suitable habitat in the Humboldt Bay region. An inventory of PG&E-owned land at the HBPP Unit 3 site, in 1999, 2002 and 2013, did not observe these species on PG&E property. Harbor seals (Phoca vitulina) do not have official status as a listed endangered or threatened species, but they are protected under the Marine Mammal Protection Act. Harbor seals are year-round residents of the Humboldt Bay region. The seals haul out on tidal flats in areas remote from human activity to rest and bear their young. The Humboldt Bay National Wildlife Refuge in the southern part of Humboldt Bay is a key breeding and hauling out area used by harbor seals (PG&E 2003).
PG&E-owned land at the HBPP Unit 3 site was inventoried for the presence of special status freshwater aquatic species in 1999 and 2002. Five special-status freshwater aquatic species occur near the project site: the northern red-legged frog, the foothill yellow-legged frog, the tailed frog, the southern torrent salamander, and the northwestern pond turtle. However, no special status freshwater aquatic species appear to occur at the site (PG&E 2003). Decommissioning Impacts Assessment The environmental impacts due to the remaining decommissioning and dismantling activities of the HBPP Unit 3 are expected to be small (most of the decommissioning and dismantling activities have already taken place under previous license amendments). Remaining activities would take place within the boundaries of the 58-hectare (ha) (143-acre [ac] ) PG&E-controlled site area, an area that was previously disturbed during HBPP operations. Dismantling activities associated with the proposed decommissioning would impact approximately 14 ha (34 ac) of land area. The remaining activities would consist of excavating the reactor caisson, stockpiling the excavated soils, dredging contaminated sediment from the intake and discharge canals, dismantling miscellaneous structures, and controlling dust and runoff. Any construction materials would be derived from offsite sources.
PG&E-owned land at the HBPP Unit 3 site was inventoried for the presence of special status freshwater aquatic species in 1999 and 2002. Five special-status freshwater aquatic species occur near the project site: the northern red-legged frog, the foothill yellow-legged frog, the tailed frog, the southern torrent salamander, and the northwestern pond turtle. However, no special status freshwater aquatic species appear to occur at the site (PG&E 2003).
Decommissioning Impacts Assessment The environmental impacts due to the remaining decommissioning and dismantling activities of the HBPP Unit 3 are expected to be small (most of the decommissioning and dismantling activities have already taken place under previous license amendments). Remaining activities would take place within the boundaries of the 58-hectare (ha) (143-acre [ac] ) PG&E-controlled site area, an area that was previously disturbed during HBPP operations. Dismantling activities associated with the proposed decommissioning would impact approximately 14 ha (34 ac) of land area. The remaining activities would consist of excavating the reactor caisson, stockpiling the excavated soils, dredging contaminated sediment from the intake and discharge canals, dismantling miscellaneous structures, and controlling dust and runoff. Any construction materials would be derived from offsite sources.
Dust generated during construction is expected to be minimal given that the construction traffic would be using paved onsite and offsite roadways. Dust derived from excavation and fill operations would be mitigated through dust control techniques (e.g., watering and/or chemical stabilization). Routine truck washing and covering truck-hauled materials would contribute to minimizing dust emissions. Gaseous emissions from construction equipment is expected to be mitigated through regular maintenance of the equipment (PG&E 2003).
Dust generated during construction is expected to be minimal given that the construction traffic would be using paved onsite and offsite roadways. Dust derived from excavation and fill operations would be mitigated through dust control techniques (e.g., watering and/or chemical stabilization). Routine truck washing and covering truck-hauled materials would contribute to minimizing dust emissions. Gaseous emissions from construction equipment is expected to be mitigated through regular maintenance of the equipment (PG&E 2003).


