* REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST TYPES A. B. AND C SURVEILLANCE TEST VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POW.E.R STATION UNIT NO. 2 (8203240369 820319 . PDR ADOCK 05000281 . p PDR DECEMBER 1981 
REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST TYPES A. B. AND C SURVEILLANCE TEST VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POW.E.R STATION UNIT NO. 2
*
* DECEMBER 1981 (8203240369 820319
* TABLE OF CONTENTS Section Title REFERENCES 1 PURPOSE 2  
  . PDR ADOCK 05000281
  .p               PDR
 
TABLE OF CONTENTS Section                           Title REFERENCES                                                   iii 1       PURPOSE                                             1-1 2      


==SUMMARY==
==SUMMARY==
2.1 Type A Test 2.2 Local Leak Rate Tests (Types Band C) 3 TYPE A TEST 3.1 Edited Log of Events 3.2 General Test Description 3.2.1 Prerequisites 3.2.2 Equipment and Instrumentation 3.2.3 Data Acquisition System 3.2.4 Data Resolution System 3.3 3.4 3.4~1 3 .. 4.2 3.4.3 3.ij.4 4 Test Analysis Test Results CILRT Results -Total Time Method CILRT Results -Mass Point Method Superimposed Leakage Rate Test Results Types C and B Penetration Leakage to be Added to Contaimnent Calculated Leakage LOCAL LEAK RATE TESTS (TYPES BAND C) Appendices 3A 3B 3C 3D 3E 3F 3G SITE METEOROLOGY PRIOR TO CILRT SITE METEOROLOGY DURING THE CILRT INSTRUMENTATION TABLE INSTRUMENTATION LOCATION (PROFILE VIEW) INSTRUMENTATION LOCATION (PLAN VIEW) CONTAINMENT INPUT VARIABLES LEAK RATE DATA -ABSOLUTE T.E.ST METHOD -MASS POINT ANALYSIS i iii 1-1 2-1 2-1 2-1 3-1 3-1 3-2 3-2 3-2 3-3 3-3 3-6 3-d 3-8 3-8 3-8 ~-1 3A-1 3B-1 3C-1 30-1 3E-1 3F-1 3G-1
2-1 2.1     Type A Test                                         2-1 2.2     Local Leak Rate Tests (Types Band C)                 2-1 3       TYPE A TEST                                         3-1 3.1     Edited Log of Events                                 3-1 3.2     General Test Description                             3-2 3.2.1   Prerequisites                                       3-2 3.2.2   Equipment and Instrumentation                       3-2 3.2.3   Data Acquisition System                             3-3 3.2.4   Data Resolution System                               3-3
* *
* 3.3     Test Analysis                                        3-6 3.4     Test Results                                        3-d 3.4~1    CILRT Results - Total Time Method                   3-8 3 .. 4.2 CILRT Results - Mass Point Method                   3-8 3.4.3    Superimposed Leakage Rate Test Results               3-8 3.ij.4  Types C and B Penetration Leakage to be Added to Contaimnent Calculated Leakage             3-9--
* TABLE OF CDNTENTS (CONT*D) Section Title Page 3H LEAK RATE DATA -ABSOLUTE TEST METHOD -TOTAL TIME ANALYSIS 3H-1 3J STABILIZATION, CILRT, AND VERIFICATION CONTAINMENT AIR MASS VS TIME 3J-1 3K CONTAINMENT LEAK RATE (MASS POINT) + UCL VS TIME 3K-1 3L CALCULATED CONTAINMENT LEAK RATE (TOTAL TIME) VS TIME 3L-1 ~A 4B 1~80-1981 TYPE B DATA  
4        LOCAL LEAK RATE TESTS (TYPES BAND C)                 ~-1 Appendices 3A       SITE METEOROLOGY PRIOR TO CILRT                     3A-1 3B      SITE METEOROLOGY DURING THE CILRT                   3B-1 3C      INSTRUMENTATION TABLE                               3C-1 3D      INSTRUMENTATION LOCATION (PROFILE VIEW)             30-1 3E      INSTRUMENTATION LOCATION (PLAN VIEW)                 3E-1 3F      CONTAINMENT INPUT VARIABLES                         3F-1
* 3G      LEAK RATE DATA - ABSOLUTE T.E.ST METHOD - MASS POINT ANALYSIS i
3G-1
* TABLE OF CDNTENTS (CONT*D)
Section                         Title                       Page 3H     LEAK RATE DATA - ABSOLUTE TEST METHOD - TOTAL TIME ANALYSIS                                               3H-1 3J     STABILIZATION, CILRT, AND VERIFICATION CONTAINMENT AIR MASS VS TIME                           3J-1 3K     CONTAINMENT LEAK RATE (MASS POINT) + UCL VS TIME     3K-1 3L     CALCULATED CONTAINMENT LEAK RATE (TOTAL TIME) VS TIME 3L-1
  ~A     1~80-1981 TYPE B DATA  


==SUMMARY==
==SUMMARY==
1980-1981 TYPE C DATA  
Q.A-1 4B      1980-1981 TYPE C DATA  


==SUMMARY==
==SUMMARY==
ii Q.A-1 4B-1
4B-1
*
* ii
* REFERENCES
: 1. 10CFR50  Appendix J. Primary Reactoi Containment Leakage Testing for Water Cooled Power Reactors. April 19. 1976
: 2. Bechtel Topical Report BN-TOP-1. Rev. 1. Testing Criteria tor Integrated Leak Rate    Testing  of    Primary  Containment Structures for Nuclear Power Plants. Novem.oer 1. 1972
: 3. 2-PT-16.3. Reactor Containment Building Integrated Leak Rate Test. May lij* 1980
: 4. ANSI 56.B. Containment  System Leak.age Testing Requirements.
February 19. 1981
* iii
* SECTION 1 PURPOSE The purpose of this report is to present a description and analyses of the Surveillance Types A, B, and C Containment Integrated Leak Rate Test CCILRT) results conducted on the Virginia Electric and Power Company*s Surry Nuclear          Power Stat1on, Unit No. 2~~--
This report is submitted as        required by 10CFR50 Appendix- J, paragraph V.B ,Reference 1) *
*
*
* 1. 2. 3. REFERENCES 10CFR50 Appendix J. Primary Reactoi Containment Leakage Testing for Water Cooled Power Reactors.
* 1-1
April 19. 1976 Bechtel Topical Report BN-TOP-1.
* SECTION 2
Rev. 1. Testing Criteria tor Integrated Leak Rate Testing of Primary Containment Structures for Nuclear Power Plants. Novem.oer
: 1. 1972 2-PT-16.3.
Reactor Containment Building Integrated Leak Rate Test. May lij* 1980 4. ANSI 56.B. Containment System Leak.age Testing Requirements.
February 19. 1981 iii 
* *
* SECTION 1 PURPOSE The purpose of this report is to present a description and analyses of the Surveillance Types A, B, and C Containment Integrated Leak Rate Test CCILRT) results conducted on the Virginia Electric and Power Company*s Surry Nuclear Power Stat1on, Unit No. 2~~--This report is submitted as required by 10CFR50 Appendix-J, paragraph V.B ,Reference
: 1)
* 1-1
* *
* 2.1 TYPE A TEST SECTION 2  


==SUMMARY==
==SUMMARY==
Pressurization for the CILRT was initiated at 2350 hours on December 15, 1981. At approximately 0150 hours on December 1o. 1981. it was noted that the pz:essur).z~tion_
 
was approximatel.y 3_., 2 psi/hr~-The anticipated pressurization rate. with the combined compressor capacity rated at 9.900 sctm. had been 4.8 to 5 psi/hr. Leakage investigation revealed that MOV-VS-200B was leaking. At 0334 hours, pressurization was secured and MOV-VS-200B was cycled. Pressurization resumed at 0336 hours. Subsequently.
2.1  TYPE A TEST Pressurization for the CILRT was initiated at 2350 hours on December 15, 1981. At approximately 0150 hours on December 1o.
the pressurization rate was 4.8 psi/hr. The leakage past MOV-VS-200B was calculated to be 3.ooo scfm and it was determined the valve had been partially open. Test pressure was reached at approximately 1111 hours and pressurization was secured. The containment temperature stabilization criteria were met at approximately 17~0 hours. From 1720 hours on December 1&. 1981 to 0950 hours on December 18. 1981. the mass trends indicated an unacceptable leakage rate of approximately 1.5 La. During this period. an extensive leakage investigation was conducted..
1981. it was noted that the pz:essur).z~tion_ was approximatel.y 3_., 2 psi/hr~- The anticipated pressurization rate. with the combined compressor capacity rated at 9.900 sctm. had been 4.8 to 5 psi/hr. Leakage investigation revealed that MOV-VS-200B was leaking. At 0334 hours, pressurization was secured and MOV-VS-200B was cycled.     Pressurization resumed     at   0336   hours.
The only major leakage path was identified at electrical penetration A-18. The leakage rate was quantified to be a minimum ot 3.5 scfm. At approximately 0950 hours on December 18, 1981. the collar bushing nut on *B* phas*e wire in penetration A-18 was found to be l.oose and was tightened.
Subsequently. the pressurization rate was 4.8 psi/hr.         The leakage past MOV-VS-200B was calculated to be 3.ooo scfm and it was determined the valve had been partially open.
Fran 1030 hours on December 18. 1981 to 0210 hours on December 19, 1981, the calculated leak rate was acceptable and the requirements of the procedure were satisfied.
Test pressure was reached at approximately 1111 hours and pressurization was     secured.     The containment   temperature stabilization criteria were met at approximately 17~0 hours.
At 0440 hours on December 19. 1981, the superimposed leak rate test commenced.
From 1720 hours on December 1&. 1981 to 0950             hours     on December 18. 1981. the mass trends indicated an unacceptable leakage rate of approximately 1.5 La. During this period. an extensive leakage investigation was conducted.. The only major
At 08~0 hours. the calculated containment ieak rate satisfied the requirements of the procedure.
* leakage path was identified at electrical penetration A-18.
Depressurization of the containment December 19. 1981. At 2138 hours. on containment was at atmospheric pressure.
leakage rate was quantified to be a minimum ot 3.5 scfm. At approximately 0950 hours on December 18, 1981. the collar bushing nut on *B* phas*e wire in penetration A-18 was found to be l.oose and was tightened. Fran 1030 hours on December 18. 1981 to 0210 hours   on December 19, 1981, the calculated leak rate was The acceptable and the requirements of the procedure were satisfied.
started at 1150 hours on December 19. 1981, the 2.2 LOCAL LEAK RATE TESTS ('l'YPES BAND C) The local leak rate testing of containment isolation valves and primary containment penetrations was conducted as required by station procedures since the last Type A Test*. The penetrations tested and their associated leak rates are iisted in Section ij ot this report.
At 0440 hours on December 19. 1981, the superimposed leak rate test commenced. At 08~0 hours. the calculated containment ieak rate satisfied the requirements of the procedure.
* The leakage past electrical penetration A-18 initiated a review of the Type B test procedures upon completion or the 2-1
Depressurization of the containment started at 1150 hours on December 19. 1981. At 2138 hours. on December 19. 1981, the containment was at atmospheric pressure.
* *
2.2   LOCAL LEAK RATE TESTS ('l'YPES BAND C)
* Integegrated Leak Rate Test ,ILRT). It was detennined that the test pressure utilized for testing the electrical penetration cannisters was below Pa. A procedure was devel.oped to require testing of the electrical penetration cannisters to Pa. All cannisters were tested prior to p1ant_operations
The local leak rate testing of containment isolation valves and primary containment penetrations was conducted as required by station procedures since the last Type A Test*. The penetrations tested and their associated leak rates are iisted in Section ij ot this report.
* 2-2 
* The leakage past electrical penetration A-18 initiated a review
* of the Type B test procedures upon         completion   or   the 2-1
* Integegrated Leak Rate Test ,ILRT). It was detennined that the test pressure utilized for testing the electrical penetration cannisters was below Pa. A procedure was devel.oped to require testing of the electrical penetration cannisters to Pa. All cannisters were tested prior to p1ant_operations *
*
*
* 3,.1 EDITED LOG OF EVENTS SECTION 3 TYPE A TEST December 15, 1981 2350 -Initiated containment pressurization December 16 1 1981 033q -Secured containment pressurization and cycled MOV-VS-200B 0336 -Restarted pressurization 1102 -Identified leakage path at electrical penetration A-18 1111 Secured containment pressurization 1720 -Completed stabilization December 17; 1981 1700 -Quantified leakage at electrical penetration A-18 to be a minimum of 3.75 scfm December 18, 1981 0800 -Only major leakage path identified penetration A-18 electrical 0950 -Tightened collar bushing nut on A-18 *B 11 Phase wire -leakage stopped 1030 -Started taking data for ILkT December 19 1 1981 0215 Completed ILRT oq35 -Started superimposed verification test 0835 Completed superimposed verification test 1150 -C0Dm1enced contairunent depressurization 2138 Completed contairunent depressurization 3-1
* 2-2
* *
* SECTION 3 TYPE A TEST 3,.1 EDITED LOG OF EVENTS December 15, 1981 2350 - Initiated containment pressurization December 16 1 1981 033q - Secured containment pressurization and cycled MOV-VS-200B 0336 - Restarted pressurization 1102 - Identified   leakage   path at electrical penetration A-18 1111   Secured containment pressurization 1720 - Completed stabilization December 17; 1981
* 3.2 GENERAL TEST DESCRIPTION 3.2.1 Prerequisites In accordance with the Surry Unit No. 2 CILRT procedures, 2-PT-16.3 (Reference 3), the following is a partial listing of the prerequisites that were completed and docwnented prior to containment pressurization  
* 1700 - Quantified be a minimum December 18, 1981 leakage at electrical penetration A-18 to of 3.75 scfm 0800 - Only   major leakage     path identified     electrical penetration A-18 0950 - Tightened collar bushing nut on A-18 *B 11 Phase wire -
*. 3.~.2 1. General inspection of the accessible exterior surfaces of the containment performed.
leakage stopped 1030 - Started taking data for ILkT December 19 1 1981 0215   Completed ILRT oq35 - Started superimposed verification test 0835   Completed superimposed verification test 1150 - C0Dm1enced contairunent depressurization 2138   Completed contairunent depressurization 3-1
interior structure and was 2. A11 equipment and instrumentation that coul.d .be damag*ed or destroyed by test pressure was removed or protected.
* 3.2   GENERAL TEST DESCRIPTION 3.2.1     Prerequisites In accordance   with the Surry Unit No. 2 CILRT procedures, 2-PT-16.3 (Reference 3), the following is a     partial listing of the prerequisites     that were completed and docwnented prior to containment pressurization *.
3*. All instrumentation used for test was calibrated within & months of the test. 4. Valve line-ups, as required, were completed, including closure of the containment isolation valves. s. 6. 7. 8. Component operable.
: 1. General inspection of the accessible interior          and exterior surfaces of the containment structure          was performed.
cooling and chilled water systems were Plant computers were operational and programmed tor the CILRT
: 2. A11 equipment and instrumentation that coul.d .be damag*ed or destroyed by test pressure was removed or protected.
* The Official Log of Events book was established and available prior to commencement of the test. Site meteorology data was taken for 7 days prior to and throughout the performance of the CILRT. Equipment and Instrumentation Pressurization of the containment was achieved .by utilization of nine air compressors.
3*. All instrumentation used for test was calibrated within
Air was piped tr.&1:ough two aftercoolers in parallel and* a refrigerated air dryer. Instrumentation and valving were installed to maintain proper monitoring and control during pressurization.
            & months of the test.
The total capacity of the pressurization system, as installed, was rated at 9,990 sctm. During the test, the necessary variables used to determine monitored using multiple resistance mirror dew po.int quartz manometers (see containment leakage were continually instrumentation which consisted of temperature detectors (RTDs), chilled indicators, and two absolute pressure Appendix 3D)
: 4. Valve line-ups, as required, were completed, including closure of the containment isolation valves.
* 3-2
: s. Component     cooling and   chilled water   systems were operable.
* *
: 6. Plant computers were operational and programmed tor the
* air systems was used during the All test instrumentation computer for data acquisition A mass flowmeter in the service superimposed verification test. readings are input into the piant and averaging.
* CILRT *
3.2.3 Data Acquisition System The Surry* Unit No. 2 utilized a Westinghouse Prodac P250 to scan., log, average, and analyze data received from the containment instrumentation.
: 7. The Official Log of Events book was established and available prior to commencement of the test.
The P250 analog scan package reads all the analog inputs in a preestaDlished manner, converts these readings into engineering units, and then stores these values for use by the plant operators and by the plant application programs.
: 8. Site meteorology data was taken for 7 days prior to and throughout the performance of the CILRT.
For the CILRT, the P250 plant computer monitored the following instrumentation:
3.~.2      Equipment and Instrumentation Pressurization of the containment was achieved .by utilization of nine air compressors. Air was piped tr.&1:ough two aftercoolers in parallel and* a refrigerated air dryer.           Instrumentation and valving were installed to maintain proper monitoring and control during pressurization. The total capacity of the pressurization system, as installed, was rated at 9,990 sctm.
2.2 RTDs 5 chilled mirrors 2 quartz manometers Scan Rate (Sec) 20 20 2 Instantaneous values of the CILRT instruments weze recorded every 5 minutes during the test period, using the P250 digital trend function on the operator*s console
During the test, the necessary variables used to determine containment   leakage     were     continually   monitored    using instrumentation       which   consisted   of   multiple    resistance temperature detectors       (RTDs),   chilled   mirror    dew  po.int indicators, and two absolute pressure quartz manometers (see Appendix 3D) *
* 3-2
* A mass flowmeter in the service air systems was used during the superimposed verification test.         All  test    instrumentation readings are input into the piant computer for data acquisition and averaging.
3.2.3     Data Acquisition System The Surry* Unit No. 2 utilized a Westinghouse Prodac P250 to scan.,
log, average, and analyze data received from the containment instrumentation.
The P250 analog scan package reads all the analog inputs in a preestaDlished manner, converts these readings into engineering units, and then stores these values for use by the plant operators and by the plant application programs. For the CILRT, the P250 plant computer monitored the following instrumentation:
Scan Rate (Sec) 2.2 RTDs                             20 5 chilled mirrors                   20 2 quartz manometers                 2 Instantaneous values of the CILRT instruments weze recorded every 5 minutes during the test period, using the P250 digital trend function on the operator*s console *
* A 10-minute time average of the readings, calculated by the P250 Average and Integrate (A6I) package, was used as input in the plant computer CILRT programs.
* A 10-minute time average of the readings, calculated by the P250 Average and Integrate (A6I) package, was used as input in the plant computer CILRT programs.
The plant computer CILRT program consists of ILRTDA'l'A, which runs every 10 minutes, collects A&I data for all the instrumentation, performs sensor validity checks, and calculates weighted average dew point temperature, vapor pressure, weighted average containment temperature, and containment air mass. Data Resolution System After the appropriate data have been acquired and averaged utilizing the plant computer system 6 the results are manually input to a remote computer system for leak rate calculations.
The plant computer CILRT program consists of ILRTDA'l'A, which runs every 10 minutes, collects A&I data for all the instrumentation, performs sensor validity checks, and calculates weighted average dew point temperature,       vapor   pressure,   weighted   average containment temperature, and containment air mass.
3.2.4.1 Absolute Method Mass Point Analysis The Absolute Method of Mass Point Analysis consists of calculating aiz masses within the containment structure over a period of time from pressure, temperature, and dew point observations during the CILRT. The air masses are computed using the ideal gas law as follows: 3-3
Data Resolution System After the appropriate data have been acquired and averaged utilizing the plant computer system 6 the results are manually input to a remote computer system for leak rate calculations.
* *
3.2.4.1     Absolute Method Mass Point Analysis The   Absolute     Method   of Mass Point Analysis consists of calculating aiz masses within the containment structure over a period   of time from pressure, temperature, and dew point observations during the CILRT. The air masses are computed using the ideal gas law as follows:
* where: M = CP-Pv) V (144) RT M =airmass, lb P = total pressure, psia Pv = average vapor pressure, psia R = 53.35 ft lbf/1bm 0 R ,for air) T = average containment temperature, 0 R V = containment free volume, 1.8 x 106 tt~ *lEq 1) The leakage rate is then determined by plotting the air mass as a function of time, using a least-squares fit to determine the slope, A -dM/dt. The leak rate is expressed as a percentage of air mass lost in 24 hours, or symbolically:
* 3-3
Leak rate= A/B (-2400) fEq 2) where A is the slope of the least-squares curve and Bis intercept.
* M   = CP-Pv) V (144)                           *lEq 1)
The sign convention is such that an outward leak is positive and the wiits are in percent/day.
RT where:
The air mass is computed separately, and the result is correlated as a function of time by means ot a least-squares fit of the form: m =At+ B 'Bq 3) The slope A and they-intercept Bare then used in .l!.quation 2 to determine the leak rate. A 95 percent confidence interval is calculated using a T distribution.
M   =airmass, lb P   = total pressure, psia Pv = average vapor pressure, psia R   = 53.35 ft lbf/1bm 0 R ,for air)
The sum of the leakage rate and the 95 percent confidence interval is the Upper Confidence Level (UCL). The leak rate is less than the UCL with the probability of 95 percent. 3.2.4.2 Absolute Method Total Time Analysis The absol.ute method of total time analysis consists of calculating air lost from the containment pressure, temperature, and dew point observations during the CILRT. The containment air (Section 3.2.4.1).
T   = average containment temperature, 0 R V   = containment free volume, 1.8 x 106 tt~
mass is computed using Equation 1 The measured leakage rate at any time ,t) is then determined by subtracting the mass at the time (Mt) f:rom the initial mass ,Mi) and dividing by the initial mass. The measured leak rate is 3-4
The leakage rate is then determined by plotting the air mass as a function of time, using a least-squares fit to determine the slope, A - dM/dt. The leak rate is expressed as a percentage of air mass lost in 24 hours, or symbolically:
* *
Leak rate= A/B (-2400)                                 fEq 2) where A is the slope of the least-squares curve and Bis they-intercept. The sign convention is such that an outward leak is positive and the wiits are in percent/day. The air mass is computed separately, and the result is correlated as a function of time by means ot a least-squares fit of the form:
* expressed as a percentage of containment mass lost in 24 hours o~ symbo1ica1ly
m =At+ B                                               'Bq 3)
: MEA Leak Rate = Mi -Mt (2400) Mi (.:1t) The sign convention is such that an outward leak is positive and the units are in percent/day.
* The slope A and they-intercept Bare then used in .l!.quation 2 to determine the leak rate.
The estimated leakage rate is then determined by plotting the measured leak rate as a function of time and then performing a least-squares tit of the measured leak rate values as follows: BST Leak Rate= At+ B where A is the slope and Bis they intercept of the squares curve. The 95 percent confidence interval is determined with the T distribution.
A   95 percent distribution.
This analysis method was used in conjunction with procedure 2-PT-16.3 (Reference
confidence   interval is calculated   using   a T The sum of the leakage rate and the 95 percent confidence interval is the Upper Confidence Level (UCL).
: 3)
The leak rate       is less   than   the UCL with the probability of 95 percent.
* 3-5
3.2.4.2   Absolute Method Total Time Analysis The   absol.ute   method   of total time analysis       consists of calculating air lost from the containment pressure,       temperature, and dew point observations during the CILRT.
--------*-
The   containment     air   mass    is  computed  using  Equation 1 (Section 3.2.4.1).
~---*
The measured leakage rate at any time ,t) is then determined by subtracting the mass at the time (Mt) f:rom the initial mass ,Mi) and dividing by the initial mass. The measured leak rate is
* 3.3 TEST ANALYSIS Test data acquired fran the start of stabi1ization to the termination of the superimposed leak verification test are shown as a graph in Appendix 3J. The graph is divided into the following zones: zone A -depicts temperature stabilization period from 1140 hours to 1710 hours on December 16, 1981. zone B -depicts unacceptable mass trend trom 1710 hours on December 16, 1981 to 1030 hours on December 18, 1981 and also depicts the removal of an RTD from scan.* Zone C -depicts acceptable mass trend December 18 , .. 1981 to 0200 hours 1981. from 1030 hours on on December 19, Zone D depicts superimposed verification test from 0440 hours to 0840 hours on December 19, 1981 *. An RTD was removed from scan as it was reading .below the maximum temperature span required .by the procedure.
* 3-4
The unacceptable mass trend shown in Zone B was a result of excessive leakage past electrical penetration A18
* expressed as a percentage of containment mass lost in 24 hours o~
* The correction of the leakage past electrical penetration A18 resulted in the acceptable mass trend shown in Zone C. The leakage rate analysis was performed .by Virginia Electric and Power Company*s CILRT program (Section 3.2.4). The input data tor the V~PCO-CILRT program are shown in Appendix 3F. The Absolute Method Mass Point Analysis (Section 3.4.2) represents the result of the containment leakage rate. The results given in Appendix JG show that the UCL is 0.03837 percent/day which is within the acceptable limit of 0.013701 percent/day (0.075 less the Type C penalty :tor valves on systems not rented to the containment).
symbo1ica1ly :
The Absolute Method Total Time Analysis (Section 3.4.1) is used to determine the acceptability of the CILRT it the test duration is less than 24 hours. The results of the total tirne analysis are shown in Appendix 3H. The results show the UCL to be 0.072185 percent/day, which is within the acceptable linut of 0.075 percent/day (La). The following appendices contain the plots provided by this report: 3-6
MEA Leak Rate = Mi - Mt       (2400)
* *
Mi   (.:1t)
* Appendix 3J 3K 3L Description Containment ai.r mass vs time (1~30 hours on 12/16/81 to 0940 hours on 12/19/81)
The sign convention is such that an outward leak is positive and the units are in percent/day.
Containment leak rate and UCL vs time, mass point ana1ysis (1030 hours on 12/18/81 to 0210 hours on 12/19/81)
The estimated leakage rate is then determined by plotting the measured leak rate as a function of time and then performing a least-squares tit of the measured leak rate values as follows:
Containment leak rate vs time, tota1 time analysis~(1030 hours on 12/18/81 to 0210 hours on 12/19/81)
BST Leak Rate= At+ B where A is the     slope   and Bis they intercept of the least-squares curve.
The leakage zate calculations weze verified by the superimposed verification test. The test ran from 0440 hours to 0840 hours on December 19, 1981. The computer calculated air mass was within 0.25 La of the metered value and satisfied the procedures
The 95 percent   confidence   interval     is determined with the T distribution.
* 3-1
This analysis method   was used   in   conjunction with procedure 2-PT-16.3 (Reference 3) *
* *
*
* 3.4 TEST RESULTS 3.4.1 CILRT Results -Total Time Method 1 .. 2. 3. 1. 2. 3. 4. 5. 3.4.3 1. Leakage rate calculated, Lam 95 percent upper confidence interval UCL, Lam leakage rate with 95 percent confidence interval (1 + 2) CILRT Results-Mass Point Method Leakage rate calculated, Lam 95 percent upper confidence interval UCL, Lam leakage rate with 95 percent confidence interval (1 + 2) Type C leakage penalty Total reportable Type A leak rate (3 + 4) superimposed Leakage Rate Test Results 0.043258 percent/day 0 .0289.;t7 percent/day 0.072185 percent/day 0.03713b percent/day 0.001238 percent/day 0.03837-.
* 3-5
pe rcent/day 0.001299 percent/day 0.039673 percent/day The Super.imposed Leak Rate Test is acceptable if Le falls within the following range: (Lo+ Lam -o.~5 La) s Le$ (Lo+ Lam+ 0.2s La) where: Le = Containment leakage rate calculated during the verification test Lo = Leakage rate imposed on containment using flow measuring device 3-8 0.122645 percent/day 0.109090 percent/day
 
