| =Text= | | =Text= |
| {{#Wiki_filter:June 6, 2013 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 June 6, 2013 Mr. Michael Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer |
|
| |
|
| ==SUBJECT:==
| | Exelon Nuclear |
| PEACH BOTTOM ATOMIC POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000277/2013406 AND | | |
| | 4300 Winfield Rd. |
| | |
| | Warrenville, IL 60555 SUBJECT: PEACH BOTTOM ATOMIC POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000277/2013406 AND |
|
| |
|
| 05000278/2013406 | | 05000278/2013406 |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000027/20242022024-09-13013 September 2024 Washington State University - U.S. NRC Security Inspection Report No.05000027/2024202 - Cover Letter ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 (Pbaps), Unit 2, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24150A3122024-08-29029 August 2024 Examination Report Letter No. 50-027/OL-24-01 Washington State University ML24150A3142024-08-29029 August 2024 Examination Result Letter No. 50-027/OL-24-01 Washington State University ML24242A2872024-08-29029 August 2024 Washington State University - 2024 Annual Report for the Wsu Nuclear Science Center IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A3812024-05-31031 May 2024 Examination Confirmation Letter No. 50-027 OL-24-01 Wsu 24-01 ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 IR 05000027/20242012024-05-0808 May 2024 Washington State University - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000027/2024201 IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24064A2792024-04-11011 April 2024 Washington State University - Issuance of Amendment No 22 to Facility Operating License No R 76 ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24099A0012024-04-0808 April 2024 (PBAPS) Units 2 and 3, Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 June 6, 2013 Mr. Michael Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer
Exelon Nuclear
4300 Winfield Rd.
Warrenville, IL 60555 SUBJECT: PEACH BOTTOM ATOMIC POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000277/2013406 AND
05000278/2013406
Dear Mr. Pacilio:
On May 9, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Peach Bottom Atomic Power Station. The inspection covered one of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on May 9, 2013, with Mr. Patrick Navin, Plant Manager, and other members of your staff.
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains security-related information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or in ADAMS.
When separated from the Enclosure, this
document is DECONTROLLED. SECURITY-RELATED INFORMA TION If you chose to provide a response, and security-related information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Raymond J. Powell, Chief Technical Support and Assessment Branch Division of Reactor Projects
Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56
Nonpublic Enclosure:
NRC Inspection Report 05000277/2013406 and 05000278/2013406 w/Attachment: Supplemental Information (CONTAINS (OUO-SRI))
cc w/encl; w/OUO-SRI J. Kovalchick, Manager, Site Security D. Allard, Director, PA Bureau of Radiation Protection T. Levering, Director of Emergency Preparedness Planning, Maryland Department of the Environment A. Lauland, Homeland Security Advisor, Maryland
cc w/o encl; w/o OUO-SRI Distribution via ListServ
ML13157A197 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available (M.D. 3.4 Non-Public A.3) OFFICE RI/DRP RI/DRP RI/DRS RI/DRP NAME NWarnek MGray ADimitriadis RPowell DATE 06/05/13 05/22/13 05/22/13 06/06/13 SECURITY-RELATED INFORMA TION Distribution w/o encl; w/o OUO-SRI: (via E-mail)
W. Dean, RA
D. Lew, DRA D. Roberts, DRP M. Layton, DRP C. Miller, DRS J. Clifford, DRS M. Gray, DRP S. Hansell, DRP, SRI A. Ziedonis, DRP, RI S. Schmitt, Admin D. Huyck, RI OEDO
Distribution cc w/encl; w/OUO_SRI:
N. Warnek, DRP S. Hansell, DRP, SRI R. Albert, NSIR S. Coker, NSIR C. Johnson, NSIR
B. Desai, DRS, RII
R. Skokowski, DRS, RIII M. Haire, DRS, RIV