2 Excavated soils will be stockpiled in areas that have been disturbed previously by plant operations. These areas will be accessed via the existing road, and the transport and deposition of the excavated material is not expected to have a significant environmental impact. Material stockpiled there would be put into 760 cubic meter (cu m) (1,000 cubic yard [cu yd]) piles. PG&E has indicated that it will use best management practices (BMPs), as appropriate, to address storm water runoff, erosion control, and revegetation. All areas disturbed during decommissioning activities would be revegetated with an appropriate seed mix in accordance with Humboldt County Coastal Commission requirements (Ordinance 2157)
2 Excavated soils will be stockpiled in areas that have been disturbed previously by plant operations. These areas will be accessed via the existing road, and the transport and deposition of the excavated material is not expected to have a significant environmental impact. Material stockpiled there would be put into 760 cubic meter (cu m) (1,000 cubic yard
. The impact of decommissioning HBPP Unit 3 on local water sources and wetlands is expected to be small. The intake and discharge canals will be dredged of contaminated sediment.
[cu yd]) piles. PG&E has indicated that it will use best management practices (BMPs), as appropriate, to address storm water runoff, erosion control, and revegetation. All areas disturbed during decommissioning activities would be revegetated with an appropriate seed mix in accordance with Humboldt County Coastal Commission requirements (Ordinance 2157).
The impact of decommissioning HBPP Unit 3 on local water sources and wetlands is expected to be small. The intake and discharge canals will be dredged of contaminated sediment.
Approximately 300 cu m (400 cu yd) would be dredged from the intake canal, and approximately 1,900 cu m (2,500 cu yd) from the discharge canal. These sediments would be drained and disposed of off-site. Discharges from the HBPP are regulated currently under a discharge permit issued by the North Coast Regional Water Quality Control Board (NCRWQCB). PG&E will address any needed modifications to its permit with the NCRWQCB. In addition, PG&E is expected to apply applicable BMPs to protect local waters and nearby wetlands from site runoff, spillage, and leaks (PG&E 2013).
Approximately 300 cu m (400 cu yd) would be dredged from the intake canal, and approximately 1,900 cu m (2,500 cu yd) from the discharge canal. These sediments would be drained and disposed of off-site. Discharges from the HBPP are regulated currently under a discharge permit issued by the North Coast Regional Water Quality Control Board (NCRWQCB). PG&E will address any needed modifications to its permit with the NCRWQCB. In addition, PG&E is expected to apply applicable BMPs to protect local waters and nearby wetlands from site runoff, spillage, and leaks (PG&E 2013).
Decommissioning and dismantling activities are not expected to impact any state- or federally-listed plant, terrestrial wildlife, marine life, or fish species. All such species that may occur within a 8-km (5-mile) radius of the proposed facility were considered by the applicant. None of these species were found to inhabit the area on or immediately adjacent to the H BPP Unit 3 site, nor were they identified at the spoils disposal site (PG&E 2013).  
Decommissioning and dismantling activities are not expected to impact any state- or federally-listed plant, terrestrial wildlife, marine life, or fish species. All such species that may occur within a 8-km (5-mile) radius of the proposed facility were considered by the applicant.
 
None of these species were found to inhabit the area on or immediately adjacent to the HBPP Unit 3 site, nor were they identified at the spoils disposal site (PG&E 2013).
References
:
Pacific Gas and Electric Company Humboldt Bat Power Plant, Unit 3 Docket Nos. 50-133, 72-27 cc: Mr. Edward D. Halpin Senior Vice President and 
 
Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 56
 
Mail Code 104/6
 
Avila Beach, CA 93424 Mr. Loren Sharp  Director and Plant Manager    Humboldt Bay Nuclear Pacific Gas & Electric Company 1000 King Salmon Avenue Eureka, CA 95503 Ms. Jennifer K. Post  Law Department Pacific Gas & Electric Company 77 Beale Street, B30A San Francisco, CA 94120 Chairman, Humboldt County Board of    Supervisors County Courthouse 825 Fifth Street Eureka, CA 95501 Mr. Gonzalo Perez  Radiation Program Director Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
 
. Regional Administrator, Region IV  U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064
 
Mr. Steven Hsu, M.S.
Senior Health Physicist Radiological Assessment Unit Radioactive Material Licensing Section Radiologic Health Branch Department of Health Services MS-7610 P.O. Box 997414 Sacramento, CA 95899-7414
 
Redwood Alliance P.O. Box 293 Arcata, CA 95521 Dr. Rich Ferguson, Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, CA 94814 California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street Sacramento, CA 95814
 
Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, CA  92101


Ms. Nancy Finley, Field Supervisor U.S. Fish & Wildlife Service Arcata Fish and Wildlife Office 1655 Heindon Road Arcata, CA 95521-4573}}
==References:==
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Pacific Gas and Electric Company    611 Ryan Plaza Drive, Suite 400 Humboldt Bat Power Plant, Unit 3    Arlington, TX 76011-8064 Docket Nos. 50-133, 72-27 Mr. Steven Hsu, M.S.
cc:
Senior Health Physicist Mr. Edward D. Halpin Radiological Assessment Unit Senior Vice President and Radioactive Material Licensing Section Chief Nuclear Officer Radiologic Health Branch Pacific Gas and Electric Company Department of Health Services P.O. Box 56 MS-7610 Mail Code 104/6 P.O. Box 997414 Avila Beach, CA 93424 Sacramento, CA 95899-7414 Mr. Loren Sharp Director and Plant Manager          Redwood Alliance Humboldt Bay Nuclear              P.O. Box 293 Pacific Gas & Electric Company      Arcata, CA 95521 1000 King Salmon Avenue            Dr. Rich Ferguson, Energy Chair Eureka, CA 95503                    Sierra Club California 1100 11th Street, Suite 311 Ms. Jennifer K. Post                Sacramento, CA 94814 Law Department Pacific Gas & Electric Company      California Public Utilities Commission 77 Beale Street, B30A              505 Van Ness, Room 4102 San Francisco, CA 94120            San Francisco, CA 94102 Chairman, Humboldt County Board of  Mr. James D. Boyd, Commissioner Supervisors                      California Energy Commission County Courthouse                  1516 Ninth Street 825 Fifth Street                    Sacramento, CA 95814 Eureka, CA 95501 Deputy Attorney General Mr. Gonzalo Perez                  State of California Radiation Program Director          110 West A Street, Suite 700 Radiologic Health Branch            San Diego, CA 92101 State Department of Health Services P.O. Box 997414 (MS 7610)          Ms. Nancy Finley, Field Supervisor Sacramento, CA 95899-7414          U.S. Fish & Wildlife Service Arcata Fish and Wildlife Office 1655 Heindon Road Arcata, CA 95521-4573
.}}

Revision as of 05:46, 4 November 2019

Letter to Nmfs Re Revised Preliminary Effects Determination
ML14129A345
Person / Time
Site: Humboldt Bay
Issue date: 06/05/2014
From: Persinko A
NRC/FSME/DWMEP/DURLD
To: Lagomarsino I
US Dept of Commerce, National Marine Fisheries Service
Bjornsen A
References
Download: ML14129A345 (6)


Text

June 5, 2014 Ms. Irma Lagomarsino, Assistant Regional Administrator National Oceanic and Atmospheric Administration National Marine Fisheries Service West Coast Region 1655 Heindon Road Arcata, CA 95521-4573

SUBJECT:

REVISED PRELIMINARY EFFECTS DETERMINATION ON LISTED SPECIES OR ESSENTIAL FISH HABITAT FOR THE PROPOSED HUMBOLDT BAY POWER PLANT UNIT 3 LICENSE TERMINATION PLAN

Dear Ms. Lagomarsino:

The U.S. Nuclear Regulatory Commission (NRC) staff currently is reviewing an application submitted by its licensee, Pacific Gas and Electric Company (PG&E), dated May 3, 2013, to terminate the Humboldt Bay Power Plant (HBPP) Unit 3 license on the site of the HBPP in Humboldt County, California. As part of its environmental review, the NRC staff is preparing an Environmental Assessment (EA) in accordance with the requirements of the National Environmental Policy Act of 1969, as amended, as specified in 10 CFR Part 51 of the NRCs regulations. In conjunction with this review, the NRC staff also is considering the potential impact of the proposed action on listed species, in accordance with the Endangered Species Act.

In 2004, the National Marine Fisheries Service (NMFS) identified the names of listed species and critical habitat for such species that may occur within the project area. In addition, the NMFS also indicated that Humboldt Bay is designated as Essential Fish Habitat (EFH) under the Magnuson-Stevens Fishery Conservation and Management Act for identified five fish species, including the North American green sturgeon, listed in 2006.