* *
--------*- ~ - - -
* 3.4.4 La = Maxinnnn a11owab1e 1eakage rate Lam= tota1 measured containment leakage rate 0.1 percent/day 0"'03713b pei:cent/day 0.109090 + 0.037136 -0.025 S 0.122645 s 0.109090 + Ou037136 + 0.025 0.121226 s 0.122645 s 0.171226 Types C and B Penetration Leakage to be Added to Containment Calcu1ated Leakage* Penetration No./1,eakage (SCFH) 1/0 .. 2 18J'0.2 8/0.8 45/0.3 9/1.0 10/1.1 Total Type C leakage to be added Total Type B leakage to be added Total Types Band C leakage to be added 3.88 SCFH 0 0.00129 percent/day NOTB: The above penetrations were in a nonvented valve lineup configuration for this test. with their respective leak rates taken from 2-PT-16.4
* 3.3   TEST ANALYSIS Test data acquired fran the start of stabi1ization to the termination of the superimposed leak verification test are shown as a graph in Appendix 3J.
The graph is divided into the following zones:
zone A - depicts temperature stabilization period from 1140 hours to 1710 hours on December 16, 1981.
zone B - depicts unacceptable mass trend trom 1710 hours on December 16, 1981 to 1030 hours on December 18, 1981 and also depicts the removal of an RTD from scan.*
Zone C - depicts acceptable mass trend from 1030 hours on December 18 , .. 1981 to 0200 hours on December 19, 1981.
Zone D   depicts superimposed verification test       from 0440 hours to 0840 hours on December 19, 1981 *.
An RTD was removed from scan as it was reading .below the maximum temperature span required .by the procedure.
The unacceptable mass trend shown in Zone B was a result of
* excessive leakage past electrical penetration A18
* The correction of the leakage past electrical penetration A18 resulted in the acceptable mass trend shown in Zone C.
The leakage rate analysis was performed .by Virginia Electric and Power Company*s CILRT program (Section 3.2.4).     The input data tor the V~PCO-CILRT program are shown in Appendix 3F.
The   Absolute   Method       Mass   Point Analysis (Section 3.4.2) represents the result of the containment leakage rate.           The results given in Appendix JG show that the UCL is 0.03837 percent/day which is within the acceptable limit of 0.013701 percent/day (0.075 less the Type C penalty :tor valves on systems not rented to the containment).
The Absolute Method Total Time Analysis (Section 3.4.1) is used to determine the acceptability of the CILRT it the test duration is less than 24 hours. The results of the total tirne analysis are shown in Appendix 3H.       The results show the UCL to be 0.072185 percent/day, which is within the acceptable linut of 0.075 percent/day (La).
The following   appendices     contain the plots provided by this report:
3-6
* Appendix                           Description 3J               Containment ai.r mass vs time (1~30 hours on 12/16/81 to 0940 hours on 12/19/81) 3K              Containment leak rate and UCL vs time, mass point ana1ysis     (1030 hours   on 12/18/81 to 0210 hours on 12/19/81) 3L              Containment leak rate vs time, tota1 time analysis~(1030 hours on 12/18/81 to 0210 hours on 12/19/81)
The leakage zate calculations weze verified by the superimposed verification test. The test ran from 0440 hours to 0840 hours on December 19, 1981. The computer calculated air mass was within 0.25 La of the metered value and satisfied the procedures *
*
* 3-1
* 3.4   TEST RESULTS 3.4.1     CILRT Results - Total Time Method 1 .. Leakage rate calculated, Lam                 0.043258 percent/day
: 2. 95 percent upper confidence interval         0 .0289.;t7 percent/day
: 3. UCL, Lam leakage rate with 95 percent confidence interval (1 + 2)                   0.072185 percent/day CILRT Results-Mass Point Method
: 1. Leakage rate calculated, Lam                 0.03713b percent/day
: 2. 95 percent upper confidence interval         0.001238 percent/day
: 3. UCL, Lam leakage rate with 95 percent confidence interval (1 + 2)                   0.03837-.
pe rcent/day
* 4.
5.
Type C leakage penalty Total reportable Type A leak rate (3 + 4) 0.001299 percent/day 0.039673 percent/day 3.4.3      superimposed Leakage Rate Test Results
: 1. The Super.imposed Leak Rate Test is acceptable if Le falls within the following range:
(Lo+ Lam - o.~5 La) s Le$   (Lo+ Lam+   0.2s   La) where:   Le = Containment leakage rate calculated during     the verification test               0.122645 percent/day Lo = Leakage rate imposed on containment using   flow measuring device               0.109090 percent/day
* 3-8
* La   = Maxinnnn a11owab1e 1eakage rate                           0.1 percent/day Lam= tota1 measured containment leakage rate                   0"'03713b pei:cent/day 0.109090 + 0.037136 - 0.025 S 0.122645     s 0.109090 + Ou037136 + 0.025 0.121226 s 0.122645 s 0.171226 3.4.4      Types C and B Penetration Leakage           to be   Added to Containment Calcu1ated Leakage*
Penetration No./1,eakage (SCFH) 1/0 .. 2 18J'0.2 8/0.8 45/0.3 9/1.0 10/1.1 Total Type C leakage to be added                   3.88 SCFH Total Type B leakage to be added                           0 Total Types Band C leakage to be added                                 0.00129 percent/day
* NOTB:   The above penetrations were in a nonvented valve lineup configuration for this test. with respective leak rates taken from 2-PT-16.4
* their
* 3-9
* 3-9
* APPENDIX 3A SITE METEOROLOGY PRIOR 'l'O CILRT Barometric Pressure (in Hg) Dew Point (OF) Dry Bu1b (OF) 12/8/81 0000 29.70 35 q.s 0400 29.57 31 4& 0800 29.&1 39 4{, 1200 29.63 32 58 1600 29.64 25 54 2000 29.12 22 45 12/9/81 0000 29.75 21 '1-0 0400 29.75 22 35 0800 29.82 19 36
* APPENDIX 3A SITE METEOROLOGY PRIOR 'l'O CILRT Barometric Pressure
* 1200 29.80 17 39 1600 29.80 12 38 2000 29.86 10 3L 12/10/81 0000 29.86 10 29 0400 29.81 10 21 0800 29.79 11 .27 1200 29.14 13 35 1600 29. 72 11 37 2000 29.80 11 30 (
  ~        ~      (in Hg)     Dew Point (OF)   Dry Bu1b (OF) 12/8/81 0000     29.70           35               q.s 0400     29.57           31               4&
0800     29.&1           39               4{,
1200     29.63           32               58 1600     29.64           25               54 2000     29.12           22               45 12/9/81 0000     29.75           21               '1-0 0400     29.75           22               35 0800     29.82           19               36
* 1200 1600 2000 29.80 29.80 29.86 17 12 10 39 38 3L 12/10/81 0000     29.86           10               29 0400     29.81           10               21 0800     29.79           11               .27 1200     29.14           13               35 1600     29. 72           11               37 2000     29.80           11               30
(
* 3A-1
* 3A-1
* APPENDIX 3A (CONT*D) Barometric Pressure (in Hg) Dew Point ,on Dry Bulb (OF) 12/11/81 0000 29.82 12 31 0400 29.83 15 31 0800 29.88 14 29 1200 29.91 16 3~ 1600 29.93 18 36 2000 29.98 19 2& 12/12/81 0000 30.03 20 31 0400 30.36 20 31 0800 30.12 20 29 1200 30.16 2 ... ttO
* APPENDIX 3A (CONT*D)
* 1600 30.18 20 41 2000 30.24 18 28 12/13/81 0000 30~26 19 2 ... 0400 30.31 17 23 0800 30~33 18 22 1200 30.34 21 40 1600 30.31 22 41 2000 30~31 21 26 ** 3A-2 APPENDIX 3A (CONT*D)
Barometric Pressure
* Barometric Pressure Cin Hg) Dew Point (OF) Dry Bul.b (OF) 12/14/81 0000 30.30 19 23 0400 30.27 21 23 0800 30.23 24 21 1200 30.12 39 44 1600 30.02 43 4q 2000 29~91 49 50 12/15/81 0000 29.87 45 q.5 0400 29.89 37 37 0800 29 .. 87 36 36 1200 29.75 31 37
  ~        ~      (in Hg)     Dew Point ,on Dry Bulb (OF) 12/11/81 0000   29.82           12             31 0400   29.83           15             31 0800   29.88           14             29 1200   29.91           16             3~
* 1600 29~53 31 37 2000 29.55 36 31 12/16/81 0000 29.67 31 31
1600   29.93           18             36 2000   29.98           19             2&
* 3A-3 APPENDIX 3B ., SITE METEOROLOGY DURING THB CILRT Barometric Pressure ~* Cin Hg) Dew Point (OF) Dry Bu1b (OF) 12/16/81 0100 29.87 37 38 0200 29.87 31 38 0300 29.87 37 38 0400 29.89 37 38 0500 29.89 37 3ts 0600 30.03 35 39 0700 30.03 36 40 0800 30.03 36 40 0900 30.11 3& 48
12/12/81 0000   30.03           20             31 0400   30.36           20             31 0800   30.12           20             29 1200   30.16           2 ...         ttO
* 1000 30.17 33* q.5 1100 30~ 17 32: 45 1200 30.17 33 44 1300 30.16 21 50 1400 30.16 29 4b 1500 30.16 30 47 1600 30.16 27 48 1700 30.10 28 47 1800 30~70 31 31 1900 30.80 30 36 2000 30.70 35 41 2100 30.80 28 31
* 12/13/81 1600 2000 0000 30.18 30.24 30~26 20 18 19 41 28 2 ...
0400   30.31           17             23 0800   30~33           18             22 1200   30.34           21             40 1600   30.31           22             41 2000   30~31           21             26
**                           3A-2
* APPENDIX 3A (CONT*D)
Barometric Pressure
  ~        ~      Cin Hg)     Dew Point (OF) Dry Bul.b (OF) 12/14/81 0000   30.30           19             23 0400   30.27           21             23 0800   30.23           24             21 1200   30.12           39             44 1600   30.02           43             4q 2000   29~91           49             50 12/15/81 0000   29.87           45             q.5 0400   29.89           37             37 0800   29 .. 87       36             36 1200   29.75           31             37
* 12/16/81 1600 2000 0000 29~53 29.55 29.67 31 36 31 37 31 31
* 3A-3
 
