ML18320A127: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 3
| page count = 3
| project = EPID:L-2018-LLA-0287
| project = EPID:L-2018-LLA-0287
| stage = Other
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations}}
{{#Wiki_filter:NRR-DMPSPEm Resource From:                            Purnell, Blake Sent:                            Friday, November 16, 2018 9:45 AM To:                              talentz@firstenergycorp.com Cc:                              Lashley, Phil H.; Wrona, David
 
==Subject:==
Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions (EPID L-2018-LLA-0287)
Mr. Lentz, By application dated October 22, 2018 (Agencywide Documents Access and Management System Accession No. ML18295A289), FirstEnergy Nuclear Operating Company (the licensee) submitted a license amendment request for Davis-Besse Nuclear Power Station, Unit No. 1. The proposed amendment would revise the technical specifications (TS) to support implementation of the certified fuel handler training program and make a number of administrative changes associated with the permanent shutdown of the plant. The revision would include changes to the organization, staffing, and training requirements in the TS, and adds the definitions for certified fuel handler and non-certified operator.
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that the review of this licensing request will take approximately [[estimated NRC review hours::250 hours]] to complete. The NRC staff expects to complete this review by November 30, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me at (301) 415-1380.
1
 
Sincerely, Blake Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Docket No. 50-346 2
 
Hearing Identifier:      NRR_DMPS Email Number:            669 Mail Envelope Properties      (BYAPR09MB28862C2CB9A130FDB5B7CB40E6DD0)
 
==Subject:==
Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions (EPID L-2018-LLA-0287)
Sent Date:              11/16/2018 9:45:20 AM Received Date:          11/16/2018 9:45:00 AM From:                    Purnell, Blake Created By:              Blake.Purnell@nrc.gov Recipients:
"Lashley, Phil H." <phlashley@firstenergycorp.com>
Tracking Status: None "Wrona, David" <David.Wrona@nrc.gov>
Tracking Status: None "talentz@firstenergycorp.com" <talentz@firstenergycorp.com>
Tracking Status: None Post Office:            BYAPR09MB2886.namprd09.prod.outlook.com Files                            Size                  Date & Time MESSAGE                          3809                  11/16/2018 9:45:00 AM Options Priority:                        Standard Return Notification:              No Reply Requested:                  No Sensitivity:                      Normal Expiration Date:
Recipients Received:}}

Revision as of 10:31, 20 October 2019

LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions
ML18320A127
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/16/2018
From: Blake Purnell
Plant Licensing Branch III
To: Lentz T
FirstEnergy Nuclear Operating Co
References
L-2018-LLA-0287; L-18-254
Download: ML18320A127 (3)


Text

NRR-DMPSPEm Resource From: Purnell, Blake Sent: Friday, November 16, 2018 9:45 AM To: talentz@firstenergycorp.com Cc: Lashley, Phil H.; Wrona, David

Subject:

Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions (EPID L-2018-LLA-0287)

Mr. Lentz, By application dated October 22, 2018 (Agencywide Documents Access and Management System Accession No. ML18295A289), FirstEnergy Nuclear Operating Company (the licensee) submitted a license amendment request for Davis-Besse Nuclear Power Station, Unit No. 1. The proposed amendment would revise the technical specifications (TS) to support implementation of the certified fuel handler training program and make a number of administrative changes associated with the permanent shutdown of the plant. The revision would include changes to the organization, staffing, and training requirements in the TS, and adds the definitions for certified fuel handler and non-certified operator.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that the review of this licensing request will take approximately 250 hours10.417 days <br />1.488 weeks <br />0.342 months <br /> to complete. The NRC staff expects to complete this review by November 30, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at (301) 415-1380.

1

Sincerely, Blake Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Docket No. 50-346 2

Hearing Identifier: NRR_DMPS Email Number: 669 Mail Envelope Properties (BYAPR09MB28862C2CB9A130FDB5B7CB40E6DD0)

Subject:

Davis-Besse LAR to Change TS Definitions and Administrative Controls for Permanently Defueled Conditions (EPID L-2018-LLA-0287)

Sent Date: 11/16/2018 9:45:20 AM Received Date: 11/16/2018 9:45:00 AM From: Purnell, Blake Created By: Blake.Purnell@nrc.gov Recipients:

"Lashley, Phil H." <phlashley@firstenergycorp.com>

Tracking Status: None "Wrona, David" <David.Wrona@nrc.gov>

Tracking Status: None "talentz@firstenergycorp.com" <talentz@firstenergycorp.com>

Tracking Status: None Post Office: BYAPR09MB2886.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3809 11/16/2018 9:45:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: