-Nuclear, Besse, to T.O. Hic Division of Emergency and Remedial Response, Ohio Environmental Protection Agency, in, regarding Submittal of Information Regarding Spill of Gasoline, Identification Number 01-62-0180, February 22. H 3 H 5 H 6 H 7 H 8 H 9 Davis-Besse Nuclear Power Station, 2004, Periodic Test Procedure 04032, Wastewater Treatment Sludge Holding Tank Analysis, Revision 01, by R. Edwards, October 28. 2004, National (NPDES) Administrative Procedure DB-CN-00030, prepared by S. Chimo, June Davis-Besse, 2007, Business Practice DBBP-CHEM-2005, Spill Prevention Control and Countermeasure (SPCC) Plan, approved by V. Capozziello, March 16. Davis-Besse, undated, Condition Report #04-01719, "In 2004-05 Spent Fuel Pool i L"",::;m,c,,,,,,,, to Onsite Groundwater", discovery date 3/5/2004 | -Nuclear, Besse, to T.O. Hic Division of Emergency and Remedial Response, Ohio Environmental Protection Agency, in, regarding Submittal of Information Regarding Spill of Gasoline, Identification Number 01-62-0180, February 22. H 3 H 5 H 6 H 7 H 8 H 9 Davis-Besse Nuclear Power Station, 2004, Periodic Test Procedure 04032, Wastewater Treatment Sludge Holding Tank Analysis, Revision 01, by R. Edwards, October 28. 2004, National (NPDES) Administrative Procedure DB-CN-00030, prepared by S. Chimo, June Davis-Besse, 2007, Business Practice DBBP-CHEM-2005, Spill Prevention Control and Countermeasure (SPCC) Plan, approved by V. Capozziello, March 16. Davis-Besse, undated, Condition Report #04-01719, "In 2004-05 Spent Fuel Pool i L"",::;m,c,,,,,,,, to Onsite Groundwater", discovery date 3/5/2004 | ||
-6 (contd.) . . . ___.____ | -6 (contd.) . . . ___.____ | ||
I ! First Energy, 1998, letter from J.H. Lash, Plant Manager, Davis-Besse Nuclear ! H : Power Station, to C. Zipp, State Fire Marshall Office, regarding Underground | I ! First Energy, 1998, letter from J.H. Lash, Plant Manager, Davis-Besse Nuclear ! H : Power Station, to C. Zipp, State Fire Marshall Office, regarding Underground | ||
: Storage Tank Overfill Release Report, Incident Number 6281145-00, September | : Storage Tank Overfill Release Report, Incident Number 6281145-00, September | ||
: 18 . | : 18 . | ||
* FirstEnergy Nuclear Operating Comp any, 2007, l ett er from Kaminskas, H 11 i Director -Site Operations, to A. Gall, Division of Surface Water, Ohio i ! Environmental Protection Agency, regarding Submittal of 2006 Annual Sludge 1-----. i Disposal Report for the Davis-Besse Nuclear Power Station! | * FirstEnergy Nuclear Operating Comp any, 2007, l ett er from Kaminskas, H 11 i Director -Site Operations, to A. Gall, Division of Surface Water, Ohio i ! Environmental Protection Agency, regarding Submittal of 2006 Annual Sludge 1-----. i Disposal Report for the Davis-Besse Nuclear Power Station! |
Revision as of 15:42, 30 April 2019
ML11094A099 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 04/26/2011 |
From: | Cooper P E License Renewal Projects Branch 2 |
To: | Allen B S FirstEnergy Nuclear Operating Co |
Cooper P E | |
References | |
Download: ML11094A099 (10) | |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 April 26, 2011 Mr. Barry S. Allen Site Vice President, FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-30S0 5501 North State Route 2 Oak Harbor, OH 43449-9760 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, LICENSE RENEWAL APPLICATION
Dear Mr. Allen:
By letter dated August 27,2010, FirstEnergy Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the Operating License NPF-003 for Davis-Besse Nuclear Operating Station, Unit 1, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Mr. Cliff Custer and the date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2323 or e-mail paula.cooper@nrc.gov.
Sincerely, Paula E. Cooper, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No.