.,                          APPENDIX 3B SITE METEOROLOGY DURING THB CILRT Barometric Pressure
    ~      ~*       Cin Hg)     Dew Point (OF)   Dry Bu1b (OF) 12/16/81 0100     29.87           37               38 0200     29.87           31               38 0300     29.87           37               38 0400     29.89           37               38 0500     29.89           37               3ts 0600     30.03           35               39 0700     30.03           36               40 0800     30.03           36               40 0900     30.11           3&               48
* 1000 1100 1200 30.17 30~ 17 30.17 33*
32:
33 q.5 45 44 1300     30.16           21               50 1400     30.16           29               4b 1500     30.16           30               47 1600     30.16           27               48 1700     30.10           28               47 1800     30~70           31               31 1900     30.80           30               36 2000     30.70           35               41 2100     30.80           28               31
* 3B-1
* 3B-1
* APPENDIX 3B (CONT*D) Barometric Pressure (in Hg) Dew Point (OF) Dry Bulb (OF) 2200 30.8 28 33 2300 30.38 27 27 12/17/81 0000 30.38 26 34 0100 30.;38 29 3~ 0200 30.36 32 34 1300 30.;.35 31 34 1400 30.39 3.2 33 0500 30.39 32 33 0600 30.39 32 34 0700 30.38 32 35
* APPENDIX 3B (CONT*D)
* 0800 30.;.38 29 38 0900 30.37 30 42 1000 30.38 31 44 1100 30 .. 38 2~ 4b 1200 30*.40 31 47 1300 30.37 32 55 1400 30.38 30 52 1500 30.32 32 52 1600 30.37 38 50 1700 29.38 43 43 1800 30.38 42 IJ2 1900 30.34 41 43 ** 3B-2 APPENDIX 3B (CONT'D)
Barometric Pressure
* Barometric Pressure Time* {in Hg) Dew Point &OF) Dry Bul.b IOF) 2000 30.35 37 50 2100 30.34 39.5 46 2200 30.37 39.5 4b 2300 ** ** ** 12/18/81 0000 ** ** ** 0100 30.36 35 49 0200 30.36 35 4~ 0300 ** ** ** 0400 30.31 39 50 0500 30.33 40 48
    ~      ~      (in Hg)     Dew Point (OF) Dry Bulb (OF) 2200   30.8           28             33 2300   30.38           27             27 12/17/81 0000   30.38           26             34 0100   30.;38         29             3~
* 0600 30.36 41 46 0700 30.38 41 Q.t, 0800 30.37 37 44 0900 30.37 35 37 1000 30~37 33 44 1100 30.37 32 41 1200 30.38 35 39 1300 30.38 33 38 1400 30~37 29 41 1500 30.37 32 41 1600 30.37 34 39 1700 30.37 28 33
0200   30.36           32             34 1300   30.;.35         31             34 1400   30.39           3.2           33 0500   30.39           32             33 0600   30.39           32             34 0700   30.38           32             35
* 3B-3 APPENDIX 3B ,coNT 1 D)
* 0800 0900 1000 30.;.38 30.37 30.38 29 30 31 38 42 44 1100   30 .. 38       2~             4b 1200   30*.40         31             47 1300   30.37           32             55 1400   30.38           30             52 1500   30.32           32             52 1600   30.37           38             50 1700   29.38           43             43 1800   30.38           42             IJ2 1900   30.34           41             43
* Barometric Pressure Time (in Hg) Dew Point (OF) Dry Bu1b (OF) 1800 30.37 28 33 1900 30.37 28 38 2000 30~37 28 34 2100 30.37 28 34 2200 30.37 28 32 2300 30.37 28 31 12/19/81 0000 30.37 28 31 0100 ** ** ** 0200 30.38 21 3At 0300 ** ... **
**                           3B-2
* 0400 ** ** ** 0500 30.38 21 34 0600 30~37 24 33 0700 30.37 18 22 0800 30~37 18 32 0900 30.38 18
* APPENDIX 3B (CONT'D)
* 3B-4
Barometric Pressure
* *
    ~      Time*   {in Hg)     Dew Point &OF) Dry Bul.b IOF) 2000     30.35           37             50 2100     30.34           39.5           46 2200     30.37           39.5           4b 2300
* APPENDIX 3C INSTRUMENTATION TAbLE The following instrwnentation was calibrated and fwictionally tested no greater than 6 months prior to the performance of this test and in accordance with 10CFR50 1 Appendix J 1 and Field Calibration Procedures using instrwnentation traceable to the National Bureau of Standards.
                    **             **           **
Weight Computer Instrument Factor Range Accuracy Sensitivity Rl'D-LM-200-1 0.02683 T1000A 55-1050F F-1 +/-0 .1oF-+/-0.090F Rl'D-LM-200-2 0.02322 T1001A 55-1050F F-2 +/-0.1oF* +/-0.09°F Rl'D-LM-200-3 0.02427 T1002A 55-105DF F-3 +/-0 .. 1DF +/-0.090F Rl'D-LM-200-4 0.01820 T1003A 55-1050F E-3 +/-0.10F +/-0 .. 09°F Rl'D-LM-200-5 0.08884 T100qA 55-105DF B-1 +/-0.10F +/-0.09°F Rl'D-LM-200-6 0.08884 T1005A 55-105DF B-2 +/-0.1°F +/-0 *. 09°F Rl'D-LM-200-7 0.08884 T1006A 55-1050F c-1 +/-0 .10F +/-0.09°F Rl'D-LM-200-8 0.08881J T1007A 55-1050F c-2 +/-0.1DF +/-0.09°F Rl'D-LM-200-9 0.04975 T1008A 55-105DF A-1 +/-0 .. 10F +/-0.09°F Rl'D-LM-200-10 O.OIJ975 T1009A 55"'.'"1050F A-2 +/-0.1°F +/-0.09°F RTD-LM-200-11 0.04975 T1010A 55-1050F
12/18/81 0000
* A-3 +/-0.1°F +/-0.09°F Rl'D-LM-200-12 0.02460 T1011A 55-1050F D-1 +/-0.10F +/-0.09°F Rl'D-LM-200-13 0.021J60 T1012A 55-105DF D-2 +/-0.1°F +/-0.09°F Rl'D-LM-200-14 0.02460 T1013A 55-1050F E-1 +/-0.1DF +/-0.09°F Rl'D-LM-200-15 0.02LJ60 TIJ02LJA 55-105DF B-2 +/-0.1DF +/-0 .. 09°F Rl'D-LM-200-16 O.OLJ76t>
                    **             **             **
T4025A 55-1050.l?
0100     30.36           35             49 0200     30.36           35             4~
I-1 +/-0.1DF +/-0.090? RTD-LM-200-17 0.04706 T4026A 55-1050F I-2 +/-0.10F +/-0.090F Rl'D-LM-:W0-18 O.OIJ766 T4027A 55-1050F I-3 +/-0.1DF +/-0.090F 3C-1
0300
* *
                    **             **             **
* APPENDIX 3C (CONT 1 D) Weight Computer Instrwnent Factor Point Range Accuracy Sensitivity Rl'D-LM-200-21 0.03608 T4009A 55-105°F H-1 +/-0.1°F +/-0 .090F Rl'D-LM-200-22 0.03961 T4020A 55-1050F H-2 +/-0.1°.F +/-0.090F RTD-LM-200-23 0 .o 1782 T4021A 55-1050F G-1 +/-0.1°F +/-0.090F Rl'D-LM-200-24 0.06800 T4022A 55-1050F G-2 +/-0.10F +/-0,.09°F Ml'-LM-200-o 0.14064 T4039A -40 to +200°F J-1 +/-0.40F +/-O.OS°F MT-LM-200-7 0.14064 T4040A -40 to +-2Q00F J-2 +/-0.4°F +/-0.05°F Ml'-LM-200-8 0.23959 T4041A -40 to +2000F K-1 +/-0.4°F +/-0.05°F Ml'-LM-200-9 0.23959 T4042A -1rn to +2Q00F K-2 +/-0.4°F +/-0.05°F Ml'-LM-200-10 0.23959 T4043A -40 to +2000F K-3 +/-Om4°F +/-0.05°F PI-LM-206 0.5 00960 0-100 psia +/-0.0&8 psia o.oon, ops PI-LM-207 o.s 00961 0-100 psia +/-0 .068 psia 0.001, °FS 3C-2
0400     30.31           39             50 0500     30.33           40             48
* * ' *. MT-7 ZONE J ZONEK MT-8 MT-IO MT-9 PROFILE VIEW NOTE: MT-G MT-LM-200-G(TYP)
* 0600 0700 0800 30.36 30.38 30.37 41 41 37 46 Q.t, 44 0900     30.37           35             37 1000     30~37           33             44 1100     30.37           32             41 1200     30.38           35             39 1300     30.38           33             38 1400     30~37           29             41 1500     30.37           32             41 1600     30.37           34             39 1700     30.37           28             33
APPENDIX 30 INSTRUMENTATION LOCATION DEW POINT SENSORS SURRY POWER STATION-UNIT 2 INTEGRATED LEAK RATE TEST 30-1
* 3B-3
,,. *
* APPENDIX 3B ,coNT 1 D)
* RT0-5 RTD-13 RTD-4 RTD-3 RTD-21 NOTES: RTD-24 RTD-18 PROFILE VIEW RTD-12 el 132' RTO-G RTD-7 el 95 1 RTD-15 RT0-14 el 4i4 11 RTD-22 RT0-2 el 18'-4" RTD-1 el -3'-6" I II ~-1-27-7 RTD-17 I. RTO-l=RTD-LM-200-1 (TYP) 2. RTD-19, 20 NOT USED 3 D-2 APPENDIX 3D JNSTRUMENTATION LOCATION R E SIS TA NC E TEMPER AT URE DETECTORS (RTD) SURRY POWER STATION-UNIT 2 INTEGRATED LEAK RATE TE 5 T
Barometric Pressure
* *
    ~      Time   (in Hg)     Dew Point (OF) Dry Bu1b (OF) 1800   30.37           28             33 1900   30.37           28             38 2000   30~37           28             34 2100   30.37           28             34 2200   30.37           28             32 2300   30.37           28             31 12/19/81 0000   30.37           28             31 0100                   **             **
* RTD-18 I RT0-17 I RTD-lj PLAN VIEW NOTES: I. RTD-l=RTD-LM-200-1 (TYP) 2. RT D-19,20 NOT USED APPENDIX 3 E 1N5 T RUMENTATfON LOCATION RESISTANCE TEMPERATURE DETECTORS (RTD) SURRY POWER STATION-UNIT 2 lNTEGRATED LEAK RATE TEST 3E-1
                    **
* *
0200   30.38           21             3At 0300
* MT-7 NOTE: PLAN VIEW MT-6 MT-LM-200-6 (TYP) APPENDIX 3 E I NSTRUME:NTATION LOCATION DEW POINT SENSORS SUR RY POWER 5 TAT ION-UNIT 2 ,f NT E GRAT E D L EA K RAT E T EST 3E-2
                    **             ...           **
* APPENDIX 3F VEPCO SURRY POWER STATION UNIT NO. 2. CONTAINMBNT INPUT VARIABLES 1030 HOURS ON 12/18/81 TO 0210 HOURS ON 12/19/81 Time ABS Pressure DEWPT Vap Pressure Dry Bu1b mours) CPsia) COF) (Psia) Temperature IOR) o.o 60.949 66.42 0.3209 534.33 o.~33 60.950 66.43 0.3210 534.34 0.667 60.950 66.45 0.3212 534.33
* 0400 0500 0600
* 1.000 60.949 66.46 0.3213 534.32 1.333 60.950 66.47 0.3215 534.34 1.667 &0.951 66.50 0.3218 534.34 2.000 60 .951 6f>.50 0.3218 534.35 2.333 60.951 66.52 0.3220 534.36
                    **
* 2.667 60.951 66.52 0.3220 534.35 3.000 60.950 66.53 0.3221 534.34 3.333 60.950 66.56 0.3225 534.35 3.667 60.951 66.56 0.3225 534.36 4.000 60 .951 f,f,.57 0.3226 534.37 4.333 60.951 66.58 0.3227 534.37 4.667 60.952 66.57 0.3226 53,._39 5.000 .60 .952 66.60 0.3229 534.38 5.333 60.952 66.60 0.3229. 534.38 5.667 60.952 66.60 0.3229, 534.38 6.000 60.952 66.61 0.3230 534.38 6.333 60.952 66.62 0.3231 534.39 6.667 60.952 66.62 0.3231 534.40
30.38 30~37
* 3F-1
                                  **
* APPENDIX 3F (CONT*O) Time ABS Pressure DEWPT Vap Pressure Dry Bulb (Hours) (Psia) (OF) IPsia) Temperature (OR) 7.000 60.952 66.62 0.3231 534~3' 7.333 60.951 66 .63 0.3232 534.39 7.667 60.951 66.6LJ 0.3234 534.39 8.000 60.951 66.63 0.3232 534.39 8.333 60.951 6&.64 0.3234 534.39 8.&67 60.951 66.&3 0.3232 534.40 9.000 60.951 M,.64 0.3234 534.40 9.333 60.951 66 .. 65 0.3235 534.40 9.667 60.951 66.64 0.32.34 534.40 10 .ooo b0.~50 66.62 0.3231 534.40
21 24
* 10.333 60.950 66.65 0.3235 534.40 10.&67 60.950 66.64 0.3234 534.40 11.000 60.950 66.64 0.3234 534.a+O 11.333 60.949 66.65 0.3235 534.40 11.667 60.94~ 66.67 0 .. 3237 534.40 12.000 60 .. ~49 66.65 0.3235 5.34.41 12.333 60.949 66.64 0.3.l34 534 .. 41 12.667 60.948 66.64 0.3234 53AJ.40 13.000 60.948 66.65 0.3235 534.40 13 .333 60.948 66.64 0.3234 534.ll1 13.667 60~948 t,6.64 0.3234 534.41 14.000 60.9£J8 66.b4 0.3234 53Q..40
                                                  **
* 14.333 60.947 66.63 0.3232 534.41 3F-2 jl
34 33 0700   30.37           18             22 0800   30~37           18             32 0900   30.38           18
---------------------------~
* 3B-4
* APPENDIX 3F (CONT .. D) Time ABS Pressure DEWPT Vap '.Pressure Dry Bu1b C.l:lours) ,Psia) (OF) CPsia) Temperature C 0 R} 14.667 60.947 66.63 0.3232 5.34.40 15.000 60.947 bb.62 0 .. 3231 534.41 15.333 60~9lH, 66.63 0.3232 534.40 1'5.667 60.~45 66.63 0.3232 534.40 *
 
*
* APPENDIX 3C
* INSTRUMENTATION TAbLE The   following instrwnentation was calibrated and fwictionally tested no greater than 6 months prior to the performance of this test and in accordance with 10CFR50 1 Appendix J 1 and Field Calibration Procedures using instrwnentation traceable to the National Bureau of Standards.
Weight       Computer Instrument       Factor       ~                    Range       ~          Accuracy   Sensitivity Rl'D-LM-200-1     0.02683     T1000A         55-1050F           F-1         +/-0 .1oF-   +/-0.090F Rl'D-LM-200-2     0.02322     T1001A         55-1050F           F-2         +/-0.1oF*   +/-0.09°F Rl'D-LM-200-3     0.02427     T1002A         55-105DF           F-3         +/-0 .. 1DF +/-0.090F Rl'D-LM-200-4     0.01820     T1003A         55-1050F           E-3         +/-0.10F     +/-0 .. 09°F Rl'D-LM-200-5     0.08884     T100qA         55-105DF           B-1         +/-0.10F     +/-0.09°F Rl'D-LM-200-6     0.08884     T1005A         55-105DF           B-2         +/-0.1°F     +/-0 *.09°F Rl'D-LM-200-7     0.08884     T1006A         55-1050F           c-1         +/-0 .10F   +/-0.09°F Rl'D-LM-200-8     0.08881J     T1007A       55-1050F           c-2         +/-0.1DF     +/-0.09°F Rl'D-LM-200-9     0.04975     T1008A         55-105DF           A-1         +/-0 .. 10F +/-0.09°F Rl'D-LM-200-10   O.OIJ975     T1009A         55"'.'"1050F       A-2         +/-0.1°F     +/-0.09°F RTD-LM-200-11     0.04975     T1010A         55-1050F
* A-3         +/-0.1°F     +/-0.09°F Rl'D-LM-200-12   0.02460     T1011A         55-1050F           D-1         +/-0.10F     +/-0.09°F Rl'D-LM-200-13   0.021J60     T1012A         55-105DF           D-2         +/-0.1°F     +/-0.09°F Rl'D-LM-200-14   0.02460     T1013A         55-1050F           E-1         +/-0.1DF     +/-0.09°F Rl'D-LM-200-15   0.02LJ60     TIJ02LJA       55-105DF           B-2         +/-0.1DF     +/-0 ..09°F Rl'D-LM-200-16   O.OLJ76t>   T4025A         55-1050.l?         I-1         +/-0.1DF     +/-0.090?
RTD-LM-200-17     0.04706     T4026A         55-1050F           I-2         +/-0.10F     +/-0.090F Rl'D-LM-:W0-18   O.OIJ766     T4027A         55-1050F           I-3         +/-0.1DF     +/-0.090F 3C-1
 
*
* APPENDIX 3C (CONT 1 D)
* Weight   Computer Instrwnent     Factor     Point           Range         ~  Accuracy     Sensitivity Rl'D-LM-200-21 0.03608   T4009A       55-105°F           H-1 +/-0.1°F       +/-0 .090F Rl'D-LM-200-22 0.03961   T4020A       55-1050F           H-2 +/-0.1°.F     +/-0.090F RTD-LM-200-23 0 .o 1782 T4021A       55-1050F           G-1 +/-0.1°F       +/-0.090F Rl'D-LM-200-24 0.06800   T4022A       55-1050F           G-2 +/-0.10F       +/-0,.09°F Ml'-LM-200-o   0.14064   T4039A       -40 to +200°F     J-1 +/-0.40F       +/-O.OS°F MT-LM-200-7   0.14064   T4040A       -40 to +-2Q00F     J-2 +/-0.4°F       +/-0.05°F Ml'-LM-200-8   0.23959   T4041A       -40 to +2000F     K-1 +/-0.4°F       +/-0.05°F Ml'-LM-200-9   0.23959   T4042A       -1rn to +2Q00F     K-2 +/-0.4°F       +/-0.05°F Ml'-LM-200-10 0.23959   T4043A       -40 to +2000F     K-3 +/-Om4°F       +/-0.05°F PI-LM-206     0.5       00960       0-100 psia             +/-0.0&8 psia o.oon,   ops PI-LM-207     o.s       00961       0-100 psia             +/-0 .068 psia 0.001, °FS 3C-2
* MT-7 ZONE J ZONEK
* MT-8       MT-IO       MT-9 PROFILE VIEW NOTE:
MT-G MT-LM-200-G(TYP)
' *.                        APPENDIX 30 INSTRUMENTATION LOCATION DEW POINT SENSORS SURRY POWER STATION-UNIT 2 INTEGRATED LEAK RATE TEST 30-1
 
,,.
el 132' RTD-12 RT0-5 RTO-G RTD-7              1 el 95 RTD-13                                           RTD-15 RT0-14 el 11 4i4 RTD-4                                             RTD-22
* RTD-3 RTD-21 RT0-2 RTD-1 el 18'-4" el
                                                                      -3'-6" I  II
                                                          ~-1-27-7 RTD-24                      RTD-17 RTD-18 PROFILE VIEW NOTES:
I. RTO-l=RTD-LM-200-1 (TYP)
: 2. RTD-19, 20 NOT USED APPENDIX 3D JNSTRUMENTATION LOCATION
* R ESIS TA NC E TEMPER AT URE DETECTORS (RTD)
SURRY POWER STATION-UNIT 2 INTEGRATED LEAK RATE TE 5 T 3 D-2
* RTD-18   I
* RT0-17 IRTD-lj PLAN VIEW NOTES:
I. RTD-l=RTD-LM-200-1 (TYP)
: 2. RT D-19,20 NOT USED APPENDIX 3 E
* 1N5 T RUMENTATfON LOCATION RESISTANCE TEMPERATURE DETECTORS (RTD)
SURRY POWER STATION-UNIT 2 lNTEGRATED LEAK RATE TEST 3E-1
 
