| | issue date = 11/07/2013 | | | issue date = 11/07/2013 |
| | title = MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information | | | title = MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information |
| | author name = Feintuch K D | | | author name = Feintuch K |
| | author affiliation = NRC/NRR/DORL | | | author affiliation = NRC/NRR/DORL |
| | addressee name = Gadzala J | | | addressee name = Gadzala J |
|
---|
Category:E-Mail
MONTHYEARML24030A0672024-01-26026 January 2024 Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities ML23268A4362023-09-21021 September 2023 Extension Date Approval for Request for Additional Information for Exemptions on Site Restoration Activities ML23134A0012023-05-0909 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No. 50-305) ML23129A0672023-05-0505 May 2023 NRC Email Acceptance - Kewaunee Solutions Exemption Request for Low-Level Radioactive Waste Transport Change from 20 to 45 Days Acknowledgement ML23100A0032023-04-0404 April 2023 Solutions - Acknowledgement Email Regarding Exemption Regarding Decommissioning Trust Funds for Site Restoration Activities (Docket No 50-305) ML23094A1442023-03-31031 March 2023 Solutions - Acknowledgement Email Regarding Exemption for Low-Level Radioactive Waste Transport within 20 Days (Docket No. 50-305) ML22108A1762022-04-14014 April 2022 E-mail: Proposed Order Conditions for In-Direct Transfer of Licenses Held by Energysolutions, LLC (Zion, TMI Unit-2, La Crosse Boiling Water Reactor, Kewaunee, Energysolutions Radioactive Materials License, and Energysolutions Export Licens ML22053A2992022-02-18018 February 2022 Email - Additional Time for Request for Additional Information Response Regarding Kewaunee Solutions Decommissioning Quality Assurance Program; NRC Response Included; (EPID L-2021-LLO-0002 and L-2021-DP3-0000) ML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML22007A3182022-01-0707 January 2022 E-mail from C. Adams, State of Wisconsin, to K. Sturzebecher, NRC, Notification and Request Kewaunee Power Station License Transfer (L-2021-LLO-002) ML21348A0522021-12-0303 December 2021 E-mail to P. Schmidt, State of Wisconsin, from K. Sturzebecher, NRC - Notification and Request Kewaunee Power Station License Transfer ML21096A1332021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Dominion Energy Exemptions for the Magnastor Storage Cask ML20015A3002020-01-14014 January 2020 KPS: CY2020 Master Inspection Plan ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19072A0652019-03-0606 March 2019 Conversation Record with T. Szymanski/Dominion Energy Response to 10 CFR 72.30(c)(3) in Triennial Update for Kewaunee ML19070A2642019-03-0505 March 2019 Email Conversation with T. Szymanski/Dominion Energy Decommissioning Funding Plan (Dfp): Kewaunee ML18351A2742018-12-17017 December 2018 KPS: CY2019 Master Inspection Plan ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML17156A0032017-06-0202 June 2017 NRR E-mail Capture - Acceptance for Review of Revision 24 to the Dominion Nuclear Facility Quality Assurance Program Description (QAPD) Topical Report (CAC Nos. MF9732-MF9739) ML17040A0222016-10-18018 October 2016 Wisconsin State Notification (LAR259-L53082) ML16287A7142016-10-13013 October 2016 E-mail - Request for Additional Information: Dominion Energy Kewaunee, Dominion Nuclear Connecticut and Virginia Electric Power Company Nuclear Facility Quality Assurance Program Description Topical Report ML16041A2732016-02-10010 February 2016 Final RAIs Regarding LAR 259 ML16054A2382015-10-14014 October 2015 E-44108 Attachment 8 E-mail from Stewart J. Yuen (Kewaunee Power Station) to Don Shaw (Areva) for Kewaunee Power Station ML15090A4872015-03-26026 March 2015 OEDO-15-00251 - Michael Mulligan, Citizen Ltr 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15071A2752015-03-12012 March 2015 NRR E-mail Capture - Request for Additional Information on Kewaunee 50.54(p) Changes to Physical Security Plan - TAC MF5779 ML15057A2192015-02-25025 February 2015 NRR E-mail Capture - Acceptance Review: Dominion Fleet-Request for Approval of Cyber Security Plan (CSP) Revised Implementation Schedule ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14251A0972014-08-22022 August 2014 NRR E-mail Capture - Draft RAI to Kewaunee Power Station on Control Room Staffing Issue ML14164A0742014-06-0202 June 2014 NRR E-mail Capture - Draft Request for Additional Information Concerning