ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION PAGE CHANGE December 18, 1989 1 Page .
ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION PAGE CHANGE December 18, 1989 1 Page r-*-~
____ ( 9001020105 891218
        . T.SP_l28_9-0_0_0_1-NL04--,-I~**~, ____
* PDR ADOCK 05000255 * ' P: PNU ADMINISTRATIVE CONTROLS 6.5.1.4 6.5.1.5 6.5.1.6 MEETING FREQUENCY The PRC shall meet at least once per calendar month with special meetings as required.
( 9001020105 891218
QUORUM A quorum of the PRC shall consist of the Chairman and four members (including alternates).
* PDR ADOCK 05000255 *
RESPONSIBILITIES The PRC shall be responsible for nuclear safety review of: a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the Site Emergency Plan. b. All proposed changes to Operating License and Technical Specifications.
    ' P:                     PNU
: c. Results of investigations of all violations of the Technical Specifications. (A report shall be prepared covering evaluation and recommendations to prevent recurrence and be forwarded to the Vice President  
 
-NOD and Nuclear Safety Service Department (NSSD).) d. Plant operations to detect potential safety hazards. e. Reports of special reviews and investigations as requested by the Plant General Manager or NSSD. f. All reportable events as defined in Section 1.4. g. All items identified under 6.5.3.4 as significant to nuclear safety. h. Monthly reports from Plant Safety and Licensing.
ADMINISTRATIVE CONTROLS ~
: i. All exceptions taken to Specification 3.0.4 to assure they are not an unreviewed question nor do they create a safety hazard. PRC review of the above items may be performed by routing, subject to the requirements of Specification 6.5.1.7. PRC may delegate review of item a. to Plant Safety and Licensing as described in Specification 6.5.3 6-5a Amendment No.
6.5.1.4   MEETING FREQUENCY The PRC shall meet at least once per calendar month with special meetings as required.
117, TSP1289-0001-NL04 I I I TSP1289-0001-NL04 ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 MARKED UP TECHNICAL SPECIFICATION PAGE December 18, 1989 1 Page
6.5.1.5    QUORUM A quorum of the PRC shall consist of the Chairman and four members (including alternates).
. -ADMINISTRATIVE CONTRO,
6.5.1.6    RESPONSIBILITIES The PRC shall be responsible for nuclear safety review of:
* 6.5.l.4 6.5.l.5 6.5.l.6 MEETING. FREQUENCY The* PRC shall meet at least once per calendar month with special. meetings as required.  
: a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the Site Emergency Plan.
*QUORUM A quorum of the PRC shall consist of the Chairman:
: b. All proposed changes to Operating License and Technical Specifications.
and four members (including alternates).
: c. Results of investigations of all violations of the Technical Specifications. (A report shall be prepared covering evaluation and recommendations to prevent recurrence and be forwarded to the Vice President - NOD and Nuclear Safety Service Department (NSSD).)
RESPONSIBILITIES The. PRC shall be responsible for nuclear safety review of: . . a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures .or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the.Site Emergency Plan. b. All'proposed changes to Operating License and Technical Specif !cations.*
: d. Plant operations to detect potential safety hazards.
: c. Results of investigations of all violations of the Technical Specifications.  
: e. Reports of special reviews and investigations as requested by the Plant General Manager or NSSD.
* (A report sha.11 be prepared covering evaluation and recommendations to *prevent recurrence and be forwarded to the Vice President  
: f. All reportable events as defined in Section 1.4.
-NOD and Nuclear Safety Service Department (NSSD).) d. Plant operations to detect potential safety hazards. e. Reports of special reviews and investigations as requested by the Plant General Manager or NSSD. f. All reportable events as defined in Section 1.4. g. All items identified under Specification as significant to nuclear safety. h. Monthly reports from Plant Safety and Licensing.
: g. All items identified under Sp~cification 6.5.3.4 as significant to nuclear safety.
PRC review of the items may be performed by routing,.*
: h. Monthly reports from Plant Safety and Licensing.
subject to the requirements of Specification PRC may delegate review of item a. to Plant Safety and Licensing as described in Specification 6.5.3 t"IO I' 1. A II exc.ep-\.1ofl5  
: i. All exceptions taken to Specification 3.0.4 to assure         I they are not an unreviewed ~afety question nor do             I they create a safety hazard.                                   I PRC review of the above items may be performed by routing, subject to the requirements of Specification 6.5.1.7. PRC may delegate review of item a. to Plant Safety and Licensing as described in Specification 6.5.3 6-5a Amendment No. l~S. 117, TSP1289-0001-NL04
+o o.re. fie.\
* ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 MARKED UP TECHNICAL SPECIFICATION PAGE December 18, 1989 1 Page TSP1289-0001-NL04
Q; ":>U.(dy  
 