*
* MT-7 NOTE:
PLAN VIEW MT-6 MT-LM-200-6 (TYP)
* APPENDIX 3 E I NSTRUME:NTATION LOCATION DEW POINT SENSORS SUR RY POWER 5 TAT ION-UNIT 2
                          ,f NT EGRAT E D L EA K RAT E T EST 3E-2
* APPENDIX 3F VEPCO SURRY POWER STATION UNIT NO. 2.
CONTAINMBNT INPUT VARIABLES 1030 HOURS ON 12/18/81 TO 0210 HOURS ON 12/19/81 Time   ABS Pressure     DEWPT     Vap Pressure     Dry Bu1b mours)     CPsia)       COF)       (Psia)   Temperature IOR) o.o       60.949       66.42       0.3209         534.33 o.~33     60.950       66.43       0.3210         534.34 0.667     60.950       66.45       0.3212         534.33
* 1.000     60.949       66.46       0.3213         534.32 1.333     60.950       66.47       0.3215         534.34 1.667     &0.951       66.50       0.3218         534.34 2.000     60 .951     6f>.50       0.3218         534.35 2.333     60.951       66.52       0.3220         534.36
* 2.667 3.000 3.333 60.951 60.950 60.950 66.52 66.53 66.56 0.3220 0.3221 0.3225 534.35 534.34 534.35 3.667     60.951       66.56       0.3225         534.36 4.000     60 .951       f,f,.57     0.3226         534.37 4.333     60.951       66.58       0.3227         534.37 4.667     60.952       66.57       0.3226         53,._39 5.000     .60 .952     66.60       0.3229         534.38 5.333     60.952       66.60       0.3229.       534.38 5.667     60.952       66.60       0.3229,       534.38 6.000     60.952       66.61       0.3230         534.38 6.333     60.952       66.62       0.3231         534.39
* 6.667     60.952       66.62       0.3231         534.40 3F-1
* Time (Hours)
ABS Pressure (Psia)
APPENDIX 3F (CONT*O)
DEWPT (OF)
Vap Pressure IPsia)
Dry Bulb Temperature   (OR) 7.000     60.952     66.62         0.3231       534~3' 7.333     60.951     66 .63       0.3232       534.39 7.667     60.951     66.6LJ       0.3234       534.39 8.000     60.951     66.63         0.3232       534.39 8.333     60.951     6&.64         0.3234       534.39 8.&67     60.951     66.&3         0.3232       534.40 9.000     60.951     M,.64         0.3234       534.40 9.333     60.951     66 .. 65     0.3235       534.40 9.667     60.951     66.64         0.32.34       534.40 10 .ooo                                           534.40
* b0.~50     66.62         0.3231 10.333     60.950     66.65         0.3235       534.40 10.&67     60.950     66.64         0.3234       534.40 11.000     60.950     66.64         0.3234       534.a+O 11.333     60.949     66.65         0.3235       534.40 11.667     60.94~     66.67         0 .. 3237     534.40 12.000     60 .. ~49   66.65         0.3235       5.34.41 12.333     60.949     66.64         0.3.l34       534 .. 41 12.667     60.948     66.64         0.3234       53AJ.40 13.000     60.948     66.65         0.3235       534.40 13 .333   60.948     66.64         0.3234       534.ll1 13.667     60~948     t,6.64       0.3234       534.41 14.000     60.9£J8     66.b4         0.3234       53Q..40
* 14.333     60.947     66.63         0.3232       534.41 3F-2 jl
* Time C.l:lours)
ABS Pressure
                ,Psia)
APPENDIX 3F (CONT ..D)
DEWPT (OF)
Vap '.Pressure CPsia)
Dry Bu1b Temperature C0 R}
14.667       60.947     66.63     0.3232         5.34.40 15.000       60.947     bb.62     0 .. 3231       534.41 15.333       60~9lH,     66.63     0.3232         534.40 1'5.667       60.~45     66.63     0.3232         534.40
*
* 3F-3
* 3F-3
* APPENDIX 3G (CONT*D) Time Mass Leakage Conf UCL (Hours) CLBM) (I/day) (I/day) (I/day) 6.333 551221.60 0.041207 0.005040 o.046.itn 6.067 551211.28 0.042827 0 .0011825 0.047651 7.000 551221.t,O 0.041938 0.004463 0.04&401 7.333 551211.49 0.042241 0.004076 0.04&317 7.667 551210.47 0.0~2185 0.003728 0.045913 a.ooo 551211.a&9  
* Time (Hours)
-0.041&29 0.003461 O.Oa.50~6 8.333 551210.47 0.040950 0.003264 0.044214 ' 8.667 551201.17 0.041049 0.003018 0.01+4008 9.000 551200.1&
Mass CLBM)
0.040924 0.002801 0.043725 9.333 551199.14 0.040&33 0.002&20 0 .04325:.t
APPENDIX 3G (CONT*D)
* 9.&&7 551200.16 0.040047 0.002509 0.042556 10 .ooo 551193.10 0.,039884 0.0023'+9 0.04.l233 I 10.333 551190.05 0 .039749 0.002204 0.041953 10.667 551191.0b 0.039353 0.002104 0.041457 11.000 551191.06 0.038825 0.002045 0.040870 1).333 551180.9&
Leakage (I/day)
0 .03882& 0.001~26 0.040752 11.6b7 551178.92 0.038772 0.001818 0.040590 12.000 551170.64 0.039022 0.001736 0.040758 12.333 551171.bf, 0 .039023 0.001&43 0.040066 12.667 551172.88 0.038812 0.001571 0.0403ts3 13.000 551171.86 0.038538 0.001515 0.0-.0053 13.333 551162.57 0.038591 0.001441 0.040033
Conf (I/day)
* 13.667 551102.57 0.038509 0.001374 0.03~883 3G-2
UCL (I/day) 6.333 551221.60       0.041207     0.005040   o.046.itn 6.067 551211.28       0.042827     0 .0011825 0.047651 7.000 551221.t,O     0.041938     0.004463   0.04&401 7.333 551211.49       0.042241     0.004076   0.04&317 7.667 551210.47       0.0~2185     0.003728   0.045913 a.ooo 551211.a&9     -0.041&29     0.003461   O.Oa.50~6 8.333 551210.47       0.040950     0.003264   0.044214
* APPENDIX 3G (CONT 1 D) Time Mass Leakage Con&#xa3; UCL <<Hours) (LfilO Ci/day) (I/day) Cl/day) 14.000 551172.88 0.037888 0.001442 0.039330 14.333 551154.49 0.037961 0.001377 0.039338 14.667 551164.d1 0.037524 0.001382 0.038906 15 .ooo 551155.51 0.037375 0.001329 0.038704 15.333 551155.72 0.037131 0.001292 0.038430 15 .667 551146.62 0.037136 0.001238 0.038374 *
                                '
8.667 551201.17       0.041049     0.003018   0.01+4008 9.000 551200.1&       0.040924     0.002801   0.043725
* 9.333 551199.14       0.040&33     0.002&20   0 .04325:.t 9.&&7 551200.16       0.040047     0.002509   0.042556 10 .ooo 551193.10       0.,039884     0.0023'+9 0.04.l233 I 10.333 551190.05       0 .039749     0.002204   0.041953 10.667 551191.0b       0.039353     0.002104   0.041457 11.000 551191.06       0.038825     0.002045   0.040870 1).333 551180.9&       0 .03882&     0.001~26   0.040752 11.6b7 551178.92       0.038772     0.001818   0.040590 12.000 551170.64       0.039022     0.001736   0.040758 12.333 551171.bf,     0 .039023     0.001&43   0.040066 12.667 551172.88       0.038812     0.001571   0.0403ts3 13.000 551171.86       0.038538     0.001515   0.0-.0053 13.333 551162.57       0.038591     0.001441   0.040033
* 13.667 551102.57       0.038509     0.001374   0.03~883 3G-2
* Time
  <<Hours)
Mass (LfilO APPENDIX 3G (CONT 1 D)
Leakage Ci/day)
Con&#xa3; (I/day)
UCL Cl/day) 14.000 551172.88     0.037888       0.001442 0.039330 14.333 551154.49     0.037961       0.001377 0.039338 14.667 551164.d1     0.037524       0.001382 0.038906 15 .ooo 551155.51     0.037375       0.001329 0.038704 15.333 551155.72     0.037131       0.001292 0.038430 15 .667 551146.62     0.037136       0.001238 0.038374
*
* 3G-3
* 3G-3
* APPENDIX 3G VEPCO SURRY POWER STATION UNIT NO. 2 LEAK RATE DATA INTEGRATED LEAK RATE TEST FROM 1030 HOURS ON 12~18/81 TO 0210 HOURS ON 12/19/81 49 DATA SETS ABSOLUTE TEST METHOD -MASS POINT ANAL~S1S .. ! :Time Mass Leakage Conf UCL (Hours) (LBM) (I/day) (~/day} (1/dan o.o 55127&.49 o.o o.o o.o 0.333 551274.26 o.o o.o o.o 0.667 551282.55  
* APPENDIX 3G VEPCO SURRY POWER STATION UNIT NO. 2 LEAK RATE DATA INTEGRATED LEAK RATE TEST FROM 1030 HOURS ON 12~18/81 TO 0210 HOURS ON 12/19/81 49 DATA SETS ABSOLUTE TEST METHOD - MASS POINT ..ANAL~S1S
-0 .039582 0.339245 0.299663 1.000 551282.76  
                                                        !
-0 .035414 0.052661 0.017247 1.333 551.270.21 0.005280 0.060467 0.0&5747
:Time       Mass           Leakage       Conf         UCL (Hours)     (LBM)           (I/day)     (~/day}       (1/dan o.o       55127&.49           o.o           o.o           o.o 0.333     551274.26           o.o           o.o           o.o 0.667     551282.55       -0 .039582     0.339245     0.299663 1.000     551282.76       -0 .035414     0.052661     0.017247 1.333     551.270.21       0.005280     0.060467     0.0&5747
* 1.6&7 55127&.2&
* 1.6&7 2.000 2.333 55127&.2&
0.004864 0.035836 0.040700 2.000 0.018629 0.0288111 0.047443 551265.95 2.333 551253 .. 60 0.036246 0.028634 0.064881 2.6&7 551263.92 0.033067 0.021901 0.054968 3.000 551264.13 0.029497 0.017572 0.0470&9 3.333 551250.77 0.034141 0.014974 0.049115 3.667 551249.55 0 .036121 0.012491 0.04tJb12 4.000 551238.22 0.041005 0.011622 0.052628 4.333 551237.20 0.043284 0 .010152 0.05343& 4 .6(,J 551236.99 0.043750 0 .087,..9 0.052498 5.000 551233.94 0.043975 0.007612 0.051587 5.333 551233.94 0.043268 0.006720 0.049988 5.667 551233.94 0.042011 0.006080 0.04l80~1
551265.95 551253 .. 60 0.004864 0.018629 0.036246 0.035836 0.0288111 0.028634 0.040700 0.047443 0.064881 2.6&7     551263.92       0.033067     0.021901     0.054968 3.000     551264.13       0.029497     0.017572     0.0470&9 3.333     551250.77       0.034141     0.014974     0.049115 3.667     551249.55       0 .036121     0.012491     0.04tJb12 4.000     551238.22       0.041005     0.011622     0.052628 4.333     551237.20       0.043284     0 .010152     0.05343&
* 6.000 551232.93 0.040659 0.005586 0.04b245 3G-1
4 .6(,J   551236.99       0.043750     0 .087,..9   0.052498 5.000     551233.94       0.043975     0.007612     0.051587 5.333     551233.94       0.043268     0.006720     0.049988 5.667     551233.94       0.042011     0.006080     0.04l80~1
* APPENDIX 3H VEPCO SURRY POWER STATION UNIT NO. 2 LEAK RATE DATA INTEG.RAT.ED LEAK RATE T.EST FROM 1030 HOURS ON 12/18/81 TO 0210 HOURS ON 12/19/81 49 DATA SETS ABSOLUTE TEST METHOD -TOTAL TIME ANALYSIS Meas Est Time Mass Leakage Leakage Conf UCL (Hours) &LBM) Cl/day) CS/day) (I/day) (i/day) o.o 551276.49 o.o o.o o.o o.o 0.333 551274.2&
* 6.000     551232.93       0.040659 3G-1 0.005586     0.04b245
0.029223 o.o o.o o.o 0.6b7 551282.55  
* APPENDIX 3H VEPCO SURRY POWER STATION UNIT NO. 2 LEAK RATE DATA INTEG.RAT.ED LEAK RATE T.EST FROM 1030 HOURS ON 12/18/81 TO 0210 HOURS ON 12/19/81 49 DATA SETS ABSOLUTE TEST METHOD - TOTAL TIME ANALYSIS Meas           Est Time       Mass         Leakage       Leakage     Conf       UCL (Hours)     &LBM)         Cl/day)       CS/day)   (I/day)   (i/day) o.o     551276.49         o.o           o.o       o.o       o.o 0.333   551274.2&     0.029223         o.o       o.o       o.o 0.6b7   551282.55     -0.039548         o.o       o.o       o.o 1.000   551282.7&     -0.027304     -0.040813   0.320027   0.279214
-0.039548 o.o o.o o.o 1.000 551282.7&  
* 1.333 1.667 2.000 551270.21 551276.26 551265.95 0.020517 0.000595 0.022953
-0.027304  
                                        -0.00&387
-0.040813 0.320027 0.279214
                                        -0.002760 0.010836 O* .l10105 0.1329&1 0 .104361 0.203719 0.130201 0.115196 2.333   551253.60     0.042710       0.027720 0.089938   0.117658
* 1.333 551270.21 0.020517 -0.00&387 O * .l10105 0.203719 1.667 551276.26 0.000595 -0.002760 0.1329&1 0.130201 2.000 551265.95 0.022953 0.010836 0 .104361 0.115196 2.333 551253.60 0.042710 0.027720 0.089938 0.117658 .66"/ 551263.92 0.020521 0.028753 0.07tl20~
  ~ .66"/ 551263.92     0.020521       0.028753 0.07tl20~ 0.10b9b2 3.000   5512&4.13     0.017938       0.028227 0.070~67   0.051St>94 3.333   551250.77     0.033597       0.033105 0.063S95   0.09&700 3.667   551249.55       0.031990     0.035936 0.058~08   O.O!f ..3~5 4.000   551238.22     0.041659       0.040724 0.054122   0.0~4847 4.333   551237.20     0.039478       0.043608 0.050721   0.0943.29 4.667   551.236.99     0.036847     0.045043 0.048.220 0.0~3263 5.000   551233.94     0.037046       0.04&102 0.046182   0.092285 5.333   551233.94       0.034133     0.046327 0.044732   0.091059
0.10b9b2 3.000 5512&4.13 0.017938 0.028227 0.070~67 0.051St>94 3.333 551250.77 0.033597 0.033105 0.063S95 0.09&700 3.667 551249.55 0.031990 0.035936 0.058~08 O.O!f .. 3~5 4.000 551238.22 0.041659 0.040724 0.054122 0.0~4847 4.333 551237.20 0.039478 0.043608 0.050721 0.0943.29 4.667 551.236.99 0.036847 0.045043 0.048.220 0.0~3263 5.000 551233.94 0.037046 0.04&102 0.046182 0.092285 5.333 551233.94 0.034133 0.046327 0.044732 0.091059
* 5.667   551233.94       0.032686 3H-1 0.;045993 0.043698   0.0S!fb91
* 5.667 551233.94 0.032686 0.;045993 0.043698 0.0S!fb91 3H-1
* Time CHours)
* APPENDIX 3H ,coNT*D) Meas Bst Time Mass leakage Leakage Cont UCL CHours) (LBM) Cl/day> &I/day) (I/day) ,~/day) 6.000 551232.93 0.031609 0.045422 0.042849 0.088271 6.333 551221.60 0.037737 o .. 046083 0.011-1530 0.087f>13 6 .. 66.7 551211.28 0.042582 0.047488 0.040147 0.087t>35 7.000 551221.60 0.034141 0.047117 0.039504 .0.0~6622 7.333 551211.49 0.038592 0.047516 0.038570 0.08&085 8.000 551211 .. 49 0.035375 0.047378 0.037258 0.084&36 8.333 551210.47 0.034493 0.04b984 0.036793 0.08377ts 8'.667 551201.17 0.037833 0.047102 0.036135 0.083.2.37 9.000 551200.16 0.036926 0.047047 0.03557'1 0.082t>24 9.333 55119.14 0.036083 0.04&861 0.035101 0.081~&2
Mass (LBM)
* 9.667 551200.lt, 0.03'l378 0.046454 0.034745 0.081199 10.000 551193.10 0.036306 O.Otl6314 0.034283 0.080597 10.333 551190.05 0.03&421 o.o4&18o 0.033837 0.080023 10.667 551191.06 0 .. 034866 0.045871 o.0334ss 0.079359 11.000 551191 .. 06 0.033810 0.045449 0.033195 0.07~&44 11 .. 333 551180.96 0.036700 0.045380 0.032771 0.078150 11.667 551178.92 0.036409 0.045275 0.03231a 0.077653 12.000 551170.64 0.038~02 0.045378 0.031936 0.077314 12 .333 551171~&6 0.037006 0.045316 0.031563 0.070878 12.667 551172.88 0.035610 0.045109 0.0312St, 0.07&366 13.000 551171.86' 0.035039 0.044852.
APPENDIX 3H ,coNT*D)
0.03097S 0.075831 13.661 551162.57  
Meas leakage Cl/day>
*0.036290 0.044692 0 .03032li 0~075020
Bst Leakage
* 14.000 551172.88 0.032219 0.044193 0.0301tU, 0.07~379 3H-2
                                            &I/day)
* APPENDIX 3H (CONT 9 D) Meas Est Time Mass Leakage Leakage Cont UCL &Hours) (LBM) <<I/day) ,1/day) ,1/day) (~/day) 14.;333 5511S4.;49 0.037056 0.044161 0.029866 0.074027 14.667 551164.81 0~033151 0.043783 0.029681 0.0734t>4 15.000 551155.51 0.035113 a.*043595 O.Ol942o 0.073021 15.333 551155.72 0~034292 0.043345 0.029200 0.072545 15.667 551146.62 0.036088 0.043258 0.028927 0.07.2185  
Cont (I/day)
UCL
                                                                    ,~/day) 6.000     551232.93     0.031609         0.045422   0.042849   0.088271 6.333     551221.60     0.037737         o .. 046083 0.011-1530 0.087f>13 6 .. 66.7 551211.28     0.042582         0.047488   0.040147   0.087t>35 7.000     551221.60     0.034141         0.047117   0.039504   .0.0~6622 7.333     551211.49     0.038592         0.047516   0.038570   0.08&085 8.000     551211 .. 49 0.035375         0.047378   0.037258   0.084&36 8.333     551210.47     0.034493         0.04b984   0.036793   0.08377ts 8'.667   551201.17     0.037833         0.047102   0.036135   0.083.2.37 9.000     551200.16     0.036926         0.047047   0.03557'1   0.082t>24
* 9.333     55119.14     0.036083         0.04&861   0.035101   0.081~&2 9.667     551200.lt,   0.03'l378       0.046454   0.034745   0.081199 10.000     551193.10     0.036306         O.Otl6314   0.034283   0.080597 10.333     551190.05     0.03&421         o.o4&18o   0.033837   0.080023 10.667     551191.06     0 .. 034866     0.045871   o.0334ss   0.079359 11.000     551191 .. 06 0.033810         0.045449   0.033195   0.07~&44 11 .. 333 551180.96     0.036700         0.045380   0.032771   0.078150 11.667     551178.92     0.036409         0.045275   0.03231a   0.077653 12.000     551170.64     0.038~02         0.045378   0.031936   0.077314 12 .333   551171~&6     0.037006         0.045316   0.031563   0.070878 12.667     551172.88     0.035610         0.045109   0.0312St,   0.07&366 13.000     551171.86'   0.035039         0.044852. 0.03097S   0.075831 13.661     551162.57   *0.036290         0.044692   0 .03032li 0~075020
* 14.000     551172.88     0.032219 3H-2 0.044193   0.0301tU,   0.07~379
* Time    Mass APPENDIX 3H (CONT 9 D)
Meas Leakage Est Leakage   Cont     UCL
  &Hours)   (LBM)     <<I/day)     ,1/day) ,1/day) (~/day) 14.;333 5511S4.;49 0.037056     0.044161   0.029866 0.074027 14.667 551164.81 0~033151     0.043783   0.029681 0.0734t>4 15.000 551155.51 0.035113     a.*043595 O.Ol942o 0.073021 15.333 551155.72 0~034292     0.043345   0.029200 0.072545 15.667 551146.62 0.036088     0.043258   0.028927 0.07.2185
*
*
* 3H-3
* 3H-3
(>J c.. .L * -I 3:: IT'I I :t: 0 C ::0 z -I IT'I ::0 < l> r en
 
* AIR MASS (LBM) 01 01 01 01 01 01 I',) OJ 0 0 0 0 0 0 0 0 0 1130 1230 1330 ZONE A 1430 TEMPERATURE STABILIZATION 1530 I\) 1630 ' -------------------
    *                              *
1730 0) 1830 ' (X) 1930 2030 2130 2230 2330 0030 0130 0230 0330 0430 0530 0630 0730 0830 0930 REMOVED RTD FROM SCAN I\) 1030 ' I 130 -.J ....... 1230 (X) 1330 1430 ZONE B 1530 LEAKAGE INVESTIGATION 1630 1730 1830 1930 2030 2130 2230 2330 0030 0130 0230 0330 0430 0530 0630 0730 0830 0930 I\) I 030 -------------
* AIR MASS (LBM) 01         01                            01 01 01         01                            01 01 I',)                         OJ -I>
' I 130 -(X) 1230 ' (X) 1330 1430 1530 1630 1730 ZONE C 1830 ACCEPTABLE MASS TREND 1930 2030 2130 2230 2330 0030 0130 ----------------
0          0                            0  0 0           0                             0 0 0           0                             0 0 1130 1230 1330 ZONE A 1430                     TEMPERATURE STABILIZATION 1530
0230 0330 PREPARATION FOR SUPERIMPOSED VERIFICATION TEST 0430 I\) -------------
          '
' 0530 U) 0630 ZONED ' 0730 SUPERIMPOSED VERIFICATION TEST (X) 0830 --------------
I\)
0930 1030 1130 1230 )> -0 orn-u )> :::0 :::0 :::0 --t oc:o :::0 rn j
0) 1630 1730 1830
* 01 01 -I> 0 0 0 ----
                            ------------------- ----
* I-z 0 IL U) U) <t ::;; >-<t Cl ' I-z LI.I t.) a: LI.I IL LI.I a: :,,: <t LI.I ..I cJ ..I t.) ::, * * . 07 ,--------------------------------*----------, .06 .05 .04 .03 .02 .or 1 A II I \ II I \ II I \ I I I \ ,,-.... , I I I \ ~..., ', I I \,' ', --1 ,, -'-~~ I 11 ---' ;, ---' ---1 LEAK RATE -------1 I I I I I I I 1030 1130 1230 1330 1430 1530 1630 17'.30 1830 1930 2030 2130 2230 2330 0030 0130 12/18/81 TIME-20 MINUTE INTERVALS 12/19/81 APPENDIX 3K CONTAINMENT LEAK RATE + UCL VS TIME SURRY POWER STATION -UNIT 2 INTEGRATED LEAK RATE TEST 3K-I
          '(X) 1930 2030 2130 2230 2330 0030 0130 0230 0330 0430 0530 0630 0730 0830 REMOVED RTD FROM SCAN 0930 I\)     1030
* w ::!: j:: ...J 0 I->-i3 ...... I-z w u a: w a. w !i 0:: :.: <( w ...J a w I-<( ...J => u ...J <( u . 06 .05 .04 .03 .02 .01 1030 12/ 18/81 1130 1230 1330 *
          '-.J I 130 1230
* 1430 1530 1630 1730 1830 1930 2030 2130 2230 2330 0030 0130 TIME-20 MINUTE INTERVALS 12/19/81 APPENDIX 3L CALCULATED CONTAINMENT LEAK RATE VS. TIME SURRY POWER STATION-UN IT 2 -INTEGRATED LEAK RATE TEST 3L-I
          .......
* *
(X)     1330 1430                             ZONE B 1530                     LEAKAGE INVESTIGATION 1630 1730 1830
* SECTION 4 LOCAL LEAK RATE TESTS CTYPES BAND C) Local leak rate tests were performed by pressuri~ing with air the penetrations listed in the following tables and either measuring leakage across containment isolation valves ,Type C) or across resilient seals CType B). The reported tests include the testing of all electrical penetration cannisters to Pa. This test:.ing was done subsequent to the Type A test and prior to operations.
      -I            1930 3::          2030 IT'I I          2130
The total Types Band C leakage documented was verified to be in accordance with station procedures.
:t:          2230 0
The following pages list the penetrations tested and their documented leakage
C            2330
::0 0030 z            0130
      -I IT'I          0230
::0
      <
l>
0330 r            0430 en 0530 0630 0730 0830 0930 I\)
          '-
(X)
I 030 I 130 1230
                                -------------
          '(X) 1330 1430 1530 1630 1730                         ZONE C 1830                 ACCEPTABLE MASS TREND 1930 2030 2130 2230 2330 0030 0130 0230 0330
                              ----------------
PREPARATION FOR SUPERIMPOSED VERIFICATION TEST
          '
I\)
0430 0530
                              -------------       ZONED U)     0630
          '(X)    0730 SUPERIMPOSED VERIFICATION TEST 0830 0930
                            --------------
1030 1130 1230
                  )>
(>J
                  -0 c..
.L orn-u
            )> :::0     :::0
:::0 --t oc:o
:::0 rn j
 
*                                                             *                                                               *
        .07 , - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - * - - - - - - - - - - ,
        .06           1A II       I\
II       I \
I-z II II I \\
I           ,,-....,
0 I I I
        .05 IL                                \ ~...,         ',
U)
U)
  <t I I         \,'               ', - -
1 ,,                                 -       '-~~
::;;
  >-
  <t Cl
  'I-z
        .04
                    '
1 I   11
                          '
                          ;,
                                                                            ---
                                                                                  ------
LEAK RATE           -------
LI.I t.)              1 a:
LI.I IL I
LI.I  .03        I
  ~                I a:
:,,:
  <t              I LI.I
  ..I             I cJ
  ..I
          .02      I t.)
::,              I
          .or 1030 1130       1230   1330   1430 1530 1630 17'.30 1830   1930 2030 2130 2230 2330 0030 0130 12/18/81                                         TIME- 20 MINUTE INTERVALS                           12/19/81 APPENDIX 3K CONTAINMENT LEAK RATE
                                                                                                                + UCL VS TIME SURRY POWER STATION -UNIT 2 INTEGRATED LEAK RATE TEST 3K-I
 
*                                                  *                                                              *
          . 06 w
::!:
j::
  ...J
          .05
  ~
0 I-
  >-
i3
  ......
I-     .04 z
w u
a:
w a.
w
  !i0::   .03
:.:
  <(
w
  ...J a
w I-
  <(
          .02
  ...J
  =>
u
  ...J
  <(
u
            .01 1030 1130 1230 1330 1430 1530 1630 1730 1830 1930 2030 2130 2230 2330 0030 0130 12/ 18/81                          TIME-20 MINUTE INTERVALS                           12/19/81 APPENDIX 3L CALCULATED CONTAINMENT LEAK RATE VS. TIME SURRY POWER STATION-UN IT 2
                                                                                              - INTEGRATED LEAK RATE TEST 3L-I
* SECTION 4 LOCAL LEAK RATE TESTS CTYPES BAND C)
Local leak rate tests were performed by pressuri~ing with air the penetrations listed in the following tables and either measuring leakage across containment isolation valves ,Type C) or across resilient seals CType B). The reported tests include the testing of all electrical penetration cannisters to Pa. This test:.ing was done subsequent to the Type A test and prior to operations.
The total Types Band C leakage documented was verified to be in accordance with station procedures. The following pages list the penetrations tested and their documented leakage *
*
* 4-1
* 4-1
* Penetration Personnel Air LOCK Personnel Air Lock Personnel Air Lock Personnel Air Lock Personnel Air Lock Fuel Transfer Tube Equipment Hatch Emergency Escape Air Lock
 
* APPENDIX 4A 1980-1981 TYPE B DATA  
*
* APPENDIX 4A
* 1980-1981 TYPE B DATA  


==SUMMARY==
==SUMMARY==
Prerepair Eguiement Tested Leakage iscfd} LQate:. 0-Ring 33.6/8-3-80 0-Ring 3.2 .4/2-9-81 0-Ring 32.4/4-26-81 0-Ring 27.48/9-7-81 0-Ring 57 .. &/1.l-13-81 0-Ring 1.92/12-7-81 0-Ring 0/12-12-81 0-Ring 0/12-12-81 Post Repair Leakage f scfdl!;!ate N/A N/A N/A N/A N/A N/A N/A N/A All electrical penetration 0-Rings were tested with no excessive leakage noted or repairs required.
 