Requests for Additional cc w/encl: Listserv DAVIS-BESSE NUCLEAR POWER STATION, UNIT LICENSE RENEWAL REQUESTS FOR ADDITIONAL General On February 16, 2011, a draft copy of the environmental audit needs list was e-mailed to the licensee for preparation of the NRC's environmental audit held on March 7-11, 2011. This list specified the additional information needed by the NRC staff to perform its environmental review. In response to the staff's request, the applicant had the information available to the staff for its review during the site environmental audit. The information is needed by the staff to have sufficient information to prepare its supplemental environmental impact statement.
Please submit the information provided at the environmental audit for docketing. The Environmental Report (ER) states that there is a lease agreement with U.S. Fish and Wildlife Service (USFWS) for land tracts adjacent to the Davis-Besse site. Please provide a copy of the lease agreement describing the lease terms and legal description of the land currently leased by the USFWS for docketing. The ER refers to areas of the Davis Besse site that are not clearly delineated Figure 3.1-1 general plant layout or on an Please include an aerial map or site plan delineating the following: Owner-controlled area Protected area Disturbed area (Le., disturbance depth greater than 2 ft) Undisturbed area (Le., pockets of undisturbed land or land with possible surface disturbance in the past of less than 2 ft, such as by agricultural practices prior to plant construction) within the 221-acre non-marshland industrial area Marshland (undisturbed) National Wildlife Refuge leased areas Aquatic & Terrestrial The ER states that there is a lease agreement with USFWS for portions of the Davis-Besse site. Information received during the audit indicates the lease is valid until 2022, or five years into the period of extended operation.
Please provide information on USFWS's management of the marsh areas under their control impoundments and invasive species management).
Please provide an evaluation of the potential environmental impacts, if any, in the event the lease with USFWS is not renewed in 2022. ENCLOSURE
-Health Physics The Updated Safety Analysis Report (USAR), Section 11.5.5, Storage Facilities, discusses how low-level radioactive waste is handled at Davis-Besse Nuclear Power Station. Davis-Besse Nuclear Power Station cannot dispose of Class Band C low-level radioactive waste at the Barnwell, South Carolina facility due to Ohio not being in the Atlantic Interstate Low-Level Radioactive Waste Management Compact. The USAR states that Davis-Besse Nuclear Power Station has sufficient capacity within the Low Level Radioactive Waste Storage Facility (LLRWSF) building for approximately five years of storage for Class Band C waste. In addition to the storage capability, the Annual Radiological Environmental Operating Report discusses the use of a contractor to process and take title of the Class Band C waste for its disposal.
However, based on the information contained in the ER and the USAR, the staff is unable to reach the conclusion that Davis-Besse Nuclear Power Station has adequate capability to store and dispose of low level radioactive waste over the term of license renewal. Please provide additional information about Davis-Besse's typical yearly low-level waste generation rates, processing methods, storage capability, and disposal options that demonstrate that there will be adequate storage and disposal capability during the period of license renewal. Cultural The ER states that there is a current lease agreement with USFWS for portions of the Davis-Besse site. Information received during the cultural break out session at the audit did not clearly specify the process of notifying the Ohio State Preservation Office in the event cultural resources are discovered on the leased land. Please describe the process or procedure for notifying the Ohio State Preservation Office in the event cultural resources were discovered on the land leased from the USFWS. The ER states that the site was constructed using fill. The geology section of the ER indicated the presence of two to three feet of topsoil overlaying an estimated 10 thousand year old glacial stratum. Areas of the plant site that remain undisturbed have a higher probability of containing cultural resources than areas previously disturbed.
Photos seen during the audit show areas where significant excavation was performed during construction.
The staff needs additional information in order to meet the request made by the Ohio State Preservation Office. Please include an aerial map or site plan delineating areas that have had extensive excavation.
-References Air &
- ."nv NOAA 2009. NOAA e-mail, J. Kosanik to J, Snooks (AREVA), National Weather AM 1 Service, March 3, 2009. Description for Meteorological Monitoring System for the Toledo Edison AM 2 Company Davis-Besse Nuclear Power Station, Unit 1, Oak Harbor, Ohio, 032C, Rev. 2, 10104/2005 . Ohio EPA, Davis-Besse Station, Auxiliary Boiler Air Quality Permit, Date of AM 3 Issuance:
05/26/89.