!.-Ct.fd.  
. -ADMINISTRATIVE CONTRO, 6.5.l.4     MEETING. FREQUENCY
--*k-** ___;_* ------------*
* The* PRC shall meet at least once per calendar month with special. meetings as required.
6..:.5a Alnendment No. t0S, /f/;. TSP0189-0001-NL04}}
6.5.l.5  *QUORUM A quorum of the PRC shall consist of the Chairman: and four members (including alternates).
6.5.l.6    RESPONSIBILITIES The. PRC shall be responsible for nuclear safety review of:
                                                      .                                     .
: a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures .or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the.Site Emergency Plan.
: b. All'proposed changes to Operating License and Technical Specif !cations.*
: c. Results of investigations of all violations of the Technical Specifications. * (A report sha.11 be prepared covering evaluation and recommendations to *prevent recurrence and be forwarded to the Vice President - NOD and Nuclear Safety Service Department (NSSD).)
: d. Plant operations to detect potential safety hazards.
: e. Reports of special reviews and investigations as requested by the Plant General Manager or NSSD.
: f. All reportable events as defined in Section 1.4.
: g. All items identified under Specification                   6.5~3.4  as significant to nuclear safety.
: h. Monthly reports from Plant Safety and Licensing.
PRC review of the ab~ve items may be performed by routing,.*
subject to the requirements of Specification 6.5.1.7~ PRC may delegate review of item a. to Plant Safety and Licensing as described in Specification 6.5.3
: 1. A II exc.ep-\.1ofl5     -\-o.~e"'  +o   Sppci~ic-c..ti~
                  ~~ey o.re. fie.\ ci.V\t.w.<~-1.ile.we.d. ~C4.4+yre~-h*o1'\ t"IO I' Q; ":>U.(dy ~(I. !.-Ct.fd.   --*k-**___;_*- - - - - - - - - - - -
* 6..:.5a Alnendment No. t0S, /f/;.
TSP0189-0001-NL04                                                         ~}}

Revision as of 19:48, 21 October 2019

Proposed Tech Spec Page 6-5a,changing Tech Spec 6.5.1.6, Responsibilities.
ML18054B332
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/18/1989
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18054B326 List:
References
NUDOCS 9001020105
Download: ML18054B332 (4)


Text

'-**

ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION PAGE CHANGE December 18, 1989 1 Page r-*-~

. T.SP_l28_9-0_0_0_1-NL04--,-I~**~, ____

( 9001020105 891218

  • PDR ADOCK 05000255 *

' P: PNU

ADMINISTRATIVE CONTROLS ~

6.5.1.4 MEETING FREQUENCY The PRC shall meet at least once per calendar month with special meetings as required.

6.5.1.5 QUORUM A quorum of the PRC shall consist of the Chairman and four members (including alternates).

6.5.1.6 RESPONSIBILITIES The PRC shall be responsible for nuclear safety review of:

a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the Site Emergency Plan.
b. All proposed changes to Operating License and Technical Specifications.
c. Results of investigations of all violations of the Technical Specifications. (A report shall be prepared covering evaluation and recommendations to prevent recurrence and be forwarded to the Vice President - NOD and Nuclear Safety Service Department (NSSD).)
d. Plant operations to detect potential safety hazards.
e. Reports of special reviews and investigations as requested by the Plant General Manager or NSSD.
f. All reportable events as defined in Section 1.4.
g. All items identified under Sp~cification 6.5.3.4 as significant to nuclear safety.
h. Monthly reports from Plant Safety and Licensing.
i. All exceptions taken to Specification 3.0.4 to assure I they are not an unreviewed ~afety question nor do I they create a safety hazard. I PRC review of the above items may be performed by routing, subject to the requirements of Specification 6.5.1.7. PRC may delegate review of item a. to Plant Safety and Licensing as described in Specification 6.5.3 6-5a Amendment No. l~S. 117, TSP1289-0001-NL04
  • ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 MARKED UP TECHNICAL SPECIFICATION PAGE December 18, 1989 1 Page TSP1289-0001-NL04

. -ADMINISTRATIVE CONTRO, 6.5.l.4 MEETING. FREQUENCY

  • The* PRC shall meet at least once per calendar month with special. meetings as required.

6.5.l.5 *QUORUM A quorum of the PRC shall consist of the Chairman: and four members (including alternates).

6.5.l.6 RESPONSIBILITIES The. PRC shall be responsible for nuclear safety review of:

. .

a. All procedures and programs specified by Specification 6.8 and changes thereto, and any other procedures .or changes thereto as determined by the Plant General Manager to affect nuclear safety; all proposed tests or experiments that affect nuclear safety; all proposed changes or modifications to plant systems or equipment that affect nuclear safety; and the.Site Emergency Plan.
b. All'proposed changes to Operating License and Technical Specif !cations.*
c. Results of investigations of all violations of the Technical Specifications. * (A report sha.11 be prepared covering evaluation and recommendations to *prevent recurrence and be forwarded to the Vice President - NOD and Nuclear Safety Service Department (NSSD).)
d. Plant operations to detect potential safety hazards.
e. Reports of special reviews and investigations as requested by the Plant General Manager or NSSD.
f. All reportable events as defined in Section 1.4.
g. All items identified under Specification 6.5~3.4 as significant to nuclear safety.
h. Monthly reports from Plant Safety and Licensing.

PRC review of the ab~ve items may be performed by routing,.*

subject to the requirements of Specification 6.5.1.7~ PRC may delegate review of item a. to Plant Safety and Licensing as described in Specification 6.5.3

1. A II exc.ep-\.1ofl5 -\-o.~e"' +o Sppci~ic-c..ti~

~~ey o.re. fie.\ ci.V\t.w.<~-1.ile.we.d. ~C4.4+yre~-h*o1'\ t"IO I' Q; ":>U.(dy ~(I. !.-Ct.fd. --*k-**___;_*- - - - - - - - - - - -

  • 6..:.5a Alnendment No. t0S, /f/;.

TSP0189-0001-NL04 ~