* Remarks N/A N/A N/A N/A N/A N/A N/A N/A All electrical penetration cannisters were tested subsequent to this Type A test with no excessive leakage roted or repairs required, with two exceptions.
Prerepair               Post Repair Penetration              Eguiement Tested       Leakage iscfd} LQate:. Leakage fscfdl!;!ate    Remarks Personnel Air LOCK                0-Ring               33.6/8-3-80                   N/A                N/A Personnel Air Lock                0-Ring                 3.2 .4/2-9-81               N/A                N/A Personnel Air Lock                0-Ring               32.4/4-26-81                 N/A                N/A Personnel Air Lock                0-Ring                 27.48/9-7-81                 N/A                N/A Personnel Air Lock                0-Ring               57 .. &/1.l-13-81             N/A                N/A Fuel Transfer Tube                0-Ring                 1.92/12-7-81                 N/A                N/A Equipment Hatch                    0-Ring                 0/12-12-81                   N/A                N/A Emergency Escape Air Lock          0-Ring                 0/12-12-81                   N/A               N/A All electrical penetration 0-Rings were tested with no excessive leakage noted or repairs required.
* Electrical Penetration A-18 was found leaking 4,320 scfd and the collar bushing nut was tightened with 1'0 11 leakage noted. Electrical Penetration with "0" leakage noted. A-17 was round to be leaking 912. scfd and the collar bushing nut was tightened 4A-1
All electrical penetration cannisters were tested subsequent to this Type A test with no excessive leakage roted or repairs required, with two exceptions.
* Penetration system 1 Comp Coo.l. 5 7 8 9 10 11 12 13 14 15 1b (CC) comp Cool. (CC) Comp Cool (CC) Comp Cool. (CC) Safety Injection (SI) Comp Cool. (CC) Comp Cool. (CC) Comp Cool. (CC) Comp Cool. (CC) Comp Cool. (CC) Comp Cool. (CC) Comp Cool (CC) cnarging (Ch) Comp Cool (CC) Valve(s) Tested *rv-cc-209.b 2-CC-177 2-CC-176 '.l'\7-CC-209A 2-.SI-150 MOV'-2b67C&D TV-CC-2.07
* Electrical Penetration A-18 was found leaking 4,320 scfd and the collar bushing nut was tightened with 1'0 11 leakage noted.
.:t-CC-242 2-CC-233 TV-CC-~10B TV-CC-210C TV-CC-210A 2-~H-309 ,"1.0V-22B9A 2-CC-59
Electrical Penetration   A-17 was   round to be leaking 912. scfd and the collar bushing nut was tightened with "0" leakage noted.
* APP.E.NDI..t.
4A-1
4B 1980-1981 TYPE C DATA SUMMAR~ Leakdge(scid)/Date  
 
>1770/11-21-81  
        *
>3240/11-20-81  
* APP.E.NDI..t. 4B
>3240/11-20-81 0/11-0~-81 360/11-08-81 19 * .:.t./11-11-81 204/11-13-81 43.2/11-13-81
* 1980-1981 TYPE C DATA SUMMAR~
: 6. 72/11-13-81 0/11-13-81  
Post Repair Penetration system          Valve(s) Tested    Leakdge(scid)/Date       Mr No/Date/Repair                          Leax.age/Date 1      Comp Coo.l.      *rv-cc-209.b        >1770/11-21-81           2111211000/11-24-81/Cl.eaned va.Lve (CC) comp Cool.      2-CC-177            >3240/11-20-81           2111200700/11-22-81                       0/11--&#xa3;l-81 (CC)                                                        Lapped and cleaned valve Comp Cool        2-CC-176                                      S2111181531/11-22-81                       0/11-2~-81 (CC)                                                        Lapped and cleaned valve 5      Comp Cool.      '.l'\7-CC-209A      >3240/11-20-81           2109050700/11-21-81/Replaced ru.ober      0/11-2.2-81 (CC)                                                                                seat 7      Safety Injection 2-.SI-150          0/11-0~-81               N/A                                        0/1.t-1:.t.-sl (SI)          MOV'-2b67C&D        360/11-08-81             211108~345/11-21-81/New gasket            0/1:.t-1:l-81 and pack.ing 8      Comp Cool.      TV-CC-2.07          19 * .:.t./11-11-81       N/A                                        N/A (CC) 9      Comp Cool.                          204/11-13-81             .t:111131801/1..!-05-61/Macru.ned disc i:; .,!4/1"--05-81 (CC)                                                                                Lapped va.t.ve 10    Comp Cool.      .:t-CC-242          43.2/11-13-81             2111130738/11-19-bl/Lapped val.ve         2:6.4/11-b-sl (CC) 11     Comp Cool.      2-CC-233            6. 72/11-13-81           N/A (CC) 12    Comp Cool.       TV-CC-~10B          0/11-13-81               N/A                                        N/A (CC) 13    Comp Cool.       TV-CC-210C          .>.l400/11-06-81          2111131b03/11-13-81/Repl.acea ru.ober (CC)                                                                                 seat 14    Comp Cool       TV-CC-210A          0/11-13-Bl                1'11/A                                    N/A (CC) 15    cnarging          2-~H-309          0/11-1!:1-til            N/A                                        N/A (Ch)         ,"1.0V-22B9A 1b    Comp Cool         2-CC-59            >432/11-11-81            2111110330/11-1~-81/Lapped va~ve          0/11-.t:0-81 (CC)
.>.l400/11-06-81 0/11-13-Bl 0/11-1!:1-til
                                                              ,rn-1
>432/11-11-81 ,rn-1 Mr No/Date/Repair 2111211000/11-24-81/Cl.eaned va.Lve 2111200700/11-22-81 Lapped and cleaned valve S2111181531/11-22-81 Lapped and cleaned valve 2109050700/11-21-81/Replaced ru.ober seat N/A 211108~345/11-21-81/New gasket and pack.ing N/A .t:111131801/1..!-05-61/Macru.ned disc i:; Lapped va.t.ve 2111130738/11-19-bl/Lapped val.ve N/A N/A 2111131b03/11-13-81/Repl.acea ru.ober seat 1'11/A N/A 2111110330/11-1~-81/Lapped va~ve
 
* Post Repair Leax.age/Date 0/11--&#xa3;l-81 0/11-2~-81 0/11-2.2-81 0/1.t-1:.t.-sl 0/1:.t-1:l-81 N/A .,!4/1"--05-81 2:6.4/11-b-sl N/A N/A N/A 0/11-.t:0-81
      *
* Penetration sistem Valve ,s) Tested 17 Comp Cool 2-CC-58 (CC) 18 Comp Cool 2-CC-1 (CC) 19 Charging MOV-.2381 (Ch) 20 ~afety Injection 2-SI-32 (SI) 21 SaJ:ety Injection MOV-2842 (SI) 23 ::,afety Injection .MOV-.l869B (SI) 24 Residual Heat MOV-RH-WO Removal (RH) 25 Comp Cool. TV-CC-205A (CC) 26 Comp Cool .TV-CC-205C (CC) 27 Comp Cool TV-CC-20~.8 (CC) 28 Chem and Vo.lume HCV-2.200 A, B, (CV) TV-2204 32 Gaseous Was-c.e TV-GW-202 (GW) TV-GW-.i03 33 Gaseous Drains TV-DG-208A (G.S) TV-DG-208:d 38 Aerated Drains TV-DA-200A (DA) *rv-DA200B
* APP~NDIX 4B (CONT 1 u)
* APP~NDIX 4B (CONT 1 u) 1980-1981 TYP~ C DATA  
* 1980-1981 TYP~ C DATA  


==SUMMARY==
==SUMMARY==
Leakage,scfd)LDate Mr NoLDateLRepair 0/11-11/81 N/A 52 .8/11-11-81 211111030~/11-13-81/Lapped vaive 0/11-li.-til N/A 0/11-09-81 N/A 21.6/11-08-d1 N/A 0/11-09-81 N/A 0/11-.ll-81 N/A 0/11-13-81 N/.~ 0/11-11-81 N/A 0/11-11-81 N/A C 0/11-22-tU N/A 0/11-:'2-81 N/A 0/12.-3-81 N/A 0/12-03-81 N/A 228/11-B-81 .n 11132 311/12-05-81/0Verhau.lea b.2/11-15-81 N/A >3240/12-!t-81 521120~2201/1~-1~-81/Lappect vaive t+tW/1.i-09-81 5.l11L0~2.241/12-12-81/Ground valve
 
* Post Repair Leax.ageL!2ate N/A 4.8/11-20-81 N/A N/a N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0/1.i-11-81 N/A 456/l~-1.t-ts 1 seat 0/12.-12-tsl
Post Repair Penetration sistem              Valve ,s) Tested    Leakage,scfd)LDate     Mr NoLDateLRepair                     Leax.ageL!2ate 17    Comp Cool          2-CC-58              0/11-11/81             N/A                                   N/A (CC) 18    Comp Cool          2-CC-1              52 .8/11-11-81         211111030~/11-13-81/Lapped vaive       4.8/11-20-81 (CC) 19    Charging            MOV-.2381            0/11-li.-til           N/A                                    N/A (Ch) 20    ~afety Injection    2-SI-32              0/11-09-81             N/A                                   N/a (SI) 21    SaJ:ety Injection  MOV-2842            21.6/11-08-d1         N/A                                    N/A (SI) 23    ::,afety Injection  .MOV-.l869B          0/11-09-81             N/A                                     N/A (SI) 24    Residual Heat      MOV-RH-WO            0/11-.ll-81           N/A                                     N/A Removal (RH) 25    Comp Cool.          TV-CC-205A          0/11-13-81             N/.~                                   N/A (CC) 26    Comp Cool          .TV-CC-205C          0/11-11-81             N/A                                     N/A (CC) 27    Comp Cool            TV-CC-20~.8        0/11-11-81             N/A                                    N/A (CC) 28    Chem and Vo.lume    HCV-2.200 A, B, C   0/11-22-tU             N/A                                    N/A (CV)            TV-2204            0/11-:'2-81           N/A                                     N/A 32    Gaseous Was-c.e      TV-GW-202          0/12.-3-81             N/A                                     N/A (GW)            TV-GW-.i03          0/12-03-81             N/A                                     N/A 33    Gaseous Drains      TV-DG-208A          228/11-B-81           .n 11132 311/12-05-81/0Verhau.lea       0/1.i-11-81 (G.S)          TV-DG-208:d          b.2/11-15-81         N/A                                     N/A 38    Aerated Drains      TV-DA-200A          >3240/12-!t-81         521120~2201/1~-1~-81/Lappect vaive     456/l~-1.t-ts 1 (DA)            *rv-DA200B          t+tW/1.i-09-81         5.l11L0~2.241/12-12-81/Ground valve seat 0/12.-12-tsl
* Penetration System Valve (s) *.rested 42 Service Air 2-SA-81 (SA) 2-SA-82 43 Air Monitoring 2-Rl~-3A, 3B (RM) *l'V-RM-200A 44 Al.r Monitoring TV-RM-200B
 
(.Rl'l) TV-RM-200C 45 PrJ.mary Grade 2-.RC-1&0 Water System TV-2519A (PG) 46 Charging FC"~-2160 (Ch) 47 Instrument Air 2-IA-8b4 (IA) TV-IA-200.
    *
2-IA-704 48 Vent & Drain TV-VG-209A System TV-VG-209B (DA) 50 ~atety Injection TV-SI-l01A (SI) TV-SI-201.B 51 3erv1.ce Water 2-sw-200 53 (SW) Safety Injection (SI) Primary Vent (VA) 2-SW-:.t08 TV-.-:;I-,WO 2-SI-234 2-VA-1 2-\/A-9
* APPENDIX ~B (CONT 1 D)
* APPENDIX ~B (CONT 1 D) b80-'U81 *.rtPE. C DATA Su.MMAR:i Leakage(sctd)/Date 0/11-21-1:11 0/11-..tl-til 360/11-0o-cs1 0/11-~0-81 2.4/11-20-81 0 /11-20-1:>1
* b80-'U81 *.rtPE. C DATA Su.MMAR:i Post .Repair Penetration System           Valve (s) *.rested   Leakage(sctd)/Date        Mr No/Dater~epair                  le a.icage/Date 42     Service Air     2-SA-81               0/11-21-1:11            N/A                                N/A (SA)         2-SA-82               0/11-..tl-til            N/A                                l'ii/A 43     Air Monitoring   2-Rl~-3A, 3B           360/11-0o-cs1            62111201&31/12-1~-81/Cleaned seat  36/12-14-b 1 (RM)         *l'V-RM-200A           0/11-~0-81              N/A                      .        N/A 44     Al.r Monitoring TV-RM-200B             2.4/11-20-81            N/A                                N/A
: 7. 2/ 11-0~-tU 0 /11-9-81 192/11-12-bl
(.Rl'l)       TV-RM-200C             0 /11-20-1:>1            N/A                                N/A 45     PrJ.mary Grade   2-.RC-1&0             7. 2/ 11-0~-tU          N/A                                N/A Water System     TV-2519A               0 /11-9-81              N/A                                N/A (PG) 46     Charging         FC"~-2160             192/11-12-bl            2A11~10~1/11-17-81/New plug        0/12-13-131 (Ch)                                                                             and cage 47     Instrument Air   2-IA-8b4               ~3.2/11-15-81            2111150407/11-1&-81/Cleaned valve  0/11-15-Bl (IA)         TV-IA-200.             0/11-15-81              N/A                                N/A 2-IA-704              528/11-15-81             2111/50408/11-15-81/Lappeci val.ve N/A 48    Vent & Drain    TV-VG-209A            0/11-14-81               N/A                                N/A System          TV-VG-209B            0/1.1-14-81             N/A                                N/A (DA) 50    ~atety Injection TV-SI-l01A            81.6/11-10'-81           2111102038/11-19-81 Lapped valve    7.2/12-11-dl (SI)          TV-SI-201.B            84 /11-10-iil           2111102101/11-21-81 Replaced Dody seat 51    3erv1.ce Water  2-sw-200              >432/11-10-81           2111101508/11-24-81/0verhauled      0/1.l-Od/81 valve (SW)          2-SW-:.t08            0/11-24-bl               N/A                                 ~/A 53    Safety Injection TV-.-:;I-,WO          52 .8/11-13-81           2111101200/11-1&-81 OVernaul.ea    0/ll-08-81 (SI)          2-SI-234              2b .4/11-13-81                               val.ve         N/A Primary Vent    2-VA-1                 0/11-12-dl              N/A                                 N/A (VA)          2-\/A-9                9.6/11-1.l-bl            N/A                               N/A
~3.2/11-15-81 0/11-15-81 528/11-15-81 0/11-14-81 0/1.1-14-81 81.6/11-10'-81 84 /11-10-iil  
 
>432/11-10-81 0/11-24-bl 52 .8/11-13-81 2b .4/11-13-81 0/11-12-dl 9.6/11-1.l-bl Mr No/Dater~epair N/A N/A 62111201&31/12-1~-81/Cleaned seat N/A . N/A N/A N/A N/A 2A11~10~1/11-17-81/New plug and cage 2111150407/11-1&-81/Cleaned valve N/A 2111/50408/11-15-81/Lappeci val.ve N/A N/A 2111102038/11-19-81 Lapped valve 2111102101/11-21-81 Replaced Dody seat 2111101508/11-24-81/0verhauled valve N/A 2111101200/11-1&-81 OVernaul.ea val.ve N/A N/A
        *
* Post .Repair le a.icage/Date N/A l'ii/A 36/12-14-b 1 N/A N/A N/A N/A N/A 0/12-13-131 0/11-15-Bl N/A N/A N/A N/A 7.2/12-11-dl 0/1.l-Od/81
* APPENDIX 4B (CONT 1 D)                         '
~/A 0/ll-08-81 N/A N/A N/A 
1~80-1~81 TYPE C DATA  
* * ' APPENDIX 4B (CONT 1 D) 1~80-1~81 TYPE C DATA  


==SUMMARY==
==SUMMARY==
Post ae:pair l'enetr ation S)!Stem Valve ,s} 'Iested Leakage:,sctd)/Date Mr NOlDateLs.ei:!!!ir Le aJtage,l!2ate 55,57 97,105 Leakage Monitoring T\7-LM-200E.
 
0/11-14-81 N/A N/A (LM) TV-LM-200G 0/11-H-81 N/A N/A TV-LM-200A 0/11-H-81 N/A N/A TV-LM-200C 0/11-14-81 N/A N/A TV-Ll'1-200F 0/11-14-81 N/A N/A TV-LM.-200H 0,111-14-ttl N/A N/A TV-LM-.200.B 0/11-14-81  
Post ae:pair l'enetr ation S)!Stem           Valve ,s} 'Iested     Leakage:,sctd)/Date     Mr NOlDateLs.ei:!!!ir Le aJtage,l!2ate 55,57 97,105 Leakage Monitoring T\7-LM-200E.         0/11-14-81             N/A                   N/A (LM)           TV-LM-200G           0/11-H-81               N/A                   N/A TV-LM-200A           0/11-H-81               N/A                   N/A TV-LM-200C           0/11-14-81             N/A                   N/A TV-Ll'1-200F         0/11-14-81             N/A                   N/A TV-LM.-200H           0,111-14-ttl           N/A                   N/A TV-LM-.200.B         0/11-14-81             'N/A                   N/A TV-LM-200D           0/11-14-dl             N/A                   N/A 56     Sample System     TV-SS-206A           1.b/U-06-1:11           N/A                   N/A (SS)           TV-SS-206B           0/12-0b-81             N/A                   N/A 56     Sample System     TV-SS-200A           0/12-09-81             N/A                   N/A (SS)           TV-SS"'.'"200B       0/l~-09-81             N/A                   N/A Sb     Sample System     TV-SS-202A           1. ~2/l.l-Oo-81         N/A                   N/A (S.5)           l'V-SS-20.lB           .48/12-06-dl           N/A                   0/1~-09-81 57     Sample System     TV-SS-.201A           0/12-03-81             N/A                   N/A (SS)           TV-SS-201B           0/12-03-81             N/A                   N/A 57     Sampl.e System     TV-SS-204A           0/12-10-1:11           N/A                   N/A (SS)           TV-SS-.204B           0/12-10-1:11           N/A                   N/A 57     Aerated Drains     TV-DA-203A           0/11-27-81             N/A                   N/A (DA)           TV-DA-203B           0/11-27-81             N/A                   N/A 58     Instrument Air     2-IA-868             0/11-14-1'$1           N/A                   N/A (IA)           1-IA-704             0/11-14-81             N/A                   N/A bO     Satety Injection   MOV-213~0A           12/11-08-81             N/A                   N/A (SI) 61     Safety Injection   MOV-2890C             0/11-01:1-bl           N/A                   N/A (SI) 62     6a1et:y Injection MOV-.28~0B           0/11-d-81               N/A                   N/A (SI) 63     Containment Spray ~-CS-~I+             0/11-~2-!>1             N/A                   N/A/11-23-1:i 1 (CS)           11ov-cs-~01c. D     50 .4/ 11-:d~d 1       N/A                   N/A
'N/A N/A TV-LM-200D 0/11-14-dl N/A N/A 56 Sample System TV-SS-206A 1.b/U-06-1:11 N/A N/A (SS) TV-SS-206B 0/12-0b-81 N/A N/A 56 Sample System TV-SS-200A 0/12-09-81 N/A N/A (SS) TV-SS"'.'"200B 0/l~-09-81 N/A N/A Sb Sample System TV-SS-202A
* APPENDIX
: 1. ~2/l.l-Oo-81 N/A N/A (S.5) l'V-SS-20.lB  
* 1m   (CONT 1 IJ)
.48/12-06-dl N/A 0/1~-09-81 57 Sample System TV-SS-.201A 0/12-03-81 N/A N/A (SS) TV-SS-201B 0/12-03-81 N/A N/A 57 Sampl.e System TV-SS-204A 0/12-10-1:11 N/A N/A (SS) TV-SS-.204B 0/12-10-1:11 N/A N/A 57 Aerated Drains TV-DA-203A 0/11-27-81 N/A N/A (DA) TV-DA-203B 0/11-27-81 N/A N/A 58 Instrument Air 2-IA-868 0/11-14-1'$1 N/A N/A (IA) 1-IA-704 0/11-14-81 N/A N/A bO Satety Injection MOV-213~0A 12/11-08-81 N/A N/A (SI) 61 Safety Injection MOV-2890C 0/11-01:1-bl N/A N/A (SI) 62 6a1et:y Injection MOV-.28~0B 0/11-d-81 N/A N/A (SI) 63 Containment Spray ~-CS-~I+ 0/11-~2-!>1 N/A N/A/11-23-1:i 1 (CS) 11ov-cs-~01c.
* 1980-1981 TYPE C DATA  
D 50 .4/ 11-:d~d 1 N/A N/A
* Penetration 64 70 71 89 90 91 93
* APPENDIX 1m (CONT 1 IJ) 1980-1981 TYPE C DATA  


==SUMMARY==
==SUMMARY==
System Valve (s) .* Tested Contain.~ent Spray 2-CS-13 (~S) MOII-CS-201A, B Recfrculation Spray MOV-RS-~55A,B (RS) Safety Injection (SI) Recirc Spray (RS) Recirc Spray (RS) Air .Ejector Discharge
 
