|
|
Line 1: |
Line 1: |
| #REDIRECT [[RS-13-145, Braidwood and Byron, Units 1 and 2 - Application for Renewed Operating Licenses]] | | {{Adams |
| | | number = ML13155A387 |
| | | issue date = 05/29/2013 |
| | | title = Braidwood and Byron, Units 1 and 2 - Application for Renewed Operating Licenses |
| | | author name = Gallagher M P |
| | | author affiliation = Exelon Generation Co, LLC |
| | | addressee name = |
| | | addressee affiliation = NRC/Document Control Desk, NRC/NRR |
| | | docket = 05000454, 05000455, 05000456, 05000457 |
| | | license number = NPF-037, NPF-066, NPF-072, NPF-077 |
| | | contact person = |
| | | case reference number = RS-13-145 |
| | | document type = Letter |
| | | page count = 2 |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:Michael R Gallagher Vice President, License Renewal~ljVII%% ~Exelon Nuclear Ex'iiGne aion,,-) 200 Exelon Way Kennett Square, PA 19348 610 765 5958 Office 610 765 5956 Fax www.exeloncorp.com michaelp.gallagher@exeloncorp.com 10 CFR 50 10 CFR 51 10 CFR 54 RS-1 3-145 May 29, 2013 U. S. Nuclear Regulatory Commission Attention: |
| | Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 |
| | |
| | ==Subject:== |
| | Application for Renewed Operating Licenses Pursuant to the Code of Federal Regulations, Title 10, Parts 50, 51, and 54, Exelon Generation Company, LLC (Exelon) hereby applies for the renewal of the Braidwood Station, Units 1 and 2 (Braidwood), and Byron Station, Units 1 and 2 (Byron) Facility Operating Licenses. |
| | The License numbers are NPF-72, NPF-77, NPF-37 and NPF-66, respectively. |
| | The existing Braidwood and Byron facility operating licenses are currently set to expire as follows: " At midnight on October 17, 2026 for Braidwood Station, Unit 1 (Facility Operating License No. NPF-72)" At midnight on December 18, 2027 for Braidwood Station, Unit 2 (Facility Operating License No. NPF-77)* At midnight on October 31, 2024 for Byron Station, Unit 1 (Facility Operating License No.NPF-37)" At midnight on November 6, 2026 for Byron Station, Unit 2 (Facility Operating License No.NPF-66) |
| | S May 29, 2013 U.S. Nuclear Regulatory Commission Page 2 Exelon seeks to extend the respective operating terms by 20 years beyond the current license expiration dates.The enclosed License Renewal Application (LRA) contains the information required by the regulations set forth in 10 CFR Parts 51 and 54, and meets the submittal timeliness requirements of 10 CFR 54.17(c) and 10 CFR 2.109(b).As required by 10 CFR 54.21 (b), current licensing basis changes which have a material effect on the content of this application will be identified annually while the application is under NRC review, and at least three months prior to the scheduled completion of the NRC review.Appendix A, Section A.5, of the enclosed Byron and Braidwood Stations (BBS) LRA provides a list of commitments made in this application. |
| | This list will be updated as required throughout the LRA review process.If you have any questions, please contact Mr. Al Fulvio, Manager, Exelon License Renewal, at 610-765-5936. |
| | I declare under penalty of perjury that the foregoing is true and correct.Executed on. 2-01"ZoI3 Respectfully, Michael P. Gallagher Vice President |
| | -License Renewal Projects Exelon Generation Company, LLC |
| | |
| | ==Enclosure:== |
| | |
| | License Renewal Application (paper submittal) cc: Regional Administrator |
| | -NRC Region III NRC Project Manager (Safety Review), NRR-DLR NRC Project Manager (Environmental Review), NRR-DLR NRC Senior Resident Inspector, Braidwood Station NRC Senior Resident Inspector, Byron Station NRC Project Manager, NRR-DORL-Braidwood and Byron Stations Illinois Emergency Management Agency -Division of Nuclear Safety}} |
|
---|
Category:Letter