Dek'S Request for Exemption from Conducting Annual Force-on-Force Exercises at Kewaunee Power Station ML14132A2062014-04-27027 April 2014 NRR E-mail Capture - Kewaunee Amendment Request for Emergency Plan Changes MF3411 - Draft RAIs ML14155A0402014-04-0707 April 2014 NRR E-mail Capture - Summarry of Kewaunee Mitigation Strategy Phone Call Last Week ML14134A5872014-04-0707 April 2014 NRR E-mail Capture - Minor Editorial/Typographical Changes to License Condition TAC MF1771) ML14097A5112014-04-0101 April 2014 NRR E-mail Capture - Draft RAI Related to Kewaunee Proposed Deletion of License Condition on Mitigation Strategy ML14069A3832014-03-0606 March 2014 NRR E-mail Capture - Draft RAI on Kewaunee Permanently Defueled Technical Specifications ML13312A2422013-11-0707 November 2013 NRR E-mail Capture - MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for Additional Information ML13297A0482013-10-23023 October 2013 NRR E-mail Capture - MF2567 - Kewaunee Eplan RAI #1 and Comparable Wording from Other Eplans ML13295A5672013-10-22022 October 2013 NRR E-mail Capture - MF2567 Kewaunee Exemption Nlar 102 (50.47 and 10 CFR Appendix E) Includes Kewaunee EP Briefing - 19 June 2013 Handout ML13275A0772013-10-0101 October 2013 NRR E-mail Capture - MF2743-RAII-AHPB-Keefe-001-2013-10-01 Request for Additional Information ML13275A0722013-10-0101 October 2013 NRR E-mail Capture - FW: MF1771-MF1952 RAI 9-27-2013.docx ML13275A0622013-09-27027 September 2013 NRR E-mail Capture - FW: MF2370 - Review of Training Plan for Certified Fuel Handler (CFH) Training - (Corrected) Request for Additional Information (RAI) ML13246A0032013-08-30030 August 2013 NRR E-mail Capture - Record of Docketing of Certifications Pertaining to Decommissioning of Kewaunee Power Station (KPS) ML13218B3722013-08-0606 August 2013 NRR E-mail Capture - MF1952 KPS Permanently Defueled License and TS - Request for Additional Information - MF1952-RAII-SCVB-Heida-001-2013-08-06 ML13186A0212013-07-0303 July 2013 NRR E-mail Capture - MF1771 - Correction to Stated Date Due for Request for Information Dated 6/26/2013 (ML13178A011) ML13178A0112013-06-26026 June 2013 NRR E-mail Capture - MF1771 (and Part of MF1952) - KPS - Record of Clarification Call and Associated Request for Additional Information (RAI) Deletion of License Condition 2.C.(15) ML13151A2452013-05-29029 May 2013 NRR E-mail Capture - Kewaunee Correspondence - Dispositioning Flawed Document, Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML13149A0412013-05-28028 May 2013 NRR E-mail Capture - MF1771 - Kewaunee LAR 255 Deletion of Licensing Condition 2.C.(15) - LIC-109 Acceptance Review Results ML13144A1002013-05-23023 May 2013 NRR E-mail Capture - Record of Docketing of Outgoing NRC Correspondence Serial No. 13-293: Certification of Permanent Removal of Fuel -- Confirming Successful EIE Docketing ML13134A5272013-05-14014 May 2013 NRR E-mail Capture - ML13133A086 = MF1438 - KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13133A0862013-05-10010 May 2013 NRR E-mail Capture - FW: MF1438 KPS - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) - Acceptance Review Results ML13128A3612013-05-0707 May 2013 NRR E-mail Capture - MD7112 - Record of Permanent Cessation of Operations 10CFR50.4(b)(8), 10CFR50.82, and the Scheduling of Certain Future Decommissioning Events 2024-01-26
[Table view] |
Text
1 NRR-PMDAPEm Resource From:Feintuch, Karl Sent: Thursday, November 07, 2013 5:50 PM To: Jack Gadzala (jack.gadzala@dom.com); Craig D Sly (Generation - 6) (craig.d.sly@dom.com)
Cc: Cunanan, Davida; Wood, Kent; Grover, Ravinder
Subject:
MF1952-RAII-SRXB-Cunana-002-2011-11-08, R equest for additional information Attachments:
MF1952-RAII-SRXB-Cunanan-002 2013-11-08.docxDRAFT REQUEST FOR ADDITIONAL INFORMATION TO DOMINION ENERGY KEWAUNEE FOR KEWAUNEE POWER STATION REGARDING THE PERMANENTLY DEFUELED LICENSE AND TECHNICAL SPECIFICATIONS LICENSE AMENDMENT REQUEST DOCKET NO.: 50-305 TAC NO.: MF1952 By a letter dated May 29, 2013, as supplemented, (Agencywide Documents Access and Management Systems Accession Number [ADAMS] ML13156A037, and supplements, Dominion Energy Kewaunee, Inc. (DEK, the licensee), submitted a license amendm ent request (LAR) to revise the Kewaunee Power Station (KPS) Plant Technical Specifications (TSs) to support a permanently defueled license and technical specifications consistent with the permanent cessation of reactor operation.