(\7P) Ventilation (VS) Ventilation (VS) Cont Vacuum & Gaseous Waste (CV) &GW) Contal..IlIUent Vac & Gaseous Waste (CV) (GW) Containment Vac (CV) MO\J-2860A M(i'J-28b0B 2-RS-11 MOV-RS-25bB 2-RS-17 MOV-RS-25t>A 2-VP-12 TV-SV-202A MO\J-\IS-200C MOV-VS-2000
Post Repair Penetration System             Valve (s) .* Tested     Leakaq~fscfd)/Date            Mr No/Date/Repair                    Leaicage/Date 64    Contain.~ent Spray 2-CS-13                 720/11-26-81                  ~111250731/11-28-Bl/Turned            0/11/.t.9/81
& 201 i.*lOV-VS-200A MOV-VS-200B&202 TV-GW-204 l'V-GW-205 TV-CV-250C
(~S)             MOII-CS-201A, B         12/11-29-81                  N/A                    rUbber disc    N/A insert Recfrculation Spray MOV-RS-~55A,B           0/1.l-01-is 1                l.\1/A                                N/A (RS)
'F\1-CV-2500 TV-GW-200 TV-\iW-201 T\7-CV-.lSOA
Safety Injection   MO\J-2860A             0/11-24-81                    N/A                                  N/A (SI)              M(i'J-28b0B             0/11-24-&1                    N/A                                  N/A 70    Recirc Spray        2-RS-11                216/11-26-81                  21112b0b30/11-2B-81jTUrned rubber    0/11-29-81 (RS)              MOV-RS-25bB            0/11-25-81                   N/A                      disc insert NA 71    Recirc Spray        2-RS-17                0/11-~5-81                    N/.A                                  N/A (RS)              MOV-RS-25t>A            0/11-25-81                   N/A                                  NA 89    Air .Ejector        2-VP-12                21b/11-18-H 1                S2111180955/11-24-81/ Lapped valve    9. o/ 11-io-1:1 1 Discharge          TV-SV-202A              0/11-18-tU                   N/A                                  NA
*rV-CV-.l50B 2-C:11-2 J:iC\1-CV-.:00 Leakaq~fscfd)/Date 720/11-26-81 12/11-29-81 0/1.l-01-is 1 0/11-24-81 0/11-24-&1 216/11-26-81 0/11-25-81 0/11-~5-81 0/11-25-81 21b/11-18-H 1 0/11-18-tU 38.4/U-1...:-81  
(\7P) 90    Ventilation        MO\J-\IS-200C          38.4/U-1...:-81               N/A                                  N/A (VS)              MOV-VS-2000 & 201      >1776/U-1~-81                 2112130738/12-13-81/Cleaned seat    16 .8/12-15-81 and disc 2112140308/12-l'J-81/Replaced. seat 91    Ventilation        i.*lOV-VS-200A          !H~/12-08-81                   2112:081800/12-1:l-81 Lapped val.ve  12/ll-~-81 (VS)              MOV-VS-200B&202        !}1.2/12-08-81                 2112081801/12-11-81/Repaired valve  24/ll-11-in seat Cont Vacuum &      TV-GW-204              0/12-03-81                     N/A                                  NA Gaseous Waste      l'V-GW-205              0/12-03-81                    N/A                                  NA (CV)    &GW)    TV-CV-250C              "'40/ 11-14-81                 21111~0732/11-23-81/0Verhauled      0/11-2&+-81 Val.ve
>1776/U-1~-81  
                                'F\1-CV-2500            0/11-14-81                    N/A                                 NA 93    Contal..IlIUent Vac TV-GW-200              0/12-03-81                    N/A                                 NA/11-..t4-H1
!H~/12-08-81  
            & Gaseous Waste    TV-\iW-201              0/12-03-Hl                                                          NA/11-i. .. -dl (CV)    (GW)    T\7-CV-.lSOA            >432/11-14-81                 ~111140832/11-1~-61/La~i:,)ed val.ve 0/11-24-tsl
!}1.2/12-08-81 0/12-03-81 0/12-03-81
                                *rV-CV-.l50B            >4 3')./ 11-14-81             .ll 11140833/11-20-81/Lapped valve    lb.ts/11-24-bl Containment Vac      2-C:11-2              0/11-11/81                     N/A                                  N/A (CV)            J:iC\1-CV-.:00          0/11-11-81                    N/A                                 N/A 4.b-S
"'40/ 11-14-81 0/11-14-81 0/12-03-81 0/12-03-Hl
* APPhNDIX ~B (CUNT 1 D)
>432/11-14-81
* Penetra"t.ion ::.)!stem         ~ j &sect; ) Tes"t.ed                                                             Post Repair LeaJca9e1scidlLDa't.e Mr No,lDate,lRe12air               Leaka9eLQa't.e 97     SampJ.e System     TV-SS-..:0.lh   O/li.-10-81           N/A                               N/A (SS)           TV-SS-203B       0/12-10-81             N/A                               'N/A 100     (;;aseous Waste   TV-GW-.lOt,     0/1:l-03-81           N/A                               N/A (GW)           TV-GW-207       0/12-03-81             N/A                               N/A 101     Fire Protection   2-Fi>-151       0/12-02-81             N/A                               N/A (Ff')         l-.FP-15.l       0/12-02-131           N/A                               N/A 103     RedC't.Or Le1:down i-RL-3           0/11-12-81             N/A.                               N/A (RL)           2-RL-5           0/11-12-81             N/A                               N/A 1014     Reactor Letdown   2-RL-13         0/11-1.l-81           N/h                               N/A (RL)           2-RL-15         0/11-12-81             N/A                               N/A 106     Safe1:y Injection .2-SI-73         0/11-10-bl             N/A                               N/A (SI) 112     Instrument Air     TV-IA-201A       0/11-1d-d1             N/A                               NA (IA)           TV-ll-201B       52.8/11-18-81         S211118~345/11-19-61/Repaired seat 2d. d/1~..:.o.l-ts1 113     Satety Injection   l-SI-174         9.o/11-0&-81           N/A                               N/A (SI)           MOiJ-2bo9A       ~. o/11-0tJ-o 1       N/A                               N/A}}
>4 3')./ 11-14-81 0/11-11/81 0/11-11-81 4.b-S Mr No/Date/Repair
~111250731/11-28-Bl/Turned N/A rUbber disc insert l.\1/A N/A N/A 21112b0b30/11-2B-81jTUrned rubber N/A disc insert N/.A N/A S2111180955/11-24-81/
Lapped valve N/A N/A 2112130738/12-13-81/Cleaned seat and disc 2112140308/12-l'J-81/Replaced.
seat 2112:081800/12-1:l-81 Lapped val.ve 2112081801/12-11-81/Repaired valve seat N/A N/A 21111~0732/11-23-81/0Verhauled Val.ve N/A N/A ~111140832/11-1~-61/La~i:,)ed val.ve .ll 11140833/11-20-81/Lapped valve N/A N/A
* Post Repair Leaicage/Date 0/11/.t.9/81 N/A N/A N/A N/A 0/11-29-81 NA N/A NA 9. o/ 11-io-1:1 1 NA N/A 16 .8/12-15-81 12/ll-~-81 24/ll-11-in NA NA 0/11-2&+-81 NA NA/11-..t4-H1 NA/11-i. .. -dl 0/11-24-tsl lb.ts/11-24-bl N/A N/A
*
* APPhNDIX ~B (CUNT 1 D) Penetra"t.ion
::.)!stem  
~j&sect;) Tes"t.ed Post Repair LeaJca9e1scidlLDa't.e Mr No,lDate,lRe12air Leaka9eLQa't.e 97 SampJ.e System TV-SS-..:0.lh O/li.-10-81 N/A N/A (SS) TV-SS-203B 0/12-10-81 N/A 'N/A 100 (;;aseous Waste TV-GW-.lOt, 0/1:l-03-81 N/A N/A (GW) TV-GW-207 0/12-03-81 N/A N/A 101 Fire Protection 2-Fi>-151 0/12-02-81 N/A N/A (Ff') l-.FP-15.l 0/12-02-131 N/A N/A 103 RedC't.Or Le1:down i-RL-3 0/11-12-81 N/A. N/A (RL) 2-RL-5 0/11-12-81 N/A N/A 1014 Reactor Letdown 2-RL-13 0/11-1.l-81 N/h N/A (RL) 2-RL-15 0/11-12-81 N/A N/A 106 Safe1:y Injection  
.2-SI-73 0/11-10-bl N/A N/A (SI) 112 Instrument Air TV-IA-201A 0/11-1d-d1 N/A NA (IA) TV-ll-201B 52.8/11-18-81 S211118~345/11-19-61/Repaired seat 2d. d/1~..:.o.l-ts1 113 Satety Injection l-SI-174 9.o/11-0&-81 N/A N/A (SI) MOiJ-2bo9A  
~. o/11-0tJ-o 1 N/A N/A}}

Revision as of 02:04, 21 October 2019

Reactor Containment Bldg Integrated Leak Rate Test Types A,B & C. One Oversize Figure Encl.Aperture Card Is Available in PDR
ML18139B808
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/31/1981
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B807 List:
References
NUDOCS 8203240369
Download: ML18139B808 (49)


Text

REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST TYPES A. B. AND C SURVEILLANCE TEST VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POW.E.R STATION UNIT NO. 2

  • DECEMBER 1981 (8203240369 820319

. PDR ADOCK 05000281

.p PDR

TABLE OF CONTENTS Section Title REFERENCES iii 1 PURPOSE 1-1 2

SUMMARY

2-1 2.1 Type A Test 2-1 2.2 Local Leak Rate Tests (Types Band C) 2-1 3 TYPE A TEST 3-1 3.1 Edited Log of Events 3-1 3.2 General Test Description 3-2 3.2.1 Prerequisites 3-2 3.2.2 Equipment and Instrumentation 3-2 3.2.3 Data Acquisition System 3-3 3.2.4 Data Resolution System 3-3

  • 3.3 Test Analysis 3-6 3.4 Test Results 3-d 3.4~1 CILRT Results - Total Time Method 3-8 3 .. 4.2 CILRT Results - Mass Point Method 3-8 3.4.3 Superimposed Leakage Rate Test Results 3-8 3.ij.4 Types C and B Penetration Leakage to be Added to Contaimnent Calculated Leakage 3-9--

4 LOCAL LEAK RATE TESTS (TYPES BAND C) ~-1 Appendices 3A SITE METEOROLOGY PRIOR TO CILRT 3A-1 3B SITE METEOROLOGY DURING THE CILRT 3B-1 3C INSTRUMENTATION TABLE 3C-1 3D INSTRUMENTATION LOCATION (PROFILE VIEW) 30-1 3E INSTRUMENTATION LOCATION (PLAN VIEW) 3E-1 3F CONTAINMENT INPUT VARIABLES 3F-1

  • 3G LEAK RATE DATA - ABSOLUTE T.E.ST METHOD - MASS POINT ANALYSIS i

3G-1

  • TABLE OF CDNTENTS (CONT*D)

Section Title Page 3H LEAK RATE DATA - ABSOLUTE TEST METHOD - TOTAL TIME ANALYSIS 3H-1 3J STABILIZATION, CILRT, AND VERIFICATION CONTAINMENT AIR MASS VS TIME 3J-1 3K CONTAINMENT LEAK RATE (MASS POINT) + UCL VS TIME 3K-1 3L CALCULATED CONTAINMENT LEAK RATE (TOTAL TIME) VS TIME 3L-1

~A 1~80-1981 TYPE B DATA

SUMMARY

Q.A-1 4B 1980-1981 TYPE C DATA

SUMMARY

4B-1

  • ii
  • REFERENCES
1. 10CFR50 Appendix J. Primary Reactoi Containment Leakage Testing for Water Cooled Power Reactors. April 19. 1976
2. Bechtel Topical Report BN-TOP-1. Rev. 1. Testing Criteria tor Integrated Leak Rate Testing of Primary Containment Structures for Nuclear Power Plants. Novem.oer 1. 1972
3. 2-PT-16.3. Reactor Containment Building Integrated Leak Rate Test. May lij* 1980
4. ANSI 56.B. Containment System Leak.age Testing Requirements.

February 19. 1981

  • iii
  • SECTION 1 PURPOSE The purpose of this report is to present a description and analyses of the Surveillance Types A, B, and C Containment Integrated Leak Rate Test CCILRT) results conducted on the Virginia Electric and Power Company*s Surry Nuclear Power Stat1on, Unit No. 2~~--

This report is submitted as required by 10CFR50 Appendix- J, paragraph V.B ,Reference 1) *

  • 1-1
  • SECTION 2

SUMMARY

2.1 TYPE A TEST Pressurization for the CILRT was initiated at 2350 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94175e-4 months <br /> on December 15, 1981. At approximately 0150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> on December 1o.

1981. it was noted that the pz:essur).z~tion_ was approximatel.y 3_., 2 psi/hr~- The anticipated pressurization rate. with the combined compressor capacity rated at 9.900 sctm. had been 4.8 to 5 psi/hr. Leakage investigation revealed that MOV-VS-200B was leaking. At 0334 hours0.00387 days <br />0.0928 hours <br />5.522487e-4 weeks <br />1.27087e-4 months <br />, pressurization was secured and MOV-VS-200B was cycled. Pressurization resumed at 0336 hours.

Subsequently. the pressurization rate was 4.8 psi/hr. The leakage past MOV-VS-200B was calculated to be 3.ooo scfm and it was determined the valve had been partially open.

Test pressure was reached at approximately 1111 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.227355e-4 months <br /> and pressurization was secured. The containment temperature stabilization criteria were met at approximately 17~0 hours.

From 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br /> on December 1&. 1981 to 0950 hours on December 18. 1981. the mass trends indicated an unacceptable leakage rate of approximately 1.5 La. During this period. an extensive leakage investigation was conducted.. The only major

  • leakage path was identified at electrical penetration A-18.

leakage rate was quantified to be a minimum ot 3.5 scfm. At approximately 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br /> on December 18, 1981. the collar bushing nut on *B* phas*e wire in penetration A-18 was found to be l.oose and was tightened. Fran 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on December 18. 1981 to 0210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br /> on December 19, 1981, the calculated leak rate was The acceptable and the requirements of the procedure were satisfied.

At 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> on December 19. 1981, the superimposed leak rate test commenced. At 08~0 hours. the calculated containment ieak rate satisfied the requirements of the procedure.

Depressurization of the containment started at 1150 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.37575e-4 months <br /> on December 19. 1981. At 2138 hours0.0247 days <br />0.594 hours <br />0.00354 weeks <br />8.13509e-4 months <br />. on December 19. 1981, the containment was at atmospheric pressure.

2.2 LOCAL LEAK RATE TESTS ('l'YPES BAND C)

The local leak rate testing of containment isolation valves and primary containment penetrations was conducted as required by station procedures since the last Type A Test*. The penetrations tested and their associated leak rates are iisted in Section ij ot this report.

  • The leakage past electrical penetration A-18 initiated a review
  • of the Type B test procedures upon completion or the 2-1
  • Integegrated Leak Rate Test ,ILRT). It was detennined that the test pressure utilized for testing the electrical penetration cannisters was below Pa. A procedure was devel.oped to require testing of the electrical penetration cannisters to Pa. All cannisters were tested prior to p1ant_operations *
  • 2-2
  • SECTION 3 TYPE A TEST 3,.1 EDITED LOG OF EVENTS December 15, 1981 2350 - Initiated containment pressurization December 16 1 1981 033q - Secured containment pressurization and cycled MOV-VS-200B 0336 - Restarted pressurization 1102 - Identified leakage path at electrical penetration A-18 1111 Secured containment pressurization 1720 - Completed stabilization December 17; 1981
  • 1700 - Quantified be a minimum December 18, 1981 leakage at electrical penetration A-18 to of 3.75 scfm 0800 - Only major leakage path identified electrical penetration A-18 0950 - Tightened collar bushing nut on A-18 *B 11 Phase wire -

leakage stopped 1030 - Started taking data for ILkT December 19 1 1981 0215 Completed ILRT oq35 - Started superimposed verification test 0835 Completed superimposed verification test 1150 - C0Dm1enced contairunent depressurization 2138 Completed contairunent depressurization 3-1

  • 3.2 GENERAL TEST DESCRIPTION 3.2.1 Prerequisites In accordance with the Surry Unit No. 2 CILRT procedures, 2-PT-16.3 (Reference 3), the following is a partial listing of the prerequisites that were completed and docwnented prior to containment pressurization *.
1. General inspection of the accessible interior and exterior surfaces of the containment structure was performed.
2. A11 equipment and instrumentation that coul.d .be damag*ed or destroyed by test pressure was removed or protected.

3*. All instrumentation used for test was calibrated within

& months of the test.

4. Valve line-ups, as required, were completed, including closure of the containment isolation valves.
s. Component cooling and chilled water systems were operable.
6. Plant computers were operational and programmed tor the
  • CILRT *
7. The Official Log of Events book was established and available prior to commencement of the test.
8. Site meteorology data was taken for 7 days prior to and throughout the performance of the CILRT.

3.~.2 Equipment and Instrumentation Pressurization of the containment was achieved .by utilization of nine air compressors. Air was piped tr.&1:ough two aftercoolers in parallel and* a refrigerated air dryer. Instrumentation and valving were installed to maintain proper monitoring and control during pressurization. The total capacity of the pressurization system, as installed, was rated at 9,990 sctm.

During the test, the necessary variables used to determine containment leakage were continually monitored using instrumentation which consisted of multiple resistance temperature detectors (RTDs), chilled mirror dew po.int indicators, and two absolute pressure quartz manometers (see Appendix 3D) *

  • 3-2
  • A mass flowmeter in the service air systems was used during the superimposed verification test. All test instrumentation readings are input into the piant computer for data acquisition and averaging.

3.2.3 Data Acquisition System The Surry* Unit No. 2 utilized a Westinghouse Prodac P250 to scan.,

log, average, and analyze data received from the containment instrumentation.

The P250 analog scan package reads all the analog inputs in a preestaDlished manner, converts these readings into engineering units, and then stores these values for use by the plant operators and by the plant application programs. For the CILRT, the P250 plant computer monitored the following instrumentation:

Scan Rate (Sec) 2.2 RTDs 20 5 chilled mirrors 20 2 quartz manometers 2 Instantaneous values of the CILRT instruments weze recorded every 5 minutes during the test period, using the P250 digital trend function on the operator*s console *

  • A 10-minute time average of the readings, calculated by the P250 Average and Integrate (A6I) package, was used as input in the plant computer CILRT programs.

The plant computer CILRT program consists of ILRTDA'l'A, which runs every 10 minutes, collects A&I data for all the instrumentation, performs sensor validity checks, and calculates weighted average dew point temperature, vapor pressure, weighted average containment temperature, and containment air mass.

Data Resolution System After the appropriate data have been acquired and averaged utilizing the plant computer system 6 the results are manually input to a remote computer system for leak rate calculations.

3.2.4.1 Absolute Method Mass Point Analysis The Absolute Method of Mass Point Analysis consists of calculating aiz masses within the containment structure over a period of time from pressure, temperature, and dew point observations during the CILRT. The air masses are computed using the ideal gas law as follows:

  • 3-3
  • M = CP-Pv) V (144) *lEq 1)

RT where:

M =airmass, lb P = total pressure, psia Pv = average vapor pressure, psia R = 53.35 ft lbf/1bm 0 R ,for air)

T = average containment temperature, 0 R V = containment free volume, 1.8 x 106 tt~

The leakage rate is then determined by plotting the air mass as a function of time, using a least-squares fit to determine the slope, A - dM/dt. The leak rate is expressed as a percentage of air mass lost in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or symbolically:

Leak rate= A/B (-2400) fEq 2) where A is the slope of the least-squares curve and Bis they-intercept. The sign convention is such that an outward leak is positive and the wiits are in percent/day. The air mass is computed separately, and the result is correlated as a function of time by means ot a least-squares fit of the form:

m =At+ B 'Bq 3)

  • The slope A and they-intercept Bare then used in .l!.quation 2 to determine the leak rate.

A 95 percent distribution.

confidence interval is calculated using a T The sum of the leakage rate and the 95 percent confidence interval is the Upper Confidence Level (UCL).

The leak rate is less than the UCL with the probability of 95 percent.

3.2.4.2 Absolute Method Total Time Analysis The absol.ute method of total time analysis consists of calculating air lost from the containment pressure, temperature, and dew point observations during the CILRT.

The containment air mass is computed using Equation 1 (Section 3.2.4.1).

The measured leakage rate at any time ,t) is then determined by subtracting the mass at the time (Mt) f:rom the initial mass ,Mi) and dividing by the initial mass. The measured leak rate is

  • 3-4
  • expressed as a percentage of containment mass lost in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> o~

symbo1ica1ly :

MEA Leak Rate = Mi - Mt (2400)

Mi (.:1t)

The sign convention is such that an outward leak is positive and the units are in percent/day.

The estimated leakage rate is then determined by plotting the measured leak rate as a function of time and then performing a least-squares tit of the measured leak rate values as follows:

BST Leak Rate= At+ B where A is the slope and Bis they intercept of the least-squares curve.

The 95 percent confidence interval is determined with the T distribution.

This analysis method was used in conjunction with procedure 2-PT-16.3 (Reference 3) *

  • 3-5

*- ~ - - -

  • 3.3 TEST ANALYSIS Test data acquired fran the start of stabi1ization to the termination of the superimposed leak verification test are shown as a graph in Appendix 3J.

The graph is divided into the following zones:

zone A - depicts temperature stabilization period from 1140 hours0.0132 days <br />0.317 hours <br />0.00188 weeks <br />4.3377e-4 months <br /> to 1710 hours0.0198 days <br />0.475 hours <br />0.00283 weeks <br />6.50655e-4 months <br /> on December 16, 1981.

zone B - depicts unacceptable mass trend trom 1710 hours0.0198 days <br />0.475 hours <br />0.00283 weeks <br />6.50655e-4 months <br /> on December 16, 1981 to 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on December 18, 1981 and also depicts the removal of an RTD from scan.*

Zone C - depicts acceptable mass trend from 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on December 18 , .. 1981 to 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> on December 19, 1981.

Zone D depicts superimposed verification test from 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> to 0840 hours0.00972 days <br />0.233 hours <br />0.00139 weeks <br />3.1962e-4 months <br /> on December 19, 1981 *.

An RTD was removed from scan as it was reading .below the maximum temperature span required .by the procedure.

The unacceptable mass trend shown in Zone B was a result of

  • The correction of the leakage past electrical penetration A18 resulted in the acceptable mass trend shown in Zone C.

The leakage rate analysis was performed .by Virginia Electric and Power Company*s CILRT program (Section 3.2.4). The input data tor the V~PCO-CILRT program are shown in Appendix 3F.

The Absolute Method Mass Point Analysis (Section 3.4.2) represents the result of the containment leakage rate. The results given in Appendix JG show that the UCL is 0.03837 percent/day which is within the acceptable limit of 0.013701 percent/day (0.075 less the Type C penalty :tor valves on systems not rented to the containment).

