Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARW3F1-2023-0055, Reply to a Notice of Violation2023-12-14014 December 2023 Reply to a Notice of Violation W3F1-2023-0014, Reply to a Notice of Violation; EA-22-1192023-02-20020 February 2023 Reply to a Notice of Violation; EA-22-119 W3F1-2022-0058, Reply to a Notice of Violation; EA-22-0332022-10-12012 October 2022 Reply to a Notice of Violation; EA-22-033 W3F1-2021-0028, Response to an Apparent Violation in NRC Inspection Report 05000382/2021013; EA-20-1142021-04-0202 April 2021 Response to an Apparent Violation in NRC Inspection Report 05000382/2021013; EA-20-114 W3F1-2019-0045, Updated Reply to a Notice of Violation; NRC Inspection Report 05000382/20180082019-06-20020 June 2019 Updated Reply to a Notice of Violation; NRC Inspection Report 05000382/2018008 W3F1-2019-0033, (Waterford 3) - Reply to Notice of Violation EA-18-020 Supplement2019-05-17017 May 2019 (Waterford 3) - Reply to Notice of Violation EA-18-020 Supplement W3F1-2018-0073, (Waterford 3) - Reply to a Notice of Violation; NRC Inspection Report 05000382/20180082018-12-14014 December 2018 (Waterford 3) - Reply to a Notice of Violation; NRC Inspection Report 05000382/2018008 W3F1-2018-0056, Reply to Notice of Violation EA-18-0202018-09-12012 September 2018 Reply to Notice of Violation EA-18-020 W3F1-2013-0072, Reply to a Notice of Violation: EA-12-2572013-12-18018 December 2013 Reply to a Notice of Violation: EA-12-257 W3F1-2012-0097, Reply to a Notice of Violation: EA-12-1982012-12-0303 December 2012 Reply to a Notice of Violation: EA-12-198 W3F1-2009-0043, Reply to Non-Cited Violation2009-09-16016 September 2009 Reply to Non-Cited Violation ML0629303022006-10-18018 October 2006 Response to NRC Inspection Report 05000382/2006009 Notice of Violation W3F1-2006-0053, Reply to Notice of Violation: EA-06-1362006-09-29029 September 2006 Reply to Notice of Violation: EA-06-136 W3F1-2006-0048, Reply to Notice of Violation: EA-06-1922006-09-18018 September 2006 Reply to Notice of Violation: EA-06-192 W3F1-2004-0040, Reply to Notice of Violation, EA-03-230, NRC Inspection Report No. 50-382/03-0072004-05-12012 May 2004 Reply to Notice of Violation, EA-03-230, NRC Inspection Report No. 50-382/03-007 2023-02-20
[Table view] |
See also: see also:IR 05000382/2018008
Text
Entergy Operations, Inc. 17265 River Road Killona, LA 70057-3093 Tel 504-739-6032 John V. Signorelli
Manager, Regulatory Assurance
(Acting) W3F1-2018-0073 December 14, 2018 U.S. Nuclear Regulatory Commission
ATTN: Document Contro
l Desk Washington, DC 20555-0001 Reference: NRC Letter to Entergy, "Waterford Steam Electric Station, Unit 3 - NRC Problem Identification and Resolution Inspection Report 05000382/2018008 and Notice of Violation," dated November 15, 2018 (ADAMS Accession
Number ML18319A379)
In Reference 1, the NRC transmitted a Notice of Violation to Entergy Operations, Inc.
(Entergy). The Notice of Violation was associated with a failure to review and accept, reject,
repair or rework nonconforming items in accordance with documented procedures. The Enclosure provides Entergy's response to the Notice of Violation. This information is provided in accordance with the provisions of 10 CFR 2.201. This letter contains no new regulatory commitments. Should you have any questions regarding this letter, please contact the Acting Regulatory Assurance Manager, John V. Signorelli, at (504) 739-6032.