After a review of the potential impacts of the proposed action, including the decommissioning and dismantling of the remaining HBPP Unit 3 facilities, the NRC staff determined that the proposed action would have minimal effect on any of the listed species or the EFH for Humboldt Bay. The supporting basis for this conclusion is provided in the enclosure to this letter, and the recent reports prepared by Stillwater Sciences in support of the Section 404 permit application for work to be performed in the intake and discharge canals.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html.

I. Lagomarsino 2 If you have any questions, please contact Mr. Alan Bjornsen of my staff. Mr. Bjornsen can be reached at (301) 415-1195 or via email at Alan.Bjornsen@nrc.gov.

Sincerely,

/RA/

Andrew Persinko, Deputy Director Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No: 50-133 License No: DPR-7

Enclosure:

Assessment of Potential Effect cc: Attached List

I. Lagomarsino 2 If you have any questions, please contact Mr. Alan Bjornsen of my staff. Mr. Bjornsen can be reached at (301) 415-1195 or via email at Alan.Bjornsen@nrc.gov.

Sincerely,

/RA/

Andrew Persinko, Deputy Director Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No: 50-133 License No: DPR-7

Enclosure:

Assessment of Potential Effect cc: Attached List DISTRIBUTION:

JHickman BWatson AMohseni ML14129A345 OFC FSME/DWMEP FSME/DWMEP OGC FSME/DWMEP FSME/DWMEP NAME ABjornsen AWalker-Smith APesin (via email) KHsueh APersinko DATE 05/09/2014 05/12/2014 05/23/2014 06/2/2014 06/ /2014 OFFICIAL RECORD COPY

Assessment of Potential Effect Ecological Assessment The vicinity within 8.0 km (5 mi) of the Humboldt Bay Power Plant (HBPP) Unit 3 site provides a wide array of habitats for plants and animals. Terrestrial ecological surveys identified more than 200 vascular plants and 12 vegetation communities in the area. Additionally, an extensive list of birds, mammals, reptiles, and amphibians is provided in Tables 2.3-3 through 2.3-5 of the Humboldt Bay ISFSI Environmental Report, Pacific Gas and Electric Company (PG&E 2003).

Numerous special status terrestrial wildlife species occur within the ecologically diverse and productive habitats in the vicinity of the project site. Inventories conducted in 1999, 2002 and 2013 on PG&E property did not indicate the presence of any of these species and found that the lack of suitable habitat made their presence unlikely (PG&E 2003 & 2013).

In the vicinity of the project, five listed species of fish (tidewater goby, Chinook salmon, Coho salmon, steelhead, and green sturgeon) occur or have the potential to occur based on the presence of suitable habitat in the Humboldt Bay region. An inventory of PG&E-owned land at the HBPP Unit 3 site, in 1999, 2002 and 2013, did not observe these species on PG&E property. Harbor seals (Phoca vitulina) do not have official status as a listed endangered or threatened species, but they are protected under the Marine Mammal Protection Act. Harbor seals are year-round residents of the Humboldt Bay region. The seals haul out on tidal flats in areas remote from human activity to rest and bear their young. The Humboldt Bay National Wildlife Refuge in the southern part of Humboldt Bay is a key breeding and hauling out area used by harbor seals (PG&E 2003).

PG&E-owned land at the HBPP Unit 3 site was inventoried for the presence of special status freshwater aquatic species in 1999 and 2002. Five special-status freshwater aquatic species occur near the project site: the northern red-legged frog, the foothill yellow-legged frog, the tailed frog, the southern torrent salamander, and the northwestern pond turtle. However, no special status freshwater aquatic species appear to occur at the site (PG&E 2003).

Decommissioning Impacts Assessment The environmental impacts due to the remaining decommissioning and dismantling activities of the HBPP Unit 3 are expected to be small (most of the decommissioning and dismantling activities have already taken place under previous license amendments). Remaining activities would take place within the boundaries of the 58-hectare (ha) (143-acre [ac] ) PG&E-controlled site area, an area that was previously disturbed during HBPP operations. Dismantling activities associated with the proposed decommissioning would impact approximately 14 ha (34 ac) of land area. The remaining activities would consist of excavating the reactor caisson, stockpiling the excavated soils, dredging contaminated sediment from the intake and discharge canals, dismantling miscellaneous structures, and controlling dust and runoff. Any construction materials would be derived from offsite sources.