The Absolute Method Total Time Analysis (Section 3.4.1) is used to determine the acceptability of the CILRT it the test duration is less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The results of the total tirne analysis are shown in Appendix 3H. The results show the UCL to be 0.072185 percent/day, which is within the acceptable linut of 0.075 percent/day (La).

The following appendices contain the plots provided by this report:

3-6

  • Appendix Description 3J Containment ai.r mass vs time (1~30 hours on 12/16/81 to 0940 hours0.0109 days <br />0.261 hours <br />0.00155 weeks <br />3.5767e-4 months <br /> on 12/19/81) 3K Containment leak rate and UCL vs time, mass point ana1ysis (1030 hours on 12/18/81 to 0210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br /> on 12/19/81) 3L Containment leak rate vs time, tota1 time analysis~(1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on 12/18/81 to 0210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br /> on 12/19/81)

The leakage zate calculations weze verified by the superimposed verification test. The test ran from 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> to 0840 hours0.00972 days <br />0.233 hours <br />0.00139 weeks <br />3.1962e-4 months <br /> on December 19, 1981. The computer calculated air mass was within 0.25 La of the metered value and satisfied the procedures *

  • 3-1
  • 3.4 TEST RESULTS 3.4.1 CILRT Results - Total Time Method 1 .. Leakage rate calculated, Lam 0.043258 percent/day
2. 95 percent upper confidence interval 0 .0289.;t7 percent/day
3. UCL, Lam leakage rate with 95 percent confidence interval (1 + 2) 0.072185 percent/day CILRT Results-Mass Point Method
1. Leakage rate calculated, Lam 0.03713b percent/day
2. 95 percent upper confidence interval 0.001238 percent/day
3. UCL, Lam leakage rate with 95 percent confidence interval (1 + 2) 0.03837-.

pe rcent/day

  • 4.

5.

Type C leakage penalty Total reportable Type A leak rate (3 + 4) 0.001299 percent/day 0.039673 percent/day 3.4.3 superimposed Leakage Rate Test Results

1. The Super.imposed Leak Rate Test is acceptable if Le falls within the following range:

(Lo+ Lam - o.~5 La) s Le$ (Lo+ Lam+ 0.2s La) where: Le = Containment leakage rate calculated during the verification test 0.122645 percent/day Lo = Leakage rate imposed on containment using flow measuring device 0.109090 percent/day

  • 3-8
  • La = Maxinnnn a11owab1e 1eakage rate 0.1 percent/day Lam= tota1 measured containment leakage rate 0"'03713b pei:cent/day 0.109090 + 0.037136 - 0.025 S 0.122645 s 0.109090 + Ou037136 + 0.025 0.121226 s 0.122645 s 0.171226 3.4.4 Types C and B Penetration Leakage to be Added to Containment Calcu1ated Leakage*

Penetration No./1,eakage (SCFH) 1/0 .. 2 18J'0.2 8/0.8 45/0.3 9/1.0 10/1.1 Total Type C leakage to be added 3.88 SCFH Total Type B leakage to be added 0 Total Types Band C leakage to be added 0.00129 percent/day

  • NOTB: The above penetrations were in a nonvented valve lineup configuration for this test. with respective leak rates taken from 2-PT-16.4
  • their
  • 3-9
  • APPENDIX 3A SITE METEOROLOGY PRIOR 'l'O CILRT Barometric Pressure

~ ~ (in Hg) Dew Point (OF) Dry Bu1b (OF) 12/8/81 0000 29.70 35 q.s 0400 29.57 31 4&

0800 29.&1 39 4{,

1200 29.63 32 58 1600 29.64 25 54 2000 29.12 22 45 12/9/81 0000 29.75 21 '1-0 0400 29.75 22 35 0800 29.82 19 36

  • 1200 1600 2000 29.80 29.80 29.86 17 12 10 39 38 3L 12/10/81 0000 29.86 10 29 0400 29.81 10 21 0800 29.79 11 .27 1200 29.14 13 35 1600 29. 72 11 37 2000 29.80 11 30

(

  • APPENDIX 3A (CONT*D)

Barometric Pressure

~ ~ (in Hg) Dew Point ,on Dry Bulb (OF) 12/11/81 0000 29.82 12 31 0400 29.83 15 31 0800 29.88 14 29 1200 29.91 16 3~

1600 29.93 18 36 2000 29.98 19 2&

12/12/81 0000 30.03 20 31 0400 30.36 20 31 0800 30.12 20 29 1200 30.16 2 ... ttO

  • 12/13/81 1600 2000 0000 30.18 30.24 30~26 20 18 19 41 28 2 ...

0400 30.31 17 23 0800 30~33 18 22 1200 30.34 21 40 1600 30.31 22 41 2000 30~31 21 26

  • APPENDIX 3A (CONT*D)

Barometric Pressure

~ ~ Cin Hg) Dew Point (OF) Dry Bul.b (OF) 12/14/81 0000 30.30 19 23 0400 30.27 21 23 0800 30.23 24 21 1200 30.12 39 44 1600 30.02 43 4q 2000 29~91 49 50 12/15/81 0000 29.87 45 q.5 0400 29.89 37 37 0800 29 .. 87 36 36 1200 29.75 31 37

  • 12/16/81 1600 2000 0000 29~53 29.55 29.67 31 36 31 37 31 31

., APPENDIX 3B SITE METEOROLOGY DURING THB CILRT Barometric Pressure

~ ~* Cin Hg) Dew Point (OF) Dry Bu1b (OF) 12/16/81 0100 29.87 37 38 0200 29.87 31 38 0300 29.87 37 38 0400 29.89 37 38 0500 29.89 37 3ts 0600 30.03 35 39 0700 30.03 36 40 0800 30.03 36 40 0900 30.11 3& 48

  • 1000 1100 1200 30.17 30~ 17 30.17 33*

32:

33 q.5 45 44 1300 30.16 21 50 1400 30.16 29 4b 1500 30.16 30 47 1600 30.16 27 48 1700 30.10 28 47 1800 30~70 31 31 1900 30.80 30 36 2000 30.70 35 41 2100 30.80 28 31

  • APPENDIX 3B (CONT*D)

Barometric Pressure

~ ~ (in Hg) Dew Point (OF) Dry Bulb (OF) 2200 30.8 28 33 2300 30.38 27 27 12/17/81 0000 30.38 26 34 0100 30.;38 29 3~

0200 30.36 32 34 1300 30.;.35 31 34 1400 30.39 3.2 33 0500 30.39 32 33 0600 30.39 32 34 0700 30.38 32 35

  • 0800 0900 1000 30.;.38 30.37 30.38 29 30 31 38 42 44 1100 30 .. 38 2~ 4b 1200 30*.40 31 47 1300 30.37 32 55 1400 30.38 30 52 1500 30.32 32 52 1600 30.37 38 50 1700 29.38 43 43 1800 30.38 42 IJ2 1900 30.34 41 43
  • APPENDIX 3B (CONT'D)

Barometric Pressure

~ Time* {in Hg) Dew Point &OF) Dry Bul.b IOF) 2000 30.35 37 50 2100 30.34 39.5 46 2200 30.37 39.5 4b 2300

    • ** **

12/18/81 0000

    • ** **

0100 30.36 35 49 0200 30.36 35 4~

0300

    • ** **

0400 30.31 39 50 0500 30.33 40 48

  • 0600 0700 0800 30.36 30.38 30.37 41 41 37 46 Q.t, 44 0900 30.37 35 37 1000 30~37 33 44 1100 30.37 32 41 1200 30.38 35 39 1300 30.38 33 38 1400 30~37 29 41 1500 30.37 32 41 1600 30.37 34 39 1700 30.37 28 33
  • APPENDIX 3B ,coNT 1 D)

Barometric Pressure

~ Time (in Hg) Dew Point (OF) Dry Bu1b (OF) 1800 30.37 28 33 1900 30.37 28 38 2000 30~37 28 34 2100 30.37 28 34 2200 30.37 28 32 2300 30.37 28 31 12/19/81 0000 30.37 28 31 0100 ** **

0200 30.38 21 3At 0300

    • ... **
  • 0400 0500 0600

30.38 30~37

21 24

34 33 0700 30.37 18 22 0800 30~37 18 32 0900 30.38 18

  • APPENDIX 3C
  • INSTRUMENTATION TAbLE The following instrwnentation was calibrated and fwictionally tested no greater than 6 months prior to the performance of this test and in accordance with 10CFR50 1 Appendix J 1 and Field Calibration Procedures using instrwnentation traceable to the National Bureau of Standards.

Weight Computer Instrument Factor ~ Range ~ Accuracy Sensitivity Rl'D-LM-200-1 0.02683 T1000A 55-1050F F-1 +/-0 .1oF- +/-0.090F Rl'D-LM-200-2 0.02322 T1001A 55-1050F F-2 +/-0.1oF* +/-0.09°F Rl'D-LM-200-3 0.02427 T1002A 55-105DF F-3 +/-0 .. 1DF +/-0.090F Rl'D-LM-200-4 0.01820 T1003A 55-1050F E-3 +/-0.10F +/-0 .. 09°F Rl'D-LM-200-5 0.08884 T100qA 55-105DF B-1 +/-0.10F +/-0.09°F Rl'D-LM-200-6 0.08884 T1005A 55-105DF B-2 +/-0.1°F +/-0 *.09°F Rl'D-LM-200-7 0.08884 T1006A 55-1050F c-1 +/-0 .10F +/-0.09°F Rl'D-LM-200-8 0.08881J T1007A 55-1050F c-2 +/-0.1DF +/-0.09°F Rl'D-LM-200-9 0.04975 T1008A 55-105DF A-1 +/-0 .. 10F +/-0.09°F Rl'D-LM-200-10 O.OIJ975 T1009A 55"'.'"1050F A-2 +/-0.1°F +/-0.09°F RTD-LM-200-11 0.04975 T1010A 55-1050F

  • A-3 +/-0.1°F +/-0.09°F Rl'D-LM-200-12 0.02460 T1011A 55-1050F D-1 +/-0.10F +/-0.09°F Rl'D-LM-200-13 0.021J60 T1012A 55-105DF D-2 +/-0.1°F +/-0.09°F Rl'D-LM-200-14 0.02460 T1013A 55-1050F E-1 +/-0.1DF +/-0.09°F Rl'D-LM-200-15 0.02LJ60 TIJ02LJA 55-105DF B-2 +/-0.1DF +/-0 ..09°F Rl'D-LM-200-16 O.OLJ76t> T4025A 55-1050.l? I-1 +/-0.1DF +/-0.090?

RTD-LM-200-17 0.04706 T4026A 55-1050F I-2 +/-0.10F +/-0.090F Rl'D-LM-:W0-18 O.OIJ766 T4027A 55-1050F I-3 +/-0.1DF +/-0.090F 3C-1

  • APPENDIX 3C (CONT 1 D)
  • Weight Computer Instrwnent Factor Point Range ~ Accuracy Sensitivity Rl'D-LM-200-21 0.03608 T4009A 55-105°F H-1 +/-0.1°F +/-0 .090F Rl'D-LM-200-22 0.03961 T4020A 55-1050F H-2 +/-0.1°.F +/-0.090F RTD-LM-200-23 0 .o 1782 T4021A 55-1050F G-1 +/-0.1°F +/-0.090F Rl'D-LM-200-24 0.06800 T4022A 55-1050F G-2 +/-0.10F +/-0,.09°F Ml'-LM-200-o 0.14064 T4039A -40 to +200°F J-1 +/-0.40F +/-O.OS°F MT-LM-200-7 0.14064 T4040A -40 to +-2Q00F J-2 +/-0.4°F +/-0.05°F Ml'-LM-200-8 0.23959 T4041A -40 to +2000F K-1 +/-0.4°F +/-0.05°F Ml'-LM-200-9 0.23959 T4042A -1rn to +2Q00F K-2 +/-0.4°F +/-0.05°F Ml'-LM-200-10 0.23959 T4043A -40 to +2000F K-3 +/-Om4°F +/-0.05°F PI-LM-206 0.5 00960 0-100 psia +/-0.0&8 psia o.oon, ops PI-LM-207 o.s 00961 0-100 psia +/-0 .068 psia 0.001, °FS 3C-2
  • MT-7 ZONE J ZONEK
  • MT-8 MT-IO MT-9 PROFILE VIEW NOTE:

MT-G MT-LM-200-G(TYP)

' *. APPENDIX 30 INSTRUMENTATION LOCATION DEW POINT SENSORS SURRY POWER STATION-UNIT 2 INTEGRATED LEAK RATE TEST 30-1

,,.

el 132' RTD-12 RT0-5 RTO-G RTD-7 1 el 95 RTD-13 RTD-15 RT0-14 el 11 4i4 RTD-4 RTD-22

  • RTD-3 RTD-21 RT0-2 RTD-1 el 18'-4" el

-3'-6" I II

~-1-27-7 RTD-24 RTD-17 RTD-18 PROFILE VIEW NOTES:

I. RTO-l=RTD-LM-200-1 (TYP)

2. RTD-19, 20 NOT USED APPENDIX 3D JNSTRUMENTATION LOCATION
  • R ESIS TA NC E TEMPER AT URE DETECTORS (RTD)

SURRY POWER STATION-UNIT 2 INTEGRATED LEAK RATE TE 5 T 3 D-2

  • RTD-18 I
  • RT0-17 IRTD-lj PLAN VIEW NOTES:

I. RTD-l=RTD-LM-200-1 (TYP)

2. RT D-19,20 NOT USED APPENDIX 3 E
  • 1N5 T RUMENTATfON LOCATION RESISTANCE TEMPERATURE DETECTORS (RTD)

SURRY POWER STATION-UNIT 2 lNTEGRATED LEAK RATE TEST 3E-1

  • MT-7 NOTE:

PLAN VIEW MT-6 MT-LM-200-6 (TYP)

  • APPENDIX 3 E I NSTRUME:NTATION LOCATION DEW POINT SENSORS SUR RY POWER 5 TAT ION-UNIT 2

,f NT EGRAT E D L EA K RAT E T EST 3E-2

  • APPENDIX 3F VEPCO SURRY POWER STATION UNIT NO. 2.

CONTAINMBNT INPUT VARIABLES 1030 HOURS ON 12/18/81 TO 0210 HOURS ON 12/19/81 Time ABS Pressure DEWPT Vap Pressure Dry Bu1b mours) CPsia) COF) (Psia) Temperature IOR) o.o 60.949 66.42 0.3209 534.33 o.~33 60.950 66.43 0.3210 534.34 0.667 60.950 66.45 0.3212 534.33

  • 1.000 60.949 66.46 0.3213 534.32 1.333 60.950 66.47 0.3215 534.34 1.667 &0.951 66.50 0.3218 534.34 2.000 60 .951 6f>.50 0.3218 534.35 2.333 60.951 66.52 0.3220 534.36
  • 2.667 3.000 3.333 60.951 60.950 60.950 66.52 66.53 66.56 0.3220 0.3221 0.3225 534.35 534.34 534.35 3.667 60.951 66.56 0.3225 534.36 4.000 60 .951 f,f,.57 0.3226 534.37 4.333 60.951 66.58 0.3227 534.37 4.667 60.952 66.57 0.3226 53,._39 5.000 .60 .952 66.60 0.3229 534.38 5.333 60.952 66.60 0.3229. 534.38 5.667 60.952 66.60 0.3229, 534.38 6.000 60.952 66.61 0.3230 534.38 6.333 60.952 66.62 0.3231 534.39
  • 6.667 60.952 66.62 0.3231 534.40 3F-1
  • Time (Hours)

ABS Pressure (Psia)

APPENDIX 3F (CONT*O)

DEWPT (OF)

Vap Pressure IPsia)

Dry Bulb Temperature (OR) 7.000 60.952 66.62 0.3231 534~3' 7.333 60.951 66 .63 0.3232 534.39 7.667 60.951 66.6LJ 0.3234 534.39 8.000 60.951 66.63 0.3232 534.39 8.333 60.951 6&.64 0.3234 534.39 8.&67 60.951 66.&3 0.3232 534.40 9.000 60.951 M,.64 0.3234 534.40 9.333 60.951 66 .. 65 0.3235 534.40 9.667 60.951 66.64 0.32.34 534.40 10 .ooo 534.40

  • b0.~50 66.62 0.3231 10.333 60.950 66.65 0.3235 534.40 10.&67 60.950 66.64 0.3234 534.40 11.000 60.950 66.64 0.3234 534.a+O 11.333 60.949 66.65 0.3235 534.40 11.667 60.94~ 66.67 0 .. 3237 534.40 12.000 60 .. ~49 66.65 0.3235 5.34.41 12.333 60.949 66.64 0.3.l34 534 .. 41 12.667 60.948 66.64 0.3234 53AJ.40 13.000 60.948 66.65 0.3235 534.40 13 .333 60.948 66.64 0.3234 534.ll1 13.667 60~948 t,6.64 0.3234 534.41 14.000 60.9£J8 66.b4 0.3234 53Q..40
  • 14.333 60.947 66.63 0.3232 534.41 3F-2 jl
  • Time C.l:lours)

ABS Pressure

,Psia)

APPENDIX 3F (CONT ..D)

DEWPT (OF)

Vap '.Pressure CPsia)

Dry Bu1b Temperature C0 R}

14.667 60.947 66.63 0.3232 5.34.40 15.000 60.947 bb.62 0 .. 3231 534.41 15.333 60~9lH, 66.63 0.3232 534.40 1'5.667 60.~45 66.63 0.3232 534.40

  • Time (Hours)

Mass CLBM)

APPENDIX 3G (CONT*D)

Leakage (I/day)

Conf (I/day)

UCL (I/day) 6.333 551221.60 0.041207 0.005040 o.046.itn 6.067 551211.28 0.042827 0 .0011825 0.047651 7.000 551221.t,O 0.041938 0.004463 0.04&401 7.333 551211.49 0.042241 0.004076 0.04&317 7.667 551210.47 0.0~2185 0.003728 0.045913 a.ooo 551211.a&9 -0.041&29 0.003461 O.Oa.50~6 8.333 551210.47 0.040950 0.003264 0.044214

'

8.667 551201.17 0.041049 0.003018 0.01+4008 9.000 551200.1& 0.040924 0.002801 0.043725

  • 9.333 551199.14 0.040&33 0.002&20 0 .04325:.t 9.&&7 551200.16 0.040047 0.002509 0.042556 10 .ooo 551193.10 0.,039884 0.0023'+9 0.04.l233 I 10.333 551190.05 0 .039749 0.002204 0.041953 10.667 551191.0b 0.039353 0.002104 0.041457 11.000 551191.06 0.038825 0.002045 0.040870 1).333 551180.9& 0 .03882& 0.001~26 0.040752 11.6b7 551178.92 0.038772 0.001818 0.040590 12.000 551170.64 0.039022 0.001736 0.040758 12.333 551171.bf, 0 .039023 0.001&43 0.040066 12.667 551172.88 0.038812 0.001571 0.0403ts3 13.000 551171.86 0.038538 0.001515 0.0-.0053 13.333 551162.57 0.038591 0.001441 0.040033
  • 13.667 551102.57 0.038509 0.001374 0.03~883 3G-2
  • Time

<<Hours)

Mass (LfilO APPENDIX 3G (CONT 1 D)

Leakage Ci/day)

Con£ (I/day)

UCL Cl/day) 14.000 551172.88 0.037888 0.001442 0.039330 14.333 551154.49 0.037961 0.001377 0.039338 14.667 551164.d1 0.037524 0.001382 0.038906 15 .ooo 551155.51 0.037375 0.001329 0.038704 15.333 551155.72 0.037131 0.001292 0.038430 15 .667 551146.62 0.037136 0.001238 0.038374

  • APPENDIX 3G VEPCO SURRY POWER STATION UNIT NO. 2 LEAK RATE DATA INTEGRATED LEAK RATE TEST FROM 1030 HOURS ON 12~18/81 TO 0210 HOURS ON 12/19/81 49 DATA SETS ABSOLUTE TEST METHOD - MASS POINT ..ANAL~S1S

!

