MONTHYEARML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 ML23012A1032022-11-10010 November 2022 Form 2.3-5 ML23012A0982022-11-10010 November 2022 Form 2.3-3 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23012A1652022-10-25025 October 2022 As-Administered Operating Test JPMs ML23012A1682022-10-25025 October 2022 As-Administered Written Examination and Answer Key ML23012A1692022-10-25025 October 2022 As-Administered Written Exam Reference Handouts ML23012A1662022-10-25025 October 2022 As-Administered Operating Test Scenarios ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A1392022-09-28028 September 2022 Proposed Written Examination ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A1432022-09-28028 September 2022 Form 3.3-1 Proposed Scenario Outlines ML23012A1372022-09-28028 September 2022 Form 3.3-2 Proposed Operating Test Simulator Scenario Guides ML23012A1342022-09-28028 September 2022 Proposed Admin Topics JPMs ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A1362022-09-28028 September 2022 Proposed Sim and Inplant System JPMs ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2152022-08-28028 August 2022 Form 3.2-1 ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2162022-08-28028 August 2022 Form 3.2-2 ML23012A2222022-08-28028 August 2022 Form 4.1-1, Record of Rejected Knowledge and Abilities ML23018A1882022-08-28028 August 2022 OP Test Outline Issue Identified ML23012A2182022-08-28028 August 2022 Form 3.3-1 ML23012A2192022-08-28028 August 2022 Form 4.1-BWR and Common ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5762021-04-19019 April 2021 GFE Results, March 2021 ML21020A1002020-11-0303 November 2020 Initial License Exam Form ES-201-1 ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21020A1062020-11-0303 November 2020 Initial License Exam Form ES-403-1 ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21013A5432020-11-0303 November 2020 Initial License Exam Forms ES-401-1 and 401-3 ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21013A5072020-11-0303 November 2020 Initial License Exam Forms ES-301-5 ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24082A2452024-03-22022 March 2024 Confirmation of Initial License Examination IR 05000263/20223012022-11-21021 November 2022 NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 ML23012A1032022-11-10010 November 2022 Form 2.3-5 ML23012A0982022-11-10010 November 2022 Form 2.3-3 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23012A1692022-10-25025 October 2022 As-Administered Written Exam Reference Handouts ML23012A1662022-10-25025 October 2022 As-Administered Operating Test Scenarios ML23012A1652022-10-25025 October 2022 As-Administered Operating Test JPMs ML23012A1682022-10-25025 October 2022 As-Administered Written Examination and Answer Key ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A1372022-09-28028 September 2022 Form 3.3-2 Proposed Operating Test Simulator Scenario Guides ML23012A1362022-09-28028 September 2022 Proposed Sim and Inplant System JPMs ML23012A1342022-09-28028 September 2022 Proposed Admin Topics JPMs ML23012A1392022-09-28028 September 2022 Proposed Written Examination ML23012A1432022-09-28028 September 2022 Form 3.3-1 Proposed Scenario Outlines ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A2182022-08-28028 August 2022 Form 3.3-1 ML23012A2222022-08-28028 August 2022 Form 4.1-1, Record of Rejected Knowledge and Abilities ML23018A1882022-08-28028 August 2022 OP Test Outline Issue Identified ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2192022-08-28028 August 2022 Form 4.1-BWR and Common ML23012A2162022-08-28028 August 2022 Form 3.2-2 ML23012A2152022-08-28028 August 2022 Form 3.2-1 ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21019A5722020-11-0303 November 2020 Initial License Exam Administered JPMs ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21019A5742020-11-0303 November 2020 Initial License Exam Administered Written Exam Key ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21013A5452020-11-0303 November 2020 Initial License Exam Forms ES-D1 ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21019A2092020-11-0303 November 2020 Initial License Exam Proposed JPMs ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21020A1022020-11-0303 November 2020 Initial License Exam Security Agreement Forms 2024-07-09
[Table view] |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Monticello Date of Exam: November 2016 Operating Test No.: 2016-301 A E CREW 1 SCENARIOS P V 1 2 3 4 T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T N I T I
C A M
A T L U N Y M(*)
T P E S A B S A B S A B S A B R T O R T O R T O R T O R I U O C P O C P O C P O C P RO RX 5 1/3 3 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 2,4, 1,3 3,4 10 4 4 2 6,7, SRO-U 8,9 MAJ 7,8,9 6,7 5 6 2 2 1 TS 3,6 2 0 2 2 RO RX 5 4 2 1 1 0 NOR 2 1 2 1 1 1 SRO-I I/C 4,6,7 4,5, 2,3, 12 4 4 2 6,7 4,6,7 SRO-U MAJ 7,8,9 6,7 5 6 2 2 1 TS 2,3 2 0 2 2 RO RX 1,3 4 3 1 1 0 NOR 1 2 1 3 1 1 1 SRO-I I/C 2,8,9 1,3 2,6 11 4 4 2 4,5, SRO-U 6,7, MAJ 7,8,9 6,7 5 6 2 2 1 TS 3,4 2 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Date of Exam: Operating Test No.:
A E CREW 2 SCENARIOS P V 1 2 3 4 T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T N I T I
C A M
A T L U N Y M(*)
T P E S A B S A B S A B S A B R T O R T O R T O R T O R I U O C P O C P O C P O C P RO RX 5 1/3 3 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 2,4, 1,3 8 4 4 2 6,7, SRO-U 8,9 MAJ 7,8,9 6,7 5 2 2 1 TS 3,6 2 0 2 2 RO RX 5 1 1 1 0 NOR 2 1 1 1 1 SRO-I I/C 4,6,7 4,5, 7 4 4 2 6,7 SRO-U MAJ 7,8,9 6,7 5 2 2 1 TS 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2
SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.