The NRC staff has reviewed the information the licensee provided and determined that additional information isneeded in order to complete the review. A request for additional information (RAI) is attached. In this case the cognizant Technical Branch is SRXB (Reactor Systems). The cognizant Reviewer is Davida Cunanan.
Please review the RAI item (RAII) for clarity and contact Karl Feintuch, USNRC, 301-415-3079, if a clarification conference call is needed and to confirm an expected response date, typically desired for 30 days from receipt, as confirmed. Upon confirmation of clarity and schedule the RAII is considered to transition from draft to firm.
Hearing Identifier: NRR_PMDA Email Number: 910 Mail Envelope Properties (Karl.Feintuch@nrc.gov20131107174900)
Subject:
MF1952-RAII-SRXB-Cunana-002-2011-11-08, Request for additional information Sent Date: 11/7/2013 5:49:47 PM Received Date: 11/7/2013 5:49:00 PM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients: "Cunanan, Davida" <Davida.Cunanan@nrc.gov>
Tracking Status: None "Wood, Kent" <Kent.Wood@nrc.gov>
Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov> Tracking Status: None "Jack Gadzala (jack.gadzala@dom.com)" <jack.gadzala@dom.com> Tracking Status: None "Craig D Sly (Generation - 6) (craig.d.sly@dom.com)" <craig.d.sly@dom.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1408 11/7/2013 5:49:00 PM MF1952-RAII-SRXB-Cunanan-002 2013-11-08.docx 23067 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
DRAFT REQUEST FOR ADDITIONAL INFORMATION TO DOMINION ENERGY KEWAUNEE FOR KEWAUNEE POWER STATION REGARDING THE PERMANENTLY DEFUELED LICENSE AND TECHNICAL SPECIFICATIONS LICENSE AMENDMENT REQUEST DOCKET NO.: 50-305 TAC NO.: MF1952 By a letter dated May 29, 2013, as supplemented, (Agencywide Documents Access and Management Systems Accession Number [ADAMS] ML13156A037, and supplements, Dominion Energy Kewaunee, Inc. (DEK, the licensee), submitted a license amendment request (LAR) to revise the Kewaunee Power Station (KPS) Plant Technical Specifications (TSs) to support a permanently defueled license and technical specifications consistent with the permanent cessation of reactor operation.
The NRC staff has reviewed the information the licensee provided and determined that additional information is needed in order to complete the review. A request for additional information (RAI) follows. In this case the cognizant Technical Branch is SRXB (Reactor Systems). The cognizant Reviewer is Davida Cunanan.
Please review the RAI item (RAII) for clarity and contact Karl Feintuch, USNRC, 301-415-3079, if a clarification conference call is needed and to confirm an expected response date, typically desired for 30 days from receipt, as confirmed. Upon confirmation of clarity and schedule the RAII is considered to transition from draft to firm.
MF1952-RAII-SRXB-Cunana-002-2011-11-08 RAI-2 In the spent fuel pool (SFP), the spent fuel stored in the racks must comply with the regulations to remain subcritical. In the case of Kewanee, they are licensed under 10 CFR 50.68 "Criticality Accident Requirements." This regulation states that:
If no credit for soluble boron is taken, the k-effective of the spent fuel storage racks loaded with fuel of the maximum fuel assembly reactivity must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, if flooded with unborated water.
To demonstrate compliance with the regulation, the licensee has performed a nuclear criticality safety (NCS) analysis of record (AOR). In this NCS AOR, Kewanee has credited neutron absorbers in the analysis to help maintain subcriticality. In order to ensure that the neutron absorbers will remain within the assumptions used in the NCS AOR, a Surveillance Program to identify and monitor any degradation is in place or is planned to be implemented in the near future. These programs will confirm that the materials will perform as designed for in the NCS AOR.
The staff questions the amount of information described in Kewanee's proposed Technical Specifications in regard to the neutron absorbing materials and it's Surveillance Programs. In particular:
- 1. Neutron absorbing materials need to be monitored and degradation mitigated in the SFP to ensure that the assumptions in the criticality analysis of record and thereby the TS 4.3.1 are not challenged. Since the materials are integral to the compliance of the TS 4.3.1 and the regulations, the areal density of the neutron absorbers and the details of the neutron absorber surveillance programs should be reflected in the TS.
Please describe how this will be achieved.
Note: In justification for having a neutron absorbers and its surveillance programs in TS, please see 10 CFR 50.36 (c)(2)(ii)(B), where it states:
Criterion 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
Furthermore 10 CFR 50.36(c)(2)(ii)(C) states:
Criterion 3. A structure, system, or component that is part of the primary success path and which functions or actuates to mitigate a design basis accident or transient that wither assumes the failure of or presents a challenge to the integrity of a fission product barrier.