Time Mass Leakage Conf UCL (Hours) (LBM) (I/day) (~/day} (1/dan o.o 55127&.49 o.o o.o o.o 0.333 551274.26 o.o o.o o.o 0.667 551282.55 -0 .039582 0.339245 0.299663 1.000 551282.76 -0 .035414 0.052661 0.017247 1.333 551.270.21 0.005280 0.060467 0.0&5747
  • 1.6&7 2.000 2.333 55127&.2&

551265.95 551253 .. 60 0.004864 0.018629 0.036246 0.035836 0.0288111 0.028634 0.040700 0.047443 0.064881 2.6&7 551263.92 0.033067 0.021901 0.054968 3.000 551264.13 0.029497 0.017572 0.0470&9 3.333 551250.77 0.034141 0.014974 0.049115 3.667 551249.55 0 .036121 0.012491 0.04tJb12 4.000 551238.22 0.041005 0.011622 0.052628 4.333 551237.20 0.043284 0 .010152 0.05343&

4 .6(,J 551236.99 0.043750 0 .087,..9 0.052498 5.000 551233.94 0.043975 0.007612 0.051587 5.333 551233.94 0.043268 0.006720 0.049988 5.667 551233.94 0.042011 0.006080 0.04l80~1

  • 6.000 551232.93 0.040659 3G-1 0.005586 0.04b245
  • APPENDIX 3H VEPCO SURRY POWER STATION UNIT NO. 2 LEAK RATE DATA INTEG.RAT.ED LEAK RATE T.EST FROM 1030 HOURS ON 12/18/81 TO 0210 HOURS ON 12/19/81 49 DATA SETS ABSOLUTE TEST METHOD - TOTAL TIME ANALYSIS Meas Est Time Mass Leakage Leakage Conf UCL (Hours) &LBM) Cl/day) CS/day) (I/day) (i/day) o.o 551276.49 o.o o.o o.o o.o 0.333 551274.2& 0.029223 o.o o.o o.o 0.6b7 551282.55 -0.039548 o.o o.o o.o 1.000 551282.7& -0.027304 -0.040813 0.320027 0.279214
  • 1.333 1.667 2.000 551270.21 551276.26 551265.95 0.020517 0.000595 0.022953

-0.00&387

-0.002760 0.010836 O* .l10105 0.1329&1 0 .104361 0.203719 0.130201 0.115196 2.333 551253.60 0.042710 0.027720 0.089938 0.117658

~ .66"/ 551263.92 0.020521 0.028753 0.07tl20~ 0.10b9b2 3.000 5512&4.13 0.017938 0.028227 0.070~67 0.051St>94 3.333 551250.77 0.033597 0.033105 0.063S95 0.09&700 3.667 551249.55 0.031990 0.035936 0.058~08 O.O!f ..3~5 4.000 551238.22 0.041659 0.040724 0.054122 0.0~4847 4.333 551237.20 0.039478 0.043608 0.050721 0.0943.29 4.667 551.236.99 0.036847 0.045043 0.048.220 0.0~3263 5.000 551233.94 0.037046 0.04&102 0.046182 0.092285 5.333 551233.94 0.034133 0.046327 0.044732 0.091059

  • 5.667 551233.94 0.032686 3H-1 0.;045993 0.043698 0.0S!fb91
  • Time CHours)

Mass (LBM)

APPENDIX 3H ,coNT*D)

Meas leakage Cl/day>

Bst Leakage

&I/day)

Cont (I/day)

UCL

,~/day) 6.000 551232.93 0.031609 0.045422 0.042849 0.088271 6.333 551221.60 0.037737 o .. 046083 0.011-1530 0.087f>13 6 .. 66.7 551211.28 0.042582 0.047488 0.040147 0.087t>35 7.000 551221.60 0.034141 0.047117 0.039504 .0.0~6622 7.333 551211.49 0.038592 0.047516 0.038570 0.08&085 8.000 551211 .. 49 0.035375 0.047378 0.037258 0.084&36 8.333 551210.47 0.034493 0.04b984 0.036793 0.08377ts 8'.667 551201.17 0.037833 0.047102 0.036135 0.083.2.37 9.000 551200.16 0.036926 0.047047 0.03557'1 0.082t>24

  • 9.333 55119.14 0.036083 0.04&861 0.035101 0.081~&2 9.667 551200.lt, 0.03'l378 0.046454 0.034745 0.081199 10.000 551193.10 0.036306 O.Otl6314 0.034283 0.080597 10.333 551190.05 0.03&421 o.o4&18o 0.033837 0.080023 10.667 551191.06 0 .. 034866 0.045871 o.0334ss 0.079359 11.000 551191 .. 06 0.033810 0.045449 0.033195 0.07~&44 11 .. 333 551180.96 0.036700 0.045380 0.032771 0.078150 11.667 551178.92 0.036409 0.045275 0.03231a 0.077653 12.000 551170.64 0.038~02 0.045378 0.031936 0.077314 12 .333 551171~&6 0.037006 0.045316 0.031563 0.070878 12.667 551172.88 0.035610 0.045109 0.0312St, 0.07&366 13.000 551171.86' 0.035039 0.044852. 0.03097S 0.075831 13.661 551162.57 *0.036290 0.044692 0 .03032li 0~075020
  • 14.000 551172.88 0.032219 3H-2 0.044193 0.0301tU, 0.07~379
  • Time Mass APPENDIX 3H (CONT 9 D)

Meas Leakage Est Leakage Cont UCL

&Hours) (LBM) <4 15.000 551155.51 0.035113 a.*043595 O.Ol942o 0.073021 15.333 551155.72 0~034292 0.043345 0.029200 0.072545 15.667 551146.62 0.036088 0.043258 0.028927 0.07.2185

  • *
  • AIR MASS (LBM) 01 01 01 01 01 01 01 01 I',) OJ -I>

0 0 0 0 0 0 0 0 0 0 0 0 1130 1230 1330 ZONE A 1430 TEMPERATURE STABILIZATION 1530

'

I\)

0) 1630 1730 1830


----

'(X) 1930 2030 2130 2230 2330 0030 0130 0230 0330 0430 0530 0630 0730 0830 REMOVED RTD FROM SCAN 0930 I\) 1030

'-.J I 130 1230

.......

(X) 1330 1430 ZONE B 1530 LEAKAGE INVESTIGATION 1630 1730 1830

-I 1930 3:: 2030 IT'I I 2130

t: 2230 0

C 2330

0 0030 z 0130

-I IT'I 0230

0

<

l>

0330 r 0430 en 0530 0630 0730 0830 0930 I\)

'-

(X)

I 030 I 130 1230


'(X) 1330 1430 1530 1630 1730 ZONE C 1830 ACCEPTABLE MASS TREND 1930 2030 2130 2230 2330 0030 0130 0230 0330


PREPARATION FOR SUPERIMPOSED VERIFICATION TEST

'

I\)

0430 0530


ZONED U) 0630

'(X) 0730 SUPERIMPOSED VERIFICATION TEST 0830 0930


1030 1130 1230

)>

(>J

-0 c..

.L orn-u

)> :::0  :::0

0 --t oc:o
0 rn j
  • * *

.07 , - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - * - - - - - - - - - - ,

.06 1A II I\

II I \

I-z II II I \\

I ,,-....,

0 I I I

.05 IL \ ~..., ',

U)

U)

<t I I \,' ', - -

1 ,, - '-~~

>-

<t Cl

'I-z

.04

'

1 I 11

'

,

---


LEAK RATE -------

LI.I t.) 1 a:

LI.I IL I

LI.I .03 I

~ I a:

,,:

<t I LI.I

..I I cJ

..I

.02 I t.)

, I

.or 1030 1130 1230 1330 1430 1530 1630 17'.30 1830 1930 2030 2130 2230 2330 0030 0130 12/18/81 TIME- 20 MINUTE INTERVALS 12/19/81 APPENDIX 3K CONTAINMENT LEAK RATE

+ UCL VS TIME SURRY POWER STATION -UNIT 2 INTEGRATED LEAK RATE TEST 3K-I

  • * *

. 06 w

!:

j::

...J

.05

~

0 I-

>-

i3

......

I- .04 z

w u

a:

w a.

w

!i0:: .03

.:

<(

w

...J a

w I-

<(

.02

...J

=>

u

...J

<(

u

.01 1030 1130 1230 1330 1430 1530 1630 1730 1830 1930 2030 2130 2230 2330 0030 0130 12/ 18/81 TIME-20 MINUTE INTERVALS 12/19/81 APPENDIX 3L CALCULATED CONTAINMENT LEAK RATE VS. TIME SURRY POWER STATION-UN IT 2

- INTEGRATED LEAK RATE TEST 3L-I

  • SECTION 4 LOCAL LEAK RATE TESTS CTYPES BAND C)

Local leak rate tests were performed by pressuri~ing with air the penetrations listed in the following tables and either measuring leakage across containment isolation valves ,Type C) or across resilient seals CType B). The reported tests include the testing of all electrical penetration cannisters to Pa. This test:.ing was done subsequent to the Type A test and prior to operations.

The total Types Band C leakage documented was verified to be in accordance with station procedures. The following pages list the penetrations tested and their documented leakage *

  • 4-1
  • APPENDIX 4A
  • 1980-1981 TYPE B DATA

SUMMARY

Prerepair Post Repair Penetration Eguiement Tested Leakage iscfd} LQate:. Leakage fscfdl!;!ate Remarks Personnel Air LOCK 0-Ring 33.6/8-3-80 N/A N/A Personnel Air Lock 0-Ring 3.2 .4/2-9-81 N/A N/A Personnel Air Lock 0-Ring 32.4/4-26-81 N/A N/A Personnel Air Lock 0-Ring 27.48/9-7-81 N/A N/A Personnel Air Lock 0-Ring 57 .. &/1.l-13-81 N/A N/A Fuel Transfer Tube 0-Ring 1.92/12-7-81 N/A N/A Equipment Hatch 0-Ring 0/12-12-81 N/A N/A Emergency Escape Air Lock 0-Ring 0/12-12-81 N/A N/A All electrical penetration 0-Rings were tested with no excessive leakage noted or repairs required.

All electrical penetration cannisters were tested subsequent to this Type A test with no excessive leakage roted or repairs required, with two exceptions.

  • Electrical Penetration A-18 was found leaking 4,320 scfd and the collar bushing nut was tightened with 1'0 11 leakage noted.

Electrical Penetration A-17 was round to be leaking 912. scfd and the collar bushing nut was tightened with "0" leakage noted.

4A-1

  • APP.E.NDI..t. 4B
  • 1980-1981 TYPE C DATA SUMMAR~

Post Repair Penetration system Valve(s) Tested Leakdge(scid)/Date Mr No/Date/Repair Leax.age/Date 1 Comp Coo.l. *rv-cc-209.b >1770/11-21-81 2111211000/11-24-81/Cl.eaned va.Lve (CC) comp Cool. 2-CC-177 >3240/11-20-81 2111200700/11-22-81 0/11--£l-81 (CC) Lapped and cleaned valve Comp Cool 2-CC-176 S2111181531/11-22-81 0/11-2~-81 (CC) Lapped and cleaned valve 5 Comp Cool. '.l'\7-CC-209A >3240/11-20-81 2109050700/11-21-81/Replaced ru.ober 0/11-2.2-81 (CC) seat 7 Safety Injection 2-.SI-150 0/11-0~-81 N/A 0/1.t-1:.t.-sl (SI) MOV'-2b67C&D 360/11-08-81 211108~345/11-21-81/New gasket 0/1:.t-1:l-81 and pack.ing 8 Comp Cool. TV-CC-2.07 19 * .:.t./11-11-81 N/A N/A (CC) 9 Comp Cool. 204/11-13-81 .t:111131801/1..!-05-61/Macru.ned disc i:; .,!4/1"--05-81 (CC) Lapped va.t.ve 10 Comp Cool. .:t-CC-242 43.2/11-13-81 2111130738/11-19-bl/Lapped val.ve 2:6.4/11-b-sl (CC) 11 Comp Cool. 2-CC-233 6. 72/11-13-81 N/A (CC) 12 Comp Cool. TV-CC-~10B 0/11-13-81 N/A N/A (CC) 13 Comp Cool. TV-CC-210C .>.l400/11-06-81 2111131b03/11-13-81/Repl.acea ru.ober (CC) seat 14 Comp Cool TV-CC-210A 0/11-13-Bl 1'11/A N/A (CC) 15 cnarging 2-~H-309 0/11-1!:1-til N/A N/A (Ch) ,"1.0V-22B9A 1b Comp Cool 2-CC-59 >432/11-11-81 2111110330/11-1~-81/Lapped va~ve 0/11-.t:0-81 (CC)

,rn-1

  • APP~NDIX 4B (CONT 1 u)
  • 1980-1981 TYP~ C DATA

SUMMARY

Post Repair Penetration sistem Valve ,s) Tested Leakage,scfd)LDate Mr NoLDateLRepair Leax.ageL!2ate 17 Comp Cool 2-CC-58 0/11-11/81 N/A N/A (CC) 18 Comp Cool 2-CC-1 52 .8/11-11-81 211111030~/11-13-81/Lapped vaive 4.8/11-20-81 (CC) 19 Charging MOV-.2381 0/11-li.-til N/A N/A (Ch) 20 ~afety Injection 2-SI-32 0/11-09-81 N/A N/a (SI) 21 SaJ:ety Injection MOV-2842 21.6/11-08-d1 N/A N/A (SI) 23  ::,afety Injection .MOV-.l869B 0/11-09-81 N/A N/A (SI) 24 Residual Heat MOV-RH-WO 0/11-.ll-81 N/A N/A Removal (RH) 25 Comp Cool. TV-CC-205A 0/11-13-81 N/.~ N/A (CC) 26 Comp Cool .TV-CC-205C 0/11-11-81 N/A N/A (CC) 27 Comp Cool TV-CC-20~.8 0/11-11-81 N/A N/A (CC) 28 Chem and Vo.lume HCV-2.200 A, B, C 0/11-22-tU N/A N/A (CV) TV-2204 0/11-:'2-81 N/A N/A 32 Gaseous Was-c.e TV-GW-202 0/12.-3-81 N/A N/A (GW) TV-GW-.i03 0/12-03-81 N/A N/A 33 Gaseous Drains TV-DG-208A 228/11-B-81 .n 11132 311/12-05-81/0Verhau.lea 0/1.i-11-81 (G.S) TV-DG-208:d b.2/11-15-81 N/A N/A 38 Aerated Drains TV-DA-200A >3240/12-!t-81 521120~2201/1~-1~-81/Lappect vaive 456/l~-1.t-ts 1 (DA) *rv-DA200B t+tW/1.i-09-81 5.l11L0~2.241/12-12-81/Ground valve seat 0/12.-12-tsl

  • APPENDIX ~B (CONT 1 D)
  • b80-'U81 *.rtPE. C DATA Su.MMAR:i Post .Repair Penetration System Valve (s) *.rested Leakage(sctd)/Date Mr No/Dater~epair le a.icage/Date 42 Service Air 2-SA-81 0/11-21-1:11 N/A N/A (SA) 2-SA-82 0/11-..tl-til N/A l'ii/A 43 Air Monitoring 2-Rl~-3A, 3B 360/11-0o-cs1 62111201&31/12-1~-81/Cleaned seat 36/12-14-b 1 (RM) *l'V-RM-200A 0/11-~0-81 N/A . N/A 44 Al.r Monitoring TV-RM-200B 2.4/11-20-81 N/A N/A

(.Rl'l) TV-RM-200C 0 /11-20-1:>1 N/A N/A 45 PrJ.mary Grade 2-.RC-1&0 7. 2/ 11-0~-tU N/A N/A Water System TV-2519A 0 /11-9-81 N/A N/A (PG) 46 Charging FC"~-2160 192/11-12-bl 2A11~10~1/11-17-81/New plug 0/12-13-131 (Ch) and cage 47 Instrument Air 2-IA-8b4 ~3.2/11-15-81 2111150407/11-1&-81/Cleaned valve 0/11-15-Bl (IA) TV-IA-200. 0/11-15-81 N/A N/A 2-IA-704 528/11-15-81 2111/50408/11-15-81/Lappeci val.ve N/A 48 Vent & Drain TV-VG-209A 0/11-14-81 N/A N/A System TV-VG-209B 0/1.1-14-81 N/A N/A (DA) 50 ~atety Injection TV-SI-l01A 81.6/11-10'-81 2111102038/11-19-81 Lapped valve 7.2/12-11-dl (SI) TV-SI-201.B 84 /11-10-iil 2111102101/11-21-81 Replaced Dody seat 51 3erv1.ce Water 2-sw-200 >432/11-10-81 2111101508/11-24-81/0verhauled 0/1.l-Od/81 valve (SW) 2-SW-:.t08 0/11-24-bl N/A ~/A 53 Safety Injection TV-.-:;I-,WO 52 .8/11-13-81 2111101200/11-1&-81 OVernaul.ea 0/ll-08-81 (SI) 2-SI-234 2b .4/11-13-81 val.ve N/A Primary Vent 2-VA-1 0/11-12-dl N/A N/A (VA) 2-\/A-9 9.6/11-1.l-bl N/A N/A

  • APPENDIX 4B (CONT 1 D) '

1~80-1~81 TYPE C DATA

SUMMARY

Post ae:pair l'enetr ation S)!Stem Valve ,s} 'Iested Leakage:,sctd)/Date Mr NOlDateLs.ei:!!!ir Le aJtage,l!2ate 55,57 97,105 Leakage Monitoring T\7-LM-200E. 0/11-14-81 N/A N/A (LM) TV-LM-200G 0/11-H-81 N/A N/A TV-LM-200A 0/11-H-81 N/A N/A TV-LM-200C 0/11-14-81 N/A N/A TV-Ll'1-200F 0/11-14-81 N/A N/A TV-LM.-200H 0,111-14-ttl N/A N/A TV-LM-.200.B 0/11-14-81 'N/A N/A TV-LM-200D 0/11-14-dl N/A N/A 56 Sample System TV-SS-206A 1.b/U-06-1:11 N/A N/A (SS) TV-SS-206B 0/12-0b-81 N/A N/A 56 Sample System TV-SS-200A 0/12-09-81 N/A N/A (SS) TV-SS"'.'"200B 0/l~-09-81 N/A N/A Sb Sample System TV-SS-202A 1. ~2/l.l-Oo-81 N/A N/A (S.5) l'V-SS-20.lB .48/12-06-dl N/A 0/1~-09-81 57 Sample System TV-SS-.201A 0/12-03-81 N/A N/A (SS) TV-SS-201B 0/12-03-81 N/A N/A 57 Sampl.e System TV-SS-204A 0/12-10-1:11 N/A N/A (SS) TV-SS-.204B 0/12-10-1:11 N/A N/A 57 Aerated Drains TV-DA-203A 0/11-27-81 N/A N/A (DA) TV-DA-203B 0/11-27-81 N/A N/A 58 Instrument Air 2-IA-868 0/11-14-1'$1 N/A N/A (IA) 1-IA-704 0/11-14-81 N/A N/A bO Satety Injection MOV-213~0A 12/11-08-81 N/A N/A (SI) 61 Safety Injection MOV-2890C 0/11-01:1-bl N/A N/A (SI) 62 6a1et:y Injection MOV-.28~0B 0/11-d-81 N/A N/A (SI) 63 Containment Spray ~-CS-~I+ 0/11-~2-!>1 N/A N/A/11-23-1:i 1 (CS) 11ov-cs-~01c. D 50 .4/ 11-:d~d 1 N/A N/A

  • APPENDIX
  • 1m (CONT 1 IJ)
  • 1980-1981 TYPE C DATA

SUMMARY

Post Repair Penetration System Valve (s) .* Tested Leakaq~fscfd)/Date Mr No/Date/Repair Leaicage/Date 64 Contain.~ent Spray 2-CS-13 720/11-26-81 ~111250731/11-28-Bl/Turned 0/11/.t.9/81

(~S) MOII-CS-201A, B 12/11-29-81 N/A rUbber disc N/A insert Recfrculation Spray MOV-RS-~55A,B 0/1.l-01-is 1 l.\1/A N/A (RS)

Safety Injection MO\J-2860A 0/11-24-81 N/A N/A (SI) M(i'J-28b0B 0/11-24-&1 N/A N/A 70 Recirc Spray 2-RS-11 216/11-26-81 21112b0b30/11-2B-81jTUrned rubber 0/11-29-81 (RS) MOV-RS-25bB 0/11-25-81 N/A disc insert NA 71 Recirc Spray 2-RS-17 0/11-~5-81 N/.A N/A (RS) MOV-RS-25t>A 0/11-25-81 N/A NA 89 Air .Ejector 2-VP-12 21b/11-18-H 1 S2111180955/11-24-81/ Lapped valve 9. o/ 11-io-1:1 1 Discharge TV-SV-202A 0/11-18-tU N/A NA

(\7P) 90 Ventilation MO\J-\IS-200C 38.4/U-1...:-81 N/A N/A (VS) MOV-VS-2000 & 201 >1776/U-1~-81 2112130738/12-13-81/Cleaned seat 16 .8/12-15-81 and disc 2112140308/12-l'J-81/Replaced. seat 91 Ventilation i.*lOV-VS-200A !H~/12-08-81 2112:081800/12-1:l-81 Lapped val.ve 12/ll-~-81 (VS) MOV-VS-200B&202  !}1.2/12-08-81 2112081801/12-11-81/Repaired valve 24/ll-11-in seat Cont Vacuum & TV-GW-204 0/12-03-81 N/A NA Gaseous Waste l'V-GW-205 0/12-03-81 N/A NA (CV) &GW) TV-CV-250C "'40/ 11-14-81 21111~0732/11-23-81/0Verhauled 0/11-2&+-81 Val.ve

'F\1-CV-2500 0/11-14-81 N/A NA 93 Contal..IlIUent Vac TV-GW-200 0/12-03-81 N/A NA/11-..t4-H1

& Gaseous Waste TV-\iW-201 0/12-03-Hl NA/11-i. .. -dl (CV) (GW) T\7-CV-.lSOA >432/11-14-81 ~111140832/11-1~-61/La~i:,)ed val.ve 0/11-24-tsl

  • rV-CV-.l50B >4 3')./ 11-14-81 .ll 11140833/11-20-81/Lapped valve lb.ts/11-24-bl Containment Vac 2-C:11-2 0/11-11/81 N/A N/A (CV) J:iC\1-CV-.:00 0/11-11-81 N/A N/A 4.b-S
  • APPhNDIX ~B (CUNT 1 D)
  • Penetra"t.ion ::.)!stem ~ j § ) Tes"t.ed Post Repair LeaJca9e1scidlLDa't.e Mr No,lDate,lRe12air Leaka9eLQa't.e 97 SampJ.e System TV-SS-..:0.lh O/li.-10-81 N/A N/A (SS) TV-SS-203B 0/12-10-81 N/A 'N/A 100 (;;aseous Waste TV-GW-.lOt, 0/1:l-03-81 N/A N/A (GW) TV-GW-207 0/12-03-81 N/A N/A 101 Fire Protection 2-Fi>-151 0/12-02-81 N/A N/A (Ff') l-.FP-15.l 0/12-02-131 N/A N/A 103 RedC't.Or Le1:down i-RL-3 0/11-12-81 N/A. N/A (RL) 2-RL-5 0/11-12-81 N/A N/A 1014 Reactor Letdown 2-RL-13 0/11-1.l-81 N/h N/A (RL) 2-RL-15 0/11-12-81 N/A N/A 106 Safe1:y Injection .2-SI-73 0/11-10-bl N/A N/A (SI) 112 Instrument Air TV-IA-201A 0/11-1d-d1 N/A NA (IA) TV-ll-201B 52.8/11-18-81 S211118~345/11-19-61/Repaired seat 2d. d/1~..:.o.l-ts1 113 Satety Injection l-SI-174 9.o/11-0&-81 N/A N/A (SI) MOiJ-2bo9A ~. o/11-0tJ-o 1 N/A N/A