MONTHYEARIR 05000456/20240032024-11-12012 November 2024 Integrated Inspection Report 05000456/2024003 and 05000457/2024003 IR 05000454/20240032024-11-12012 November 2024 Integrated Inspection Report 05000454/2024003 and 05000455/2024003 05000454/LER-2024-002, Reactor Vessel Closure Head Penetration 31 Degraded2024-11-0707 November 2024 Reactor Vessel Closure Head Penetration 31 Degraded RS-24-122, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2024-11-0707 November 2024 Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24297A2702024-10-23023 October 2024 Notification of NRC Baseline Inspection and Request for Information: Inspection Report 05000455/2025002 ML24291A0012024-10-17017 October 2024 Submittal of Core Operating Limits Report, Cycle 25 RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24281A1502024-10-0707 October 2024 Request for Information for NRC Commercial Grade Dedication Inspection Report 05000454/2025010 and 05000455/2025010 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report 2024-09-06
[Table view] |
Text
Michael R Gallagher Vice President, License Renewal~ljVII%% ~Exelon Nuclear Ex'iiGne aion,,-) 200 Exelon Way Kennett Square, PA 19348 610 765 5958 Office 610 765 5956 Fax www.exeloncorp.com michaelp.gallagher@exeloncorp.com 10 CFR 50 10 CFR 51 10 CFR 54 RS-1 3-145 May 29, 2013 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455
Subject:
Application for Renewed Operating Licenses Pursuant to the Code of Federal Regulations, Title 10, Parts 50, 51, and 54, Exelon Generation Company, LLC (Exelon) hereby applies for the renewal of the Braidwood Station, Units 1 and 2 (Braidwood), and Byron Station, Units 1 and 2 (Byron) Facility Operating Licenses.
The License numbers are NPF-72, NPF-77, NPF-37 and NPF-66, respectively.
The existing Braidwood and Byron facility operating licenses are currently set to expire as follows: " At midnight on October 17, 2026 for Braidwood Station, Unit 1 (Facility Operating License No. NPF-72)" At midnight on December 18, 2027 for Braidwood Station, Unit 2 (Facility Operating License No. NPF-77)* At midnight on October 31, 2024 for Byron Station, Unit 1 (Facility Operating License No.NPF-37)" At midnight on November 6, 2026 for Byron Station, Unit 2 (Facility Operating License No.NPF-66)
S May 29, 2013 U.S. Nuclear Regulatory Commission Page 2 Exelon seeks to extend the respective operating terms by 20 years beyond the current license expiration dates.The enclosed License Renewal Application (LRA) contains the information required by the regulations set forth in 10 CFR Parts 51 and 54, and meets the submittal timeliness requirements of 10 CFR 54.17(c) and 10 CFR 2.109(b).As required by 10 CFR 54.21 (b), current licensing basis changes which have a material effect on the content of this application will be identified annually while the application is under NRC review, and at least three months prior to the scheduled completion of the NRC review.Appendix A, Section A.5, of the enclosed Byron and Braidwood Stations (BBS) LRA provides a list of commitments made in this application.
This list will be updated as required throughout the LRA review process.If you have any questions, please contact Mr. Al Fulvio, Manager, Exelon License Renewal, at 610-765-5936.
I declare under penalty of perjury that the foregoing is true and correct.Executed on. 2-01"ZoI3 Respectfully, Michael P. Gallagher Vice President
-License Renewal Projects Exelon Generation Company, LLC
Enclosure:
License Renewal Application (paper submittal) cc: Regional Administrator
-NRC Region III NRC Project Manager (Safety Review), NRR-DLR NRC Project Manager (Environmental Review), NRR-DLR NRC Senior Resident Inspector, Braidwood Station NRC Senior Resident Inspector, Byron Station NRC Project Manager, NRR-DORL-Braidwood and Byron Stations Illinois Emergency Management Agency -Division of Nuclear Safety