Ohio EPA, No Permit Needed for Diesel Generators at Davis-Besse NPS, October 1, 1996. TRC Environmental Corporation, Emission Inventory Report, Centerior Energy AM 5 Corporation, Davis-Besse Nuclear Power Station, Oak Harbor, Ohio, February 10, 1995. AM 6 DBNPS, Greenhouse gas emissions at Davis-Besse, dated 03/04/2011 (1 page) 7 Memorandum from J.S. Seitz DBNPS, Actual vs Potential Emissions of Stationary Combustion Sources for 2005-2009 (15 pages) -Gale will add emissions for 2010 Second Extension of January 25, 1995 Emit Transition Policy and Clarification of Interim Policy, July 10, 1998 Final Title V Permit to West Lorain Plant, Issue Date: 11/19/04 (1 page) 4V\J"'-,,"V\.'>J Non-Title V Air Emissions Report for Davis-Besse Station, Non-Title V Air Emissions Report for Davis-Besse Station, AM 11 dated 04/04/2008 (1 Ohio EPA, 2008-2009 Non-Title V Air Emissions Report for Davis-Besse AM 12 dated 02/26/2010 (1 page)-_ .._...................
+ ......._...... _._----_ ... _--_ ..................
-.. Ohio EPA, Engineering Guide #61, "What is Ohio EPA's policy for limiting the AM 13 to emit (PTE) of air contaminant emissions at a facility for purposes of federal permitting?," Revised September 5, 1996 (3 pages) from Polly Bolssoneault (DBNPS) to Jay Liebrecht (Ohio EPA), Submittal of AM 14 o Annual Report for DBNPS Auxiliary Boiler (3 pages) AM 15 Davis-Besse 10 Yr. Average Operating Hours and Fuel Burn (2 pages) ...... f--.-.-.... AM 16 DBNPS, Diesel PM summaries (2 pages)
.b_L-08-039 Water WD rpt. for 2007 _2008-02-05.pdf Water WD Rpt for 2008_2009-02-11.pdf Water WD Rpt for 2006.pdf A 7 AE3.b_Reutter et al 1980 Env Evaluation Final Report Study 1.pdf A 8 AE3.c_Reutter J.M. 1981a, Ent.pdf AE3.d_Reutter 1981 b, Imp. pdf TR-1.PDF 2010_PUB356(Oct 2010).pdf 2011_RarePlantSpeciesbyCounty.pdf Layout for New Structures_12-7
-1 O.pdf T T 5_FirstEnergy Xmiss Line Veg Mgmt Specifications.
pdf T Best Mgmt Practices.
pdf T 2009b Critical Habitat.pdf 2009a.pdf 2009.pdf and Herdendorf 1993.pdf T 12 TR6.c_ Campbell 1995.pdf T 13 TR6.c_FirstEnergy 2008.pdf T 14 TR6.c_GORP 2009.pdf T 15 TR6.c_Herdendorf 1987.pdf T 16 TR6.c_MIPN 2009.pdf T TR6.c_ODNAP 2009c.pdf TR6.c_ODNAP 2009d.pdf 1988.pdf TR6.d_Ewert and Rodewald 2008, Mng Habits for Migrating Birds in ... T 21 TR6.d_FirstEnergy 2008.pdf
-Terrestrial (contd.) T H 1 2008.pdf 2009_Refuge Profiles.
pdf TR6.g_FECorp 2009,pdf TR6.g_0PSB 2007.pdf TR6.g_USEPA 2009.pdf Associates, Inc., 2002, letter J. Hewlett, Senior l..:JeCJIOClISI.
First Energy Service Co. clo Toledo Edison Company, regarding Preliminary Wetland Evaluation, Proposed Temporary Containment Area, Davis-Besse Plant, T T T T T T T T H Centerior Energy, 1994, letter from L.F. Stortz, Vice-President
-Nuclear, Besse, to T.O. Hic Division of Emergency and Remedial Response, Ohio Environmental Protection Agency, in, regarding Submittal of Information Regarding Spill of Gasoline, Identification Number 01-62-0180, February 22. H 3 H 5 H 6 H 7 H 8 H 9 Davis-Besse Nuclear Power Station, 2004, Periodic Test Procedure 04032, Wastewater Treatment Sludge Holding Tank Analysis, Revision 01, by R. Edwards, October 28. 2004, National (NPDES) Administrative Procedure DB-CN-00030, prepared by S. Chimo, June Davis-Besse, 2007, Business Practice DBBP-CHEM-2005, Spill Prevention Control and Countermeasure (SPCC) Plan, approved by V. Capozziello, March 16. Davis-Besse, undated, Condition Report #04-01719, "In 2004-05 Spent Fuel Pool i L"",::;m,c,,,,,,,, to Onsite Groundwater", discovery date 3/5/2004
-6 (contd.) . . . ___.____
I ! First Energy, 1998, letter from J.H. Lash, Plant Manager, Davis-Besse Nuclear ! H : Power Station, to C. Zipp, State Fire Marshall Office, regarding Underground
- Storage Tank Overfill Release Report, Incident Number 6281145-00, September
- 18 .