Dust generated during construction is expected to be minimal given that the construction traffic would be using paved onsite and offsite roadways. Dust derived from excavation and fill operations would be mitigated through dust control techniques (e.g., watering and/or chemical stabilization). Routine truck washing and covering truck-hauled materials would contribute to minimizing dust emissions. Gaseous emissions from construction equipment is expected to be mitigated through regular maintenance of the equipment (PG&E 2003).

2 Excavated soils will be stockpiled in areas that have been disturbed previously by plant operations. These areas will be accessed via the existing road, and the transport and deposition of the excavated material is not expected to have a significant environmental impact. Material stockpiled there would be put into 760 cubic meter (cu m) (1,000 cubic yard

[cu yd]) piles. PG&E has indicated that it will use best management practices (BMPs), as appropriate, to address storm water runoff, erosion control, and revegetation. All areas disturbed during decommissioning activities would be revegetated with an appropriate seed mix in accordance with Humboldt County Coastal Commission requirements (Ordinance 2157).

The impact of decommissioning HBPP Unit 3 on local water sources and wetlands is expected to be small. The intake and discharge canals will be dredged of contaminated sediment.

Approximately 300 cu m (400 cu yd) would be dredged from the intake canal, and approximately 1,900 cu m (2,500 cu yd) from the discharge canal. These sediments would be drained and disposed of off-site. Discharges from the HBPP are regulated currently under a discharge permit issued by the North Coast Regional Water Quality Control Board (NCRWQCB). PG&E will address any needed modifications to its permit with the NCRWQCB. In addition, PG&E is expected to apply applicable BMPs to protect local waters and nearby wetlands from site runoff, spillage, and leaks (PG&E 2013).

Decommissioning and dismantling activities are not expected to impact any state- or federally-listed plant, terrestrial wildlife, marine life, or fish species. All such species that may occur within a 8-km (5-mile) radius of the proposed facility were considered by the applicant.

None of these species were found to inhabit the area on or immediately adjacent to the HBPP Unit 3 site, nor were they identified at the spoils disposal site (PG&E 2013).

References:

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Pacific Gas and Electric Company 611 Ryan Plaza Drive, Suite 400 Humboldt Bat Power Plant, Unit 3 Arlington, TX 76011-8064 Docket Nos. 50-133, 72-27 Mr. Steven Hsu, M.S.

cc:

Senior Health Physicist Mr. Edward D. Halpin Radiological Assessment Unit Senior Vice President and Radioactive Material Licensing Section Chief Nuclear Officer Radiologic Health Branch Pacific Gas and Electric Company Department of Health Services P.O. Box 56 MS-7610 Mail Code 104/6 P.O. Box 997414 Avila Beach, CA 93424 Sacramento, CA 95899-7414 Mr. Loren Sharp Director and Plant Manager Redwood Alliance Humboldt Bay Nuclear P.O. Box 293 Pacific Gas & Electric Company Arcata, CA 95521 1000 King Salmon Avenue Dr. Rich Ferguson, Energy Chair Eureka, CA 95503 Sierra Club California 1100 11th Street, Suite 311 Ms. Jennifer K. Post Sacramento, CA 94814 Law Department Pacific Gas & Electric Company California Public Utilities Commission 77 Beale Street, B30A 505 Van Ness, Room 4102 San Francisco, CA 94120 San Francisco, CA 94102 Chairman, Humboldt County Board of Mr. James D. Boyd, Commissioner Supervisors California Energy Commission County Courthouse 1516 Ninth Street 825 Fifth Street Sacramento, CA 95814 Eureka, CA 95501 Deputy Attorney General Mr. Gonzalo Perez State of California Radiation Program Director 110 West A Street, Suite 700 Radiologic Health Branch San Diego, CA 92101 State Department of Health Services P.O. Box 997414 (MS 7610) Ms. Nancy Finley, Field Supervisor Sacramento, CA 95899-7414 U.S. Fish & Wildlife Service Arcata Fish and Wildlife Office 1655 Heindon Road Arcata, CA 95521-4573

.