ML17142A436: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 23: Line 23:
IMPORTANCE RO 4.3 SRO 4.3 D Bulk Drywell Temperature Manual Calculation (JPM-001) Conduct of Operations 2.1.26 Knowledge of industrial safety procedures (such as rotating equipment, electrical, high temperature, high pressure, caustic, chlorine, oxygen and hydrogen). IMPORTANCE RO 3.4 SRO 3.6 N Demonstrate Elect rical Safety Practices for Racking Out a 4160 KV Breaker (JPM- FP-MA-ES-01-001) Equipment Control 2.2.15 Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, line
IMPORTANCE RO 4.3 SRO 4.3 D Bulk Drywell Temperature Manual Calculation (JPM-001) Conduct of Operations 2.1.26 Knowledge of industrial safety procedures (such as rotating equipment, electrical, high temperature, high pressure, caustic, chlorine, oxygen and hydrogen). IMPORTANCE RO 3.4 SRO 3.6 N Demonstrate Elect rical Safety Practices for Racking Out a 4160 KV Breaker (JPM- FP-MA-ES-01-001) Equipment Control 2.2.15 Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, line
-ups, tag-outs, etc.
-ups, tag-outs, etc.
IMPORTANCE RO 3.9 SRO 4.3 N Independent Verification of RHR following shutdown of Torus Cooling.  
IMPORTANCE RO 3.9 SRO 4.3 N Independent Verification of RHR following shutdown of Torus Cooling.
(JPM-4 AWI-04.04.02-005) Radiation Control
(JPM-4 AWI-04.04.02-005) Radiation Control


====2.3.4 Knowledge====
====2.3.4 Knowledge====
Line 30: Line 30:
IMPORTANCE RO 3.2 SRO 3.7 D Expected Dose Determination to Inspect Equipment (JPM-4 AWI-08.04.01-006) Emergency Plan N/A N/A N/A NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
IMPORTANCE RO 3.2 SRO 3.7 D Expected Dose Determination to Inspect Equipment (JPM-4 AWI-08.04.01-006) Emergency Plan N/A N/A N/A NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
* Type Codes & Criteria:
* Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from bank ES-301 Administrative Topics Outline Form ES-301-1    Facility:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from bank ES-301 Administrative Topics Outline Form ES-301-1    Facility:
Monticello Nuclear Generating Plant Date of Examination:
Monticello Nuclear Generating Plant Date of Examination:
November 2016 Examination Level:
November 2016 Examination Level:
Line 51: Line 51:
IMPORTANCE RO 2.9 SRO 4.6 D EAL Classification (JPM A.2-101-002) NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
IMPORTANCE RO 2.9 SRO 4.6 D EAL Classification (JPM A.2-101-002) NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
* Type Codes & Criteria:
* Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from}}
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from}}

Revision as of 18:31, 26 April 2019

2016 Monticello Nuclear Generating Plant Initial License Examination Outline ES-301-1
ML17142A436
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/18/2017
From: Reeser D W
NRC/RGN-III/DRS/OLB
To:
Nuclear Management Co
Shared Package
ML15274A421 List:
References
Download: ML17142A436 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Monticello Nuclear Generating Plant Date of Examination:

November 2016 Examination Level:

RO SRO Operating Test Number:

2016-301 Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations 2.1.45 Ability to identify and interpret diverse indications to validate the response of another indication.

IMPORTANCE RO 4.3 SRO 4.3 D Bulk Drywell Temperature Manual Calculation (JPM-001) Conduct of Operations 2.1.26 Knowledge of industrial safety procedures (such as rotating equipment, electrical, high temperature, high pressure, caustic, chlorine, oxygen and hydrogen). IMPORTANCE RO 3.4 SRO 3.6 N Demonstrate Elect rical Safety Practices for Racking Out a 4160 KV Breaker (JPM- FP-MA-ES-01-001) Equipment Control 2.2.15 Ability to determine the expected plant configuration using design and configuration control documentation, such as drawings, line

-ups, tag-outs, etc.

IMPORTANCE RO 3.9 SRO 4.3 N Independent Verification of RHR following shutdown of Torus Cooling.

(JPM-4 AWI-04.04.02-005) Radiation Control

2.3.4 Knowledge

of radiation exposure limits under normal or emergency conditions.

IMPORTANCE RO 3.2 SRO 3.7 D Expected Dose Determination to Inspect Equipment (JPM-4 AWI-08.04.01-006) Emergency Plan N/A N/A N/A NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from bank ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Monticello Nuclear Generating Plant Date of Examination:

November 2016 Examination Level:

RO SRO Operating Test Number:

2016-301 Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations

2.1.4 Knowledge

of individual licensed operator responsibilities related to shift l staffing, such as medical requirements, "no-solo" operation, maintenance l of active license status, 10CFR55, etc.

IMPORTANCE RO 3.3 SRO 3.8 D, P SRO - NRC License Maintenance Responsibilities (JPM-OWI-01.08-002) Conduct of Operations

2.1.1 Knowledge

of Conduct of Operations Requirements IMPORTANCE RO 3.

8 SRO 4.2 N Pre-Job Brief for APRM Heat Balance Calibration (JPM-FP-PA-HU-06-001) Equipment Control 2.2.40 Ability to apply Technical Specifications for a system.

IMPORTANCE RO 3.4 SRO 4.7 N LCO 3.0.9 Application Determination

- Blocked Open HELB Door (JPM-OWI-02.07-002) Radiation Control

2.3.4 Knowledge

of radiation exposure limits under normal or emergency conditions.

IMPORTANCE RO 3.2 SRO 3.7 N Authorization to exceed Administrative Dose Limit. (JPM-4-AWI-08.04.01-008) Emergency Plan 2.4.41 Knowledge of the emergency action level thresholds and classifications.

IMPORTANCE RO 2.9 SRO 4.6 D EAL Classification (JPM A.2-101-002) NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from