- FirstEnergy Nuclear Operating Comp any, 2007, l ett er from Kaminskas, H 11 i Director -Site Operations, to A. Gall, Division of Surface Water, Ohio i ! Environmental Protection Agency, regarding Submittal of 2006 Annual Sludge 1-----. i Disposal Report for the Davis-Besse Nuclear Power Station!
____.J I IFirstEnergy Nuclear Operating Company, 2009, letter from B. Allen, Vice President i i H 13 I -Nuclear, to A. .Gall, Sludge Coordinator, Ohio Protection i ! I Agency, regarding Submittal of the 2008 Annual Sludge Disposal Report for the i !Q§i\l i!?..
§i IlLJ.Ci 1l1J§i1)'?3. .1 : FirstEnergy Nuclear Operating Company, 2010, letter from P.M. Boissoneault, i H 14 I Manager, Site Chemistry, to A. Gall, Sewage Sludge Coordinator, Ohio , I Environmental Protection Agency, regarding Submittal of the 2009 Annual Sludge .i. -H-I Disposal Rep_ort for Davis-Besse Nuclear Station, Janual)' 21. ____I.. FirstEnergy Nuclear Operating Company, 2011, letter from P.M. Boissoneault, [ 15 Manager, Site Chemistry, to A. Gall, Sewage Sludge Coordinator, Ohio i i Environmental Protection Agency, regarding Submittal of the 2010 Annual Sludge !
i Surface Water, Ohio Environmental Protection Agency, regarding National ! , H 16 I Pollutant Discharge Elimination System Permit Renewal Application, Davis-Besse I I i Nuclear Power Station, EPA ID No. OH0003786, Permit No. 21B00011*ID, October I I ! .------+=_.
---_._------_._------_
..__...__ ..__..__._--_..__._._--'i I OEPA, 2010, letter from E. Swindall, Division of Water, to FirstEnergy Nuclear Gen i H 17 I Corp -Davis-Besse, regarding Preliminal)'
Compliance Review of Discharge . I ! Monitorif'!g November 20. I r-------*----**-
--*-----------*----------**-*
..*---*------*-------***---1 I I OEPA, 2010, letter from E. Swindall, Division of Water, to FirstEnergy Nuclear Gen
- I , H 18 ! Corp -Davis-Besse, regarding Preliminal)'
Compliance Review of Discharge l.. ..... -......
..................
'. ............
...... ................ I H 19 I Davis-Besse, undated, Graphs of tritium in wells I Socioeconomics, Environmental Justice & Land Use i-S"1$JS4, 5_Support Payments &Property Values ! r S sort) ......_-...............
_... I S 5 6 -7 Socioeconomics, Environmen t al Justice & Lan d Use 3 U.S. Government Leases for Ottawa Wildlife Refuge Formal documentation for land swap agreement (if there is one) Copies of photographs (6, 7, 15, 18, and 19 on flash drive at audit) C 1 demonstrating the level of disturbance on the industrialized portions of the plant. I Draft Final Preliminary Assessment Report: Locust Point Anti-Aircraft Artillery C 2 Firing Area, FUDS Property No. G050H0996, Nov 2010,2 volumes, prepared by Shaw Environmental for Army Corps of Engineers.
Request for Docket.
April 26, 2011 Mr. Barry S. Allen Site Vice President, FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, LICENSE RENEWAL APPLICATION
Dear Mr. Allen:
By letter dated August 27,2010, FirstEnergy Nuclear Operating Company submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the Operating License NPF-003 for Davis-Besse Nuclear Operating Station, Unit 1, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These requests for additional information were discussed with Mr. Cliff Custer and the date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-2323 or e-mail paula.cooper@nrc.gov.
Sincerely, IRA! Paula E. Cooper, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No.
Requests for Additional cc w/encl: Listserv DISTRIBUTION:
See next page Letter to Barry S. Allen from Paula E. Cooper dated April 26, 2011 REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY: DLRRF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris DWrona EMilier MMahoney ICouret, OPA TReilly, OCA BHarris, OGC VMitlyng, RII JCameron, Rill