Respectfully, John V. Signorelli
JVS/mmz Subject: Reply to a Notice of Violation; NRC Inspection Report 05000382/2018008 Waterford Steam Electric Station, Unit 3 (Waterford 3) NRC Docket No. 50-382 Facility Operating License No. NPF-38
W3F1-2018-0073
Page 2 of 2 cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Waterford Steam Electric Station, Unit 3 NRR Project Manager
Enclosure: Reply to Notice of Violation, NRC Inspection Report 05000382/2018008
ENCLOSURE
W3F1-2018-0073 Entergy Operations, Inc. Reply to Notice of Violation, NRC Inspection Report 05000382/2018008
W3F1-2018-0073 Enclosure
Page 1 of 2 Entergy Operations, Inc. Reply to Notice of Violation, NRC Inspection Report 05000382/2018008 In U.S. Nuclear Regulatory Commission (NRC) letter to Entergy Operations, Inc. "Waterford
Steam Electric Station, Unit 3 - NRC Problem Identification and Resolution Inspection Report
05000382/2018008 and Notice of Violation," dated November 15, 2018 (ADAMS Accession
Number ML18319A379), the NRC issued a Notice of Violation to Entergy Operations' Waterford Steam Electric Station, Unit 3 (Waterford 3). Entergy concurs with the violation as cited in the Notice of Violation regarding the failure to review and accept, reject, repair or rework nonconforming items in accordance with documented
procedures. In accordance with the provisions of 10 CFR 2.201, this enclosure provides Entergy's reply to the Notice of Violation.
Description of Violation Violation During a NRC inspection conducted September 17 through October 4, 2018, a violation of NRC requirements was identified. In accordance with the NRC Enforcement Policy, the violation is listed below: 10 CFR Part 50, Appendix B, Criterion XV, requires, in part, that nonconforming items shall be reviewed and accepted, rejected, repaired or reworked in
accordance with documented procedures. Contrary to the above, in May 2016, the licensee failed to review and accept, reject, repair or rework nonconforming items in accordance with documented procedures. Specifically, following receipt of information from Electroswitch that a number of basic components within relays and switches did not conform to
quality requirements, the licensee failed to dedicate these commercial-grade
parts as described in 10 CFR Part 21. This violation is associated with a Green significance determination process finding.
End of Violation
Reason for the Violation Entergy personnel did not adequately follow procedure EN-LI-102, "Corrective Action Program"
resulting in a failure to properly review and accept, reject, repair or rework nonconforming items.
W3F1-2018-0073 Enclosure
Page 2 of 2 Corrective Steps That Have Been Taken and the Results Achieved The identified condition was entered into Entergy's corrective action program. A review was completed to identify installed Electroswitch relays and switches that are affected by this
condition. The condition did not adversely affect the operation of any installed plant
components nor did it result in a loss of a safety-related function. Entergy has also developed a
corrective action plan to address the violation and to correct the nonconforming condition. These corrective actions have been entered into
Entergy's corrective action program. The corrective steps that will be taken are provided below. Corrective Steps That Will Be Taken The corrective action plan includes the performance of validation testing to correct the non-conforming condition and ensure that the affected basic components conform to quality requirements. Validation test parameters will be in accordance with approved Commercial Grade Dedication plans. The following actions will be completed:Action 1: Obtain appropriate test specimens. Action 2: Develop validation testing plans for each of the different Electroswitch switch and relay family types installed at Waterford 3. Action 3: Perform validation testing.
Action 4: Determine appropriate disposition of results. Document in an approved Engineering Change evaluation. Action 5: Complete an Adverse Condition Anal
ysis (ACA) to determine cause and identify actions required to correct the condition. This ACA will include analysis of the identified cross cutter, Problem Identification and Resolution (P.2), and the actions needed to address it. Additional actions identified by the ACA will be added to the corrective action plan.
Date When Full Compliance Will Be Achieved Entergy will be in full compliance by June 21, 2019.